This file is a project specification sheet for tree planting work under a federal contract opportunity with the U.S. Department of Agriculture Forest Service. The document outlines the FY26 Malheur Tree Planting Contract (Requisition Number 1164142) managed through the Ecosystem Characterization and Restoration Division (ECRD). The project period of performance runs from April 1, 2026 through June 30, 2026, focusing on reforestation activities in the Malheur National Forest across the Blue Mountain Ranger District and Emigrant Creek Ranger District.

The specification details planting unit requirements including acreage (174 acres for the EmiC1 unit referenced), aspect, slope percentage, elevation, target trees per acre (TPA), spacing specifications, species mix composition, scalp size parameters, vegetation cover conditions, stock type, root length requirements, walk-in distance in miles, and designations of mandatory versus optional work elements. The contractor is responsible for furnishing all labor, equipment, supervision, transportation, supplies (except government-furnished items), and incidentals necessary to perform hoedad planting of coniferous tree seedlings according to the specifications outlined in the Statement of Work and related attachments (Solicitation Number 1240BK26R0003).

View the file

Other files

File Type Posted
1240BK26R0003 Amendment 0001.pdf PDF
Attachment 2_PWS_MalheurTreePlanting_Rev.2_3.18.2026.pdf PDF
1240BK26R0003 Amendment 0001.pdf PDF
Attachment 17_Map Rail Ridge 2026 Planting Unit_20.pdf PDF
Attachment 1_Schedule of Items FY26 Malheur NF Tree Planting.pdf PDF
Attachment 73_Past_Performance_and_Experience_Form.pdf PDF
Attachment 38_Map Rail Ridge 2026 Planting Unit_84.pdf PDF
1. RFP 1240BK26R0003 - Malheur NF; Blue Mt. RD and Emigrant Cree RD.pdf PDF
Attachment 39_Map Rail Ridge 2026 Planting Unit_86.pdf PDF
Attachment 65_Exhibit_D_D-1_Hoedad_Shovel_Planting.pdf PDF
Attachment 16_Map Rail Ridge 2026 Planting Unit_18.pdf PDF
Attachment 30_Map Rail Ridge 2026 Planting Unit_62.pdf PDF
Attachment 52_ Map Saw4.pdf PDF
Attachment 5_Map EmiC3.pdf PDF
Attachment 43_Map Sand Planting_Unit 12.pdf PDF
Attachment 28_Map Rail Ridge 2026 Planting Unit_58.pdf PDF
Attachment 2_PWS_FY26MalheurTreePlantingContract_Rev.1_2.11.2026.pdf PDF
Attachment 69_Exhibit_K_Plot Radius and Frequency.pdf PDF
Attachment 18_Map Rail Ridge 2026 Planting Unit_22.pdf PDF
Attachment 40_Map Rail Ridge 2026 Tree Planting Overview Map.pdf PDF
Attachment 51_ Map Saw3.pdf PDF
Attachment 61_DUIS_BMRD_Sand and Rail Ridge_FY26 Malheur Tree Planting_Rev.1_2.11.2026.xlsx XLSX spreadsheet
Attachment 42_Map Sand Planting_Unit 10.pdf PDF
Attachment 13_ Map Rail Ridge 2026 Planting Access South.pdf PDF
Attachment 76_WD_77-0079_Rev.81_12.03.2025.pdf PDF
Attachment 74_R6-FS-6300-52 USDA Fire Protection and Suppression.pdf PDF
Attachment 53_ Map Saw5.pdf PDF
Attachment 29_Map Rail Ridge 2026 Planting Unit_60.pdf PDF
Attachment 46_Map Sand Planting_Unit 18.pdf PDF
Attachment 72_Exhibit_P_Site_Preparation_Scalping.pdf PDF
Attachment 56_ Map Saw8.pdf PDF
Attachment 19_Map Rail Ridge 2026 Planting Unit_24.pdf PDF
Attachment 68_Exhibit_I_Container_Seedling_Placement.pdf PDF
Attachment 3_ Map EmiC1.pdf PDF
Attachment 36_Map Rail Ridge 2026 Planting Unit_78.pdf PDF
Attachment 66_Exhibit_G_Bareroot_Placement.pdf PDF
Attachment 64_Exhibit_B_Natural_Objects_for_Shade_Micrositing.pdf PDF
Attachment 67_Exhibit_H_Bareroot_Seedling_Root_Measurment.pdf PDF
Attachment 58_ Map SawVicinity.pdf PDF
Attachment 23_Map Rail Ridge 2026 Planting Unit_44.pdf PDF
Attachment 27_Map Rail Ridge 2026 Planting Unit_54.pdf PDF
Attachment 45_Map Sand Planting_Unit 16.pdf PDF
Attachment 10_Map HC3.pdf PDF
Attachment 34_Map Rail Ridge 2026 Planting Unit_72.pdf PDF
Attachment 15_Map Rail Ridge 2026 Planting Unit_12.pdf PDF
Attachment 22_Map Rail Ridge 2026 Planting Unit_42.pdf PDF
Attachment 41_Map Sand Planting Access Map.pdf PDF
Attachment 63_Exhibit_A_Government_Quality_Assurance_Plan.pdf PDF
Attachment 44_Map Sand Planting_Unit 14.pdf PDF
Attachment 33_Map Rail Ridge 2026 Planting Unit_70.pdf PDF
Show 40 more

Latest 50 of 79 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DUIS_Access_Formatting

Project Title: ;0604 (MAL) FY26 Malheur Tree Planting Contract - ECRD Planting Units
Requisition Number: 1164142
Period of Performance: 4/1/2026-6/30/2026
ItemUnit Name#AcresAspectSlope %Elevation (feet)Target TPASpacingSpecies MixScalp SizeVegetation CoverStock TypeRoot LengthWalk-In MilesMandatory or Optional
3.0EmiC
3.1EmiC11174E<30%5,20012019x19Ponerosa Pine 100%24"<5%Bareroot<12"N/AMandatory
3.2EmiC22114N<20%5,20012019x19Ponerosa Pine 100%24"<5%Bareroot<12"N/AMandatory
3.3EmiC33395W<40%5,40012019x19Ponerosa Pine 100%24"<5%Bareroot<12"N/AMandatory
3.4EmiC44352W<40%5,40012019x19Ponerosa Pine 100%24"<5%Bareroot<12"N/AMandatory
Total1035
4.0HC
4.1HC11394E<30%4,80012019x19Ponerosa Pine 100%24"<5%Bareroot<12"N/AMandatory
4.2HC2243E<20%4,90012019x19Ponerosa Pine 100%24"<5%Bareroot<12"N/AMandatory
4.3HC3391E<20%4,90012019x19Ponerosa Pine 100%24"<5%Bareroot<12"N/AMandatory
Total528
5.0Saw
5.1Saw11114SW<50%5,20012019x19Ponerosa Pine 100%24"<5%Bareroot<12"N/AMandatory
5.2Saw22142E<20%5,20012019x19Ponerosa Pine 100%24"<5%Bareroot<12"N/AMandatory
5.3Saw33152N<20%5,40012019x19Ponerosa Pine 100%24"<5%Bareroot<12"N/AMandatory
5.4Saw4461N<50%5,40012019x19Ponerosa Pine 100%24"<5%Bareroot<12"N/AMandatory
5.5Saw55365W<30%5,40012019x19Ponerosa Pine 100%24"<5%Bareroot<12"N/AMandatory
5.6Saw66163NE<20%5,10012019x19Ponerosa Pine 100%24"<5%Bareroot<12"N/AMandatory
5.7Saw77118N<30%5,20012019x19Ponerosa Pine 100%24"<5%Bareroot<12"N/AMandatory
5.8Saw88226E<40%5,30012019x19Ponerosa Pine 100%24"<5%Bareroot<12"N/AMandatory
5.9Saw99245W<40%5,10012019x19Ponerosa Pine 100%24"<5%Bareroot<12"N/AMandatory
Total1586
6.0YJ
6.1YJ Unit 33143NE<60%5,00012019x19Ponerosa Pine 100%24"<5%Bareroot<12"N/AOptional
6.2YJ Unit 77176E<30%5,00012019x19Ponerosa Pine 100%24"<5%Bareroot<12"N/AOptional
Total319
Unit #Road Access
EmiC1Burns-Izee Rd/Hines Logging Rd to NF Rd 43 to forest road 4340
EmiC2Burns-Izee Rd/Hines Logging Rd to NF Rd 43 to forest road 4340
EmiC3Burns-Izee Rd/Hines Logging Rd to NF Rd 43 to forest road 4340
EmiC4Burns-Izee Rd/Hines Logging Rd to NF Rd 43 to forest road 999
HC1Burns-Izee Rd/Hines Logging Rd to NF Rd 47 to forest road 37 to forest road 512
HC2Burns-Izee Rd/Hines Logging Rd to NF Rd 47 right on forest road 37 right on forest road 575 then left to forest road 790
HC3Burns-Izee Rd/Hines Logging Rd to NF Rd 47 right on forest road 37 right on forest road 575 left to forest road 790 then right on forest road 887
Saw1Burns-Izee Rd/Hines Logging Rd to NF Rd 47
Saw2Burns-Izee Rd/Hines Logging Rd to NF Rd 47 then right onto NF Rd 921
Saw3Burns-Izee Rd/Hines Logging Rd to NF Rd 47 then right onto NF Rd 921 staying left to the 477
Saw4Burns-Izee Rd/Hines Logging Rd to NF Rd 47 then right onto NF Rd 37 right onto NF road 481
Saw5Burns-Izee Rd/Hines Logging Rd to NF Rd 47 then right onto NF Rd 190
Saw6Burns-Izee Rd/Hines Logging Rd to NF Rd 47 then left onto NF Rd 933
Saw7Burns-Izee Rd/Hines Logging Rd to NF Rd 47 then left onto NF Rd 933 and left onto FS road 453
Saw8Burns-Izee Rd/Hines Logging Rd to NF Rd 47 then right onto NF Rd 3 7right onto FS road 915
Saw9Burns-Izee Rd/Hines Logging Rd to NF Rd 47 then right onto NF Rd 921 staying left to the 477
YJ3Burns-Izee Rd/Hines Logging Rd to NF Rd 47 then right onto NF Rd 37 to the 37-3745 junction
YJ7Burns-Izee Rd/Hines Logging Rd to NF Rd 47 then right onto NF Rd 37 right onto NF road 575

File details come from the government source that posted it. Updated .