ATTACHMENT 6 General Conditions Breakout.xlsx
XLSX spreadsheet 13 KB Posted
- Solicitation number
- 36C24926R0037_0001
About this file
This file is a General Conditions Breakout spreadsheet that provides a detailed cost breakdown of general conditions for the construction project to renovate Building 1 Primary Care at a Department of Veterans Affairs facility under Solicitation 36C24926R0037 (Project #614-17-113). The spreadsheet appears to serve as a pricing template or cost estimation tool for bidders to itemize general conditions expenses separately from other contract costs.
The document functions as an appendix or template for contractors to organize and present general conditions costs in a standardized format during the bidding process. It does not contain specific contract requirements, performance objectives, or deliverable descriptions, but rather provides the framework for vendors to break out indirect costs, overhead, and other general conditions expenses associated with the construction renovation work. This breakout allows the government to evaluate how contractors are allocating resources for project administration, management, insurance, bonds, and other non-labor general costs that support the overall construction effort.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Addendum 2_Revised Drawings.pdf | ||
| Addendum 2_Cover Sheet.pdf | ||
| Addendum 2_Revised Specifications.pdf | ||
| Addendum 2_Questions and Answers.pdf | ||
| 36C24926R0037 0004.docx | DOCX document | |
| 36C24926R0037 0003.docx | DOCX document | |
| 36C24926R0037 0002.docx | DOCX document | |
| Sign Proof.pdf | ||
| Sign Schedule.pdf | ||
| Solicitation Questions and Answers_614-17-113.pdf | ||
| Site Visit Sign-in Sheet_36C24926R0037.pdf | ||
| 36C24926R0037 0001.docx | DOCX document | |
| ATTACHMENT 9 DBA Wage Determination TN20260200 5-18-2026.pdf | ||
| ATTACHMENT 3 Project Drawings_614-17-113.pdf | ||
| ATTACHMENT 8 Past Performance Questionnaire_614-17-113.pdf.pdf | ||
| ATTACHMENT 7 Price Breakout Schedule.xlsx | XLSX spreadsheet | |
| ATTACHMENT 5 Contractor EMR Certification Form.docx | DOCX document | |
| ATTACHMENT 1 Project Specifications Vol 1 of 2_614-17-113.pdf | ||
| ATTACHMENT 2 Project Specifications Vol 2 of 2_614-17-113.pdf | ||
| ATTACHMENT 4 Calc. of Self Performed Work.xlsx | XLSX spreadsheet | |
| 36C24926R0037_1.docx | DOCX document |
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GC Breakout
| GENERAL CONDITIONS BREAKOUT | ||
| When entering a line item for General Conditions costs on Schedule of Values, a breakout of the General Conditions costs must be provided. Per VAAR 852.243-70 Construction Contract Changes-Supplement, paragraph (c)(1), the following contractual restrictions apply: Overhead and Contractor's fee percentages shall be considered to include insurance other than mentioned herein, field and office supervisors and assistants, security police, use of small tools, incidental job burdens, and general home office expenses and no separate allowance will be made. Assistants to office supervisors include all clerical, stenographic and general office help. Incidental job burdens include, but are not necessarily limited to, office equipment and supplies, temporary toilets, telephone and conformance to OSHA requirements. Items such as, but not necessarily limited to, review and coordination, estimating and expediting relative to contract changes are associated with field and office supervision and are considered to be included in the Contractor's overhead and/or fee percentage. | ||
| General Condition Description | Value | |
| Project Management: | $ - 0 | |
| Superintendent(s) | $ - 0 | |
| Safety Manager | $ - 0 | |
| CPM Scheduler | $ - 0 | |
| Quality Assurance/Quality Control | $ - 0 | |
| Project Manager (s) | $ - 0 | |
| Project Executive | $ - 0 | |
| Field Office Engineer | $ - 0 | |
| Field Office Support Staff | $ - 0 | |
| Project Expeditor | $ - 0 | |
| Assistant Superintendent (s) | $ - 0 | |
| Project Manager Subtotal: | $ - 0 | |
| Bonds and Insurance (excluding any for Subcontractors): | $ - 0 | |
| Builder’s Risk Insurance | $ - 0 | |
| General Liability Insurance | $ - 0 | |
| Security, Payment & Performance Bonds | $ - 0 | |
| Bonds and Insurance Subtotal: | $ - 0 | |
| Site Conditions: | $ - 0 | |
| Temporary Power Consumption (Offices) | $ - 0 | |
| Temporary Power Consumption (General Site Use) | $ - 0 | |
| Temporary Water and Sewer Consumption | $ - 0 | |
| Temporary Water Hookup, Distribution & Meters | $ - 0 | |
| Temporary Electrical Hookup, Distribution & Meters | $ - 0 | |
| Temporary Telephone & Network System Installation | $ - 0 | |
| Temporary Telephone & Internet Consumption Fees | $ - 0 | |
| Temporary Fire Protection | $ - 0 | |
| Temporary Heating & Cooling | $ - 0 | |
| Temporary Fencing | $ - 0 | |
| Temporary Covered Walkways | $ - 0 | |
| SWPPP Measures | $ - 0 | |
| Temporary Entries and Truck Washes | $ - 0 | |
| Street Cleaning (by G.C.) | $ - 0 | |
| Traffic Control Measures | $ - 0 | |
| Temporary Barricades & Signage | $ - 0 | |
| Temporary Roads & Walkways (install & maintenance) | $ - 0 | |
| Temporary Lighting | $ - 0 | |
| Temporary Partitions & Covered Floor Openings | $ - 0 | |
| Temporary Toilets/Sanitary Measures | $ - 0 | |
| Temporary Laydown (prep and restoration) | $ - 0 | |
| Security System/Watchman | $ - 0 | |
| Pre-construction Photo Documentation | $ - 0 | |
| Progress Photos | $ - 0 | |
| Temporary Protection (in place work/adjacent structures) | $ - 0 | |
| $ - 0 | ||
| $ - 0 | ||
| $ - 0 | ||
| General Conditions Total | $ - 0 |