This document is a Solicitation Amendment for Solicitation Number 47PL0124R0030 for the NARA Replace Roof on Bays F&G project. GSA is seeking to replace the roofing assembly over Bays F&G of an existing NARA structure to eliminate water infiltration. The work has a two hundred ninety (290) calendar day period of performance. A pre-proposal site visit is scheduled for June 28, 2024. Responses to pre-proposal inquiries are provided, including details on the approximately 54,000 square foot roof area, payment schedule, and bond requirements. The solicitation does not allow for liquid applied roofing systems as an alternative to the required full removal and installation of a single-ply roofing membrane. The amendment includes a summary of the key questions and GSA's responses. No changes have been made to the Statement of Work.

View the file

Other files for this federal contract opportunity

Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

Block 14 Continuation Page 47PL0124R0030, Amendment 0001 Project: NARA Replace Roof on Bays F&G

Amendment 0001

As Amendment #0001 to Solicitation 47PL0124R0030, GSA provides the following:

A. Responses to Pre-Proposal Inquiries/Requests for Information received up to July 12, 2024, see the PPI log on page 3. No changes have been made to the scope of work (SOW).

B. Add the Site Visit Attendee attachment, “Site Visit Attendees”.

All Amendments must be acknowledged in an Offeror’s submitted SF1442.

Amend No. Item # Date Submitted

Question Type

(Technical or Admin)

Question Response Date Response Responded

By

1 1 5/27/2024 Admin

When soon do you plan on awarding the job, and how soon could the contractor start?

7/10/2024

GSA anticipates an award by August 2024. The awardee would begin POP with Notice to Proceed as listed in the

RFP. CO/CS

1 2 5/27/2024 Technical Do you have the area of bays F & G, or know how we could get it?

7/10/2024 SOW Section 2 Scope of work has the approximate Square Feet of 54,000. PM

1 3 5/27/2024 Admin What’s the payment schedule?

7/10/2024 Please see the Agreement section III.H. Administrative Matters. CO/CS

1 4 5/27/2024 Admin Do we provide just a standard payment and performance bond?

7/10/2024 Please see RFP section I.F. FAR 52.228-1 Bid Guarantee (Sep 96). CO/CS

1 5 5/27/2024 Admin Is there a certain form we write our proposal on, or just write out a detailed proposal? 7/10/2024 Please see RFP section VI. Method of Award. CO/CS

1 6 6/24/2024 Technical

I am inquiring to see if GSA is open to allowing ACS bid on this project as a liquid applied roofing system instead of a full removal and installation of single-ply. The liquid applied coating systems restore roofs with 10yr + warranties, meeting/exceeding Net-Zero, Sustainability Federal requirements. NRCA, CRRC, Executive Order 14005, 14008, 14057, FM, NSF, UL, CA Title 24, and Miami Dade HVHZ. It saves tax payers money, while shortening the construction timelines and eliminating demolition phases, and saving on labor costs. These coating systems have been used by the federal government for over 20yrs and are a proven cost and energy saving system. Past performance and case studies can be provided: DHS, DOD, and VA projects. Please advise if GSA is allowing alternatives, such as, liquid applied roofing systems so we may submit ACS’s information for the site walk on Friday, June 28th at 10am." 7/10/2024

This membrane coating won't work on our roof at NARA.

The current ballasts and pavers are going to have to be removed first. After those materials are removed the current roof won't really be attached to anything, it isn't fastened down. Adding a membrane to the top can't keep the layers connected to the deck. Additionally, most of the leaks are at the perimeter where the gutters and transitions to the walls occur. We need a system that will flash/counter flash over these areas to provide better protection.

PM

1 7 7/11/2024 Technical Please provide bidding quantities for deteriorated underlayment. 7/11/2024 The area of Bays F&G is 54,000 Square Feet PM

1 8 7/11/2024 Admin Please provide the site visit sign in sheet. 7/11/2024 Please see "Site Visit Atendees". CO/CS

1 9 7/11/24 Technical

Do the Superintendent, SSHO and QC Manager need to be 3 separate individuals?

7/11/2024

No, Superintendent and SSHO can be one individual and QC a different individual. Will need a minimum of 2 individuals to fill the roles. Must separate Quality and safety to ensure safety is not being compromised for quantity or quality of work PM

1 10 5/26/2024 Technical

Would it be more feasible to recoat the roof with a single ply, than with ARC’s Liquid TPO Bio Roof Coating.

7/12/2024

The requirement is the full removal of existing ballasted roof material and the installation of a fully adhered single ply roofing membrane. This would require securing the new roof to the building. Proposals must address termination and flashings. GSA does not see how using a liquid coating over the existing roof could achieve the requirements. If proposer has a method to achieve the requirements, provide a detailed assembly and approach. SME

topmostSubform[0]:
Page1[0]:
Code[0]: 10PQCB2
Copies[0]:
CheckBox9[0]: 1
Code[2]: 10PQCB2
NameandTitleOfficer[0]: Heather Bowden, Branch Chief, Construction Contracting
Is[0]: Off
CheckBox10[0]: Off
NameandAddress[0]:
DateSigned[1]:
Pages[0]: 4
AmendmentNo[0]: 0001
Dated10B[0]:
ModificationNo[0]:
AdministeredBy[0]: Acquisition Management Division

Construction Branch Team B 1301 A Street, Suite 610 Tacoma, WA 98401 USA

FacilityCode[0]:
CheckBox13B[0]: Off
CheckBox13D[0]: Off
ReqNumber[0]: EQ10PCPB-24-0007
Dated9B[0]: 6/21/2024
C13[0]:
Description[0]: Please see continuation page.
NotExtended[0]: 1
Code[1]:
AmendmentNo[1]: 47PL0124R0030
ContractIDCode[0]:
DateSigned[0]:
CheckBox11[0]: 1
Page[0]: 1
AccountingData[0]:
CopiesReturned[0]:
CheckBox13A[0]: Off
IsNot[0]: 1
EffectiveDate[0]: 7/16/2024
A13[0]:
ProjectNo[0]:
CheckBox13C[0]: Off
Extended[0]: Off
D13[0]:
IssuedBy[0]: Acquisition Management Division

Construction Branch Team B 1301 A Street, Suite 610 Tacoma, WA 98401 USA NameandTitleSigner[0]:

File details come from the government source that posted it. Updated .