Attachment 46_Map Sand Planting_Unit 18.pdf

PDF 621 KB Posted

Attached to
Malheur NF Tree Planting
Solicitation number
1240BK26R0003
Issued by

About this file

This document is a map and specification sheet for a forest reforestation project on the Malheur National Forest. Unit 18 encompasses 93 acres designated for sand planting activities in fiscal year 2026. The project specifies a target tree planting density of 150 trees per acre with an average spacing of 17 feet by 17 feet between plantings. The species mix comprises ponderosa pine (PIPO) at 80 percent, Douglas-fir (PSME) at 5 percent, and larch (LAOC) at 15 percent.

The map displays the unit's location within Township 17 South, Range 29 East and Township 18 South, Range 29 East, showing the planting area outlined in green with small tree symbols indicating planned planting locations. The map includes topographic contours at 100-foot and 500-foot intervals, existing road networks (including closed roads under the Omnibus Public Lands Management Act), stream categories for environmental compliance, and relevant landmarks including Highway 243 to the north. This specification sheet appears to be an internal project planning document for forest management operations.

View the file

Other files

File Type Posted
1240BK26R0003 Amendment 0001.pdf PDF
Attachment 2_PWS_MalheurTreePlanting_Rev.2_3.18.2026.pdf PDF
1240BK26R0003 Amendment 0001.pdf PDF
Attachment 17_Map Rail Ridge 2026 Planting Unit_20.pdf PDF
Attachment 1_Schedule of Items FY26 Malheur NF Tree Planting.pdf PDF
Attachment 73_Past_Performance_and_Experience_Form.pdf PDF
Attachment 38_Map Rail Ridge 2026 Planting Unit_84.pdf PDF
1. RFP 1240BK26R0003 - Malheur NF; Blue Mt. RD and Emigrant Cree RD.pdf PDF
Attachment 39_Map Rail Ridge 2026 Planting Unit_86.pdf PDF
Attachment 65_Exhibit_D_D-1_Hoedad_Shovel_Planting.pdf PDF
Attachment 16_Map Rail Ridge 2026 Planting Unit_18.pdf PDF
Attachment 30_Map Rail Ridge 2026 Planting Unit_62.pdf PDF
Attachment 52_ Map Saw4.pdf PDF
Attachment 5_Map EmiC3.pdf PDF
Attachment 43_Map Sand Planting_Unit 12.pdf PDF
Attachment 28_Map Rail Ridge 2026 Planting Unit_58.pdf PDF
Attachment 62_DUIS_ECRD_EmiC_HC_Saw_YJ_FY26 Malheur Tree Planting_Rev.1_2.11.2026.xlsx XLSX spreadsheet
Attachment 2_PWS_FY26MalheurTreePlantingContract_Rev.1_2.11.2026.pdf PDF
Attachment 69_Exhibit_K_Plot Radius and Frequency.pdf PDF
Attachment 18_Map Rail Ridge 2026 Planting Unit_22.pdf PDF
Attachment 40_Map Rail Ridge 2026 Tree Planting Overview Map.pdf PDF
Attachment 51_ Map Saw3.pdf PDF
Attachment 61_DUIS_BMRD_Sand and Rail Ridge_FY26 Malheur Tree Planting_Rev.1_2.11.2026.xlsx XLSX spreadsheet
Attachment 42_Map Sand Planting_Unit 10.pdf PDF
Attachment 13_ Map Rail Ridge 2026 Planting Access South.pdf PDF
Attachment 76_WD_77-0079_Rev.81_12.03.2025.pdf PDF
Attachment 74_R6-FS-6300-52 USDA Fire Protection and Suppression.pdf PDF
Attachment 53_ Map Saw5.pdf PDF
Attachment 29_Map Rail Ridge 2026 Planting Unit_60.pdf PDF
Attachment 72_Exhibit_P_Site_Preparation_Scalping.pdf PDF
Attachment 56_ Map Saw8.pdf PDF
Attachment 19_Map Rail Ridge 2026 Planting Unit_24.pdf PDF
Attachment 68_Exhibit_I_Container_Seedling_Placement.pdf PDF
Attachment 3_ Map EmiC1.pdf PDF
Attachment 36_Map Rail Ridge 2026 Planting Unit_78.pdf PDF
Attachment 66_Exhibit_G_Bareroot_Placement.pdf PDF
Attachment 64_Exhibit_B_Natural_Objects_for_Shade_Micrositing.pdf PDF
Attachment 67_Exhibit_H_Bareroot_Seedling_Root_Measurment.pdf PDF
Attachment 58_ Map SawVicinity.pdf PDF
Attachment 23_Map Rail Ridge 2026 Planting Unit_44.pdf PDF
Attachment 27_Map Rail Ridge 2026 Planting Unit_54.pdf PDF
Attachment 45_Map Sand Planting_Unit 16.pdf PDF
Attachment 10_Map HC3.pdf PDF
Attachment 34_Map Rail Ridge 2026 Planting Unit_72.pdf PDF
Attachment 15_Map Rail Ridge 2026 Planting Unit_12.pdf PDF
Attachment 22_Map Rail Ridge 2026 Planting Unit_42.pdf PDF
Attachment 41_Map Sand Planting Access Map.pdf PDF
Attachment 63_Exhibit_A_Government_Quality_Assurance_Plan.pdf PDF
Attachment 44_Map Sand Planting_Unit 14.pdf PDF
Attachment 33_Map Rail Ridge 2026 Planting Unit_70.pdf PDF
Show 40 more

Latest 50 of 79 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

T 17 S R 29 E

T 18 S R 29 E

0 0.20.1 Miles

FY2026 Sand Planting Units

100 foot contour

500 foot contour

US or State Highway

I - INTERSTATE HIGHWAY

Major Road

Arterial Road

Collector Road

Local Road

Off Forest Road

Closed Road - OPML = 1 closed roads

Stream Category Uncategorized Stream

Category 1 Stream

Category 2 Stream ! ! ! Category 4 Stream

Sand Planting 2026 - Malheur NF Unit 18 - 93 Acres

Target TPA: 150

Average Spacing: 17 X 17

Species Mix: PIPO (80) PSME (5) LAOC(15)

File details come from the government source that posted it. Updated .