This document outlines a pest management plan for the Russell Research Center (RRC). It details the monthly spraying and baiting schedule for different areas and rooms within the RRC facility. Spraying occurs on the third Friday of each month in all areas except those noted as exceptions. Baiting only is specified for certain rooms, primarily those used for toxicology, mycotoxins, antimicrobial resistance, and animal quarters. The plan provides room numbers and areas where spraying is allowed, as well as those designated for baiting only. Proper protection and escort requirements are identified for high containment labs. The related federal contract opportunity is for operations and maintenance support services at the United States National Poultry Research Center in Athens, Georgia, to be awarded by the Agricultural Research Service of the US Department of Agriculture.

View the file

Other files for this federal contract opportunity

Other files attached to O&M Support Services, USNPRC, Athens GA, newest first.
File Type Posted
Sol_12405B23R0012_Amd_0003.pdf PDF
QAs.pdf PDF
Attachment_22_USDA CASUP 2CSR Clean Agent.pdf PDF
Attachment_18_B45 Custodial Room Area Excel Export.xlsx XLSX spreadsheet
Attachment_7_Mowed_Areas_-_RRC 7.27.23.pdf PDF
Attachment_3_Equipment_PM_List_7.27.23.xlsx XLSX spreadsheet
Attachment_21_fire inspection devices.pdf AFA.PDF PDF
Sol_12405B23R0012_Amd_0002.pdf PDF
Attachment_20_Underground storage tanks 2021.pdf PDF
Attachment_19_Copy of Athens Access and security Inventory.xlsx XLSX spreadsheet
Sol_12405B23R0012_Amd_0001.pdf PDF
Attachment_12_Security Rounds USNPRC Campus.pdf PDF
Sol_12405B23R0012.pdf PDF
Attachment_1_Government_Furnished_Equipment.pdf PDF
Attachment_9_Vehicle_Inspections.pdf PDF
Technical Exhibit_1_Price Schedule.xlsx XLSX spreadsheet
Attachment_7A_SEPRL_Lawn_Mowing_Map_12.20.22.pdf PDF
Attachment_8_SEPRL_Building_45_Biosafety_Manual_APRIL_2021.pdf PDF
Technical Exhibit_2_Past Performance Questionnaire.docx DOCX document
Attachment_3_Equipment_PM_List_12.20.22.xlsx XLSX spreadsheet
Attachment_15_Davis-Bacon Act WD GA20230321.pdf PDF
Attachment_2_RRC_Bldg_1_Space_Utilization_Spreadsheet_Combined.xlsx XLSX spreadsheet
Attachment_4_2023 Vehicle Inventory.pdf PDF
Attachment_5_USNPRC Fire Extinguisher Inventories.pdf PDF
Attachment_7_Mowed_Areas_-_RRC.pdf PDF
Attachment_10_SEPRL_Fences_and_Gates.pdf PDF
Attachment_11_SEPRL_Housekeeping_Plan.pdf PDF
Attachment_12_Guard Security Rounds.pdf PDF
Attachment_13_Performance Work Statement_USNPRC Opertions and Maintenance_July 23_Final.pdf PDF
Attachment_14_Collective Bargaining Agreements.pdf PDF
Attachment_16_Service Contract Act WD 2015-4469.pdf PDF
Show all 31

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 6

Pest Management Plan

RRC

INFORMATION ON SPRAYING AND BAITING AT RRC

Spray monthly, 3rd Friday of each month.

Bait rooms marked with red dot (upper left corner of the door frame).

Spray in all areas except as noted below:

8th Floor Toxicology & Mycotoxin Culture Room 824 Rooms 806, 807, 836 7th Floor FSIS - Entire Floor BAIT ONLY 6th Floor FSIS - Entire Floor BAIT ONLY 5th Floor PMS - Rooms 502, 536, 547, 553 A&B, 556, Panel Rooms L5AH, L5CL 4th Floor PPMQ - Rooms 409, 410, 411, 412, 413, 437, 441, 442, 424, 448, 450, Vermiculite Room QARU - Rooms 406, 421, 424, 425, 431, 434, 435, 454, 456 3rd Floor Toxicology & Mycotoxin - Rooms 344, 346, 360, 364 BAIT ONLY - Entire Animal Quarters, 332 through 340, P 305 through P 319 (Caution in placing bait trays in hallways).

Bait central and outside hallways only in animal quarters.

SEP - Rooms 306, 307, 309, 309A, 318, 319, 320, 322 - BAIT ONLY 2nd Floor The 2nd Floor will be sprayed first.

Area Administrative Staff - Rooms 202, 202D, entire suite 203, 204, 220, 221, 223, 224, 225, 226, 227, 229 Antimicrobial Resistance - Room 207C - BAIT ONLY Lab P213 area Bait Only 1st Floor Spray late in the day Sensory Lab - Rooms 129-134 PPMQ - Rooms 118 - 121, no corridors in this area Restroom in Pilot Plant area and P104 Reception Booth Room 135 Entire 1st Floor pilot plant rooms, spray corridor only Basement The Health Unit, B36A, will be sprayed after the 2nd floor

QSARU - BAIT ONLY: B10, B12, B14

Attachment 6

RRC - B45 cooler/storage sprayed PB-4 Suite - Spray Conference Room, Breakroom, Hall and secretaries’ offices.

PB-5 (BSL3 Lab) – Spray all room areas in and adjacent to the lab; Personnel must escorted into the area.

Subbasement Toxicology & Mycotoxin PMSP - Room SB15 AH Room RRC B15 building.

This building can not be sprayed with in a 7 day window of spraying SEPRL or vice versa due to Bio requirements.

Routine interior and exterior pest control Feed Room, Necropsy Room, Bathrooms, change rooms, hallways, cook tank building interior and exterior.

Cooler, outside only.

Sample Receiving Building – all rooms