Attachment 5 - Section M (Draft Posted 4-3-2024).pdf
PDF 214 KB Posted
- Attached to
- SSC/AATS SAFS 2. 1 Federal contract opportunity
- Solicitation number
- FA881124RB003(FA881124FB005)
About this file
This document provides an evaluation criteria for a federal contract opportunity to provide Acquisition and Financial Support Services (SAFS-2.1) for Assured Access To Space. The opportunity will be awarded as a small business set-aside contract using the General Services Administration (GSA) OASIS Small Business Pool 5B vehicle. The period of performance is anticipated to begin in fiscal year 2025 for an indefinite delivery indefinite quantity contract that will be firm fixed price. Evaluation will be based on three factors: RFP compliance, technical, and cost/price. The technical factor is most important and will be evaluated based on the offeror's technical approach, responses to two problem statements, and responses to two scenarios related to strategic analysis, acquisition planning and strategic communications. The cost/price factor will evaluate total evaluated price, price reasonableness, compliance with limitations on subcontracting, and whether pricing is unbalanced. Award will be made on a best value tradeoff basis.
View the file
Other files for this federal contract opportunity
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Fair Opportunity Proposal Request (FOPR)
Attachment 5, (FA8811-24-R-B003)
Evaluation Criteria
Acquisition and Financial Support Services (SAFS-2.1)
For
Assured Access To Space
Table of Contents
1.0 Basis for Awarding Task Order
2.0 Reserved
3.0 Interchanges
4.0 Evaluation Factors/Subfactors
4.1 Relative Importance of Factors/Subactors and Evaluation Approach/Ratings
4.2 Solicitation Requirements
5.0 FACTOR 1 – RFP COMPLIANCE
5.1 Reserved
5.2 Model Task Order
5.3 Reserved
5.4 Current Facility Clearance
5.5 OCI Mitigation Plan
5.6 Total Compensation Plan
6.0 FACTOR 2 – TECHNICAL
6.1 Subfactor 1 – Technical Approach
6.2 Subfactor 2 – Cost Estimate Problem Statement #1 and #2 Responses ......... Error! Bookmark not defined.
6.3 Subfactor 3 – Strategic Cell, Acq Planning, and Strategic Comm Scenario #1 and #2 Responses .. 8
7.0 FACTOR 3 – COST/PRICE
7.1 Total Evaluated Price (TEP)
7.2 Price Reasonableness
7.3 Limitation on Subcontracting
7.4 Unbalanced Pricing
8.0 RESPONSIBILITY DETERMINATION
ATTACHMENT 5: EVALUATION CRITERIA
1.0 Basis for Awarding Task Order
This effort will be awarded to the Offeror whose proposal satisfies the requirements of the Instructions to
Offerors (ITO), the established Evaluation Criteria, and provides the best value to the Government in accordance with Federal Acquisition Regulation (FAR) Part 16.505(b). Award of the Task Order (TO) will be accomplished using the Best Value Tradeoff method as allowed under FAR part 16.505. The competitive award will reflect the contract line-item number structure reflected in the model task order.
The Government seeks to award to the Offeror who provides Space Systems Command (SSC) Assured
Access To Space (AATS) an optimal approach that will effectively and efficiently meet the requirements described in the AATS/SAFS-2.1 TO Performance Work Statement (PWS). This may result in an award to other than the lowest priced offeror, or other than the highest technically rated offeror whose proposal is deemed acceptable, where the decision is consistent with the evaluation factors/subfactors, and the Decision
Authority (DA) reasonably determines the offeror provides the best value.
While the Government Evaluation Team will strive for maximum objectivity, the decision process, by its nature, is subjective and, therefore, professional judgment is implicit throughout the entire process. While the DA may use reports and analyses prepared by others, the decision shall represent the DA's independent judgment.
By proposing to this solicitation, the Offeror consents to all solicitation requirements including: terms and conditions and technical requirements. Failure to comply with all of the conditions listed in this Evaluation
Criteria and ITO, may result in an offer being determined ineligible for award.
2.0 Reserved
3.0 Interchanges
In accordance with FAR 16.505, the Government will evaluate proposals for this fair opportunity competition. The Government intends to award a TO without Interchanges. However, the Government reserves the right to conduct Interchanges if in the Government’s best interest.
Interchanges are fluid interaction(s) between the CO and the Offerors that may address any aspect of the proposal and may or may not be documented in real time. The Government intends to make an award based on the initial proposal submissions without conducting Interchanges. Therefore, each offer should contain the Offeror’s best terms from a price and technical standpoint.
However, the Government reserves the right to hold Interchanges using Interchange Notices (INs) if, during the evaluation, it is determined to be in the best interest of the Government. Although the Government reserves the right to have interchanges, the Government reserves the right to not conduct the interchange process regarding the problem statements and scenarios submitted for Factor 2, subfactors 2 and 3.
Offeror responses to INs will be considered in making the order selection decision. Interchanges may be conducted with one, some, or all offerors as the Government is not required to conduct Interchanges with any or all Offerors responding to this FOPR.
4.0 Evaluation Factors/Subfactors
The following evaluation Factors and Subfactors will be used to evaluate each proposal as seen in Tables
4-1 to 4-3.
Table 4-1 Evaluation Factors/Subfactors
EVALUATION FACTORS EVALUATED RATING
Factor 1 - RFP Compliance
Model Task Order
Acceptable/Unacceptable
Current Facility Clearance
OCI Mitigation Plan
Total Compensation Plan
Factor 2 - Technical
Subfactor 1 – Technical Approach
(Personnel Management Plan and
Contractor Staffing Matrix)
Outstanding/
Good/
Acceptable/
Unacceptable
Subfactor 2 - Problem Statement
#1 & #2 Responses
Outstanding/
Good/
Acceptable/
Unacceptable
Subfactor 3 – Scenario #1 & #2
Responses
Outstanding/
Good/
Acceptable/
Unacceptable
Factor 3 – Cost/ Price
TEP Used in best-value trade-off with
Factor 2 - Technical.
Price Reasonableness Yes / No
Limitation on Subcontracting Yes / No
Unbalanced Pricing Yes / No
4.1 Relative Importance of Factors/Subfactors and Evaluation Approach/Ratings
The relative importance of each factor/subfactor are as follows: Factor 2 - Technical is significantly more important than Factor 3 - Cost/Price. Within Factor 2, the three subfactors will each have their own ratings.
Subfactor 1 is significantly more important than Subfactors 2 and 3 combined, and Subfactors 2 and 3 are of equal importance.
The Government evaluation team will first evaluate Factor 1- RFP Compliance and if Factor 1 is rated
“unacceptable”, the proposal may be eliminated from the competition without any further evaluation and thus ineligible for award. If Factor 1 is rated “acceptable”, the evaluation team will then evaluate each
Factor 2 Subfactor. If any Factor 2 Subfactor is evaluated as “unacceptable” this will render the entire proposal unacceptable and, therefore, ineligible for award.
For Factor 3 – Cost/Price, the Government will evaluate the proposal for reasonableness, unbalanced pricing, and compliance with FAR Clause 52.219-14 – Limitation on Subcontracting. A proposal will be ineligible for award for this Task Order if the Government determines the proposed price is unreasonable or the Offeror is not in compliance with FAR Clause 52.219-14. An offer may be rejected if the Government determines the lack of balance poses an unacceptable risk to the Government.
A tradeoff will be made between Factor 2 - Technical Subfactors and Factor 3- Cost/Price where Factor 2 is significantly more important than Factor 3 - Cost/Price. A tradeoff based on the relative importance of factors/Subfactors may result in an award to other than the lowest priced offeror or other than the highest technically rated offeror where the decision is consistent with the evaluation factors and the Decision
Authority determines the awarded approach is in the best interest of the Government. The offeror is reminded that, in accordance with paragraph 3.0, the Government intends to award this task order based on the initial proposal, as received, without Interchanges.
Table 4-2 RFP Compliance Ratings
Table 4-3 Technical Ratings
Factor 1 – RFP Compliance
Rating Description
Acceptable Proposal clearly meets the minimum requirements.
Unacceptable Proposal does not clearly meet the minimum requirements.
Factor 2- Technical (Applied to each Subfactor)
Rating Description
Outstanding
• Proposal demonstrates an exceptional approach and understanding of the requirements;
• Contains multiple strengths and/or at least one significant strength; and
• Risk of unsuccessful performance is very low
Good
• Proposal demonstrates a thorough approach and understanding of the requirements;
• Contains at least one strength or significant strength; and
• Risk of unsuccessful performance is low
Acceptable
• Proposal demonstrates an adequate approach and understanding of the requirements; and
• Risk of unsuccessful performance is no worse than moderate
Unacceptable
• Proposal does not meet requirements of the solicitation, thus, contains one or more deficiencies; or
• Risk of unsuccessful performance is high.
• Proposal is un-awardable.
4.2 Solicitation Requirements
Offerors are required to meet or exceed all solicitation requirements, such as terms and conditions, organizational conflict of interest analysis results, representations and certifications, and technical requirements, in addition to those identified as Factors or Subfactors. Failure to comply with the terms and conditions of the solicitation may result in the Offeror being ineligible for award. The Government reserves the right to cross-reference between volumes and sections of volumes to support proposal evaluation.
5.0 FACTOR 1 – RFP COMPLIANCE
See Table 4-2 for Factor 1 ratings.
5.1 Reserved
5.2 Model Task Order
Offeror’s will be evaluated on whether they accurately complete/sign the model task order in accordance with the ITO.
5.3 Reserved
5.4 Current Facility Clearance
Offeror’s will be evaluated on whether they provided the Current Facility Clearance in accordance with the ITO. Additionally, the Offeror’s proposal will be evaluated on whether it is consistent with the DD 254 requirements in the RFP.
5.5 OCI Mitigation Plan
Offeror’s will be evaluated on whether they provided an OCI Disclosure and Analysis Form in accordance with ITO Attachment 4-8. In the event there are actual or potential OCIs, the Offeror will be evaluated on whether they provided an OCI Mitigation Plan along with a completed OCI
Mitigation Plan Checklist in accordance with ITO Attachment 4-8, noting any current or foreseen
OCI concerns.
NOTE: Whether the OCI Mitigation Plan adequately addresses all actual or potential OCIs by clearly explaining how the OCI will be avoided, mitigated, or neutralized will be assessed/considered as part of the CO’s contractor responsibility determination.
5.6 Total Compensation Plan
Offeror’s will be evaluated on whether they, as well as their subcontractors, provide a Total
Compensation Plan for all professional employee labor categories proposed to perform the effort in accordance with the ITO Paragraph 5.6. Offeror’s will also be evaluated on whether they provided a list of subcontractors to include points of contact and phone numbers of who will be submitting professional employee compensation packages to the Government. Failure by the prime or subcontractors to submit their Total Compensation Plan may result in the proposal being rated unacceptable under this Factor.
NOTE: Whether the Total Compensation Plan demonstrates a sound management approach and understanding of the contract requirements with proposed salary and fringe benefits that will facilitate the recruitment and retention of employees will be assessed/considered as part of the CO’s contractor responsibility determination.
6.0 FACTOR 2 – TECHNICAL
The Technical Volume is comprised of the Offeror’s responses to the following ITO Attachments and will be evaluated at the Sub-factor level.
Subfactor 1 – Technical Approach: Personnel Management Plan (ITO Attachment 4-1) and
Contractor’s Staffing Matrix (ITO Attachment 4-2)
- Subfactor 2 – Problem Statement Responses: Problem Statement #1 Response (ITO
Attachment 4-3) and Problem Statement #2 Response (ITO Attachment 4-4)
- Subfactor 3 – Scenario Responses: Scenario 1 # Response (ITO Attachment 4-5) and Scenario
#2 Response (ITO Attachment 4-6).
The Government may assign significant strengths, strengths, weaknesses, significant weaknesses, or deficiencies to the Offeror’s proposal, which are defined below:
- Significant strength - An aspect of an Offeror's proposal with appreciable merit or that will exceed specified performance or capability requirements to the considerable advantage of the
Government during contract performance.
- Strength - An aspect of an Offeror’s proposal with merit or that will exceed specified performance or capability requirements to the advantage of the Government during contract performance.
- Weakness - A flaw in the proposal that increases the risk of unsuccessful contract performance.
- Significant weakness - A flaw in the proposal that appreciably increases the risk of unsuccessful contract performance.
- Deficiency - A material failure of a proposal to meet a Government requirement or a combination of significant weaknesses in a proposal that increases the risk of unsuccessful contract performance to an unacceptable level.
When evaluating each Technical Subfactor, the Government may find certain areas that are advantageous or considerably advantageous to the Government, such as the speed of transition/on-ramping beyond minimum requirements; qualification requirements proposed that are beyond
Minimum Qualification Requirements; the number of FTEs proposed beyond the Minimum FTE
Requirements, etc. in the Technical Approach or other subfactors. The Government reserves the right to incorporate significant strengths and strengths into the contract. When the significant strength or strength is incorporated into the contract, it will become a requirement in the contract throughout execution. For example, if the offeror proposes a Contactor Staffing Matrix with the number of FTEs beyond the minimum requirements, the Government will attach the Contractor’s
Staffing Matrix to the successful offeror’s awarded contract, and it will be considered the minimum requirements throughout contract performance. In execution, the contractor may staff higher than the minimum requirements but not below the minimum requirements.
If the Offeror receives unacceptable on any subfactor, they will be deemed un-awardable.
6.1 Subfactor 1: Technical Approach
See Table 4-3 for rating criteria for this Subfactor.
The Government will evaluate:
- The extent to which the offeror’s Personnel Management Plan meets or exceeds RFP requirements, including the Government Minimum Qualification Requirements, and is credible;
- The extent to which the offerors Personnel Management Plan demonstrates efficient on-ramp of personnel so that all Key Personnel are in place on the first day of task order performance and all other personnel are in place NLT 30 calendar days after performance start; and
- The extent to which the proposed Contractor Staffing Matrix meets or exceeds RFP requirements including the Government’s Minimum FTE Requirements identified in ITO
Attachment 4-2 Staffing Matrix.
6.2 Subfactor 2: Cost Estimate Problem Statement #1 & #2 Responses
The Government will evaluate the extent to which the Offeror’s responses are accurate, complete and in compliance with all applicable regulations for the Cost Estimation Problem Statements.
See ITO Attachment 4-3 & 4-4 for details on the problem statements.
6.3 Subfactor 3: Strategic Cell, Acquisition Planning and Strategic Communications Scenario #1 and Scenario #2 Responses
Scenario 1: The Government will evaluate the extent to which the Offeror’s summarized strategic analysis of possible acquisition strategies, and the stakeholder engagement plan is likely to achieve stated goals.
Scenario 2: The Government will evaluate the extent to which the Offeror’s response develops an engagement product that will achieve the strategic messaging campaign goals.
See ITO Attachment 4-5 & 4-6 for details on the scenarios.
7.0 FACTOR III – COST/PRICE
The Government will evaluate the Offeror’s Cost/Pricing Matrix to ensure Reasonableness, compliance with Limitations on Subcontracting, and the absence of Unbalanced Pricing. The
Government will compute a Total Evaluated Price (TEP) which will be used by the Task Order
Decision Authority in making the best value determination.
See Table 4-1 for rating criteria for this Factor.
7.1 Total Evaluated Price (TEP)
For purposes of evaluation, the Total Evaluated Price (TEP) for each proposal is calculated as follows: the sum of the amounts for all FFP labor CLINs, Cost Reimbursable ODC CLINs, and
Cost Reimbursable GSA Contract Access Fee CLINs for the basic period and all option periods.
Evaluation of the options shall not obligate the Government to Exercise the options.
7.2 Price Reasonableness
For a price to be reasonable, it must represent a price to the Government that a prudent person would pay in the conduct of competitive business, in effect, not unreasonably high. Normally, price reasonableness is established through cost and price analysis techniques as described in FAR
15.404-1. For additional information on determining reasonableness see FAR 31.201-3. In accordance with FAR 15.403-3, the Government may require the submission of Data Other Than
Certified Cost or Pricing Data to the extent necessary to support a determination of a fair and reasonable price.
A price analysis will be conducted in accordance with FAR 15.404-1 in order to ensure a fair and reasonable price has been proposed. The proposal will be ineligible for award for this Task Order if the price is determined as unreasonable.
7.3 Limitation on Subcontracting
The Government will evaluate the Offeror’s proposal to ensure that the proposal complies with
FAR Clause 52.219-14. The Offeror will be determined non-responsive and ineligible for award if this criterion is not met.
7.4 Unbalanced Pricing
Offerors are cautioned against submitting a materially unbalanced offer. The Government will analyze offers to determine if they are unbalanced with respect to prices for separately priced line items despite an acceptable Total Evaluated Price (TEP). Unbalanced pricing exists when, despite an acceptable TEP, the price of one or more items is significantly overstated or understated as indicated by the application of price analysis techniques. An offer may be rejected if the
Government determines the lack of balance poses an unacceptable risk to the Government (FAR
15.404-1(g)).
8.0 RESPONSIBILITY DETERMINATION
No award shall be made unless the Procuring Contracting Officer (PCO) makes an affirmative determination of responsibility. To be determined responsible, an Offeror shall:
- Meet the general standards described in FAR 9.104-1;
- Provide an OCI Mitigation Plan that adequately addresses all actual or potential OCIs by clearly explaining how the OCI will be avoided, mitigated, or neutralized.
- Provide a Total Compensation Plan that demonstrates a sound management approach and understanding of the contract requirements with proposed salary and fringe benefits that will facilitate the recruitment and retention of employees.