Attachment 6 Center Pivot Irrigation System - Materials List - Miles City MT.pdf

PDF 177 KB Posted

Attached to
Center Pivot Irrigation System Installation Federal contract opportunity
Solicitation number
12805B24R0009
Issued by
Department of Agriculture Agricultural Research Service Field Research Implementation and Information Delivery Plains Area

About this file

This document includes a materials list and specifications for a center pivot irrigation system installation project. The project involves installing two center pivot irrigation systems with new booster pumps and electrical upgrades at an agricultural research facility. Key components include over 88,000 feet of PVC piping in various sizes, sprinkler packages, control panels, collector rings, regulators, hose drops, tires, and other irrigation equipment. The project also requires upgrading electrical panels and installing over 4,800 feet of cable. A mandatory site visit is scheduled for February 21st or 22nd, with registration required by February 20th. The solicitation number is 12805B24R0009 and is seeking installation services from qualified contractors for the center pivot irrigation system project.

View the file

Other files for this federal contract opportunity

Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Quantity Irrigation System Unit 1 Booster Pump Pivot 9 -- Cornell Pump 6YB-50 HP with Mechanical Seal & Run Dry Kit Ea.

1 Booster Pump Pivot 1O -- Cornell Pump 6YB-40 HP with Mechanical Seal & Run Dry Kit Ea.

1 24" Dogleg Ea.

40 24" PVC PIP 80 PSI Pipe Installed Ft.

8880 21" PVC PIP 80 PSI Pipe Installed Ft.

1480 18" PVC PIP 80 PSI Pipe Installed Ft.

300 15" PVC PIP 80 PSI Pipe Installed Ft.

11 Air Vac Assemble off the Pipeline Ea.

1 24" PVC Tee Ea.

1 21" PVC Tee Ea.

1 18" PVC Tee Ea.

1 24" x 21" PVC Reducer Ea.

2 15" PVC Repair Coupler Ea.

2 21" PVC Repair Coupler Ea.

3 15" x 1O" PVC Reducer Ea.

1 21" x 18" PVC Reducer Ea.

2 15" PVC Elbows Ea.

1 18" PVC Elbows Ea.

2 21" PVC Elbows Ea.

1 24" PVC Elbows Ea.

1 18" x 15" PVC Reducer Ea.

1 18" x 12" PVC Reducer Ea.

2 12" x 1O" PVC Reducer Ea.

2 12" Pivot Point Dogleg Ea.

2 8" Automatic On/Off Valve Ea.

2 12" Gear Operated Butterfly Valve Ea.

1 Pivot 9, 10, 12- Steel Fitting for Booster Pump at Pivot Point Ea.

2 Pivot 9, 10, 12 - Extend Concrete Pad for Pump Ea.

Quantity Electrical System Unit 1 50 Hp Soft Start Panel with Lighting Arrestor & Pivot Relay - Pivot 9 Ea.

1 40 Hp Soft Start Panel with Lighting Arrestor & Pivot Relay - Pivot 10 Ea.

4850 350 MCM Cable in Conduit Installed with Trencher Ft.

2 Upgrade Pivot Panels on Pivot 9 Ea.

2 Pivot Radio to Pump Site Ft.

2 Pump Panel at Pivot Points Tie in Ea.

2 Pivot Point Electrical Tie in Ea.

2 Steel Pedestal Ea.

2 MDU Meter Loop Ea.

2 200 Amp Fused Disconnect Ea.

2 200 Amp Junction Box Ea.

3 400 Amp Junction Box Ea.

1 Copper Wire and Electrical Fittings Ea.

Quantity Pivot #10 - 1745' Valley Center Pivot Model 8000 or equivalent Unit 1 8 5/8" Pivot Point w/ Flex, Ladder, and Blue Running Strobe Ea.

1 Icon 5 Control Panel w/ Agsense Telemetry Unit Ea.

1 GPS Positioning Ea.

1 11-Conductor Aeromotive Collector Ring Ea.

1 Pressure Transducer Ea.

1 High Voltage Surge Protection Ea.

250 15-PSI Nelson Regulators (estimate) Ea.

250 Premium Blue Hose Drop Variable Length 60" Ground Clearance (estimate) Ea.

1 Nelson R3030 Sprinkler Package @ 1975 GPM Ea.

5 160' 8 5/8" Pivot Span w/ 30" Coupler Spacing Ea.

5 180' 6 5/8" Pivot Span w/ 30" Coupler Spacing Ea.

1 45' Overhang w/ R55i Secondary End gun Ea.

1745 11-Conductor Span Cable - 10 guage ft 10 11.2 X 38 Non-Directional Tire Assembly with Rim and Tube, 6 Ply Ea.

1 2HP Booster Pump w/ Dirty Water Filter, Nelson SR100 End Gun Ea.

Project: Center Pivot Irrigation System - Materials List

North Line - Phase I - (Pivots #9 - #10)

BASE BID: (CLIN 0001)

1 River Pump - Cornell - 8NHTR-VC18DB with 300 HP Ea.

1 Modification to Pump House to Fit New Pumps Steel Ea.

1 Modification to Pump House to Fit New Pumps - Labor Ea.

Quantity Screen System For River Pump Site Unit Sprinkler Computer Nozzels Weld Couplers for Nozzels 2" Automatic On/Off Valve Stainless Steel Mess 2" Galvanized Pipe 1-114" Galvanized Pipe 2" Fitting 1-114" Fittings Mounting Hardware Submersible Pump for Screen Submersible Pump Panel with Relay Electrical Fittings & Wire Labor for Electrical Labor Welding Labor for Install

Quantity River Manifold Unit 36" x 112" Steel Pipe 36" Steel Flange Class D 36" Steel Dome Ends 36" Gear Operated Butterfly Valves 20" x 112 Steel Pipe 20" Steel Flange Class D 20" Globe Style Check Valve 20" Gear Operated Butterfly Valve 24" x 112" Steel Pipe 24" Steel Flange Class D 24" Gear Operated Butterfly Valve 24" 90 Deg Steel Sweeps Air Vacs Couplers Drain Lines Bolts Gaskets

Quantity Electrical System Unit 1 300 Hp Yaskawa Drive With Lighting Arrestor - River Pump Site Ea.

1 Steel Pedestal Ea.

1 MDU Meter Loop Ea.

1 200 Amp Junction Box Ea.

1 1200 Amp Fused Disconnect Ea.

1 Copper Wire and Electrical Fittings Ea.

Pump Site - Phase I

OPTION I: (CLIN 0002)

Ea.1

1 Ea.

1 24" Dogleg Ea.

4160 24" PVC PIP 80 PSI Pipe Installed Ft.

5360 21" PVC PIP 80 PSI Pipe Installed Ft.

2230 8" PVC PIP 80 PSI Pipe Installed Ft.

5 Air Vac Assemble off the Pipeline Ea.

1 24" PVC Elbows Ea.

1 24" PVC Tee Ea.

3 21" PVC Tee Ea.

3 18" PVC Tee Ea.

2 21" PVC Repair Coupler Ea.

1 24" x 21" PVC Reducer Ea.

1 21" x 18" PVC Reducer Ea.

3 8" Pivot Point Dogleg Ea.

1 6" Pivot Point Dogleg Ea.

4 6" Automatic On/Off Valve Ea.

3 8" Gear Operated Butterfly Valve Ea.

1 6" Gear Operated Butterfly Valve Ea.

Quantity Electrical System Unit 5620 2/0 Cable in Conduit with 12-2 Installed Ft.

2350 2 AWG Cable in Conduit with 12-2 Installed Ft.

1580 4 AWG Cable in Conduit with 12-2 Installed Ft.

4 Pivot Point Electrical Tie in Ea.

1 Steel Pedestal Ea.

1 MDU Meter Loop Ea.

4 30 Amp Fused Disconnect Ea.

1 60 Amp Fused Disconnect Ea.

2 100 Amp Fused Disconnect Ea.

1 200 Amp Fused Disconnect Ea.

1 Copper Wire and Electrical Fittings Ea.

Quantity Pivot #1 1314'- Valley Center Pivot Model 7000 or equivelant Unit 1 6 5/8" Pivot Point w/ Flex, Ladder, and Blue Running Strobe Ea.

1 Icon 5 Control Panel w/ Agsense Telemetry Unit Ea.

1 Encoder Positioning Ea.

1 11-Conductor Aeromotive Collector Ring Ea.

1 Pressure Transducer Ea.

1 High Voltage Surge Protection Ea.

140 15 'PSI Nelson Regulators (estimate) Ea.

140 Premium Blue Hose Drop Variable Length 60" Ground Clearance (estimate) Ea.

1 Nelson R3030 Sprinkler Package@730 GPM Ea.

7 180' 6 5/8" Pivot Span w/ 108" Coupler Spacing Ea.

1 54' Overhang w/ R551 Secondary End gun Ea.

1314 11-Conductor Span Cable - 8 guage ft.

7 11.2 X 24 Non-Directional Tire Assembly with Rim and Tube, 6 Ply Ea.

2 End of Field Stops Ea.

1 2HP Booster Pump w/ Dirty Water Filter, Nelson SR100 End Gun Ea.

1 Concrete Pivot Pad Ea.

Quantity Pivot #2 - 1194' Valley Center Pivot Model 7000 or equivelant Unit 1 6 5/8" Pivot Point w/ Flex, Ladder, and Blue Running Strobe Ea.

1 Icon 5 Control Panel w/ Agsense Telemetry Unit Ea.

1 Encoder Positioning Ea.

1 11-Conductor Aeromotive Collector Ring Ea.

1 Pressure Transducer Ea.

1 High Voltage Surge Protection Ea.

125 15 'PSI Nelson Regulators (estimate) Ea.

125 Premium Blue Hose Drop Variable Length 60" Ground Clearance (estimate) Ea.

1 Nelson R3030 Sprinkler Package @ 625 GPM Ea.

2 205' 6 5/8" Pivot Span w/ 108" Coupler Spacing Ea.

4 180' 6 5/8" Pivot Span w/ 108" Coupler Spacing Ea.

1 64' Overhang w/ R55i Secondary End gun Ea.

1194 11-Conductor Span Cable - 8 guage Ea.

6 11.2 X 24 Non-Directional Tire Assembly with Rim and Tube, 6 Ply Ea.

2 End of Field Stops Ea.

1 2HP Booster Pump w/ Dirty Water Filter, Nelson SR 100 End Gun Ea.

1 Concrete Pivot Pad Ea.

OPTION II: (CLIN 0003)

South Line - Phase I - (Pivots 1,2,3,4)

Quantity Pivot #3 - 1554' Valley Center Pivot Model 7000 or equivelant Unit 1 6 5/8" Pivot Point w/ Flex, Ladder, and Blue Running Strobe Ea.

1 Icon 5 Control Panel w/ Agsense Telemetry Unit Ea.

1 Encoder Positioning Ea.

1 11-Conductor Aeromotive Collector Ring Ea.

1 Pressure Transducer Ea.

1 High Voltage Surge Protection Ea.

170 15 'PSI Nelson Regulators (estimate) Ea.

170 Premium Blue Hose Drop Variable Length 60" Ground Clearance (estimate) Ea.

1 Nelson R3030 Sprinkler Package @ 1000 GPM Ea.

2 205' 6 5/8" Pivot Span w/ 108" Coupler Spacing Ea.

6 180' 6 5/8" Pivot Span w/ 108" Coupler Spacing Ea.

1 64' Overhang w/ RSSi Secondary End gun Ea.

1554 11-Conductor Span Cable - 8 guage ft.

8 11.2 X 24 Non-Directional Tire Assembly with Rim and Tube, 6 Ply Ea.

2 End of Field Stops Ea.

1 2HP Booster Pump w/ Dirty Water Filter, Nelson SR100 End Gun Ea.

1 Concrete Pivot Pad Ea.

Quantity Pivot #4 - 806' Valley Center Pivot Model 7000 or equivelant Unit 1 6 5/8" Pivot Point w/ Flex, Ladder, and Blue Running Strobe Ea.

1 Icon 5 Control Panel w/ Agsense Telemetry Unit Ea.

1 Encoder Positioning Ea.

1 11-Conductor Aeromotive Collector Ring Ea.

1 Pressure Transducer Ea.

1 High Voltage Surge Protection Ea.

90 15 'PSI Nelson Regulators (estimate) Ea.

90 Premium Blue Hose Drop Variable Length 60" Ground Clearance (estimate) Ea.

1 Nelson R3030 Sprinkler Package@ 480 GPM Ea.

2 205' 6 5/8" Pivot Span w/ 108" Coupler Spacing Ea.

2 180' 6 5/8" Pivot Span w/ 108" Coupler Spacing Ea.

1 36' Overhang w/ R55i Secondary End gun Ea.

806 11-Conductor Span Cable - 10 guage ft 4 11.2 X 24 Non-Directional Tire Assembly with Rim and Tube, 6 Ply Ea.

1 2HP Booster Pump w/ Dirty Water Filter, Nelson SR100 End Gun Ea.

1 Concrete Pivot Pad Ea.

South Line - Phase I
North Line - Phase I
Pump Site - Phase I

File details come from the government source that posted it. Updated .