This document contains a past performance questionnaire for a prospective contractor under Solicitation Number 70Z02320RACB00700 for the Cutter Boat Over-The-Horizon V requirement. The United States Coast Guard seeks to procure this fifth generation cutter boat. The past performance questionnaire requests a reference to assess the prospective contractor's performance on a prior contract across categories such as quality, schedule, management, and regulatory compliance. It defines rating levels from exceptional to unsatisfactory and provides fields for the reference to enter a rating, justification, contract details including award and completion dates, total and current dollar values, and a recommendation on whether to use the contractor for similar requirements.

View the file

Other files

File Type Posted
Amendment A00002 Attachment 3 - CB-OTH_V_Pricing_Worksheet.xlsx XLSX spreadsheet
Amendment A00002 Attachment 7_RFP 70Z02320RACB00700_CB-OTH_V_Solicitation Provisions.pdf PDF
Amendment A00002 70Z02320RACB00700 SF-30 10-01-20.pdf PDF
Amendment A00001 Attachment 3 - CB-OTH_V_Pricing_Worksheet.xlsx XLSX spreadsheet
Amendment A00001 Attachment 8 - Questions or Clarifications Form.pdf PDF
Amendment A00001 Attachment 10 - CG_Lineweight.zip ZIP file
Amendment A00001 Attachment 9 - Davit Falls Pictures.pdf PDF
Amendment A00001 70Z02320RACB00700 SF30- 09-11-2020.pdf PDF
Amendment A00001 Attachment 1-Specification.pdf PDF
Attachment 1_RFP_70Z02320RACB00700_CB-OTH_V_Specification - Final.pdf PDF
Attachment 2-3_GFI_13_Video_DavitOpsFromBridge.mp4 MP4 file
Attachment 7_RFP 70Z02320RACB00700_CB-OTH_V_Solicitation Provisions - Final.pdf PDF
RFP 70Z02320RACB00700_CB-OTH_V - Final.pdf PDF
Attachment 2-6_GFI_16_Video_FRC.mp4 MP4 file
Attachment 2-1_RFP 70Z02320RACB00700_CB-OTH_V_GFI_1-11- Final.zip ZIP file
Attachment 3_RFP 70Z02320RACB00700_CB-OTH_V_Pricing_Worksheet - Final.xlsx XLSX spreadsheet
Attachment 2-2_GFI_12_Video_DavitOpsFromBoat.mp4 MP4 file
Attachment 4_RFP 70Z02320RACB00700_CB-OTH_V_Compliance_Matrix - Final.xlsx XLSX spreadsheet
Attachment 2-5_GFI_15_Video_DavitOpsPiP2.mp4 MP4 file
Attachment 2-4_GFI_14_Video_DavitOpsPiP.mp4 MP4 file
Attachment 6_RFP 70Z02320RACB00700_CB-OTH_V_USCG_Safe_Operating_Envelope_Full-Scale_Trials_Results_July_2016 - Final.pdf PDF
Attachment 2-7_GFI_17_Video_NSC.mp4 MP4 file
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 5 Past Performance Questionnaire Solicitation Number: 70Z02320RACB00700

Please provide your assessment of the prospective offeror’s level of past performance on a contract for which you were the reference. Please fill in the below tables and choose the appropriate rating from the drop-down list using the definitions on page two and provide justification for that rating.

Prospective offeror or evaluator may fill out page one. Submit the questionnaire by the proposal due date to: CG-9123BoatBuy@uscg.mil.

Contractor Being Evaluated Company/Government Agency Completing the Questionnaire

Period of Performance Being Assessed

Contract Award Date Order Number (if applicable)

Contract Completion Date Total Dollar Value (includes unexercised options; ceiling amount for IDIQ) Current Dollar Value (current obligated amount) Project Title Contract Effort Description (Identify the key requirements and/or type of effort. The description should be detailed enough so that it can be used in determining the relevance of this program or project. Address the complexity of the contract/order effort and the overall technical risk associated with accomplishing the effort. Ensure acronyms are identified. Provide a complete description of the contract/order effort that identifies key technologies, components, subsystems, and requirements.

Address annual production quantity. For task/ delivery order contracts, state the number of orders issued during the period, the number of orders completed during the period, and the number of orders that remain active.)

Evaluator Email and Phone

Contract Number

Evaluator Name mailto:CG-9123BoatBuy@uscg.mil mailto:CG-9123BoatBuy@uscg.mil

Rating Definition Justification Exceptional Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective

To justify an Exceptional rating, identify multiple significant events and state how they were of benefit to the Government. A singular benefit, however, could be of such magnitude that it alone constitutes an Exceptional rating.

Also, there should have been NO significant weaknesses identified.

Very Good Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with some minor problems for which corrective actions taken by the contractor was effective.

To justify a Very Good rating, identify a significant event and state how it was a benefit to the Government. There should have been no significant weaknesses identified.

Satisfactory Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.

To justify a Satisfactory rating, there should have been only minor problems, or major problems the contractor recovered from without impact to the contract/order. There should have been NO significant weaknesses identified. A fundamental principle of assigning ratings is that contractors will not be evaluated with a rating lower than Satisfactory solely for not performing beyond the requirements of the contract/order.

Marginal Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being evaluated reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.

To justify Marginal performance, identify a significant event in each category that the contractor had trouble overcoming and state how it impacted the Government. A Marginal rating should be supported by referencing the management tool that notified the contractor of the contractual deficiency (e.g., management, quality, safety, or environmental deficiency report or letter).

Unsatisfactory Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains a serious problem(s) for which the contractor’s corrective actions appear or were ineffective.

To justify an Unsatisfactory rating, identify multiple significant events in each category that the contractor had trouble overcoming and state how it impacted the Government. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating. An Unsatisfactory rating should be supported by referencing the management tools used to notify the contractor of the contractual deficiencies (e.g., management, quality, safety, or environmental deficiency reports, or letters).

Category and Description Rating (drop down) Justification Quality of Product or Service Contractor’s conformance to contract/order requirements, specifications and standards of good workmanship.

Choose a Rating

Schedule. Assess the timeliness of the contractor against the completion of the contract, task orders, milestones, delivery schedules, and administrative requirements.

Choose a Rating

Management. Assess the integration and coordination of all activity needed to execute the contract/order, specifically the timeliness, completeness and quality of problem identification, corrective action plans, proposal submittals, the contractor’s history of reasonable and cooperative behavior (to include timely identification of issues in controversy), customer satisfaction, timely award and management of subcontracts.

Choose a Rating

Regulatory Compliance Consider failure to report in accordance with contract terms and conditions, late or nonpayment to subcontractors, trafficking violations, tax delinquency, defective cost or pricing data, terminations, suspension and debarments.

Assess compliance with all terms and conditions in the contract/order relating to applicable regulations and codes, Consider aspects of performance such as compliance with financial, environmental, safety, and labor regulations as well as any other reporting requirements in the contract terms and conditions.

Choose a Rating

Given what I know today I Choose a Recommendation recommend them for similar requirements.

QualityOfProductorServiceJustification:
ScheduleJustification:
ManagementJustification:
RegulatoryComplianceJustification:
RecommendationJustification:
QualityOfProductOrServiceDropdown: [Choose A Rating]
ScheduleDropdown: [Choose A Rating]
ManagementDropdown: [Choose A Rating]
RegulatoryComplianceDropdown: [Choose A Rating]
RecommendationDropdown: [Choose a Recommendation]
Contract Effort Description Identify the key requirements andor type of effort The description should be detailed enough so that it can be used in determining the relevance of this program or project Address the complexity of the contractorder effort and the overall technical risk associated with accomplishing the effort Ensure acronyms are identified Provide a complete description of the contractorder effort that identifies key technologies components subsystems and requirements For taskdelivery order contracts state the number of orders issued during the period the number of orders completed during the period and the number of orders that remain active:
Project Title:
Contractor Being Evaluated:
CompanyGovernment Agency Completing the Questionnaire:
Total Dollar Value includes unexercised options ceiling amount for IDIQ:
Current Dollar Value current obligated amount:
Evaluator Name:
Evaluator Email and Phone:
Contract Completion Date:
Contract Award Date:
Order Number if applicable:
Contract Number:
Period of Performance Being Assessed:

File details come from the government source that posted it. Updated .