Attachment 5 Wage Rate Determinations.pdf
PDF 5 MB Posted
- Attached to
- Blackwell Water Tower Rehab
- Solicitation number
- 12441926Q0001
- Issued by
-
Department of Agriculture Forest Service
About this file
This document is a General Wage Determination for construction building projects in Wisconsin, issued by the U.S. Department of Labor. The document covers multiple counties and specifies prevailing wage rates for various construction trade workers, including asbestos workers/insulators, bricklayers, carpenters, cement masons, electricians, heat and frost insulators, ironworkers, laborers, millwrights, pipefitters, plumbers, sheet metal workers, and truck drivers.
The wage determination applies to building construction projects that do not include residential construction, and is effective from September 12, 2025. It includes detailed hourly rates and fringe benefits for different job classifications across numerous Wisconsin counties, with variations based on specific geographic areas. The document notes that contracts are subject to the Davis-Bacon Act and Executive Orders 14026 and 13658, which require contractors to pay at least the specified minimum wage rates to workers. Additional details include provisions for hazardous waste premiums and instructions for wage determination appeals.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Questions - Answers 3.pdf | ||
| Questions - Answers 2.pdf | ||
| Questions - Answers.pdf | ||
| Attachment 4 12441926Q0001 SOI.xlsx | XLSX spreadsheet | |
| 12441926Q0001.pdf | ||
| Attachment 2 BLA Water Tower Rehab Specs.pdf | ||
| Attachment 3 BLA WT Sustainable Prods.pdf | ||
| Attachment 1 BLA Water Tower Rehab Dwgs.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .