Attachment 33_Map Rail Ridge 2026 Planting Unit_70.pdf
PDF 596 KB Posted
- Attached to
- Malheur NF Tree Planting Federal contract opportunity
- Solicitation number
- 1240BK26R0003
- Issued by
- Department of Agriculture Forest Service
About this file
This is a project map and specifications document for the Rail Ridge Planting 2026 project on the Malheur National Forest. The project encompasses 26 planting units across the designated area in Township 14 South, Range 28 East. Unit 70, the focus of this map, comprises 14 acres with a target of 195 trees per acre planted at 15x15 foot spacing. The species composition consists of 90% Ponderosa Pine (PIPO) and 10% Douglas-fir (PSME).
The map illustrates Unit 70's boundaries, stream categories (ranging from uncategorized to Category 4 streams), and road access levels from closed roads to high user comfort routes. The unit is accessed via multiple road types and is adjacent to a Category 1 stream. Elevation contours (100 and 500 foot intervals) and section lines are marked to assist with navigation and spatial orientation of the planting area.
View the file
Other files for this federal contract opportunity
Show all 50
Malheur NF Tree Planting has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
T 14 S R 28 E
2140038
2140074
0 0.20.1 Miles
Rail 26 Planting Units
Stream Category Uncategorized Stream
Category 1 Stream
Category 2 Stream
Category 4 Stream
Road Status
CLOSED ROADS
HIGH CLEARANCE VEHICLES
SUITABLE FOR PASSENGER CARS
MODERATE DEGREE OF USER
COMFORT
HIGH DEGREE OF USER
COMFORT
Interstate
US or State Higway
100 foot contour
500 foot contour
Rail Ridge Planting 2026 - Malheur NF
Target TPA: 195
Average Spacing: 15x15
Species Mix:
UNIT 70 - 14 Acres
PIPO (90%) PSME (10%)
File details come from the government source that posted it. Updated .