Attachment_10_SEPRL_Fences_and_Gates.pdf
PDF 2 MB Posted
- Attached to
- O&M Support Services, USNPRC, Athens GA Federal contract opportunity
- Solicitation number
- 12405B23R0012
About this file
This document package provides construction drawings and specifications for fence and gate improvements at the USDA Southeast Poultry Research Laboratory in Athens, Georgia. The drawings depict the locations and lengths of various fences and gates throughout the facility, including production gates, access gates for buildings, and perimeter fences. Notes indicate the drawings represent the overall phasing sequence for the project and that detailed disruption avoidance plans will be provided by the general contractor.
The related federal contract opportunity is a solicitation for operations and maintenance support services at the USNPRC facility in Athens, Georgia. Solicitation number 12405B23R0012 was issued by the USDA Agricultural Research Service Field Research Implementation and Information Delivery agency.
View the file
Other files for this federal contract opportunity
Show all 31
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
B L D
G
F F
E
L
I
M
I
T
S
O
F
Z
O
N
E
A
E
S
C
A
L
E
D
F
R
O
M
F
I
R
M
C
D
B
L
D
G
F
F
E
B L D
G
F F
E
B
L
F
F
B
L
F
F
B
L
F
F
E
C
O
L
L
E
S
T
A
T
I
O
N
R
A
D
W
A
S
P
H
A
L
P
V
E
U
B
L
I
C
W
I
D
H
V
R
I
E
S
B
N
O
R
H
C
O
N
I
V
E
R
WV
GV
BLDG
FFE: 646.50
BLDG 43
FFE: 646.50
GV
TYP.
S
A D
U
NO. DATE BY DESCRIPTION
DATE
PROJECT NO.
KIMLEY-HORN PROJ. NO.
DESIGNER
DRAWN BY
PROJECT MANAGER
REAL PROPERTY
SAFETY & HEALTH
PPM
EPM
REVISIONS
Facility Improvements
A-E FIRM USDA
Southeast Poultry Research Laboratory
Research
Agricultural
Service
K. OLSON
R. PHIPPS
02 MAR 2018
SHEET TITLE DWG No
D. ELENBAAS
160595003
PACKAGE B: FINAL SUBMITTAL
FACILITIES ENGINEERING BRANCH
5601 SUNNYSIDE AVENUE
BELTSVILLE, MD. 20705-5100
FACILITIES DIVISION
P. JOVANOVICH
R. DRECHSLER
J. ADAMS
AC-3250-C-15-0005
PPM
LEGEND:LEGEND:
NORTH
CONSTRUCTION SEQUENCE 7 NOTES:
G170PHASING SEQUENCE 7
SEQUENCE DRAWING DEPICT THE OVERALL INTENT OF THE
SEQUENCING FOR THE PROJECT. THE INTENT IS SUBJECT TO
CHANGE AND DETAILED DISRUPTION AVOIDANCE PLANS WILL BE
SUBMITTED FOR EACH PHASE OF WORK BY THE GENERAL
CONTRACTOR PRIOR TO THE START OF A NEW PHASE
GENERAL NOTE:
PACKAGE B: ISSUE FOR CONSTRUCTION SUBMITTAL
Jeff.Scarbrough Length Measurement 76'-8"
Jeff.Scarbrough Length Measurement 215'-0"
Jeff.Scarbrough Length Measurement 404'-1"
Jeff.Scarbrough Length Measurement 524'-6"
Jeff.Scarbrough Length Measurement 202'-6"
Jeff.Scarbrough Length Measurement 422'-6"
Jeff.Scarbrough Length Measurement 373'-7"
Jeff.Scarbrough Length Measurement 527'-1"
Jeff.Scarbrough Length Measurement 388'-9"
Jeff.Scarbrough Length Measurement 31'-6"
Jeff.Scarbrough Length Measurement 105'-8"
Jeff.Scarbrough Length Measurement 91'-5"
Jeff.Scarbrough Length Measurement 144'-5"
Jeff.Scarbrough Length Measurement 84'-4"
Jeff.Scarbrough Length Measurement 67'-5"
Jeff.Scarbrough Length Measurement 74'-2"
Jeff.Scarbrough Length Measurement 285'-1"
Jeff.Scarbrough Length Measurement 98'-4"
Jeff.Scarbrough Length Measurement 11'-11"
Jeff.Scarbrough Length Measurement 125'-11"
Jeff.Scarbrough Callout Hill Gate
Jeff.Scarbrough Callout B45 Access Gate
Jeff.Scarbrough Callout RRC Gate
Jeff.Scarbrough Callout Production Gate (South)
Jeff.Scarbrough Callout UGA Gate
Jeff.Scarbrough Callout River Gate
Jeff.Scarbrough Callout Water Gate
Jeff.Scarbrough Callout Old Main Gate
Jeff.Scarbrough Callout Pedestrian Gate (Turnstile)
Jeff.Scarbrough Callout Main Gate 1 2 3 4 5
Teddy.Laguins Callout Production Gate (North)
Teddy.Laguins Length Measurement 59'-1"
Teddy.Laguins Callout B45 Gate (North)
Teddy.Laguins Callout B47 Gate (North)
Teddy.Laguins Length Measurement 20'-3"
Jeff.Scarbrough Polylength Measurement 1,720'-1"
File details come from the government source that posted it. Updated .