This is a detailed specifications document containing technical requirements and standards for road maintenance and forest maintenance support services. The document outlines 15 different maintenance categories including snow removal, equipment and operator requirements, work area management, surface maintenance, drainage structure maintenance, vegetation control, sign maintenance, and roadway obliteration.
Key specifications include requirements for snow removal maintaining 4 inches of compacted snow, detailed equipment specifications for various machinery like excavators and dozers, traffic control requirements limiting delays to 15 minutes, surface maintenance standards for both passenger and high clearance vehicle roads, vegetation removal standards limiting cut height to 6 inches above ground, and specific measurement/payment terms for each maintenance category. The document provides technical requirements that would support contract opportunity 1282B125R0003 from the USDA Forest Service Region 2, which is holding an information session on 12/19/2024. Work will be performed through individual task orders specifying exact locations and requirements from these base specifications.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF30 1282B125R0003 A0004.pdf | ||
| SF30 1282B125R0003 A0003.pdf | ||
| SF30 1282B125R0003 A0002.pdf | ||
| 1282B125R0003.pdf | ||
| 1282B125R0003 QA 1.docx | DOCX document | |
| SF 30 A00001.pdf | ||
| Solicitation_Update_20241218.docx | DOCX document | |
| ATTACHMENT 5 R2RM_SOI_for_TOPRs_Under 100k_20241127.xlsx | XLSX spreadsheet | |
| ATTACHMENT 4 R2RM_AdminUnitsTable_20241127.xlsx | XLSX spreadsheet | |
| ATTACHMENT 2 R2RM_SOI_MATOC_Proposal_20241127.xlsx | XLSX spreadsheet | |
| 1282B125R0003.pdf | ||
| ATTACHMENT 7 FORM Equipment Cleaning Inspection Form_20241203.pdf | ||
| ATTACHMENT 1 WAGE DETERMINATION ARAPAHOE CO.pdf | ||
| ATTACHMENT 8 PAST PERFORMANCE QUESTIONNAIRE.docx | DOCX document | |
| ATTACHMENT 6 R2RM_SOI_for_TOPRs_Over 100k_20241127.xlsx | XLSX spreadsheet |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Specifications
Specification List
| 800 – DEFINITIONS AND ABBREVIATIONS | 3 |
| 803 - SNOW REMOVAL | 7 |
| 807 - FURNISHED EQUIPMENT & OPERATOR | 9 |
| 808 - WORK AREA MANAGEMENT | 12 |
| 811 - SURFACE MAINTENANCE | 14 |
| 812 - SURFACE STABILIZATION | 20 |
| 813 - SPOT SURFACING & ROCK PLACEMENT | 22 |
| 814 - ASPHALT SURFACE MAINTENANCE | 22 |
| 832 - LOAD, HAUL AND PLACE MATERIALS | 24 |
| 833 – DRAINAGE STRUCTURE RECONDITION | 25 |
| 841 - DISTURBED AREA TREATMENT | 27 |
| 842 - ROADWAY VEGETATION MAINTENANCE | 28 |
| 861 - MAINTENANCE of CATTLEGUARDS, GATES, BARRIERS, GUARDRAILS, & RETAINING WALLS | 31 |
| 872 - SIGN MAINTENANCE | 34 |
| 881 - MOBILIZATION & EQUIPMENT MOVING | 36 |
| 891 - WATER SUPPLY, WATERING, AND WATER DRAFTING EQUIPMENT | 37 |
| 893 – AGGREGATE SUPPLY AND STOCKPILING | 39 |
| 894 - ROADWAY OBLITERATION | 41 |
R2 Road Maintenance and Other Forest Maintenance/Support Services - Specifications
800 – DEFINITIONS AND ABBREVIATIONS
1.1 Definitions
Wherever in these specifications, the following terms, or pronouns in place of them, are used, the intent and meaning shall be interpreted as follows:
Catch Basin. The area immediately adjacent to inlet invert of the culvert.
Channel. A natural waterway leading into or away from a culvert or bridge.
Cross ditch. A shallow ditch placed across the roadbed to remove water from the roadbed surface that can be driven across by full-size pickups or other high clearance vehicles; usually placed diagonal to the centerline.
Culvert. Any structure with a bottom, regardless of fill depth, depth of invert burial, or presence of horizontal driving surface, or any bottomless (natural channel) structure with footings that will not have wheel loads in direct contact with the top of the structure.
Lead-off ditch. A ditch used to remove water from roadside drainage ditches, the roadway, cattleguards, or drainage structures such as culverts and drainage dips.
Drain Dip. Is an out sloped depression along a road alignment that is constructed both to disperse runoff from the road surface and to allow passage of motor vehicles at reduced road speeds. Drain Dips shape the road surface to have a gentle reverse grade that directs water off the road rather than allowing water to run down the road.
Drainage structure. A term identifying manufactured devices placed to control water movements. A structure installed to control, divert, or move water off or across the road, including but not limited to culverts, bridges, draining dips, rolling dips, and water bars.
Excess Material. Material from the roadway in excess to that needed for maintenance of roadway.
Grade. The vertical alignment of the top surface of the road.
High Clearance Vehicles. A high clearance vehicle is defined as a SUV or truck type vehicle, with at least 6 inches of clearance or more from the lowest point of the frame, body, suspension, or differential to the ground.
Passenger Vehicles. Standard passenger cars with no more than 6 inches of clearance and may be legally operated on public highways.
Paved Surface or Pavement. Denotes asphalt, concrete, or other stabilized materials excluding natural aggregates. Dust palliative treatments are not considered as pavement.
Roadbed. The portion of a road between the intersection of the subgrade and side slopes, excluding that portion of the ditch below the subgrade.
Slough or Slide. Material deposited on the roadway that may need to be repositioned or removed.
Slump. A localized portion of the roadbed that has slipped, or otherwise become lower than the adjacent roadbed, and constitutes a hazard to traffic.
Turnouts. A short auxiliary lane on a one-lane road provided for passage of meeting vehicles.
Unsuitable Material. Material removed during maintenance, which must be disposed of in designated locations. Includes material with substantial amounts of vegetation or other objectionable material.
Waterbar - Are abrupt changes in the shape of the road intended to reduce erosion and control traffic. Waterbars are similar to Drain Dips, but are shorter and more frequent.
Work Listing. Each task order will include a listing of the road number, road name, and description of work to be performed by mile post.
Work Schedule. The Service Provider's current schedule for work planning and progression to complete work within the period of performance.
1.2 Quantity Measurement Terms
U.S. Customary Units of measure are used in conjunction with these specifications.
The methods of measurement and computation will be those necessary to accurately determine the quantities of materials furnished and work performed.
Measurement will be made of each item or unit of work, as shown in the Schedule of Items, completed and accepted in accordance with the contract provisions, specifications, and drawings.
1.3 Abbreviations
Whenever in these specifications, or in other contract documents, the following terms, or pronouns in place of them, are used, the intent and meaning shall be interpreted as follows:
AASHTO – American Association of State Highway and Transportation Officials.
AC – Acre CY – Cubic Yard EA – Each HR – Hour LF – Linear Foot LS – Lump Sum mgal – Thousand Gallon MI – Mile
MUTCD – Manual of Uniform Traffic Control Devices R2 Road Maintenance and Other Forest Maintenance/Support Services
800 – DEFINITIONS AND ABBREVIATIONS
Figure 800-1 – Illustration of Road Structure Terms
803 - SNOW REMOVAL
803.01 Service Required
Remove snow from designated surfaces.
803.02 Performance Standard
A. Snow removal is complete when the surface is available and useable for all intended use, safe for the intended users, and will efficiently drain. Do not remove road surface aggregate during plowing operations. Maintain 4 inches minimum of compacted snow on the road surface or as specified in each Task Order.
B. Avoid damage to residual trees and signs when removing or plowing snow off the road. Culvert inlets and outlets shall be flagged and staked to ensure protection against damage.
803.03 Location of Work
Location of work is as specified in the Schedule of Items or as ordered by the Contracting Officer.
803.04 Measurement
Measurement under this Section will be made by the total number of units for each completed and accepted item listed in the Schedule of Items.
A. Single Lane Roads, Mile: Snow removal will be measured along the centerline of the roadway. Turnouts are considered incidental. Measurement will be to the nearest one-tenth (0.1) mile.
B. Double Lane Roads, Mile: Snow removal will be measured along the centerline of the roadway. Measurement will be to the nearest one-tenth (0.1) mile.
C. Each: One entire unit. Measure the actual number of units completed and accepted.
D. Lump Sum: Do not measure directly. The bid amount is complete payment for all work described in the contract and necessary to complete the work for that pay item.
803.05 Payment
The accepted quantities will be paid at the contract price per unit of measurement for the Section 803 pay items listed in the schedule of items. Payment will be full compensation for the work prescribed in this Section.
| Pay Item Number |
| Description |
| Unit |
| 803(1) |
| Snow Removal - Single Lane |
| Mile / Per Task Order |
| 803(2) |
| Snow Removal - Double Lane |
| Mile / Per Task Order |
| 803(3) |
| Snow Removal |
| Lump Sum / Per Task Order |
| 803(4) |
| Snow Removal |
| Each / Per Task Order |
803 SNOW REMOVAL
807 - FURNISHED EQUIPMENT & OPERATOR
807.01 Service Required
Furnishing and operating equipment with qualified operator.
807.02 Performance Standard
Equipment can be owned or rented. Equipment is expected to be in well maintained and functional operating condition. If unforeseen equipment maintenance or repair is required, equipment shall be repaired or replaced within 3 days of equipment failure.
Standard attachments costs will be included in the individual line item. Non-standard attachments will be bid per task order using line item 807(18).
The equipment shall be furnished as specified in the table below:
Description
| Min HP |
| Min Reach |
| Min Weight |
Capacity
Standard Attachments
Remarks
| Large Excavator |
| 155 |
| 30’ |
| 45,000 |
| 1.5 CY |
| Hydraulic Thumb |
| In addition to common excavation, must be equipped to grasp and lift logs up to 36-inches diameter and boulders up to 30-inch diameter. 320 Equivalent |
| Medium Excavator |
| 100 |
| 18' |
| 30,000 |
| Hydraulic Thumb |
| 316 Equivalent |
| Small Excavator |
| 69 |
| 15’ |
| 20,000 |
| Hydraulic Thumb |
| 308 Equivalent |
Mini Excavator
| 23 |
| 07’ |
| 9,000 |
| 0.5 CY |
| Hydraulic Thumb attachment |
| 303 Equivalent |
| Backhoe |
| 70 |
| 15’ |
| 15,000 |
| 1.25 CY bucket |
| 72” front, 24” back bucket |
| Extend-a-hoe acceptable |
| Wheel Loader |
| 200 |
| - |
| 40,000 |
| 3 CY |
| Grader |
| 140 |
| - |
| 30,000 |
| 12’ wide, 24” blade |
| Dump Truck |
| - |
| - |
| - |
| 10 CY |
| Belly Dump |
| - |
| - |
| - |
| 20 CY |
| Brush Cutter |
| - |
| 14’ |
| Rotary capable |
| Wheeled only |
| Roller |
| - |
| - |
| 20,000 |
| - |
Vibratory, pneumatic
| Small Dozer |
| 90 |
20,000
| Rippers |
| D3 Equivalent (D5K) |
| Medium Dozer |
| 120 |
30,000
| Rippers |
| D4 Equivalent (D6K) |
| Skid Steer |
| 75 |
| - |
| 7,000 |
| - |
| - |
| Water Truck (2000 Gallons) |
| - |
| - |
| - |
| 2000 Gallons |
| - |
| Water Truck (4000 Gallons) |
| - |
| - |
| - |
| 4000 Gallons |
| - |
807.03 Location of Work
As SPECIFIED IN THE TASK ORDER or as ordered by the Contracting Officer.
807.04 Acceptable Quality Levels
A. Submit proposed equipment to the CO 7 days prior to mobilization
B. Equipment shall be well maintained, free of leaks, meet all state and federal regulations and capable of operating at least 90% of the time.
C. Equipment shall be operated by a fully trained, qualified, and competent operator at all times.
D. Equipment shall be clean and free of soil, plant parts, seeds, and other debris prior to delivery on National Forest Lands. If using equipment on multiple Task Order at one time, or if there are long mobilization distances between sites on the same Task Order, the Contracting Officer may require cleaning of equipment and inspection prior to entering or leaving project sites. See 881 for cleaning, inspection, and documentation requirements.
807.05 Measurement
A. Hour - The accepted quantities will be paid at the established hourly rate rounded to the nearest half (1/2) hour.
B. Non-operable equipment or equipment dependent on another piece of non-operable equipment will not be paid for.
C. Hours of operation shall be the same as for the Service Provider’s regular work shift, unless otherwise directed in writing by the Contracting Officer.
D. Moving of equipment will be paid through the 881(1) line item and all costs for moving equipment shall be included in that line item at time of bidding.
E. Minimum time for a piece of equipment will be 8 hours unless hourly equipment item is used in conjunction with another non-hourly item.
807.06 Payment
A. The accepted quantities will be paid at the contract price per unit of measurement for the Section 807 pay items listed in the schedule of items. Payment will be full compensation for the work prescribed in this Section.
| Pay Item Number |
| Description |
| Unit |
| 807(1) |
| Furnish Equipment, Large Excavator |
| Hour / Per Task Order |
| 807(2) |
| Furnish Equipment, Medium |
| Hour / Per Task Order |
| 807(3) |
| Furnish Equipment, Small Excavator |
| Hour / Per Task Order |
| 807(4) |
| Furnish Equipment, Mini Excavator |
| Hour / Per Task Order |
| 807(5) |
| Furnish Equipment, Backhoe |
| Hour / Per Task Order |
| 807(6) |
| Furnish Equipment, Wheel Loader |
| Hour / Per Task Order |
| 807(7) |
| Furnish Equipment, Grader |
| Hour / Per Task Order |
| 807(8) |
| Furnish Equipment, Dump Truck |
| Hour / Per Task Order |
| 807(9) |
| Furnish Equipment, Belly Dump |
| Hour / Per Task Order |
| 807(10) |
| Furnish Equipment, Brush Cutter |
| Hour / Per Task Order |
| 807(11) |
| Furnish Equipment, Roller |
| Hour / Per Task Order |
| 807(12) |
| Furnish Equipment, Small Dozer |
| Hour / Per Task Order |
| 807(13) |
| Furnish Equipment, Medium Dozer |
| Hour / Per Task Order |
| 807(14) |
| Furnish Equipment, Skid Steer |
| Hour / Per Task Order |
| 807(15) |
| Furnish Equipment, Water Truck (2000 Gallons) |
| Hour / Per Task Order |
| 807(16) |
| Furnish Equipment, Water Truck (4000 Gallons) |
| Hour / Per Task Order |
| 807(17) |
| Furnish Equipment, Mobile Welder |
| Hour / Per Task Order |
| 807(18) |
| Furnish Equipment, Non-Standard Attachment |
| Hour / Per Task Order |
807 - Furnished Equipment & Operator
808 - WORK AREA MANAGEMENT
808.01 Description
This Section establishes Contractor responsibilities for traffic control and equipment requirements in work areas.
808.02 Requirements
A. Traffic Conditions - Unless otherwise provided in the Task Order, roads are to remain open to traffic with not more than fifteen (15) minutes maximum delay time.
B. A plan for satisfactory handling of traffic, approved by the Government, is required prior to initiating or performing work that interferes with use of traveled roadways.
C. Traffic Control Devices
1. Provide signs and other devices complying with National Standards as contained in Part VI of the Manual of Uniform Traffic Control Devices (MUTCD). Provide traffic control for occupied work areas that is in accordance with these specifications. All signs and devices remain the property of the Contractor.
2. Keep traffic devices current with maintenance operation and remove upon completion.
3. Use warning signs to control traffic approaching the work area from either direction and from side accesses.
4. Required signs may be mounted on portable or temporary mountings. Use standard MUTCD shapes, colors, sizes, and legends.
5. Mark hazards incidental to the work within or on the roadway, shoulders, or turnouts with hazard identification markers, illuminated beacons, and other MUTCD devices to safely guide road users through the area. Mark work segments not completed on a daily basis appropriately for night travel. Obtain authorization before commencing work at night.
6. Advisory speed plates may be used to control traffic through the work area.
D. Flaggers - Provide properly equipped, trained and national highway institute flagger certified, flag person(s) where the traffic is required to stop before proceeding. Stop traffic in locations which provide width enough for passage of traffic and reasonable protection for vehicles. When flag control is used, advance warning signs are required.
E. Contractor's Equipment
1. Use truck headlights at all times while operating. Backup horns are required on all self-propelled equipment in excess of 5 metric tons (5½ tons) gross weight.
2. Park vehicles and machinery not currently used in the maintenance operation off the roadway at approved locations to minimize interference with normal use.
808.03 Location of Work
Location of work is as specified in the Schedule of Items or as ordered by the Contracting Officer.
808.04 Measurement
All work and materials are indirectly included to paid work in this contract with the exception of flagger operations and variable message boards which will be estimated per task order and the individual pay items laid out in 808.05.
A. Hour - The accepted quantities will be paid at the established hourly rate, rounded to the nearest half (1/2) hour, that flagging is in operation.
B. Day – For each Variable Message Board on site, a calendar day beginning and ending at midnight. Rounding portions of a day up to the full day.
808.05
The accepted quantities will be paid at the contract price per unit of measurement for the Section 808 pay items listed in the schedule if items. Payment will be full compensation for the work prescribed in this Section.
| Pay Item Number |
| Description |
| Unit |
| 808(1) |
| Single Flagger Operation |
| Hour |
| 808(2) |
| Dual Flagger Operation |
| Hour |
| 808(3) |
| Variable Message Board(s) |
| Day / Per Task Order |
808 WORK AREA MANAGEMENT
811 - SURFACE MAINTENANCE
811.01 Description
Smooth, reshape or recondition native or aggregate surfaced roads including roadways, shoulders, turnouts, drivable waterbars, rolling dips, drain dips, and intersections. No asphalt maintenance or reconstruction is included in this section.
811.02 Definitions
A. Passenger Vehicle Roads - Assigned to roads open and maintained for travel by a prudent driver in a standard Passenger Vehicle. The road surface is typically 14’-24’ wide and maintained with a road grader to the following standards; when the surface is shaped to drain 2%-4% with either outsloped, insloped or crowned roadway, wash boards are removed, and where ditches and road surface drainage structures function efficiently. Assigned to roads that provide a moderate degree of user comfort and convenience at moderate travel speeds. These roads are aggregate surfaced or shapeable native and may experience higher travel volumes than high clearance vehicle roads.
B. High Clearance Vehicle Roads - Assigned to roads open for use by High Clearance Vehicle. The road surface is typically 8’-14’ wide and maintained to the following standards; when the surface is shaped to drain 4%-7% minimum, with either an outsloped, inlsoped, or crowned roadway, and where ditches and road surface drainage structures function efficiently. The road surface is typically native material has no continuous ruts or rills, and no large concentrations of unsuitable materials remain. Traffic is normally minor, usually consisting of one or a combination of administrative, permitted, dispersed recreation, or other specialized uses.
811.03 Maintain Passenger Vehicle Roads Work Requirements
A. The Schedule of Items line item description will specify if “Drainage and Roadway” is required or if just “Roadway, No drainage” is required.
B. Roadway:. The roadbed shall be crowned or sloped to conform to the original roadway prism. Maintenance operations shall not widen the road bed unless specifically instructed otherwise by the CO. All berms generated shall be removed from the shoulders and incorporated into the roadway surface except those that are specifically designated to remain. Turnouts shall also be included with the blading of the road surface.
On roads open to public traffic, berms of materials caused by road maintenance operations shall be removed from the roadway prior to the end of each day's work.
The blading shall proceed in an orderly fashion by successive passes with graders parallel to the road centerline, progressing from the lower side to the upper side of the roadbed and back across. In the process, shoulder material shall be cut and replaced to prevent vegetation encroachment.
On native surface roads, all ruts, holes, washes and washboards shall be removed by scarifying or cutting to the bottom of such defects. Fines accumulated in blading roads or from drainage ditches shall not be wasted over fill shoulders.
On aggregate surface roads, all ruts, holes, washes and washboards shall be removed by scarifying or cutting to the bottom of the aggregate surface. Scarification of subgrade material will not be permitted unless SPECIFIED IN THE TASK ORDER.
Rocks, woody debris, or other material remaining on the roadway after the final blading that are larger than 4” measured on any side or are larger than the maximum size of imported surfacing shall be disposed of by sidecasting unless otherwise SPECIFIED IN THE TASK ORDER. Sidecasting into streams, lakes or water courses will not be permitted.
The roadbed immediately before and after cattle guards and bridges shall be bladed in such a manner as to effect a smooth transition. Material shall not be deposited inside cattleguards or onto bridges. Any material deposited on bridge decks, including any accumulated material, shall be removed from bridge decks I. Removal of Obstructions. Unless otherwise SPECIFIED IN THE TASK ORDER, loose rocks which extended more than four (4) inches above the road surface shall be removed or repositioned to provide adequate clearance for vehicular travel. Logs and downed trees shall be cut over the entire width of the roadway to provide opening for vehicular travel. Logs and downed trees shall be cut into short lengths and placed outside the roadway. Slash shall be scattered outside the roadway and drainage ways. Rocks and other objects outside the usable width may remain, if drainage is not obstructed.
II. Slough, Slides, and Slumps. Minor sloughs, slides, and slumps that are less than five (5) cubic yards per one-hundred (100) foot station, shall be removed or repaired. Minor slough and slide material, including soil, rock, and vegetative matter which encroaches onto the ditches, roadway or shoulder and which obstructs drainage shall be disposed of by sidecasting unless otherwise SPECIFIED IN THE TASK ORDER. Any voids shall be filled with material generated from the adjacent area or as otherwise SPECIFIED IN THE TASK ORDER. Material shall be placed in layers not to exceed eight (8) inches in depth and compacted by operating equipment over each layer. Placing sidecasted material where it may subsequently erode and enter streams, lake or water courses will not be permitted.
C. Drainage: Drainage structures and related items shall be cleared of all foreign material and all vegetative growth which interferes with the drainage flow pattern. Grass shall be left in place provided drainage is not obstructed. Sidecasting of material is allowed unless SPECIFICED THE TASK ORDER. Placing side casted material where it may subsequently erode and enter streams, lakes or water courses will not be permitted.
Culverts shall have their inlet and outlet cleaned as well as three (3) feet of the upper and lower ends of the inside cleaned out to expose the full diameter of the culvert. If debris is lodged in the culvert to the extent it cannot be cleaned by shovel, bar, and hand labor, the CO shall be notified of the location within 5 working days for a final determination of corrective measures to be taken.
Unless otherwise SPECIFIED IN THE TASK ORDER, catch basins shall be cleared of material to the bottom of the invert of the culvert and at least eighteen (18) inches horizontally towards the backslope or the width of the basin, whichever is greater. The backslope shall be cleaned of loose material.
Inlet channel transition from the ditchline to the catch basin shall be cleaned. Material removed, if suitable, may be blended into existing native road surfaces or shoulders. On aggregate surfaced roads, care must be taken to assure the material is not mixed into the existing aggregate. Unsuitable material shall be disposed of by sidecasting unless otherwise SPECIFIED IN THE TASK ORDER. Placing side casted material where it may subsequently erode and enter streams, lakes or water courses will not be permitted.
Ditches shall be cleaned to conform to previous line, grade, and cross section. Cleaning is not required on ditches that provide drainage and are free of debris larger than three (3) inches in diameter and one (1) foot in length. On aggregate surfaced roads, care must be taken to assure the material is not mixed into the existing aggregate. Unsuitable material shall be disposed of by sidecasting unless otherwise SPECIFIED IN THE TASK ORDER.
Drain dips shall be maintained to a depth and width to provide drainage and reasonable conformity to the original lines, grades, and cross sections, unless otherwise SPECIFIED IN THE TASK ORDER or designated on the ground. Hand work may be necessary to obtain a smooth surface and uniform cross section.
Lead-off ditches shall be cleaned or installed and shall daylight. Material generated from the lead-off ditches shall be blended into existing road surfaces or shoulders.
On aggregate surfaced roads, care must be taken to assure the material is not mixed into the existing aggregate. Unsuitable material shall be disposed of by sidecasting unless otherwise SPECIFIED IN THE TASK ORDER.
811.04 Maintain High Clearance Vehicle Roads
A. The Schedule of Items line item description will specify if “Drainage and Roadway” is required or if just “Drainage Maintenance Only” is required.
B. Drainage: This work shall consist of maintaining drainage dips, drivable waterbars, and related items such as catch basins, outlet ditches, lead-off ditches, and existing riprap. Shape the surface and shoulders to provide drainage and accommodate high clearance vehicles. Ruts and washouts that prevent normal road surface runoff and have potential to further damage the road or adjacent resource shall be repaired. Ruts and washouts that impede vehicular travel by high clearance vehicles shall be repaired. Sidecasting of material is allowed unless SPECIFICED THE TASK ORDER. Placing side casted material where it may subsequently erode and enter streams, lakes or water courses will not be permitted.
Drainage structures and related items shall be cleared of all foreign material and all vegetative growth which interferes with the flow pattern. Grass shall be left in place provided drainage is not obstructed.
Unless otherwise SPECIFIED IN THE TASK ORDER, catch basins shall be cleared of material to the bottom of the invert of the culvert and at least eighteen (18) inches horizontally towards the backslope of the width of the basin, whichever is greater.
The backslope shall be cleaned of loose material.
Inlet channel transition from the ditchline to the catch basin shall be cleaned. Material removed, if suitable, may be blended into existing native road surfaces or shoulders.
Ditches shall be cleaned to conform to previous line, grade, and cross section. Cleaning is not required on ditches that provide drainage and are free of debris larger than three (3) inches in diameter and one (1) foot in length.
Drain dips and drivable waterbars to be cleaned or installed shall be shaped to a depth and width to provide drainage in reasonable conformity to the original lines, grades and cross section, unless otherwise SPECIFIED IN THE TASK ORDER or designated on the ground. Hand work may be necessary to obtain a smooth surface and uniform cross section. Lead-off ditches shall be cleaned or installed and shall daylight. Material generated from the lead-off ditches shall be removed and blended into existing native road surfaces or shoulders.
C. Roadway. Roadway maintenance shall include shaping the surface and shoulders to provide drainage and accommodate high clearance vehicles. Ruts and washouts that prevent normal road surface runoff and have potential to further damage the road or adjacent resource shall be repaired. Ruts and washouts that impede vehicular travel by high clearance vehicles shall be repaired. Materials for filling the ruts shall be generated from the roadway or otherwise SPECIFIED IN THE TASK ORDER. Material shall be placed in layers and compacted by operating equipment over the full width of each layer.
I. Removal of Obstructions. Unless otherwise SPECIFIED IN THE TASK ORDER, logs and downed trees, stumps, and loose rocks which extended more than four (4) inches above the road surface shall be removed or repositioned to provide adequate clearance for vehicular travel. Logs and downed trees should be cut over the entire width of the roadway to provide an opening for vehicular travel. Logs and downed trees shall be cut into short lengths and placed outside the roadway. Slash shall be scattered outside the roadway and drainage ways. Rocks and other objects outside the usable width may remain if drainage is not obstructed.
II. Slough, Slides, and Slumps. Minor sloughs, slides, and slumps that are less than five (5) cubic yards per one-hundred (100) foot station, shall be removed or repaired. Minor slough and slide material, including soil, rock, and vegetative matter which encroaches onto the ditches, roadway or shoulder and which obstructs drainage shall be disposed of by sidecasting unless otherwise SPECIFIED IN THE TASK ORDER. Any voids shall be filled with material generated from the adjacent area or as otherwise SPECIFIED IN THE TASK ORDER. Material shall be placed in layers not to exceed eight (8) inches in depth and compacted by operating equipment over each layer. Placing sidecasted material where it may subsequently erode and enter streams, lake or water courses will not be permitted.
811.0 Road Surface Compaction
If additional compactive effort is required for surface maintenance, then the Schedule of Items will include a line item for Road Surface Compaction and will indicate the applicable method. The Work List will specify where compaction is required.
1. Compaction A.. Layer Placement Method (Hauling and Spreading Equipment). Operating spreading and hauling equipment over the full width of the roadway.
1. Compaction B. Layer Placement (Roller Compaction) Method Adjust the moisture content of the material to a moisture content suitable for compaction. Water for Road Surface Compaction will be paid by the 891(1) Water Supply and Watering pay item and all requirements of section 891 apply. Fill the interstices around rock with earth or other fine material as practical. Operate roller compaction equipment over the full width of each layer until there is no visible evidence of further consolidation or, if when a sheepsfoot roller is used, the roller “walks out” of the layer. Make at least three complete passes. Use compression-type rollers at speeds less than 6 feet (1.8 meters) per second and vibratory rollers at speeds less than 3 feet (1 meter) per second. Ensure rollers meet the following requirements:
· Steel wheeled rollers, other than vibratory, capable of exerting a force of not less than 250 pounds per inch (4.5 kilogram/millimeter) of width of the compression roll or rolls.
· Vibratory steel wheeled rollers equipped with amplitude and frequency controls with a minimum dynamic force of 30,000 pounds (130 kilonewtons) impact per vibration, specifically designed to compact the material on which it is used.
· Pneumatic-tired rollers with smooth tread tires of equal size that will provide a uniform compacting pressure for the full width of the roller and capable of exerting a ground pressure of at least 80 psi (550 Kilopascals).
· Sheepsfoot, tamping, or grid rollers capable of exerting a force of 250 pounds per inch (4.5 kilogram/millimeter) of width of roller drum.
811.07 Location of Work
Location of work is as specified in the Schedule of Items, the Work List, or as ordered by the Contracting Officer.
811.07 Measurement
A. Mile: measured along the centerline of the roadway. Measurement will be to the nearest one-tenth (0.1) mile.
B. mgal: The unit mgal (one-thousand gallons) represents the actual quantity of water loaded, hauled and placed as ordered by the Contracting Officer measured to the one-tenth of mgal (0.1). Three-thousand gallons loaded, hauled and placed would be paid for as three mgal.
811.08 Payment
The accepted quantities will be paid at the contract price per unit of measurement for the Section 811 pay items listed in the schedule of items. Payment will be full compensation for the work prescribed in this Section.
| Pay Item Number |
| Description |
| Unit |
| 811(1) |
| Maintain Passenger Vehicle Road (Drainage and Roadway) |
| Mile* |
| 811(2) |
| Maintain Passenger Vehicle Road (Roadway, No Drainage) |
| Mile* |
| 811(3) |
| Maintain High Clearance Vehicle Roads |
(Drainage and Roadway) Mile*
| 811(4) |
| Maintain High Clearance Vehicle Roads |
(Drainage Maintenance Only) Mile*
| 811(5) |
| Road Surface Compaction, Method (FILL IN "A" or "B") |
| Mile/Per Task Order |
| 891(1) |
| Water Supply and Watering (FILL IN – Government Source or Contractor Provided) |
| mgal/Per Task Order |
811 – SURFACE MAINTENANCE
812 - SURFACE STABILIZATION
812.01 Service Required Preparing the surface, furnishing, and applying materials for stabilizing surfaces and controlling dust.
812.02 Performance Standard
A. Provide a commercial certification that includes the date, identification number (truck or trailer), net mass, and brand name with each shipment. For liquid, nonpetroleum dust palliatives also provide the net volume and specific gravity at 60 ºF, percent solids by mass, and pH. For solid dust palliatives also provide the concentration of the product.
B. Use distributor equipment conforming to 812.02(D) below. Equip the distributor with a hose and nozzle for areas inaccessible to the distributor and for touch-up work. Do not apply a dust palliative when the weather is foggy or rainy or when rain is anticipated within 24 hours of application. Do not apply chloride brines, or lignosulfonate when the ground is frozen. Protect the surfaces of structures and trees from splatter or marring during application. Use multiple applications at a reduced rate if necessary, to prevent runoff. Do not discharge dust palliative into streams.
C. Surface Stabilization is complete when the surface remains stable and dust does not become air borne for the time period designated in the contract.
D. Distributor.
1. Adjustable full circulation spray bar to 15 foot width.
2. Positive controls including tachometer, pressure gauge, volume measuring device, or calibrated tank to uniformly deposit material over the full width within 0.02 gallons per square yard of the required rate; and
3. Thermometer for measuring the temperature in the tank.
E. Dust Abatement Materials
1. Water
2. Magnesium Chloride (MC)
3. Calcium Chloride Brine (CCB)
4. Lignosulfonate (LS)
F. Preparation.
1. When lignosulfonate is used, dilute it with water until the mixture contains a minimum 48 percent concentration. When calcium chloride brine is used, provide a minimum 36 percent concentration. When magnesium chloride brine is used, provide a minimum 28 percent concentration.
2. Thoroughly mix the components. Apply when the ambient air temperature is 40°F or above. Process the dust palliative uniformly throughout the layer, moisten as necessary, and compact the surface.
G. Maintenance and Opening to Traffic.
1. Do not permit traffic on the treated surface until the dust palliative has penetrated and cured enough to prevent excessive pickup under traffic. If it becomes necessary to permit traffic before that time, apply blotter as necessary.
2. Location and restrictions will be in the Work List.
812.03 Location of Work Location of work is as specified in the Schedule of Items or as ordered by the Contracting Officer.
812.04 Measurement Measurement under this Section will be made by the total number of units for each completed and accepted item listed in the Schedule of Items.
A. Single Lane Roads, Mile: Surface Stabilization will be measured along the centerline of the roadway. Turnouts are incidental. Measurement will be to the nearest one-tenth (0.1) mile.
B. Double Lane Roads, Mile: Surface Stabilization will be measured along the centerline of the roadway. Measurement will be to the nearest one-tenth (0.1) mile.
812.05 Payment The accepted quantities will be paid at the contract price per unit of measurement for the Section 812 pay items listed in the schedule of items. Payment will be full compensation for the work prescribed in this Section.
| Pay Item Number |
| Description |
| Unit |
| 812(1) |
| Surface Stabilization Single Lane, Application Rate (FILL IN) |
| Mile / Per Task Order |
| 812(2) |
| Surface Stabilization Double Lane, Application Rate (FILL IN) |
| Mile / Per Task Order |
812 - SURFACE STABILIZATION
813 - SPOT SURFACING & ROCK PLACEMENT
813.01 Service Required
Procure, load, haul, place, shape, and compact material to repair or stabilize road surfaces.
813.02 Performance Standard B. Spot surfacing is complete when the designated quantity of the ordered material has been placed, shaped, and compacted.
C. Material Specifications
1. Material certification and sieve analyses shall be approved by the contracting officer prior to transporting onto National Forest System Lands.
2. Classifications for aggregate materials will be specified in each task order on the Schedule of Items description. Material class/ classes that are not available by local suppliers, alternative material certification(s) and sieve analyses may be submitted to the Contracting Officer for approval.
3. Materials furnished by the Contractor shall conform to Forest Service specifications or whatever gradations called out in each specific task order.
D. Compaction Requirements - Compact the aggregate using one of the following methods as specified:
Compaction A.. Layer Placement Method (Hauling and Spreading Equipment). Operating spreading and hauling equipment over the full width of the roadway.
Compaction B. Layer Placement (Roller Compaction) Method Adjust the moisture content of the material to a moisture content suitable for compaction. Water for will be paid by the 891(1) Water Supply and Watering pay item and all requirements of section 891 apply. Fill the interstices around rock with earth or other fine material as practical. Operate roller compaction equipment over the full width of each layer until there is no visible evidence of further consolidation or, if when a sheepsfoot roller is used, the roller “walks out” of the layer. Make at least three complete passes. Use compression-type rollers at speeds less than 6 feet (1.8 meters) per second and vibratory rollers at speeds less than 3 feet (1 meter) per second. Ensure rollers meet the following requirements:
· Steel wheeled rollers, other than vibratory, capable of exerting a force of not less than 250 pounds per inch (4.5 kilogram/millimeter) of width of the compression roll or rolls.
· Vibratory steel wheeled rollers equipped with amplitude and frequency controls with a minimum dynamic force of 30,000 pounds (130 kilonewtons) impact per vibration, specifically designed to compact the material on which it is used.
· Pneumatic-tired rollers with smooth tread tires of equal size that will provide a uniform compacting pressure for the full width of the roller and capable of exerting a ground pressure of at least 80 psi (550 Kilopascals).
· Sheepsfoot, tamping, or grid rollers capable of exerting a force of 250 pounds per inch (4.5 kilogram/millimeter) of width of roller drum.
E. Shaping
1. Shape the subgrade to a smooth surface and to the cross-section required. Shape slopes to gradually transition into slope adjustments without noticeable breaks. At the ends of cuts and at intersections of cuts and embankments, adjust slopes in the horizontal and vertical planes to blend into each other or into the natural ground.
F. Rip Rap and Boulder Placement
1. Place rip rap and/or boulders in locations as Specified In the Task Order. No compaction is required.
813.03 Location of Work
Location of work is as specified in the Schedule of Items or as ordered by the Contracting Officer.
813.04 Measurement
Measurement under this Section will be made by the total number of units for each item listed in the schedule of items completed and accepted.
A. Cubic Yard: The quantity will be the number of cubic yards measured in the vehicles. Materials measured by the cubic yard in the hauling vehicle shall be measured therein at the point of delivery. Vehicles may be of any size or type, provided that the box is of such shape that the actual volume may be readily and accurately determined.
B. Ton: Material measured by the ton shall be verified by certified weight tickets.
C. mgal: The unit mgal (one-thousand gallons) represents the actual quantity of water loaded, hauled and placed as ordered by the Contracting Officer measured to the one-tenth of mgal (0.1). Three-thousand gallons loaded, hauled and placed would be paid for as three mgal.
813.05
Amounts and gradation will be specified in each task order on the Schedule of Items. Payment will be full compensation for the work prescribed in this Section.
| Pay Item Number |
| Description |
| Unit |
| 813(1) |
| Spot Surfacing, Gradation (FILL IN), Compaction Method (FILL IN “A” or “B”) |
| CY / Per Task Order |
| 813(2) |
| Spot Surfacing, Gradation (FILL IN), Compaction Method (FILL IN “A” or “B”) |
| Ton / Per Task Order |
| 813(3) |
| Riprap, Size (FILL IN) |
| CY / Per Task Order |
| 813(4) |
| Boulders, Size (FILL IN) |
| CY / Per Task Order |
| 891(1) |
| Water Supply and Watering (FILL IN – Government Source or Contractor Provided) |
| mgal/Per Task Order |
813 - SPOT SURFACING & ROCK PLACEMENT
814 - ASPHALT SURFACE MAINTENANCE
814.01 Service Required
Repair and cleaning of pavement surfaces.
814.02 Performance Standard
A. This work is complete when the pavement is clean and free of cracks, potholes, and surface irregularities.
B. Follow industry standards as outlined in the Asphalt Institute Manual Series Number 16.
814.03 Location of Work
Location of work is as specified in the Schedule of Items or as ordered by the Contracting Officer.
814.04 Measurement
Measurement under this Section will be made by the total number of units for each item listed in the schedule of items completed and accepted.
A. Paved Surface Cleaning (Single Lane), Mile: The work activity will be measured along the centerline of the roadway. Turnouts are incidental. Measurement will be to the nearest one- tenth (0.1) mile.
B. Paved Surface Cleaning (Double Lane), Mile: The work activity will be measured along the centerline of the roadway. Measurement will be to the nearest one-tenth (0.1) mile.
C. Ton: Material measured by the ton shall be verified by certified weight tickets.
D. Linear Foot: Measure the work along its length from end to end; parallel to the base or foundation; along the top; along the front face; or along the invert. Do not measure overlaps. Measure to the nearest linear foot.
E. Each: One entire unit. Measure the actual number of units completed and accepted.
814.05
The accepted quantities will be paid at the contract price per unit of measurement for the Section 814 pay items listed in the schedule of items. Payment will be full compensation for the work prescribed in this Section.
Pay Item Number
| Description |
| Unit |
| 814(1) |
| Pothole Patching |
| Ton / Per Task Order |
| 814(2) |
| Skin Patching |
| Ton / Per Task Order |
| 814(3) |
| Crack Sealing |
| Linear Foot / Per Task Order |
| 814(4) |
| Paved Surface Cleaning Single Lane |
| Mile |
| 814(5) |
| Paved Surface Cleaning Double Lane |
| Mile |
| 814(6) |
| Paved Surface Cleaning Per Task Order |
| Each / Per Task Order |
814 - Asphalt Surface Maintenance
832 - LOAD, HAUL, AND PLACE MATERIALS
832.01 Service Required Load, haul, and place material at designated sites. This work may be ordered as an individual item, such as may be required to move stockpiled materials to locations, or may be ordered in conjunction with other required work.
832.02 Performance Standard Loading, hauling, and placing is complete when no obstruction remains in or adjacent to the roadway or in ditches which would have the potential to interfere with traffic use, block or divert water from structures or channels. This includes relocation, repositioning, stabilization, and revegetation as ordered by the Contracting Officer.
832.03 Location of Work Location of work is as specified in the Schedule of Items or as ordered by the Contracting Officer.
832.04 Measurement
Measurement under this Section will be made by the total number of units for each item listed in the schedule of items completed and accepted.
A. Cubic Yard: The quantity will be the number of cubic yards measured in the vehicles. Materials measured by the cubic yard in the hauling vehicle shall be measured therein at the point of delivery. Vehicles may be of any size or type, provided that the box is of such shape that the actual volume may be readily and accurately determined.
A. Lump Sum: Do not measure directly. The bid amount is complete payment for all work described in the contract and necessary to complete the work for that pay item
832.05 Payment
Amounts and gradation will be specified in each task order. Payment will be full compensation for the work prescribed in this Section.
| Pay Item Number |
| Description |
| Unit |
| 832(1) |
| Load, Haul, and Place Material - (FILL IN material type or gradation) |
| Cubic Yard / Per Task Order |
| 832(2) |
| Load, Haul, and Place Material - (FILL IN material type or gradation |
| Lump Sum / Per Task Order |
832 – LOAD, HAUL, AND PLACE MATERIALS
833 – DRAINAGE STRUCTURE RECONDITION
833.01 Service Required:
Remove or replace drainage structures including ditch relief culverts, drivable water-bars, drain dips, and cross ditches. Corrugated Metal Pipes (CMP) and Heavy Duty Plastic Pipes (HDPE) removed shall be disposed off NFS lands in accordance with local, state, and federal regulations. This includes all excavation and backfill.
833.02 Performance Standard:
A. Drainage structure installation or replacement is complete when designated water-bars, ditch relief culverts (DRC), or cross ditches have been installed to the lines and grades specified. A DRC is an 18” or 24” conduit installed beneath the road surface to relieve drainage in longitudinal ditches at the toe of the back slopes.
B. Standards when installing ditch relief culverts:
1. Ditch relief culverts should be located and installed sufficiently upgrade of watercourse crossings so that water and sediment can be filtered through a vegetated slope before reaching the stream.
2. Ditch relief culverts shall be staked by the Forest Service prior to installation.
3. Ditch relief culverts should be installed at intervals along the road that are close enough to prevent significant erosion of the ditch and below the culvert outfall on the native hillslope.
4. Ditch relief culverts should be installed at locations where collected water and sediment is not discharged directly onto unstable areas or into watercourses.
5. Replace any pipe that is distorted by more than 5 percent of nominal dimensions, or that is ruptured or broken.
6. On each side of the pipe, excavate an area at least as wide as the diameter of the pipe. Backfill without damaging or displacing the pipe. Complete backfilling of the trench with suitable material
7. Standard excavation depth is typically no more than 5’ depth at road centerline and a standard backhoe will suffice for installation.
C. Drainage dips shall be shaped to a depth and width to provide drainage and in reasonable conformity to the original lines, grades, and cross sections unless others identified in the task order or designated on the ground. Handwork may be necessary to obtain a smooth surface and uniform cross section. Lead off ditches shall be cleaned for a distance of (10) feet from the drainage dip.
D. Culvert cleaning for pay items 833(11), 833(12), and 833(13) include removing any material with inlet and outlet of pipe. Culverts which have silted in to a depth of ¼ of their opening height or more shall have their inlet and outlets cleaned as well as (3) feet of the upper and lower ends of the inside cleaned out to expose the full diameter of the culvert.
E. Culverts shall have their inlet and outlet cleaned as well as three (3) feet of the upper and lower ends of the inside cleaned out to expose the full diameter of the culvert. If debris is lodged in the culvert to the extent it cannot be cleaned by shovel, bar, and hand labor, the COR shall be notified of the location within 5 working days for a final determination of corrective measures to be taken.
F. Compact backfill:
1. Adjust the moisture content of the backfill material to a moisture content suitable for compaction. Compact each layer 6 inch layer loose material depth with a minimum of three complete passes or until visual displacement ceases using a mechanical tamper.
833.03 Location of Work:
As SPECIFIED IN THE TASK ORDER or as ordered by the Contracting Officer.
833.04 Measurement:
Measurement under this Section will be made by the total number of units for each item listed in the SCHEDULE OF ITEMS completed and accepted.
A. Linear Foot (LF): Measure the work along its length from end to end; parallel to the base or foundation; along the top; along the front face; or along the invert. Do not measure overlaps. Measure to the nearest linear foot.
A. Each: One entire unit. Measure the actual number of units completed and accepted.
B. Cubic Yard: The quantity will be the number of cubic yards measured in the vehicles.
833.05 PAYMENT:
A. The accepted quantities will be paid at the contract price per unit of measurement for the Section 833 pay item listed in the schedule of items. Payment will be full compensation for the work prescribed in this Section.
| Pay Item Number |
| Description |
| Unit |
| 833(1) |
| 18" 16 Gauge CMP Remove and Replace |
| LF/Per Task Order |
| 833(2) |
| 24" 16 Gauge CMP Remove and Replace |
| LF/Per Task Order |
| 833(3) |
| 18" HDPE Remove and Replace |
| LF/Per Task Order |
| 833(4) |
| 24" HDPE Remove and Replace |
| LF/Per Task Order |
| 833(5) |
| Install New Drain Dip |
| EA/Per Task Order |
| 833(6) |
| Install New Drivable Waterbar |
| EA/Per Task Order |
| 833(7) |
| Clean Culverts 24" Diameter and Under |
| EA/Per Task Order |
| 833(8) |
| Clean Culverts 24" Diameter through 48" |
| EA/Per Task Order |
| 833(9) |
| Clean Culverts over 48" |
| EA/Per Task Order |
| 833(10) |
| Jetting Culverts |
| EA/Per Task Order |
833 – DRAINAGE STRUCTURE RECONDITION
841 - DISTURBED AREA TREATMENT
841.01 Service Required
Apply vegetative treatments including seed, mulch, fertilizer or other products in designated areas.
841.02 Performance Standard
A. Treatment is complete when ordered quantities of vegetative treatment products have been applied to designated or disturbed areas.
B. Seed mix designation and application rate table will be specified in each task order.
841.03 Location of Work Location of work is as specified in the Schedule of Items or as ordered by the Contracting Officer.
841.04 Measurement Measurement under this Section will be made by the total number of units for each item listed in the SCHEDULE OF ITEMS completed and accepted.
A. Mile: Work activity will be measured along the centerline of the road regardless of the number of lanes. Measurement will be to the nearest one-tenth (0.1) mile.
B. Acre: Work activity will be measured to the nearest one-hundredth (0.01) acre.
841.05 Payment The accepted quantities will be paid at the contract price per unit of measurement for the Section 841 pay items listed in the schedule of items. Payment will be full compensation for the work prescribed in this Section.
| Pay Item Number |
| Description |
| Unit |
| 841(1) |
| Disturbed Area Treatment |
| Acre / Per Task Order |
| 841(2) |
| Disturbed Area Treatment |
| Mile / Per Task Order |
841 – DISTURBED AREA TREATMENT
842 - VEGETATION MAINTENANCE
842.01 Service Required
Remove vegetation, including trees, on roadway surfaces, roadsides, ditches and drainage structures.
842.02 Performance Standard
A. Cut brush, trees and other vegetation within each area treated to a maximum height of 6 inches above the ground surface or obstruction such as rocks or existing stumps. Trees larger than 4 inches diameter breast height (DBH) within the treatment area shall remain unless otherwise designated. When work is performed under this Section, remove all limbs which extend into the treated area, or over the roadbed, to a height of 16 feet above the roadway surface elevation.
B. When ordered by the Contracting Officer to work in a weed infested area the contractor will be required to prevent spreading the infestation into un-infested areas by cleaning vehicles and equipment. The contractor will use wash stations approved by the Contracting Officer.
C. Work may be performed either by hand or mechanically…