This document package provides construction drawings and specifications for fence and gate improvements at the USDA Southeast Poultry Research Laboratory in Athens, Georgia. The drawings depict the locations and lengths of various fences and gates throughout the facility, including production gates, access gates for buildings, and perimeter fences. Notes indicate the drawings represent the overall phasing sequence for the project and that detailed disruption avoidance plans will be provided by the general contractor.

The related federal contract opportunity is a solicitation for operations and maintenance support services at the USNPRC facility in Athens, Georgia. Solicitation number 12405B23R0012 was issued by the USDA Agricultural Research Service Field Research Implementation and Information Delivery agency.

View the file

Other files for this federal contract opportunity

Other files attached to O&M Support Services, USNPRC, Athens GA, newest first.
File Type Posted
Sol_12405B23R0012_Amd_0003.pdf PDF
QAs.pdf PDF
Attachment_20_Underground storage tanks 2021.pdf PDF
Attachment_19_Copy of Athens Access and security Inventory.xlsx XLSX spreadsheet
Attachment_7_Mowed_Areas_-_RRC 7.27.23.pdf PDF
Attachment_3_Equipment_PM_List_7.27.23.xlsx XLSX spreadsheet
Attachment_21_fire inspection devices.pdf AFA.PDF PDF
Attachment_22_USDA CASUP 2CSR Clean Agent.pdf PDF
Attachment_18_B45 Custodial Room Area Excel Export.xlsx XLSX spreadsheet
Sol_12405B23R0012_Amd_0002.pdf PDF
Sol_12405B23R0012_Amd_0001.pdf PDF
Attachment_12_Security Rounds USNPRC Campus.pdf PDF
Attachment_2_RRC_Bldg_1_Space_Utilization_Spreadsheet_Combined.xlsx XLSX spreadsheet
Attachment_4_2023 Vehicle Inventory.pdf PDF
Attachment_5_USNPRC Fire Extinguisher Inventories.pdf PDF
Attachment_7_Mowed_Areas_-_RRC.pdf PDF
Attachment_11_SEPRL_Housekeeping_Plan.pdf PDF
Attachment_12_Guard Security Rounds.pdf PDF
Attachment_13_Performance Work Statement_USNPRC Opertions and Maintenance_July 23_Final.pdf PDF
Attachment_14_Collective Bargaining Agreements.pdf PDF
Attachment_16_Service Contract Act WD 2015-4469.pdf PDF
Attachment_7A_SEPRL_Lawn_Mowing_Map_12.20.22.pdf PDF
Attachment_8_SEPRL_Building_45_Biosafety_Manual_APRIL_2021.pdf PDF
Technical Exhibit_2_Past Performance Questionnaire.docx DOCX document
Sol_12405B23R0012.pdf PDF
Attachment_1_Government_Furnished_Equipment.pdf PDF
Attachment_9_Vehicle_Inspections.pdf PDF
Technical Exhibit_1_Price Schedule.xlsx XLSX spreadsheet
Attachment_3_Equipment_PM_List_12.20.22.xlsx XLSX spreadsheet
Attachment_6_Pest_Management_Plan_-_RRC_Jan_22.pdf PDF
Attachment_15_Davis-Bacon Act WD GA20230321.pdf PDF
Show all 31

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

B L D

G

F F

E

L

I

M

I

T

S

O

F

Z

O

N

E

A

E

S

C

A

L

E

D

F

R

O

M

F

I

R

M

C

D

B

L

D

G

F

F

E

B L D

G

F F

E

B

L

F

F

B

L

F

F

B

L

F

F

E

C

O

L

L

E

S

T

A

T

I

O

N

R

A

D

W

A

S

P

H

A

L

P

V

E

U

B

L

I

C

W

I

D

H

V

R

I

E

S

B

N

O

R

H

C

O

N

I

V

E

R

WV

GV

BLDG

FFE: 646.50

BLDG 43

FFE: 646.50

GV

TYP.

S

A D

U

NO. DATE BY DESCRIPTION

DATE

PROJECT NO.

KIMLEY-HORN PROJ. NO.

DESIGNER

DRAWN BY

PROJECT MANAGER

REAL PROPERTY

SAFETY & HEALTH

PPM

EPM

REVISIONS

Facility Improvements

A-E FIRM USDA

Southeast Poultry Research Laboratory

Research

Agricultural

Service

K. OLSON

R. PHIPPS

02 MAR 2018

SHEET TITLE DWG No

D. ELENBAAS

160595003

PACKAGE B: FINAL SUBMITTAL

FACILITIES ENGINEERING BRANCH

5601 SUNNYSIDE AVENUE

BELTSVILLE, MD. 20705-5100

FACILITIES DIVISION

P. JOVANOVICH

R. DRECHSLER

J. ADAMS

AC-3250-C-15-0005

PPM

LEGEND:LEGEND:

NORTH

CONSTRUCTION SEQUENCE 7 NOTES:

G170PHASING SEQUENCE 7

SEQUENCE DRAWING DEPICT THE OVERALL INTENT OF THE

SEQUENCING FOR THE PROJECT. THE INTENT IS SUBJECT TO

CHANGE AND DETAILED DISRUPTION AVOIDANCE PLANS WILL BE

SUBMITTED FOR EACH PHASE OF WORK BY THE GENERAL

CONTRACTOR PRIOR TO THE START OF A NEW PHASE

GENERAL NOTE:

PACKAGE B: ISSUE FOR CONSTRUCTION SUBMITTAL

Jeff.Scarbrough Length Measurement 76'-8"

Jeff.Scarbrough Length Measurement 215'-0"

Jeff.Scarbrough Length Measurement 404'-1"

Jeff.Scarbrough Length Measurement 524'-6"

Jeff.Scarbrough Length Measurement 202'-6"

Jeff.Scarbrough Length Measurement 422'-6"

Jeff.Scarbrough Length Measurement 373'-7"

Jeff.Scarbrough Length Measurement 527'-1"

Jeff.Scarbrough Length Measurement 388'-9"

Jeff.Scarbrough Length Measurement 31'-6"

Jeff.Scarbrough Length Measurement 105'-8"

Jeff.Scarbrough Length Measurement 91'-5"

Jeff.Scarbrough Length Measurement 144'-5"

Jeff.Scarbrough Length Measurement 84'-4"

Jeff.Scarbrough Length Measurement 67'-5"

Jeff.Scarbrough Length Measurement 74'-2"

Jeff.Scarbrough Length Measurement 285'-1"

Jeff.Scarbrough Length Measurement 98'-4"

Jeff.Scarbrough Length Measurement 11'-11"

Jeff.Scarbrough Length Measurement 125'-11"

Jeff.Scarbrough Callout Hill Gate

Jeff.Scarbrough Callout B45 Access Gate

Jeff.Scarbrough Callout RRC Gate

Jeff.Scarbrough Callout Production Gate (South)

Jeff.Scarbrough Callout UGA Gate

Jeff.Scarbrough Callout River Gate

Jeff.Scarbrough Callout Water Gate

Jeff.Scarbrough Callout Old Main Gate

Jeff.Scarbrough Callout Pedestrian Gate (Turnstile)

Jeff.Scarbrough Callout Main Gate 1 2 3 4 5

Teddy.Laguins Callout Production Gate (North)

Teddy.Laguins Length Measurement 59'-1"

Teddy.Laguins Callout B45 Gate (North)

Teddy.Laguins Callout B47 Gate (North)

Teddy.Laguins Length Measurement 20'-3"

Jeff.Scarbrough Polylength Measurement 1,720'-1"

File details come from the government source that posted it. Updated .