Attachment 6 - Technical Subfactor 3.pdf

PDF 429 KB Posted

Attached to
Aircrew and Maintenance Training Federal contract opportunity
Solicitation number
FA300222R0012
Issued by
Department of the Air Force Air Education and Training Command

About this file

This document contains a statement of objectives and request for contractor statement of work from the Air Force Security Assistance Training Squadron for Cessna 208 aircraft maintenance training. The statement of objectives describes the required scope of work to fulfill C-208 maintenance training for international partners, including objectives to provide trainees with thorough system operation understanding and skills to perform minor maintenance tasks. The requirements include specific topics to be covered and for the training to be a combination of formal classroom instruction and hands-on exercises over a period not exceeding 120 days. The contractor statement of work is requested to include details on the scope of work, training requirements, timeline, capacity, place of performance and period of performance from January 2022 through December 2022. Pricing is also requested to be included on a provided spreadsheet. Responses from contractors are due by August 31, 2021.

View the file

Other files for this federal contract opportunity

Other files attached to Aircrew and Maintenance Training, newest first.
File Type Posted
Technical Subfactor 3 - Pricing Model.xlsx XLSX spreadsheet
Final AMT Q and A 29 Apr 22.pdf PDF
AMT Q and A 29 Apr 22.pdf PDF
Technical Subfactor 2 - Pricing Model.xlsx XLSX spreadsheet
Solicitation - FA300222R0012 - Original Copy.pdf PDF
Technical Subfactor 3 - Pricing Model.xlsx XLSX spreadsheet
Attachment 5 - Technical Subfactor 2 - 14 Apr 22.docx DOCX document
AMT Q and A 22 APR 22.pdf PDF
Solicitation Amendment FA300222R00120003 SF 30 (1).pdf PDF
AMT Q and A 18 Apr 2022.pdf PDF
Attachment 2 - Addenda to 52.212-2 7 Apr 22.pdf PDF
Attachment 3 - PWS 6 Apr 22.pdf PDF
Attachment 4 - Ordering Guide 7 Apr 22.pdf PDF
Solicitation Amendment FA300222R00120002 SF 30.pdf PDF
AMT Q and A_7 Apr 22.pdf PDF
Attachment 1 - Addenda to 52.212-1 24 Mar 2022.pdf PDF
Solicitation Amendment FA300222R00120001 SF 30.pdf PDF
AMT Q and A 22 Mar 2022.pdf PDF
Pre Proposal Conference 3 15 22.pdf PDF
Pre-proposal Conference Interested Parties 3 15 22.pdf PDF
Consolidation Slides.pdf PDF
Attachment 2 - Addenda to 52.212-2.pdf PDF
Attachment 5 - Technical Subfactor 2.pdf PDF
Attachment 7 - Past Performance Information.pdf PDF
Solicitation - FA300222R0012.pdf PDF
Attachment 3 - PWS.pdf PDF
Attachment 8 - Past Performance Questionnaire.pdf PDF
Attachment 1 - Addenda to 52.212-1.pdf PDF
Attachment 4 - Ordering Guide.pdf PDF
Show all 29

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE AIR FORCE

AIR FORCE INSTALLATION CONTRACTING CENTER

War-winning capabilities … on time, on cost

21 July 2021

MEMORANDUM FOR Multi-awardees of A&MT

FROM: 338 ESS/PK(B)(D)

2021 FIRST STREET WEST

JBSA-RANDOLPH TX 78150-4302

SUBJECT: Request for Contractor Statement of Work – FY2102(SF3) – C-208 Initial and Practical

Maintenance Training for Eighteen (18) students.

1. The United States Government (USG) is requesting Category D – C-208 Initial and Practical Maintenance Training as outlined in the Statement of Objectives, dated 21 Jul 2021.

The anticipated period of performance is 01 Jan 2022 through 31 Dec 2022 for the Task Order. Training dates are expected to be between 01 Jan 2022 through 31 Dec 2022 for all students. USG is requesting that the training be broken out as follows:

CLIN 0008 – Category D-C-208 Basic Familiarization Course – Quantity 18 EACH

CLIN 0009 – Category D- C-208 Practical Maintenance (Operational) – Quantity 18 EACH

2. The vendor shall provide a Contractor Statement of Work (CSOW).

a. CSOW shall cover, at a minimum, the following:

1. Scope of Work

2. Task Objectives

3. Training Requirements

4. Training Timeline/Schedule

5. Training Capacity

6. Place of Performance

7. Task Order Period of Performance

8. Pricing Sheet completed (example attached to sample task order SOO)

b. Pricing Sheet completed with a price per each student.

3. USG is requesting your completed CSOW be received in our office not later than 10:00 a.m. Central Standard Time on Tuesday, 31 Aug 2021. Your CSOW shall be submitted and any resulting task order will be made—in accordance with Ordering Guide, Section IV. Selection Process of the basic contract.

4. In accordance with FAR 52.232-18, Availability of Funds, Funds are not presently available for this contract. The Government’s obligation under this contract is contingent upon the availability of appropriated funds from which payment for contract purposes can be made. No legal liability on the part of the Government for any payment may arise until funds are made available to the Contracting Officer for this contract and until the Contractor receives notice of such availability, to be confirmed in writing by the Contracting Officer.

5. Any questions shall be directed, via email, to the Contracting Officer, Mr. John Doe, at john.doe@us.af.mil, with a copy sent to the Contract Specialist, Ms. Jane Doe, at jane.doe@us.af.mil.

John Doe

JOHN DOE, CIV, DAF

Contracting Officer Attachments:

1. Statement of Objective (SOO)

2. Pricing Model Spreadsheet mailto:robarge@us.af.mil

Attachment 1

STATEMENT OF OBJECTIVES

Cessna-208 Aircraft Maintenance Training

I. INTRODUCTION

As the U.S. Air Force’s (USAF) executive agent for international training, the Air Force Security Assistance Training Squadron (AFSAT) coordinates and manages USAF and Contractor provided flying and non-flying training for international partners under the auspice of Foreign Military Sales

(FMS).

II. SCOPE

This Statement of Objectives (SOO) describes the scope of work, objectives, and requirements needed to fulfill C-208 maintenance training for AFSAT’s International Partners in accordance with Performance Work Statement (PWS) guidance. AFSAT requires the contractor provide a Contractors- Statement of Work (C-SOW) in response to this SOO. AFSAT requires a C-208 aircraft maintenance training capability in order for partner nations to effectively and efficiently operate in accordance with Federal Aviation Administration (FAA) guidelines. AFSAT requires the contractor identify required infrastructure, facilities, classrooms, flight-line, hangar space, etc., which will be required to deliver a successful training program, and describe how gaining access to these items will occur.

III. TASK OBJECTIVES STATEMENT

This SOO is for C-208 Initial and Practical Maintenance Training in accordance with PWS Section 2.2. This training is intended for aircraft maintenance technicians with limited experience in maintaining the C-208 aircraft. AFSAT requires, at a minimum, this course provide a thorough understanding of basic system operation and equip each individual with the skills to perform hands-on minor maintenance tasks. AFSAT requires, upon completion of this course, graduates will be familiar with C-208 maintenance manuals and checklists, know the location of aircraft components, understand the normal operation of aircraft systems, know the basic requirements of C-208 aircraft inspections, know basic servicing requirements, be made aware of the requirements for repair of aircraft systems, know the basics of system troubleshooting, and know the procedures for aircraft maintenance documentation.

IV. REQUIREMENTS

AFSAT requires a training solution and detailed operation plan to support the execution of these training requirements. AFSAT requires, at a minimum, these topics be included in the training:

a) C-208 Basic Familiarization

b) C-208 Aircraft Safety

c) C-208 Maintenance Manuals

d) C-208 Aircraft Inspection and Servicing

e) C-208 Airframe Components

f) C-208 Power Plant Components

g) C-208 Avionics & Electric Components

h) C-208 Air-conditioning Components

i) C-208 Hydraulic Components

j) C-208 Component Troubleshooting and Replacement

k) Maintenance Documentation

AFSAT requires this training, per class, to not exceed 120 days. AFSAT recommends this training be a combination of formal classroom instruction and necessary performance exercises (hands-on) to provide proficiency. AFSAT requires the primary emphasis to be “hands-on” practical experience, which will allow all students to complete all trained tasks with minimal supervision. This training program must adhere to the PWS guidance provided as well as OEM technical guidance, FAA regulations, and manufacturer specifications.

AFSAT requires the training capacity for this SOO to train at a minimum (6) six students per class, with a total of (3) three classes required. A schedule shall be provided illustrating all requested training. AFSAT requires all Maintenance Instructors be fully qualified IAW PWS paragraph 3.2.1.2. Additional maintenance training requirements may be identified later.

V. PLACE AND PERIOD OF PERFORMACE

AFSAT requires the Contractor to propose primary place(s) of performance to support this C-208 maintenance training course. The Period of Performance (PoP) requirements for this SOO is 01 January 2022 – 31 December 2022. AFSAT requires all training on this SOO to begin within the PoP.

Attachment 2

Attachment 2 - Pricing Model - C208 Initial and Practical Aircraft Maintenance Training for 3 classes, 6 students per class, 18 total students

Period of Performance

CLI

N TITLE

# of Student s Unit of Issue

Q ty

Unit Price

SUBTO

TAL

08 C-208 Basic Familiarization 18 Each

C-208 Practical Maintenance (Operational) 18 Each

TOTAL

Populate only the yellow boxes above, with the proposed units and cost per unit. If you have concerns with the CLIN structure, please notify John Doe (john.roe@us.af.mil).

SAMPLE CONTRACTOR STATEMENT OF WORK

CONTRACTOR STATEMENT OF WORK

ORGANIZATION

REQUIREMENT NAME: Ie. Country XX request for C-208 Initial and Practical Maintenance

Training

REQUIRING ORGANIZATION: AFSAT

Period of Performance

Location of Training

Number of Classes/Students

Training Organization

DATE: AUTHOR:

SERVICES

INTRODUCTION

This section shall identify the scope of training being provided. A short narrative of what the training will consist of shall be provided. The details of the training will be captured in the SCOPE OF WORK below.

SCOPE OF WORK

This section will be a detailed description of the scope of work and at a minimum shall:

- Include a detailed list by name and description of all the training being provided to meet requirements

- List total number of students being trained

- List the details for training aids being utilized, ie. aircraft, equipment, devices, etc.

- List a detailed breakout of Academics, hands-on, etc. training being provided

- List the details of all the hours being provided as part of the training

- List the details of facilities, classrooms, flight-line, etc. being utilized as part of the training

- List the details for all student support being provided, if applicable, ie. transportation, lodging, etc.

DELIVERABLES

This section shall be a detailed list of all deliverables being provided per performance work statement. This list shall include, at a minimum:

- Training Syllabus/Courseware

- Training schedule

- Training Reports

- Student Certificates

- Quality/Safety Plans

- Emergency Evacuation Plans

- Notification Reports, ie COVID guidelines/protocol

PLACE OF PERFORMANCE

Location(s) of training

TIMELINE

Projected Period of Performance (PoP). This section shall include a detailed breakout of the PoP and the timeline to complete all training requirements

SERVICES COORDINATION

U.S. GOVERNMENT RESPONSIBILITIES

This section will be a detailed list of all USG responsibilities in support of this contract as viewed by the contractor.

CONTRACTOR RESPONSIBILITIES

This section will be a detailed list of all other contactor responsibilities not already listed in other sections of this contractor statement of work.

AFSAT Points of Contact (POC):

This will be the AFSAT Contracting Officer Representative (COR) in which the contractor shall work with.

CRITERIA FOR COMPLETION

This section shall summarize all criteria for completion.

POINTS OF CONTACT

NAME / TITLE CONTACT INFORMATION (PHONE; EMAIL)

Program Manager

Contracting Specialist

Additional POCs

Attachment 1
STATEMENT OF OBJECTIVES
I. INTRODUCTION
II. SCOPE
III. TASK OBJECTIVES STATEMENT
IV. REQUIREMENTS
V. PLACE AND PERIOD OF PERFORMACE

File details come from the government source that posted it. Updated .