RFI IDs 33-36 Images_Compressed.pdf

PDF 12 MB Posted

Attached to
Building 215 Clean Room HEPA Filter Replacement
Solicitation number
1333ND26RNB190014
Issued by

About this file

This document set consists of photographs of HVAC (heating, ventilation, and air conditioning) equipment and control systems, supplemented by technical specification documentation.

The images depict industrial HVAC infrastructure including: a gray metal electrical control panel with a "Danger - Electrical Hazard" warning label mounted on corrugated metal decking; internal wiring diagrams and control components featuring Siemens temperature sensors and control modules; Ebtron digital transmitters with "EB-Link Inside" capability mounted in stainless steel enclosures with caution labels; fire protection system piping and valving; a Nailor Industries single duct terminal unit rated at 24 volts with a diamond flow sensor calibration chart dated September 4, 2001 (Model D20RW, Serial No. 147055-114); and various pressure gauges, transformers, and interconnected electrical components. Technical documentation includes equipment specification sheets showing control voltage of 24 volts DC, 60 Hz operation, and dimensional specifications for inlet sizes of 14-12 inches. The equipment incorporates multiple Siemens monitoring devices, terminal units with analog displays, and integrated fire protection systems marked with appropriate safety warnings. The infrastructure appears to be part of a larger building mechanical system with both supply and return air handling capabilities.

View the file

Other files

File Type Posted
Amendment 0004 - 1333ND26RNB190014.pdf PDF
Amendment 0003 - 1333ND26RNB190014.pdf PDF
Amendment 0002 - 1333ND26RNB190014.pdf PDF
Attachment 7 - Davis Bacon Wage Rates.pdf PDF
Attachment 6 - Guidelines for Contractors and A-E firms - September 9 2025.pdf PDF
Attachment 3 - Specifications.pdf PDF
Attachment 8 - Project Data Sheet.doc DOC document
Information regarding Site Visit and RFIs.pdf PDF
Attachment 10 - Key Personnel Resume Form.docx DOCX document
Attachment 5 - Cleanroom Rebalance 35 Report.pdf PDF
Attachment 2 - Drawings.pdf PDF
Attachment 1 - BUILDING 215 - Basis of Design Report.pdf PDF
Attachment 9 - Past Performance Questionnaire.doc DOC document
Attachment 4 - Phasing Plan.pdf PDF
Solicitation 1333ND26RNB190014 - B215 HEPA Filters.pdf PDF
Amendment 0001 - 1333ND26RNB190014.pdf PDF
Attachment 8 - Key Personnel Resume Form.docx DOCX document
Attachment 3 - Specifications.pdf PDF
Attachment 5 - Davis Bacon Wage Rates.pdf PDF
Attachment 1 - Basis for Design.pdf PDF
Attachment 7 - Past Performance Questionnaire.doc DOC document
Attachment 4 - Guidelines for Contractors and A-E firms - March 11 2024.pdf PDF
RFP 1333ND24RNB190036 - B101 Towers.pdf PDF
Attachment 6 - Project Data Sheet.doc DOC document
Attachment 2 - Drawings.pdf PDF
Information regarding Site Visit and RFIs.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AHU Control Panel Example (Outside)

AHU Control Panel Example (Inside)
AFMS Example
AFMS Probe Example
VAV Box (Example)
VAV Box Nameplate
VAV Box (Inside)
VAV Pneumatic Reheat Control Valve

File details come from the government source that posted it. Updated .