Attachment 4-3 - Problem Statement 1 (Draft Posted 4-4-2024).pdf
PDF 113 KB Posted
- Attached to
- SSC/AATS SAFS 2. 1 Federal contract opportunity
- Solicitation number
- FA881124RB003(FA881124FB005)
About this file
This presolicitation notice provides details for the Space Systems Command Assured Access to Space Acquisition and Financial Support Task Order 2.1. The Space Force intends to issue a total small business set-aside competitive solicitation using the GSA OASIS SB Pool 5B IDIQ contract vehicle. The solicitation will seek advisory and assistance services that are non-personal in nature to support the SSC space development and acquisition mission. Services include program management, consulting, logistics, professional engineering, financial services, and IT support. The period of performance is anticipated to begin in fiscal year 2025 with a firm fixed price contract. Interested parties must submit any comments on the draft solicitation by 1200L on March 18, 2024. Only contractors holding a prime contract under GSA OASIS SB Pool 5B will be considered for award.
View the file
Other files for this federal contract opportunity
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Fair Opportunity Proposal Request (FOPR)
(FA8811-24-R-B003)
SSC/AATS
Attachment 4-3 Problem Statement #1
Problem Statement. Offeror shall demonstrate their understanding of Section 3.2 of the PWS requirements by producing a Space Force Program Office Estimate that provides accurate calculations, insightful analysis and adequate documentation using the following parameters:
I. Estimate #1
1. Estimate Description: This risk-adjusted estimate is for a launch vehicle capable of placing an 8,000 lbs. payload into Geosynchronous Transfer Orbit (GTO). Assume the launch vehicle is in the Post Milestone-C production phase of manufacturing and on its 3rd re-flight (4th flight total) of the same re-usable booster.
2. Input technical parameters:
a. Engine Thrust: 330,000 lbs.
b. Engine ISP: 349
c. Payload Fairing Volume: 2,500 ft3
d. Total Avionics Empty Weight: 1,600 lbs.
e. Main Stage Structure Empty Weight: 105,000 lbs.
f. Second Stage Structure Empty Weight: 6,500 lbs.
3. Cost Estimate shall be submitted in Microsoft Excel format and reported at the mean.
4. Provide your Estimate #1 response as a separate standalone Microsoft Excel workbook. The workbook shall be fully self-contained with no data links outside of the workbook. Linking cells to other tabs within the workbook is acceptable:
a. Leave all formulas intact
b. Document your sources
c. Fully explain any Cost Estimating Relationships (CERs)
d. Provide Ground Rules & Assumptions as part of your hardcopy proposal
e. Provide risk parameters and justification
f. Provide an estimate for Other Government Costs (OGC)
g. Do Not embed macros
h. All Excel sheets should be unlocked
File details come from the government source that posted it. Updated .