This is a Project Data Sheet template designed for offerors to document relevant past contract experience and project qualifications in response to the NIST Building 215 Clean Room HEPA Filter Replacement solicitation (1333ND26RNB190014). The form serves as an appendix to establish an organization's capability and experience for this small business set-aside acquisition.

The template requires offerors to provide comprehensive project information including the firm's UEI number, point of contact details, and role on the referenced project (prime contractor, subcontractor, or joint venture partner). Respondents must document the contract number, delivery/task order number, contract value, award date, and completion date. The form requests detailed descriptions of the work performed, with particular emphasis on self-performed work and relevance to the RFP requirements. Additional fields capture construction project specifics such as award amount, final price, contract type (firm-fixed price, cost/time and material), and construction delivery method (design-build, design-bid-build, or delivery/task order). Customer and owner information, including primary point of contact and communication details, must be included. This template is not a solicitation document with specific products or services requirements, response deadlines, or contract terms, but rather an experience documentation form to support proposal submissions for the NIST facility maintenance project.

View the file

Other files

File Type Posted
Amendment 0004 - 1333ND26RNB190014.pdf PDF
RFI IDs 33-36 Images_Compressed.pdf PDF
Amendment 0003 - 1333ND26RNB190014.pdf PDF
Amendment 0002 - 1333ND26RNB190014.pdf PDF
Information regarding Site Visit and RFIs.pdf PDF
Attachment 10 - Key Personnel Resume Form.docx DOCX document
Attachment 5 - Cleanroom Rebalance 35 Report.pdf PDF
Attachment 2 - Drawings.pdf PDF
Attachment 1 - BUILDING 215 - Basis of Design Report.pdf PDF
Attachment 8 - Project Data Sheet.doc DOC document
Attachment 7 - Davis Bacon Wage Rates.pdf PDF
Attachment 6 - Guidelines for Contractors and A-E firms - September 9 2025.pdf PDF
Attachment 3 - Specifications.pdf PDF
Attachment 9 - Past Performance Questionnaire.doc DOC document
Attachment 4 - Phasing Plan.pdf PDF
Solicitation 1333ND26RNB190014 - B215 HEPA Filters.pdf PDF
Amendment 0001 - 1333ND26RNB190014.pdf PDF
Attachment 7 - Past Performance Questionnaire.doc DOC document
Attachment 4 - Guidelines for Contractors and A-E firms - March 11 2024.pdf PDF
RFP 1333ND24RNB190036 - B101 Towers.pdf PDF
Attachment 5 - Davis Bacon Wage Rates.pdf PDF
Attachment 1 - Basis for Design.pdf PDF
Attachment 8 - Key Personnel Resume Form.docx DOCX document
Attachment 3 - Specifications.pdf PDF
Attachment 2 - Drawings.pdf PDF
Information regarding Site Visit and RFIs.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 4

PROJECT DATA SHEET

Project (check one): FORMCHECKBOX Contract 1 FORMCHECKBOX Contract 2 FORMCHECKBOX Contract 3 FORMCHECKBOX Contract 4 FORMCHECKBOX Contract 5

FORMCHECKBOX

Contract 6 FORMCHECKBOX Contract 7 FORMCHECKBOX Contract 8 FORMCHECKBOX Contract 9 FORMCHECKBOX Contract 10

1. Experience for: FORMCHECKBOX Offeror FORMCHECKBOX Joint-Venture FORMCHECKBOX Subcontractor (Explain)_______________ Firm Name:

UEI #:

Address:

Phone Number:

Point of Contact: Contact Phone Number:

2. Work Performed as: FORMCHECKBOX Prime Contractor FORMCHECKBOX Sub Contractor FORMCHECKBOX Joint Venture FORMCHECKBOX Other (Explain) Percent of project work performed:

If subcontractor, who was prime (Name/Phone #):

3. Contract Number: Delivery/Task Order Number:

Title:

Location:

Contract Dollar Value:

Award date (mm/dd/yy): Completion Date (mm/dd/yy):

4. Type of work monitored:

FORMCHECKBOX

New Construction FORMCHECKBOX Renovation FORMCHECKBOX Repair FORMCHECKBOX Alteration FORMCHECKBOX Other (explain):

5. Type of Contract/Task Order (Check ALL that apply):

FORMCHECKBOX

Firm-Fixed Price FORMCHECKBOX Cost/Time and Material FORMCHECKBOX

6. Construction Project:

Award Amount: Final Price:

Type of Construction Contract/Task Order (Check ALL that apply):

FORMCHECKBOX

Design-Build FORMCHECKBOX Design-Bid-Build FORMCHECKBOX Delivery/Task Order (IDIQ) FORMCHECKBOX

If Design-Build, identify the Lead Design Firm: _____________________________________________

7. Customer/Owner Name:

Point of Contact (POC): POC Phone Number:

FAX Number: POC E-mail address:

8. Provide a detailed description of the project, the services provided, and the relevancy to the project requirements of this RFP:

9. Provide a detailed description of what work your firm self-performed on this project:

10. Other Information: