Attachment 15_Map Rail Ridge 2026 Planting Unit_12.pdf
PDF 623 KB Posted
- Attached to
- Malheur NF Tree Planting Federal contract opportunity
- Solicitation number
- 1240BK26R0003
- Issued by
- Department of Agriculture Forest Service
About this file
This is a planning map for the Rail Ridge Planting 2026 project on the Malheur National Forest. Unit 12 encompasses 41 acres and is designated for reforestation with ponderosa pine (PIPO) at 100% species composition. The planting targets 195 trees per acre with an average spacing of 15 feet by 15 feet. The map displays the unit boundary, stream categories (including uncategorized, Category 1, 2, and 4 streams), road status ranging from closed roads to high-degree user comfort roads, contour lines at 100-foot and 500-foot intervals, and the 26 rail planting units across the project area. The location is identified as Township 14 South, Range 28 East, with the planting unit illustrated with tree symbols indicating the proposed planting layout across the designated acreage.
View the file
Other files for this federal contract opportunity
Show all 50
Malheur NF Tree Planting has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
T 14 S R 28 E
17 16
2150000
0 0.20.1 Miles
Rail 26 Planting Units
Stream Category Uncategorized Stream
Category 1 Stream
Category 2 Stream
Category 4 Stream
Road Status
CLOSED ROADS
HIGH CLEARANCE VEHICLES
SUITABLE FOR PASSENGER CARS
MODERATE DEGREE OF USER
COMFORT
HIGH DEGREE OF USER
COMFORT
Interstate
US or State Higway
100 foot contour
500 foot contour
Rail Ridge Planting 2026 - Malheur NF
Target TPA: 195
Average Spacing: 15x15
Species Mix:
UNIT 12 - 41 Acres
PIPO (100%)
File details come from the government source that posted it. Updated .