Attachment 7_2 Submittal Transmittal Form - 1.pdf

PDF 45 KB Posted

Attached to
NARA Replace Roof on Bays F&G Federal contract opportunity
Solicitation number
47PL0124R0030
Issued by
General Services Administration Public Buildings Service Region 10

About this file

This document is a Submittal Transmittal Form for a federal contract opportunity to replace the roof on Bays F&G of an existing structure for the General Services Administration (GSA) in Region 10.

The contract number is not provided. This submittal is either new or a resubmittal, with the previous submission number noted. The form requires the contractor to provide details on the submittal item, including the specification section, drawing number, and description. The GSA Contracting Officer's Representative (COR) or Project Manager will review and provide a determination of "Accepted", "Accepted with comments", or "Rejected" on the submittal.

The related federal contract opportunity, Solicitation Number 47PL0124R0030, is for NARA to replace the roof on Bays F&G of an existing structure. The work is required to be completed within 290 calendar days from the Notice to Proceed, including 260 days to Substantial Completion and 30 days to Final Completion. A pre-proposal site visit is scheduled for June 28, 2024 at 10:00 AM PST.

View the file

Other files for this federal contract opportunity

Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL FORM

TO: General Services Admin. (GSA) FROM: Contractor Name Date of Submittal Attention: Insert Name - COR/PM

CONTRACT NUMBER SUBMISSION NUMBER SUBMITTAL

NEW RESUBMITTAL

PREVIOUS SUBMISSION NUMBER: NAME:

TO BE COMPLETED BY CONTRACTOR FOR GOVERNMENT USE ONLY

ITEM

NO.

SPECIFICATION SECTION/

PARA NO./DRAWING NO. DESCRIPTION OF SUBMITTAL Accepted

Accepted (with comments) Rejected

FOR PRIME CONTRACTOR USE ONLY

I have reviewed the above Material/Items, and the items comply with all specifications of the contract

DATE TYPE OR PRINT NAME AND TITLE SIGNATURE