Attachment 5 SSFB IFS .pdf
PDF 55 MB Posted
- Attached to
- Hot Aisle Containment with Server Rack
- Solicitation number
- Not on record
About this file
This document is an attachment related to a federal contract opportunity for the purchase, delivery, and installation of sixteen (16) seismic compliant IT Cabinet Racks in two hot aisle containment (HAC) configurations. The contract requires each HAC to have two rows of four cabinets, for a total of eight cabinets per HAC. The contractor must provide and install various components for the cabinets, including brush grommet rail kits, copper bus bars, vertical cable bar kits, blanking/filler panels, remote power distribution units (rPDUs), rPDU bracket sets, ganging kits, and temperature sensors. The contract also requires the installation of new floor tiles, manually adjustable-flow floor vents, and pre- and post-installation measurements of airflow, temperature, and power within the facility. All questions are due by September 17, 2024, and the contract is being issued by the Department of the Air Force Space Command.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Question Answered.docx | DOCX document | |
| Attachment A - Mod Build-Out Parts List_v3_for RFQ.pdf | ||
| Attachment 1 Clauses and Provisions.pdf | ||
| Attachment 3-Quote Worksheet.xlsx | XLSX spreadsheet | |
| DCG_Combo.pdf | ||
| Attachment 2 Statement of Work .pdf | ||
| Attachment 8 Drawing.pdf | ||
| Attachment 4 Parts List.pdf | ||
| Attachment 6 HVAC Study.pdf | ||
| Attachment 7 Seven (7) Tile Pitch.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .