This is a calculation template for self-performed versus subcontracted work required for specialty trade contractors responding to the solicitation for construction renovation work at a Department of Veterans Affairs facility.

The template mandates that offerors with NAICS code 23xxxxx (All Other Specialty Trade Contractors) must demonstrate that at least 25 percent of contract performance costs for personnel will be performed by the prime contractor's own employees. Offerors are required to provide a detailed breakdown of personnel costs and material/equipment costs organized by specification division applicable to the project. The template includes columns to designate whether subcontractors are small businesses (SB Vendor Y or N), with instructions to populate only gray-shaded areas. After calculating subtotals for personnel and material/equipment costs, offerors must add home office overhead, profit/fee, and bond costs. A certification formula calculates the percentage of self-performed work by dividing total prime contractor personnel costs by total personnel costs from both prime and all subcontractors, multiplied by 100. The completed template must be signed and dated by an authorized representative with their typed name and title, certifying the accuracy of all representations provided.

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Table 1

CALCULATION OF SELF-PERFORMED/SUBCONTRACTED WORK
Offerors for All Other Specialty Trade Contractors (NAICS code 23xxxxx) must provide
at least 25 percent of the cost of the contract performance incurred for personnel will be spent on the prime contractor's employees. Provide a breakdown of material and personnel costs, by specification division listed for the project. Home Office overhead,profit/fee and bond costs shall be added after a subtotal of personnel and material/ Equipment costs has been calculated. Clearly identify the personnel costs you will be performing. Below is a suggested format.
Specification DivisionSB Vendor (Y or N)Personnel CostMaterial/Equipment Costs
PrimeY$0.00$0.00Change SB Vendor to Y or N based on vendor size. Add costs to gray areas only.
SubY$0.00$0.00
SubY$0.00$0.00
SubY$0.00$0.00
SubY$0.00$0.00
SubY$0.00$0.00
SubN$0.00$0.00
SubN$0.00$0.00
SubN$0.00$0.00
SubN$0.00$0.00
SubN$0.00$0.00
(Add additional lines as necessary for each Division applicable to this project)$$
$ - 0$0.00
$$
Sub Total (Personnel Costs, Material/Equipment Costs)$0.00Add percentage to gray areas only.
Percentage0Profit$0.00
Percentage0Home Office Overhead$0.00
Percentage0Bond$0.00
Grand Total$0.00
Calculation of self-performed personnel costs:
1. Total personnel costs * both prime and all subcontractors:$0.00
2. Subtract all subcontractor personnel costs* companies that will perform work
on this contract:$0.00
3. Remainder is ‘Total amount of work to be self-performed under the
Contract’:$0.00
4. Self-performed work = Line 3/Line 1 x 100 =ERROR:#DIV/0!
*personnel costs include labors, mechanics, other tradesmen, and office personnel directly charged to
the project (includes project manager, job superintendent, administrative, estimators, etc.)
I certify the above representations are true and correct to the best of my knowledge.

(Signature and Typed Name of Authorized Representative) Date

(Title of Authorized Representative)