Attachment 36_Map Rail Ridge 2026 Planting Unit_78.pdf
PDF 631 KB Posted
- Attached to
- Malheur NF Tree Planting Federal contract opportunity
- Solicitation number
- 1240BK26R0003
- Issued by
- Department of Agriculture Forest Service
About this file
This document is a project map and specification sheet for the Rail Ridge Planting 2026 project on Malheur National Forest. Unit 78 encompasses 51 acres located in Township 14 South, Range 28 East, with a target tree planting density of 260 trees per acre at 13x13 foot spacing. The species composition specified is 50% Ponderosa Pine (PIPO) and 50% Larch/Western Larch (LAOC).
The map displays the planting unit boundaries marked in green with tree planting locations indicated by symbols throughout the unit. Stream categories (ranging from uncategorized to Category 4) are delineated in blue, with contour lines at 100-foot and 500-foot intervals shown in tan. Road access is depicted with varying designations including closed roads, high clearance vehicle routes, and roads suitable for passenger cars with varying degrees of user comfort. The Rail Ridge Planting project comprises 26 total planting units across the project area, with Unit 78 representing one component of this larger reforestation initiative on the Malheur National Forest.
View the file
Other files for this federal contract opportunity
Show all 50
Malheur NF Tree Planting has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
T 14 S R 28 E
2150000
0 0.40.2 Miles
Rail 26 Planting Units
Stream Category Uncategorized Stream
Category 1 Stream
Category 2 Stream
Category 4 Stream
Road Status
CLOSED ROADS
HIGH CLEARANCE VEHICLES
SUITABLE FOR PASSENGER CARS
MODERATE DEGREE OF USER
COMFORT
HIGH DEGREE OF USER
COMFORT
Interstate
US or State Higway
100 foot contour
500 foot contour
Rail Ridge Planting 2026 - Malheur NF
Target TPA: 260
Average Spacing: 13x13
Species Mix:
UNIT 78 - 51 Acres
PIPO (50%) LAOC (50%)
File details come from the government source that posted it. Updated .