Questions - Answers 3.pdf

PDF 61 KB Posted

Attached to
Blackwell Water Tower Rehab
Solicitation number
12441926Q0001
Issued by

About this file

The document appears to be a section of a contract specification focusing on discharge sampling, testing, and reporting requirements for water tower operations. The contractor is responsible for three key tasks: (1) recording discharge volume for tower draining and flushing water on a daily basis, (2) reporting daily recordings to the Contracting Officer's Representative on a weekly basis for all contract-related discharges, and (3) running bypass discharge through a water flow meter. Water tower flushing and draining calculations will be based on water tower storage changes and flow meter readings.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Does the following include recording the volume of water that is loss through the pressure relief valve while the bypass system is in place? Yes

File details come from the government source that posted it. Updated .