Attachment 5 Wage Rate Determinations.pdf

PDF 5 MB Posted

Attached to
Blackwell Water Tower Rehab
Solicitation number
12441926Q0001
Issued by

About this file

This document is a General Wage Determination for construction building projects in Wisconsin, issued by the U.S. Department of Labor. The document covers multiple counties and specifies prevailing wage rates for various construction trade workers, including asbestos workers/insulators, bricklayers, carpenters, cement masons, electricians, heat and frost insulators, ironworkers, laborers, millwrights, pipefitters, plumbers, sheet metal workers, and truck drivers.

The wage determination applies to building construction projects that do not include residential construction, and is effective from September 12, 2025. It includes detailed hourly rates and fringe benefits for different job classifications across numerous Wisconsin counties, with variations based on specific geographic areas. The document notes that contracts are subject to the Davis-Bacon Act and Executive Orders 14026 and 13658, which require contractors to pay at least the specified minimum wage rates to workers. Additional details include provisions for hazardous waste premiums and instructions for wage determination appeals.

View the file

Other files

File Type Posted
Questions - Answers 3.pdf PDF
Questions - Answers 2.pdf PDF
Questions - Answers.pdf PDF
Attachment 4 12441926Q0001 SOI.xlsx XLSX spreadsheet
12441926Q0001.pdf PDF
Attachment 2 BLA Water Tower Rehab Specs.pdf PDF
Attachment 3 BLA WT Sustainable Prods.pdf PDF
Attachment 1 BLA Water Tower Rehab Dwgs.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .