Attachment 5a - 18 WG Design Guide Criteria.pdf
PDF 161 KB Posted
- Attached to
- Repair HVAC in PAX Terminal B3409
- Solicitation number
- FA527025R0006
About this file
This is an 18 Wing Facility Design Criteria document that provides comprehensive design requirements for construction projects at Kadena Air Base and other military installations in Okinawa, Japan. The document establishes that architects and engineers contracted to design real property facilities must incorporate specific design criteria, use collaborative integrated design processes, and consider all building lifecycle stages including deconstruction and rehabilitation.
The criteria requires compliance with U.S. standards for critical safety components like fire suppression systems, fire alarms, and drinking water systems, which cannot be substituted with Japanese standards without commander approval. The document outlines requirements for incorporating Japan Edited Specifications (JES) and Japanese Industrial Standards (JIS) where appropriate, while maintaining compliance with Department of Defense Building Code and other federal requirements. It specifies an Environmental Severity Classification of C51 for corrosion resistance considerations and includes special provisions for oil-water separators, ADA-compliant entryways, and blind-operated vending facilities. The document serves as a foundational reference for ensuring consistent design standards across 18 Wing facilities while accommodating both U.S. and Japanese construction requirements.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Section 01 33 16.18 30 Page 1 of 14
[FA5270-xx-x-xxxx] [Project Title]
SECTION 01 33 16.18 30
18 WING FACILITY DESIGN CRITERIA
11/21
Document Number: 18WG 01 33 16.18 30 Issue Date: 03 Nov 2021 Supersedes: N/A (1st issue) Source: See References UMRL Date: 01 Nov 2021
OPR: 718 CES/CEN
Pages: 14
Section 01 33 16.18 30 Page 2 of 14
1. PART 1
1.1. GENERAL INSTRUCTIONS
1.1.1. A&E contracted to design real property facilities for
construction on 18 Wing properties shall incorporate the design criteria referenced in this SECTION into the construction work plan deliverable.
1.1.2. After award, develop the accepted proposal into the completed design, as described herein. Use a collaborative, integrated design process for all stages of project delivery with comprehensive performance goals for site development, energy, water, material selection, indoor environmental quality, and waste diversion. Ensure incorporation of these criteria and goals in project delivery. Consider all stages of the building lifecycle, including deconstruction, rehabilitation, re-purposing, or demolition.
1.1.3. The Statement of Work (SOW) accompanying each TO will provide detailed descriptions of the scope of the design broken into the applicable construction disciplines. References to specific design criteria listed in the SOW are for additional reference purposes only and do not alter the requirements imposed by the:
a) a) Federal Facility Criteria (FFC) and related requirements for Department of Defense (DOD) facility design contracts as defined in SECTION 01 33 16.18 30, 18 WING FACILITY DESIGN CRITERA, or
b) Requirements defined in the Federal Acquisition Regulation (FAR) clauses and provisions incorporated into the award or this TO by reference or by full text.
1.2. APPLICABILITY
1.2.1. Unless specifically described elsewhere in the contract documents, this SECTION references the design criteria applicable to all real property facilities designed for AF-use on Kadena Air Base, all Military Family Housing (MFH) areas located on Okinawa area Air Force, US Marine Corps, and US Army installations, Munitions Storage Area (MUNS), Kadena Marina, and Okuma Recreation Area.
1.2.2. MILCON or projects for use by the US Army, US Navy, or USMC may have additional requirements not listed in this SECTION.
1.3. DEFINITIONS
1.3.1. CONSTRUCTION AGENT (CA)
a) Professional Registered members of the Contractor’s Construction Team that follow the construction plans, supervise the construction workers, perform testing, submit required submittals, oversee Quality Control, and submit documents to the Government to document progress meeting the schedule from construction NTP until project closeout.
1.3.2. DESIGN AGENT (DA)
Section 01 33 16.18 30 Page 3 of 14
a) Professional Registered members of the Contractor’s Design Team that check, approve, sign, date, and certify that the design submittals comply with the contract requirements.
1.3.3. DESIGNER OF RECORD (DOR)
a) The DOR is responsible for maintaining the integrity of the design and for compliance with the contract requirements through construction and documentation of the as-built condition by coordination, review and approval of extensions of design, material, equipment and other construction submittals, review and approval or disapproval of requested deviations to the accepted design or to the contract, coordination with the Government of the above activities, and by performing other typical professional design responsibilities.
b) The DOR shall stamp, sign, and date each design drawing and other design deliverables under their responsible discipline at each design submittal stage.
1.4. ORDER OF PRECEDENCE
1.4.1. In the event of a conflict or inconsistency between any of the requirements within the Contract, the following precedence is applied:
a) Any portions of the accepted proposal which both conform to and exceed the requirements of the solicitation.
b) The provisions of the solicitation.
c) All other provisions of the accepted proposal.
d) Any design products including, but not limited to, plans, specifications, engineering studies and analyses, shop drawings, and equipment installation drawings. These are "deliverables" under the contract are not part of the contract itself. Design products must conform to all provisions of the contract, in the order of precedence.
1.5. ARCHITECT AND ENGINEER QUALIFICATIONS
1.5.1. The Contractor shall appoint a Skilled Licensed Construction Engineer or Architectural Engineer, in accordance with paragraphs 1 and 2 of Article 4, Contract Handling Regulations of the Prime Minister's Office of the Government of Japan, as the Project Engineer for this contract.
a) A First Grade Construction Engineer or Architectural Engineer shall have the Class 1 Engineering Manager, Architectural Construction License ("1 Kyuu Kenchiku Sekou Kanri Gishi") or 1st Class Architect License ("1 Kyuu Kenchiku Shi").
b) A First Grade Construction Engineer or Architectural Engineer is required if the value of this contract is equal to or greater than $1 million or Yen equivalent, or the total value of all contracts the Contractor has through 18 CONS/LGCC is $3 million or Yen equivalent.
c) A Second Grade Construction Engineer or Architectural
Section 01 33 16.18 30 Page 4 of 14
Engineer is acceptable if the value of this contract is below $1 million or Yen equivalent, or the total value of all contracts the Contractor has through 18 CONS/LGCC is less than $3 million or Yen equivalent.
2. PART 2
2.1. DESIGN SPECIFICATIONS AND CRITERIA
2.1.1. OVERARCHING REGULATOR REQUIREMENTS
a) Design and Construction must comply with applicable Public Laws (P.L.), Executive Orders (E.O.), Code of Federal Regulations (CFR), Department of Defense Instructions (DODI), Department of Defense Manuals (DODM), and Department of Defense Directives (DODD), and other Federal Facility Criteria (FFC).
2.1.2. 18 WING-UNIQUE DESIGN OR EXECUTION CRITERIA
a) All 18 Wing-unique design criteria and/or execution criteria, specifications and supplements, and other guidance that is not available from online sources will be attached to the requirements package.
b) Design criteria shall be incorporated into the final design.
c) Environmental specifications and supplements shall be incorporated into the final design package as-is without altering their content. In cases where the A&E feels their content requires revisions for accuracy or currency, notify the Contracting Officer and request to coordinate directly with the Chief of the Environmental Office on the revised content.
2.1.3. SOLE SOURCE EQUIPMENT SELECTIONS
a) In cases where the facility user requires the incorporation of specific materials, specific pieces of equipment, or other items not normally designated in the UFGS sections, these requirements will be clearly described in SECTION 01
01 00, STATEMENT OF WORK.
2.1.4. ONLINE REFERENCES
a) All FFC and Air Force (AFCEC) design criteria documents applicable to this project are available online through the World Building Design Guide website located at:
https://www.wbdg.org/FFC/
b) Addition references can be found in UFGS 01 42 00, downloadable from:
https://www.wbdg.org/FFC/DOD/UFGS/UFGS%2001%2042%2000.pdf
2.1.5. FEDERAL REQUIREMENTS
a) Code Of Federal Regulations https://www.wbdg.org/ffc/fed/code-federal-regulations
b) Federal Facilities Council
Section 01 33 16.18 30 Page 5 of 14 https://www.wbdg.org/ffc/ffc
2.1.6. FEDERAL FACILITY CRITERIA (FFC)
a) Unified Master Reference List https://www.wbdg.org/ffc/DOD/unified-master-reference
2.1.7. UNIFIED FACILITIES GUIDE SPECIFICATIONS (UFGS)
a) Incorporate UFGS specifications, as well as JES specifications (See part 1.12of the SECTION), into the specification package of the construction plans.
b) The DOR shall revise all specifications appropriately to meet the intent of the design.
c) Include entries on the AF Form 66, Submittal Register, to account for all submittals required by the individual sections of the specifications package.
https://www.wbdg.org/ffc/DOD/unified-facilities-guide-specifications-ufgs
2.1.8. UNIFIED FACILITIES CRITERIA (UFC)
a) Unified Facilities Criteria (UFC) provide common requirements across DOD for safety, sustainability, durability, and functionality for DOD facilities. UFC incorporate a combination of consensus building codes, DOD-defined technical and user requirements, and applicable statutory and regulatory requirements.
b) Other than exceptions to the design criteria specifically authorized and defined by DODBC, the criteria referenced by DODBC, and this Section, the contractor shall notify the Contracting Officer (CO) and the 718 CES Project Engineer prior to incorporating standards into the design.
c) Always reference original criteria documents when determining which standards and code apply in all situations.
https://www.wbdg.org/ffc/DOD/unified-facilities-criteria-ufc
2.1.9. ANTITERRORISM/FORCE PROTECTION
a) All designs provided by this project must comply the DOD antiterrorism/force protection requirements per UFC 4-010-01.
https://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc/ufc-4- 010-01
2.1.10. DOD BUILDING CODE
a) UFC 1-200-01, DOD Building Code (DODBC), represents the foundational document of the UFC program in providing general building requirements and overarching criteria, establishing the use of consensus building codes and standards, establishing criteria implementation rules and protocols (including core UFC), and identifying unique military criteria.
b) DODBC describes the hierarchy of all design criteria to be used on this contract and references 2018 International Building Code® (IBC) and 2018 International Existing Building
Section 01 33 16.18 30 Page 6 of 14
Code® (IEBC) as the core of the design criteria hierarchy, and the criteria of specific UFCs supplementing various trade and commercial standards and codes, such as those published by the NFPA or the National Plumbing Code.
c) Ensure all designs provided under this contract comply with the standards and requirements defined in most current version of the DODBC, all criteria referenced by DODBC, and the other requirements defined in this Section.
https://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc/ufc- 1-200-01
2.1.11. UNIFIED MASTER REFERENCE LIST (UMRL)
a) The URML list the regulatory requirements, material standards, and other requirements from all currently active UFGS specifications. Reference the current UMRL to determine which version of a standard or other requirement is currently valid for DOD projects.
https://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs/unified-master-reference-list
b) When incorporating Japan Standards into the project, refer to the list of currently USACE-approved Japan Standards and use limitations, as described in paragraph 1.9 of this SECTION.
2.1.12. DESIGN-BUILD CRITERIA
https://www.wbdg.org/FFC/DOD/UFC/ufc_1_200_01_2019_c1.pdf
2.1.13. DEPARTMENT OF DEFENSE (DOD) CRITERIA
https://www.wbdg.org/ffc/DOD
a) Engineering and Construction Bulletins (ECB)
b) DOD UNIFIED DESIGN GUIDANCE
c) DOD Supplemental Technical Criteria https://www.wbdg.org/ffc/DOD/supplemental-technical-criteria
d) DOD Handbooks https://www.wbdg.org/ffc/DOD/handbooks
e) DOD Manuals https://www.wbdg.org/ffc/DOD/manuals
f) DOD Facilities Pricing Guide https://www.wbdg.org/ffc/DOD/DOD-unit-costarea-cost-factors-and-facilities- pricing-guides
g) DOD Unit Cost/Area Cost Factors and Facilities Pricing Guides, Non-COS Standards
h) Non-COS Standards https://www.wbdg.org/ffc/DOD/non-cos-standards
i) Military Health System (MHS): DOD Space Planning Criteria for Health Facilities https://www.wbdg.org/ffc/dha/mhs-space-planning-criteria-health-
Section 01 33 16.18 30 Page 7 of 14 facilities
j) Military Health System (MHS) Templates https://www.wbdg.org/ffc/DOD/mhs-templates
k) Mil-Std-1691 Construction and Material Schedule for Military Medical, Dental, Veterinary and Medical Research Laboratories https://www.wbdg.org/ffc/DOD/mil-std-1691-military-medical-and-dental-facilities/1691
l) Tri-Services Sustainability Program https://www.wbdg.org/ffc/DOD/tri-services-sustainability-program
m) Federal and Military Specifications and Standards https://www.wbdg.org/ffc/DOD/federal-military-specifications-standards
2.1.14. AIR FORCE (AFCEC) CRITERIA
https://www.wbdg.org/ffc/af-afcec
a) Change to AF New Construction and Major Renovation Certification Requirements https://www.wbdg.org/FFC/AF/POLICY/AF_Standard_Design_Policy.pdf
b) AF Corporate Facilities Standards (AFCFS) https://www.wbdg.org/ffc/af-afcec/corporate-facilities-standards-afcfs
c) Installation Facilities Standards (IFS) N/A
(1) There are no IFS Standards for Kadena or the 18 Wing published at the WBDG website. In lieu of the IFS, use the current version of the Kadena Design Guide (KDG).
(2) Policies and Guidance for AF Design and Construction https://www.wbdg.org/ffc/af-afcec/policies-and-guidance-af-design-and-construction
(3) Standard Designs https://www.wbdg.org/ffc/af-afcec/prototypes-standard-designs
(4) Guidance Documents https://www.wbdg.org/ffc/af-afcec/guidance-documents
(5) Air Force Manuals (AFM) https://www.wbdg.org/ffc/af-afcec/manuals-afm
(6) Engineering Technical Letters (AFETL)
(A) There are currently no active AFETL that apply to the design criteria.
2.1.15. U.S. ACCESS BOARD
https://www.wbdg.org/ffc/usab
2.1.16. FEDERAL & EXECUTIVE GOVERNMENT
a) 10 CFR Part 433 Energy Efficiency Standards for the Design
Section 01 33 16.18 30 Page 8 of 14 and Construction of New Federal Commercial and Multi-Family High-Rise Residential Buildings
b) 10 CFR Part 435 Energy Efficiency Standards for the Design and Construction of New Federal Low-Rise Residential Buildings
c) 10 CFR Part 436, Federal Energy Management and Planning Programs
d) 36 CFR Part 800, Protection of Historic Properties
2.1.17. CONGRESSIONAL ACTS
a) Energy Independence and Security Act of 2007
b) Energy Policy Act of 2005
c) National Energy Conservation Policy Act (NECPA)
2.1.18. EXECUTIVE ORDERS (EO)
a) EO 13693 Planning for Federal Sustainability in the Next Decade https://www.wbdg.org/ffc/fed/executive-orders
2.1.19. FEDERAL FACILITY COUNSEL
a) Green Seal https://www.wbdg.org/ffc/green-seal
b) NIBS Guideline 3-2012 https://www.wbdg.org/FFC/NIBS/nibs_gl3.pdf
2.2. 18 WING UNIQUE REQUIREMENTS
2.2.1. KADENA DESIGN GUIDE (KDG)
a) In place of the Installation Facility Standards (IFS) identified as Air Force (AFCEC) criteria, use the most recent version of the KDG.
b) Beyond providing design guidance concerning esthetic design elements, such as that found in the IFS Standards, the KDG assists designers by providing default and/or preferred selections when several suitable technical design options exist. This serves to optimize long-term facility support by the installation by using equipment types that installation personnel are certified and equipped to maintain. This also ensures maximum compatibility with test equipment and interchangeability of components by limiting the types/sizes of equipment busses, interconnects, and interfaces to those designated in the KDG.
c) Unless guidance in the SOW or project drawings specifically direct otherwise, the DOR shall ensure that final designs are consistent with KDG preferences.
d) Notify the 718 CES project designer in advance if selecting options that differ from the KDG preference.
2.2.2. 18 WING POLICY GUIDELINES
a) Wing-unique specifications, supplements, guidelines, and
Section 01 33 16.18 30 Page 9 of 14 other documents attached to this requirements package supersede corresponding documents available at www.wbdg.org and through SpecsIntact.
b) A&E shall incorporate the applicable elements of the following 18 Wing Policy and Guidelines into the most appropriate numbered SECTION of the final deliverable package for all designs:
(1) 01 01 00-A, 18 WING ADMINSTRATIVE POLICY REQUIREMENTS
(2) 01 33 00-A, SUBMITTAL PROCEDURES
(3) 01 33 16.18 30, 18 WING FACILITY DESIGN CRITERIA
GUIDELINE
2.2.3. 18WING ENVIRONMENTAL SPECIFICATIONS AND SUPPLEMENTS
a) Insert the attached version of the Temporary Environmental Controls specification as-is into the final deliverable package for all construction work:
(1) 01 57 19.01, TEMPORARY ENVIRONMENTAL CONTROLS – 18 WING
b) Do not use the corresponding UFGS or JES versions of the above specification.
c) MILCON and USACE projects shall include the 18 Wing issued version but may supplement it with other versions.
2.2.4. 18 WING ASBESTOS, LEAD-BASED PAINT, PCB, AND MERCURY
SPECIFICATIONS AND SUPPLEMENTS
a) Insert the attached versions of the following specifications and supplements as-is into the final deliverable package for all construction work where each document applies to the anticipated scope of work:
(1) 02 82 00, ASBESTOS MITIGATION
(2) 02 82 00.00 30, ASBESTOS MITIGATION - 18 WING
(3) 02 83 00, LEAD MITIGATION
(4) 02 83 00.00 30, LEAD MITIGATION - 18 WING
(5) 02 84 16.00 30, PCB-CONTAINING BALLASTS AND MERCURY-
CONTAINING LAMPS
b) Include items (1) and (2) as a set, and items (3) and (4) as a set, when applicable.
c) Do not use the corresponding UFGS or JES versions of the above specifications.
d) MILCON and USACE projects shall include the 18 Wing issued versions but may supplement them with other versions.
e) Note that the attached versions may differ in version and content from those issued previously.
2.2.5. AF FORM 66, SUBMITTAL REGISTER
a) Provide a Submittal Register that includes all submittals listed in the individual specifications of the final specification package.
Section 01 33 16.18 30 Page 10 of 14
2.3. LEVELS OF CONSTRUCTION
2.3.1. All designs provided on this contract shall be consistent with the requirements of Permanent Construction, as defined in UFG 1- 200-01, paragraph 1-3.2.1, unless specified otherwise in Section 01 11 00.00 30, STATEMENT OF WORK.
2.4. ENVIRONMENTAL SEVERITY CLASSIFICATION (ESC)
2.4.1. Unless otherwise specifically directed in the contract documents, follow the Environmental Severity Classification (ESC) standard of C51 as listed in UFC 1-200-01, Appendix A, Table A-2, as the basis for design when determining the level of corrosion resistance for piping, equipment, hardware, and items subject to corrosion.
2.4.2. Indicate the same ESC standard in the basis of design and all diagrams, tables, UFGS specifications, and other documents that will comprise the final construction execution package.
2.5. INCORPORATION OF JEGS AND JAPAN STANDARDS
2.5.1. JAPAN EDITED SPECIFICATIONS
a) By default, A&E shall incorporate the criteria of UFC and UFGS specifications into all DOD designs per DODD 4270.5 paragraph 4.7, dated 12 Feb 2005.
b) The US Army Corps of Engineers (USACE), which is the Authority Having Jurisdiction (AHJ) regarding the use of materials meeting Japanese standards for AF construction projects in the Pacific theater, has drafted and authorized the use of the Japan Edited Specifications (JES) in lieu of UFGS specifications, where appropriate. The JES are limited set of modified UFGS specifications that incorporate Japan Industrial Standards (JIS), and many common standards from other Japan Standards Organizations. The JES also includes limited compliance with JEGS requirements.
c) A&E shall incorporate applicable JES into the project specifications and edit the JES accordingly for the project.
d) When incorporating JES into designs, A-E are not expected to provide proof of equivalency between US and Japanese standards through testing or other laboratory analysis unless specifically stated in each JES. The DOR shall document the use of JES standards and the use of Acceptable Alternative Japanese Standards in the Design Analysis.
e) The exceptions for JES use include, but are not limited to, fire and life safety devices and elevator items that do not meet U.S. code and criteria.
f) The ‘Full Japan Edited Specifications (JES 1.2 Zip)’ contains PDF and SpecsIntact versions of the JES set of specifications and the AAJS Backcheck documents listing the equivalencies and limitations of use for Japan standards compared to the US standards.
g) Review and comply with the use requirement listed in the JAPAN DISTRICT DESIGN GUIDE. The most current publication of
Section 01 33 16.18 30 Page 11 of 14 the JES, Version 1.2 dated February 2021, can be downloaded from:
https://www.poj.usace.army.mil/Business-With-Us/References/
2.5.2. THE JAPAN DISTRICT DESIGN GUIDE (JDDG), VERSION 5.1, FEB 2021
a) The JDDG provides guidance and clarity concerning a host of design criteria issues Japan based A&E encounter when designing Air Force projects for execution in Japan.
b) A&E shall use the JDDG as their primary source of Japan regional guidance, followed by the Kadena Design Guide, described later in this section.
2.5.3. THE JAPAN DISTRICT DESIGN GUIDE APPENDIX, VERSION 5, FEB 2021
a) The Japan District Design Guide (JDDG) provides detailed information concerning Japan fire rated gypsum board assemblies, common Japanese and English names for plants, special inspections and designated seismic system, MCIPAC- MPC/Protective Design Center Tech. Report (USMC only), and high-level design network diagrams.
b) The most current publication of the JES, Version 1.2 dated February 2021, can be downloaded from:
https://www.poj.usace.army.mil/Business-With-Us/References/
2.5.4. JAPAN EDITED SPECIFICATION BACKCHECK DOCUMENTS
a) For reference purposes, JES Backcheck documents can be downloaded from:
https://www.wbdg.org/FFC/DOD/HNA/AAJS_BackcheckDocsSubmittal_V1.pdf
2.5.5. JEGS-UFGS PROCEDURAL CONFLICTS
a) In cases where JEGS criteria conflict with standard CONUS procedures (such as regulatory agency notification, hazardous waste disposal, etc.) listed in the stock UFGS specifications that will revised for inclusion in the final design’s specification package, confirm with the 718 CES Design Engineer whether a JEGS-compliant 18 Wing replacement specification or supplement exists.
b) When 18 Wing replacement specifications or supplements exist, use the designated replacement document.
c) When replacement documents do not exist, revise the stock UFGS specification for JEGS compliance and notify the Design Engineer during the 65% Design Review of the revised specification number, and the paragraphs that were revised to incorporate JEGS compliance.
d) By default, the JEGS criteria supersedes the standard DODBC, however, there may be reasons why the DODBC criteria may be preferred on some projects.
e) In cases where it is unclear, request the CO and 718 CES Project Engineer to provide clarification from the Authority Having Jurisdiction (AHJ). Record the AHJ’s final decision in the Basis of Design documents.
Section 01 33 16.18 30 Page 12 of 14
2.6. MANDATORY U.S. STANDARD MATERIALS
2.6.1. All the following materials incorporated into the design and delivered facility shall be those that are certified under the U.S. standards (e.g. UL listed, FM approved, ASTM, etc.) as defined in DOD Building Code, the commercial codes referenced in the UFCs, UFGS specifications, and shall be labeled, as required.
2.6.2. These items shall not be substituted with materials meeting similar Japanese standards (e.g. JIS, JASS, etc.) without the written approval of the 18 CEG Commander:
a) Fire suppression systems, including valves, alarm valves, sprinklers (pipes and fittings of Japanese manufacturer may meet the function requirements). Fire suppression systems includes wet chemical, dry chemical, mist, deluge, pre-action, foam, and clean agent, in addition to standard sprinkler systems.
b) Fire pumps, including motors, controllers, drives, and valves.
c) Fire alarm and mass notification systems, including panels, initiating devices, notification appliances, smoke alarms (conductors and conduits of Japanese manufacturer may meet the functional requirements).
d) Engineering technician requirements for development of fire suppression systems and alarm system shop drawings, calculations, and material submittals.
e) Fire doors, smoke doors, and frames.
f) Fire dampers and smoke dampers.
g) Interior finishes with flame spread and smoke development ratings required for installation of rated assemblies.
h) Insulation with flame spread and smoke development ratings.
i) Fireproofing and fire stopping materials.
j) Plenum rated cables.
k) Domestic water supply piping in the building and plumbing fixtures that directly dispense potable drinking water and require an NSF certification rating. Japanese plumbing fixtures that do not directly dispense potable drinking water are allowed, such as urinals and water closets.
2.7. FACILITIES FOR US NAVY AND US MARINE CORPS
2.7.1. For projects that will be operated by US Navy or US Marine Corps units, include the criteria in FC 1-300-09N Navy and Marine Corps Design Procedures, With Change 6.
https://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc/fc-1- 300-09n
2.8. DEVIATIONS TO CRITERIA
2.8.1. Deviations from life safety, occupational safety, security, antiterrorism, or other criteria required by federal law or
Section 01 33 16.18 30 Page 13 of 14
Department of Defense direction are not permitted unless specifically authorized in legislation or Defense direction.
2.8.2. Approved deviations to criteria apply to a specific facility project and remain in effect indefinitely or until reevaluation/reconfirmation is required by other guidance (AFI, UFC, etc.).
2.8.3. Comply with applicable international agreements, if any. If construction criteria are not addressed in applicable international agreements, follow the more stringent of United States and GOJ criteria.
2.8.4. When the DOD/AF and GOJ disagree on which is more stringent, solutions will be determined by collaboration between the AF Subject Matter Expert (SME), host-nation liaison, and other applicable stake holders (Combatant Command, Department of State, etc.). For conflicts not resolved seek additional assistance from AFCEC/COS.
2.9. CLARIFICATION OF CONFLICT IN DESIGN STANDARDS
2.9.1. In cases where criteria are unclear, or conflicting criteria exist that cannot be resolved through the DODBC guidance or the instructions in this section, bring the issue to the attention of the 718 CES Project Engineer for resolution.
2.9.2. Prior to incorporating any changes not defined in the contract text and/or related design criteria, request the CO provide an official approval in writing from the Authority Having Jurisdiction (AHJ).
2.10. NOTIFICATION OF LIABILITY UNDER JAPAN REGULATIONS OR ACTS
2.10.1. Notify the CO of any situation in which mandatory Japan law or regulations impose a stricter safety requirement than that stipulated by the Government contract which may put the contractor at risk of civil liability for non-compliance with mandatory GOJ requirements.
2.10.2. Draft a notification containing a description of the conflict referencing the Japan regulation, act, or law, by number and title, and submit to the CO. If requested by the CO, provide a technical proposal modifying the criteria to meet the Japan requirements and include the costs. The CO shall make all final determinations concerning changes and reimbursements in accordance with the applicable Federal Acquisition Regulations
(FAR).
2.11. OIL-WATER SEPARATOR PROHIBITION (OWS)
2.11.1. Air Force Policy discourages the use of OWS in new construction except in cases where specifically allowed by JEGS Best Management Practices. Note that even when JEGS warrants inclusion, AF IMSC must approve the use of OWS into any new project.
2.11.2. If including an OWS in any new design, request the 718 CES Environmental Section review its use and obtain AF IMSC approval as soon as possible the design process by submitting drawings and the basis of justification. Record AF IMSC’s final
Section 01 33 16.18 30 Page 14 of 14 decision in the Basis of Design documents. Disapproval may require alternate methods of compliance.
2.12. ADA-COMPLIANT ENTRYWAYS
2.12.1. ADA-compliant entryways in accordance with the DODI 1125.03 [have been waived] [shall be incorporated] on this contract.
2.13. BLIND-OPERATED VENDING MACHINES
2.13.1. Blind-operated vending facilities in compliance with the Randolph–Sheppard Act, 20 U.S.C. § 107 et seq., [have been waived][shall be incorporated] on this contract, when applicable.
End of Section