Addendum 2_Cover Sheet.pdf
PDF 244 KB Posted
- Solicitation number
- 36C24926R0037_0001
About this file
This document is Addendum No. 002 to the contract for the Memphis VA Medical Center Building 1 Primary Care renovation project (VA Project #614-17-113), issued by Guidon on August 12, 2026.
The addendum incorporates specification and drawing modifications along with responses to Requests for Information (RFIs) collected during the bidding phase. Drawing changes include replacement of five sheets: AD101 (First Floor Demolition Plan), AD401 (Enlarged Demolition Plan), AS111 (First Floor Reflected Ceiling Plan), AF101 (First Floor Wall Finish Plan), and AF102 (First Floor Floor Finish Plan), all containing additional or modified plan notes. Specification changes add 22 new specification sections to the contract documents, including thermal insulation (07 21 13), low energy power assist door operators (08 71 13.11), glazing surface films (08 87 00), resinous flooring systems (09 67 23.50 and 09 67 23.60), interior furnishings and fixtures (chalkboards, tackboards, signage, toilet compartments, cubical curtain track, folding panel partitions, wall and door protection, fire extinguisher cabinets, and plastic lockers), patient lifts (11 73 00), window shades (12 24 00), manufactured wood casework (12 32 00), countertops (12 36 00), an integrated patient care modular system (12 56 70.13), and HVAC testing, adjusting, and balancing (23 05 93). All listed modifications are incorporated into the contract documents as of the addendum issue date.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
August 12, 2026
Memphis VA Medical Center
Renovate Building 1 Primary Care
VA Project #614-17-113
ADDENDUM NO. 002
TITLE: ADDENDUM NO. 002
ISSUE DATE: August 12, 2026
The following instructions herein and the listed documents below are hereby modified to be incorporated as part of the contract documents.
This Addendum consists of pertinent specification and drawing changes/ modifications as noted below. In addition, this Addendum consists of responses to RFI’s collected during bidding. Answers are indicated as noted below.
This change consists of additions, deletions and modifications as follows:
SUMMARY OF CHANGES TO DRAWINGS:
1. Sheet AD101 – FIRST FLOOR DEMOLITION PLAN
a. Included additional/modified demolition plan notes – Replace entire sheet.
2. Sheet AD401 – ENLARGED DEMOLITION PLAN
a. Included additional/modified demolition plan notes – Replace entire sheet.
3. Sheet AS111 – FIRST FLOOR REFLECTED CEILING PLAN
a. Included additional/modified plan notes – Replace entire sheet.
4. Sheet AF101 – FIRST FLOOR WALL FINISH PLAN
a. Included additional/modified plan notes – Replace entire sheet.
5. Sheet AF 102 – FIRST FLOOR FLOOR FINISH PLAN
a. Included additional/modified plan notes – Replace entire sheet.
SUMMARY OF CHANGES TO SPECIFICATIONS:
1. 00 01 10 TABLE OF CONTENTS – has been updated.
2. 07 21 13 THERMAL INSULATION – has been included.
3. 08 71 13.11 LOW ENERGY POWER ASSIST DOOR OPERATORS – has been included.
4. 08 87 00 GLAZING SURFACE FILMS – has been included.
5. 09 67 23.50 RESINOUS TERRAZO FLOORING – has been included.
6. 09 67 23.60 RESINOUS URETHANE AND EPOXY MORTAR FLOORING – has been included.
7. 10 11 13 CHALKBOARD & MARKERBOARDS – has been included.
8. 10 11 23 TACKBOARDS – has been included.
9. 10 14 00 SIGNAGE – has been included.
10. 10 21 13 TOILET COMPARTMENTS – has been included.
11. 10 21 23 CUBICAL CURTAIN TRACK - has been included.
12. 10 22 39 FOLDING PANEL PARTITIONS – has been included.
13. 10 26 00 WALL & DOOR PROTECTION – has been included.
14. 10 28 00 TOILET BATH & LAUNDRY – has been included.
15. 10 44 13 FIRE EXTINGUISHER CABINETS – has been included.
16. 10 51 26 PLASTIC LCOKERS – has been included.
17. 11 73 00 PATIENT LIFTS – has been included.
18. 12 24 00 WINDOW SHADES – has been included.
19. 12 32 00 MANUFACTURED WOOD CASEWORK - has been included.
20. 12 36 00 COUNTERTOPS – has been included.
21. 12 56 70.13 INTEGRATED PATIENT CARE MODULAR SYSTEM – has been included.
22. 23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC – has been included.
END OF ADDENDUM #002