This is a Questions and Answers document for solicitation #36C24926R0037 addressing clarifications regarding project scope, specifications, and documentation.
The document contains five questions and answers addressing contractor concerns about electrical work, piping replacement, building dimensions, furniture specifications, and signage requirements. Regarding electrical work, the government declined to provide additional switchboard information, photographs of the Main Switchboard (MSB) and Emergency Switchboard (ESB), or a secondary site visit, directing contractors to reference existing project documents. For sanitary piping marked as E(SAN) on sheet PD102, the government clarified that all existing sanitary piping above the ceiling within the outlined area must be replaced from the deck connection downward, with pipe length calculable using provided deck height and ceiling height measurements and routing shown on drawings. The floor-to-deck height for partitions is specified as 13.67 feet. For CFCI equipment specifications including model numbers, finishes, fabric grades, and dimensions, the government referenced Basis of Design information on sheets AS80 and AF601, along with specification sections 10 28 00, 12 31 00, 12 32 00, 05 00 00, 10 21 23, 09 06 00, and 11 73 00. Interior signage must match the existing Clinical Lab signage manufacturer and product line referenced as 614-17-112, with contractors directed to Sign Schedule and Sign Proof attachments for details.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation # 36C24926R0037
Questions and Answers
1. Please provide existing switchboard information including manufacturer, catalog number, model number, bus rating, available fault current, existing breaker schedule, and photographs of the interiors of the MSB and ESB. The contract documents require additions to the existing gear, but sufficient information has not been provided to identify compatible breakers or verify available spaces. We want to ensure we provide an accurate electrical estimate.
Answer: No additional pictures can be provided at this time nor will there be a secondary site visit. Please refer to all project documents for details.
2. Note in top left corner of sheet PD102 states “all existing piping with the outlined area, denoted E(SAN) above the ceiling shall be replaced in its entirety from connection at the deck, down the existing wall pipe size and routing to match existing. “ We cannot quantify this scope of work. Is there more information that can be provided or more complete drawings?
Answer: E(SAN) is used to denote existing sanitary piping. This project will replace all E(SAN) piping from the deck as noted in the drawing. The length of the pipe drop can be calculated using the provided deck height and ceiling height(or floor to deck height). The length of the pipe runs is shown on the drawings. As stated in the drawings these pipes are to be demolished and replaced with new. Pipe routing does not change.
3. What are the floor to deck height for partitions?
Answer: 13.67ft
4.Do you have detailed specification information for the CFCI Equipment? Model numbers, finishes, fabrics or fabric grades for upholstery, dimensions (or elevations), options, etc.?
Needing this information to properly price furniture, equipment etc.
Answer: Basis of Design information is provided on sheets AS80 & AF601.
Applicable specification sections include but are not limited to 10 28 00, 12 31 00, 12 32 00, 05 00 00, 10 21 23, 09 06 00, 11 73 00.
5. Interior signage. States match existing. Can they provide existing signage manufacturer and product lines for the existing signage in the building complex and or the design specs.
Answer: Manufacturer and product line to match 614-17-112 Clinical Lab signage.
See Attachments “Sign Schedule” and “Sign Proof”.
END SOLICITATION QUESTIONS AND ANSWERS