This is a Schedule of Items (SOI) template spreadsheet for Task Order Project Requests (TOPRs) under $100,000 for Region 2 Road Maintenance and Forest Maintenance/Support Services. The template lists 76 line items across various maintenance categories including snow removal, furnished equipment (excavators, loaders, dozers, etc.), flagging operations, road maintenance, surface treatments, drainage work, vegetation management, barrier/gate maintenance, and signage work.

The document indicates that some line items will use pre-established MATOC procurement prices while others will have pricing determined "PER TASK ORDER." The template is designed to be filled in by the Contracting Officer after award based on Administrative Units and MATOC Proposal SOIs. The document relates to solicitation 1282B125R0003 from the USDA Forest Service, which includes an upcoming information session scheduled for December 19, 2024 from 1300-1500 Mountain time.

View the file

Other files

File Type Posted
SF30 1282B125R0003 A0004.pdf PDF
SF30 1282B125R0003 A0003.pdf PDF
SF30 1282B125R0003 A0002.pdf PDF
1282B125R0003.pdf PDF
1282B125R0003 QA 1.docx DOCX document
SF 30 A00001.pdf PDF
Solicitation_Update_20241218.docx DOCX document
ATTACHMENT 3 R2RM_Service Specs_20241203.docx DOCX document
ATTACHMENT 4 R2RM_AdminUnitsTable_20241127.xlsx XLSX spreadsheet
ATTACHMENT 2 R2RM_SOI_MATOC_Proposal_20241127.xlsx XLSX spreadsheet
1282B125R0003.pdf PDF
ATTACHMENT 7 FORM Equipment Cleaning Inspection Form_20241203.pdf PDF
ATTACHMENT 1 WAGE DETERMINATION ARAPAHOE CO.pdf PDF
ATTACHMENT 8 PAST PERFORMANCE QUESTIONNAIRE.docx DOCX document
ATTACHMENT 6 R2RM_SOI_for_TOPRs_Over 100k_20241127.xlsx XLSX spreadsheet
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Road Mx SOI

R2 Road Maintenance and Other Forest Maintenance/Support Services
Schedule of Items for Task Order Project Requests (TOPRs)

Estimated Value UNDER $100,000

Prices apply to work within Administrative Unit:[(Will be filled in by CO after award based on the Administrative Units and the MATOC Proposal SOI(s)]
Description of Offered ItemQuantityUnitUnit PriceAmount
803(1)Snow Removal - Single Lane0MIPER TASK ORDERPER TASK ORDER
803(2)Snow Removal - Double Lane0MIPER TASK ORDERPER TASK ORDER
803(3)Snow Removal0LSPER TASK ORDERPER TASK ORDER
803(4)Snow Removal0EAPER TASK ORDERPER TASK ORDER
807(1)Furnished Equipment, Large Excavator0HourPER TASK ORDERPER TASK ORDER
807(2)Furnished Equipment, Medium Excavator0HourPER TASK ORDERPER TASK ORDER
807(3)Furnished Equipment, Small Excavator0HourPER TASK ORDERPER TASK ORDER
807(4)Furnished Equipment, Mini Excavator0HourPER TASK ORDERPER TASK ORDER
807(5)Furnished Equipment, Backhoe0HourPER TASK ORDERPER TASK ORDER
807(6)Furnished Equipment, Wheel Loader0HourPER TASK ORDERPER TASK ORDER
807(7)Furnished Equipment, Grader0HourPER TASK ORDERPER TASK ORDER
807(8)Furnished Equipment, Dump Truck0HourPER TASK ORDERPER TASK ORDER
807(9)Furnished Equipment, Belly Dump0HourPER TASK ORDERPER TASK ORDER
807(10)Furnished Equipment, Brush Cutter0HourPER TASK ORDERPER TASK ORDER
807(11)Furnished Equipment, Roller0HourPER TASK ORDERPER TASK ORDER
807(12)Furnished Equipment, Small Dozer0HourPER TASK ORDERPER TASK ORDER
807(13)Furnished Equipment, Medium Dozer0HourPER TASK ORDERPER TASK ORDER
807(14)Furnished Equipment, Skid Steer0HourPER TASK ORDERPER TASK ORDER
807(15)Furnished Equipment, Water Truck (2000 Gallons)0HourPER TASK ORDERPER TASK ORDER
807(16)Furnished Equipment, Water Truck (4000 Gallons)0HourPER TASK ORDERPER TASK ORDER
807(17)Furnish Equipment, Mobile Welder0HourPER TASK ORDERPER TASK ORDER
807(18)Furnish Equipment, Non-Standard Attachment0HourPER TASK ORDERPER TASK ORDER
808(1)Single Flagger Operation0HourPER MATOC PROCUREMENT PRICEPER MATOC PROCUREMENT PRICE
808(2)Dual Flagger Operation0HourPER MATOC PROCUREMENT PRICEPER MATOC PROCUREMENT PRICE
808(3)Variable Message Board(s)0DayPER TASK ORDERPER TASK ORDER
811(1)Maintain Passenger Vehicle Road - Drainage and Roadway0MIPER MATOC PROCUREMENT PRICEPER MATOC PROCUREMENT PRICE
811(2)Maintain Passenger Vehicle Road - Roadway, No Drainage0MIPER MATOC PROCUREMENT PRICEPER MATOC PROCUREMENT PRICE
811(3)Maintain High Clearance Vehicle Roads - Drainage and Roadway0MIPER MATOC PROCUREMENT PRICEPER MATOC PROCUREMENT PRICE
811(4)Maintain High Clearance Vehicle Roads - Drainage Maintenance Only0MIPER MATOC PROCUREMENT PRICEPER MATOC PROCUREMENT PRICE
811(5)Road Surface Compaction, Method (FILL IN "A" or "B")0MIPER TASK ORDERPER TASK ORDER
812(1)Surface Stabilization Single Lane, Application Rate (FILL IN)0MIPER TASK ORDERPER TASK ORDER
812(2)Surface Stabilization Double Lane, Application Rate (FILL IN)0MIPER TASK ORDERPER TASK ORDER
813(1)Spot Surfacing, Gradation (FILL IN), Compaction Method (FILL IN “A” or “B”)0CYPER TASK ORDERPER TASK ORDER
813(2)Spot Surfacing, Gradation (FILL IN), Compaction Method (FILL IN “A” or “B”)0TonPER TASK ORDERPER TASK ORDER
813(3)Riprap, Size (FILL IN)0CYPER TASK ORDERPER TASK ORDER
813(4)Boulders, Size (FILL IN)0CYPER TASK ORDERPER TASK ORDER
814(1)Pothole Patching0TonPER TASK ORDERPER TASK ORDER
814(2)Skin Patching0TonPER TASK ORDERPER TASK ORDER
814(3)Crack Sealing0LFPER TASK ORDERPER TASK ORDER
814(4)Paved Surface Cleaning Single Lane0MIPER MATOC PROCUREMENT PRICEPER MATOC PROCUREMENT PRICE
814(5)Paved Surface Cleaning Double Lane0MIPER MATOC PROCUREMENT PRICEPER MATOC PROCUREMENT PRICE
814(6)Paved Surface Cleaning Per Task Order0EAPER TASK ORDERPER TASK ORDER
832(1)Load, Haul, and Place Material - (FILL IN material type or gradation)0CYPER TASK ORDERPER TASK ORDER
832(2)Load, Haul, and Place Material - (FILL IN material type or gradation)0LSPER TASK ORDERPER TASK ORDER
833(1)18" 16 Gauge CMP Remove and Replace0LFPER TASK ORDERPER TASK ORDER
833(2)24" 16 Gauge CMP Remove and Replace0LFPER TASK ORDERPER TASK ORDER
833(3)18" HDPE Remove and Replace0LFPER TASK ORDERPER TASK ORDER
833(4)24" HDPE Remove and Replace0LFPER TASK ORDERPER TASK ORDER
833(5)Install New Drain Dip0EAPER TASK ORDERPER TASK ORDER
833(6)Install New Drivable Waterbar0EAPER TASK ORDERPER TASK ORDER
833(7)Clean Culverts 24" Diameter and Under0EAPER TASK ORDERPER TASK ORDER
833(8)Clean Culverts 24" Diameter through 48"0EAPER TASK ORDERPER TASK ORDER
833(9)Clean Culverts over 48"0EAPER TASK ORDERPER TASK ORDER
833(10)Jetting Culverts0EAPER TASK ORDERPER TASK ORDER
841(1)Disturbed Area Treatment0AcrePER TASK ORDERPER TASK ORDER
841(2)Disturbed Area Treatment0MIPER TASK ORDERPER TASK ORDER
842(1)Vegetation Maintenance0MIPER MATOC PROCUREMENT PRICEPER MATOC PROCUREMENT PRICE
842(2)Danger Tree Removal0EAPER TASK ORDERPER TASK ORDER
842(3)Curve Brushing0AcrePER MATOC PROCUREMENT PRICEPER MATOC PROCUREMENT PRICE
861(1)Maintain Cattleguard0EAPER TASK ORDERPER TASK ORDER
861(2)Replace Cattleguard0EAPER TASK ORDERPER TASK ORDER
861(3)Maintain Traffic Gate0EAPER TASK ORDERPER TASK ORDER
861(4)Maintain Guardrail0EAPER TASK ORDERPER TASK ORDER
861(5)Maintain Guardrail Barrier0EAPER TASK ORDERPER TASK ORDER
861(6)Maintain Rock/Earth Barrier0EAPER TASK ORDERPER TASK ORDER
861(7)Maintain Retaining Wall0LFPER TASK ORDERPER TASK ORDER
861(8)Replace Traffic Gate0EAPER TASK ORDERPER TASK ORDER
861(9)Remove Ttraffic Gate0EAPER TASK ORDERPER TASK ORDER
861(10)Remove Guardrail Barrier0EAPER TASK ORDERPER TASK ORDER
861(11)Remove Jersey Barrier0EAPER TASK ORDERPER TASK ORDER
861(12)Remove Rock/Earth Barrier0EAPER TASK ORDERPER TASK ORDER
872(1)Clean Sign Face0EAPER TASK ORDERPER TASK ORDER
872(2)Recondition Sign Face0EAPER TASK ORDERPER TASK ORDER
872(3)Remove and Replace Single Post and Sign0EAPER TASK ORDERPER TASK ORDER
872(4)Remove and Replace Double Post and Sign0EAPER TASK ORDERPER TASK ORDER
872(5)Remove and Replace Sign0EAPER TASK ORDERPER TASK ORDER
872(6)Remove Sign0EAPER TASK ORDERPER TASK ORDER
872(7)Remount Sign0EAPER TASK ORDERPER TASK ORDER
872(8)Apply New Sign Face0EAPER TASK ORDERPER TASK ORDER
872(9)Maintain Marker0EAPER TASK ORDERPER TASK ORDER
872(10)Replace Marker0EAPER TASK ORDERPER TASK ORDER
872(11)Sign, Marker Maintenance0EAPER TASK ORDERPER TASK ORDER
881(1)Mobilization & Equipment Moving0LSPER TASK ORDERPER TASK ORDER
891(1)Water Supply and Watering (FILL IN – Government Source or Contractor Provided)0mgalPER TASK ORDERPER TASK ORDER
893(1)Aggregate Supply and Stockpiling (FILL IN gradation or class)0TonPER TASK ORDERPER TASK ORDER
893(2)Aggregate Supply and Stockpiling (FILL IN gradation or class)0CYPER TASK ORDERPER TASK ORDER
894(1)Roadway Obliteration, Method 10EAPER TASK ORDERPER TASK ORDER
894(2)Roadway Obliteration, Method 10EAPER TASK ORDERPER TASK ORDER
894(3)Roadway Obliteration, Method 30EAPER TASK ORDERPER TASK ORDER
894(4)Entrance Way Obliteration0EAPER TASK ORDERPER TASK ORDER