Attachment 5 R-243-0459_RevA_ Chg3_Feb2022.pdf
PDF 342 KB Posted
- Solicitation number
- 70Z08023R21909B00
About this file
This is a solicitation for the overhaul and manufacture of propulsion shafts and overhaul of rudders for the United States Coast Guard. The solicitation seeks contractors to provide labor, equipment, and materials to evaluate, repair, test, inspect, preserve, package, and mark propulsion shafts and rudders in accordance with specification R-243-0459. Contractors will be responsible for receiving, inspecting, overhauling, testing, preserving, packaging, packing, and marking propulsion shafts and rudders from various Coast Guard cutter classes. Services include pre-repair inspections, welding and machining repairs, heat treatment, dimensional inspections, and application of protective coatings. Responses are due by the date specified in the solicitation, with contract awards determined thereafter. Pricing will be based on labor hours and material costs for overhauling each individual item as released in delivery orders.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REVISION No. A . CHANGE NO. 3 .
PROPULSION SHAFT OVERHAUL
378’ WHEC, 210’, 270’, 282’ WMEC,
225’ WLB and 140’ WTGB
U. S. COAST GUARD VESSELS
R-243-0459
ORIGINATED BY: P.R. Mulrooney . DATE: 02/2005 .
UPDATED BY: James Happe (Revision A) (Change 3) . DATE: 2/01/2022 .
ORIGINATOR’S COMMAND: Surface Forces Logistics Center (SFLC) .
DEPARTMENT / DIVISION: Long Range Enforcer Supply One (LRE-SUP-1) .
INTERNAL REVIEWER: D.Heisey, S.Hardsock, K. Danahy, E. Gaskins. DATE: 3/4/13 .
SWORB APPROVAL: D. Dressel . DATE: .
USCG – SFLC
DATE 02/2007
SPEC NUMBER: R-243-0459
REV: A (12/12); Change 3 (2/01/22)
PROPULSION SHAFT OVERHAUL 378’WHEC,
210’, 270’, 282’ WMEC, 225’ WLB and 140’ WTGB U.S. COAST
GUARD VESSELS
1.0. SCOPE
1.1. This specification provides the requirements for the receipt, inspection & condition/test reports, overhaul, testing, preservation, packaging, packing and marking of propulsion shafts used on WHEC, WMEC, WLB and WTGB
U. S. Coast Guard Vessels.
1.2. Classification
1.2.1. Types of propulsion shafts
DATA
SHEET
VESSEL
CLASS
U/I TITLE NSN
Para 2.3.2
Dwgs
001 140 WTGB EA SHAFT, PROPULSION 2010-01-089-8123 (a)
002 210A WMEC SET SHAFT SET, PROP 2010-01-459-5795 (b)
003 210B WMEC EA SHAFT, LINE 2010-01-141-3512 (c)
004 210B WMEC EA SHAFT, TAIL 2010-01-092-5810 (d)
005 225 WLB EA SHAFT, PROPULSION 2010-01-399-5912 (e)
006 270 A&B WMEC EA SHAFT, TAIL 2010-01-135-7065 (f)
007 282 WMEC EA SHAFT,STERN TUBE 2010-00-248-6828 (g)
008 282 WMEC EA SHAFT, PROP 2010-00248-6829 (g)
009 378 WHEC EA SHAFT, STERN TUBE 2010-01-140-8901 (i)
378 WHEC
719-726 EA SHAFT, TAIL (EW) 2010-01-141-9944 (h)
378 WHEC
715-718 EA SHAFT, TAIL (PSI) 2010-01-078-4097 (j)
012 140 WTGB EA
SHAFT, PROPULSION
(FORGING)
2010-01-F93-0330 (a)
13 210A WMEC EA
SHAFT, PROPULSION, FWD
(FORGING)
2010-01-F93-0321 (b)
14 210A WMEC EA
SHAFT, PROPULSION, AFT
(FORGING)
2010-01-F93-0322 (b)
15 210B WMEC EA
SHAFT, LINE
(FORGING)
2010-01-F93-0326 (c)
16 210B WMEC EA
SHAFT, TAIL
(FORGING)
2010-01-F93-0323 (d)
SPEC NUMBER: R-243-0459
REV: A (12/12); Change 3 (2/01/22)
017 270 A&B WMEC EA
SHAFT, TAIL
(FORGING)
2010-01-F93-0327 (f)
018 378 WHEC EA
SHAFT, STERN TUBE
(FORGING)
2010-01-F93-0336 (i)
019 378 WHEC EA
SHAFT, TAIL
(FORGING)
2010-01-F93-0337 (h) / (j)
1.3. Government Furnished Property (GFP)
1.3.1. The propulsion shafts listed in 1.2.1 constitute all of the GFP applicable to this specification. This list contains propulsion shafts that have been in service in addition to shaft forgings. Individual shaft(s) will be released to the Contractor as dictated by USCG requirements with the issuance of a delivery order.
a. Due to the large quantity of work required to repair / overhaul individual propulsion shafts, only one propulsion shaft, identified by individual part number and / or corresponding national stock number, will be repaired per delivery order.
b. The 210A WMEC Shaft Set is identified under a single part / national stock number but consists of two (2) each individual shafts. With regards to the Acceptance and subsequent overhaul timeline of this single shaft set, the set shall be viewed as two (2) separate individual shafts.
1.4. Government Furnished Material (GFM)
1.4.1. Propulsion shaft sleeves constitute all of the GFM applicable to this specification and will be released to the Contractor as necessary with the issuance of a delivery order or contract modification that authorizes the repair / overhaul of the applicable propulsion shaft. Nominal dimensional data and material information can be found on the applicable Data Sheets listed above in section 1.2.1.
2.0.APPLICABLE DOCUMENTS
2.1. General – The documents listed in this section are specified in sections 3, 4, or 5 of this specification. This section does not include documents cited in other sections of this specification or recommended for additional information or as examples. While every effort has been made to ensure the completeness of this list, document users are cautioned that they must meet all specified requirements cited in sections 3, 4, or 5 of this specification, whether or not they are listed.
2.2. Government Documents – The following specifications and standards form a part of this specification to the extent specified herein. Unless otherwise specified, the documents listed here by number and date shall be those in the
SPEC NUMBER: R-243-0459
REV: A (12/12); Change 3 (2/01/22) current Department of Defense Single Stock Point of Specifications and
Standards (DODSSP) and supplements thereto.
2.2.1. Military Specifications
a. MIL-DTL-2845E(SH), 18 Aug 1999; Propulsion Systems, Boat and
Ship; Main Shafting, Propellers, Bearings, Gauges, Special Tools, and
Associated Repair Parts; Preservation, Packaging, Packing and Storage of.
b. MIL-R-23461A, 26 Jun 1987; Resin Compound, Room Temperature
Curing, for Metal Coating
c. MIL-S-23284A, 15 Jun 1990; Steel Forgings, Carbon and Alloy, for
Shafts, Sleeves, Propeller Nuts, Couplings, and Stocks (Rudder and
Diving Planes).
d. DODD 4140.01-M-1, Dated 7 Sep 2007; Compliance for Defense
Packaging: Phytosanitary Requirements for Wood Packaging Material
(WPM).
2.2.2. Military Standards
a. MIL-STD-2191, 05 Nov 1992; Repair Welding, Weld Cladding, Straightening, and Cold Rolling of Main Propulsion Shafting.
b. MIL-STD-2199B (SH), Change Notice 1, 28 Jan 2020; Coverings for
Waterborne Main Propulsion Shafting On US Naval Surface Ships and
Submarines
c. MIL-STD-2035A, 15 May 1995; Nondestructive Testing Acceptance
Criteria.
2.2.3. NAVSEA Technical Publications
a. S9243-AW-TRS-011/0203-086-501A, Change D, 01 Jun 2004;
Technical Repair Standard for Surface Ships Main Propulsion Shafting
Overhaul Procedures.
b. T9074-AS-GIB-010/271(1), 16 Feb 1999; Requirements for
Nondestructive Testing Methods.
c. CUMBERSOME WORK PRACTICE (CWP) Letter, No. 372. Dated
12 Sep 2012; Deletion of Main Propulsion Shaft In-Service Ultrasonic
Testing Requirement, Approval Of.
2.3. Other Government Documents – The following documents form a part of this specification to the extent specified herein. The documents listed shall be by title and effective date, unless otherwise documented.
2.3.1. Coast Guard Specifications.
SPEC NUMBER: R-243-0459
REV: A (12/12); Change 3 (2/01/22)
a. USCG-SFLC Specification D-000-0100 Rev G, 02/2006; Bar Coding for USCG Surface Forces Logistics Center procured material.
b. USCG SFLC Standard Specification 6310, 2012, Requirements For
Preservation Of Ship Structures, For Underwater Body Paint
Requirements.
2.3.2. Drawings, Shafts
a. 140 WTGB-243-002 Rev (B), 08 Jul 2019, Propulsion Shafting
Arrangement
b. 618WMEC-243-008 Rev (B), 03 Apr 2020; 210’ MMA “A” Class
Shafting Arrangement, & Details (Water Lubricated Bearings).
c. 627WMEC-243-006 Rev (D), 26 Mar 2020 210 FT “B” Class, Line
Shaft.
d. 627WMEC-243-007 Rev (D), 01 Apr 2020 210 FT “B” Class, Tail
Shaft.
e. 225B-WLB-243-001 Rev (J), 08 May 2014; Propulsion Shafting
Arrangement.
f. 905-WMEC-243-12 Rev (B), 07 Jun 2011; Controllable Pitch Shafting
Details
g. 282-WMEC_203_10 Rev (GG), 09 Mar 2017, Shafting Details.
h. 378FRAM-W-243-30 Rev (D), 26 Feb 2020; Tail Shaft (EW)
i. 378FRAM-W-243-27 Rev (F), 26 Feb 2020; WHEC Shafting Details
j. 378FRAM-W-243-31 Rev (C), 26 Feb 2020, Tail Shaft (hulls 715-718, PSI)
k. 803-2145807, Rev C 19 Dec 1988 NAVSEA Standard Propulsion
Shafting Drawing
2.4. Commercial Documents – The following specifications and standards form a part of this specification to the extent specified herein. Unless otherwise specified, the documents listed here by number and date shall be those in the current Department of Defense Single Stock Point of Specifications and
Standards (DODSSP) and supplements thereto.
2.4.1. American National Standards Institute (ANSI)/ National Conference of
Standards Laboratories (NCSL)
a. ANSI/NCSL Z540.3-2006, 03 Aug 2006, Requirements for the
Calibration of Measuring and Test Equipment.
2.4.2. Society of Automotive Engineers (SAE)
a. SAE J448, 01 Aug 2011, Surface Texture.
SPEC NUMBER: R-243-0459
REV: A (12/12); Change 3 (2/01/22)
2.4.3. American Society for Testing & Materials (ASTM)
a. ASTM-A-668/A668M-04 (R 2009), 01 Mar 2004; Standard
Specification for Steel Forgings, Carbon and Alloy, for General
Industrial Use.
b. ASTM B 369 – 09; 01 Apr 2009 Standard Specification for Copper-
Nickel Alloy Castings.
2.4.4. National Association of Corrosion Engineers (NACE)
a. NACE RP0375, Dated 03 Nov 2006, Field-Applied Underground Wax
Coating Systems for Underground Pipelines: Application, Performance, and Quality Control.
2.4.5. American Water Works Association (AWWA)
a. AWWA C217, Dated 16 Jan 2016, Microcrystalline Wax and Petrolatum
Tape Coating Systems for Steel Water Pipe and Fittings
2.5. Document Availability – To obtain the referenced documents see section 6.1 of this specification.
2.6. Specification Order of Precedence – In the event of a conflict between the text of this specification and the references cited herein, this specification shall take precedence. Nothing in this specification, however, supersedes applicable laws and regulations unless a specific exemption has been obtained.
3.0.REQUIREMENTS
3.1. Government Furnished Property (GFP) - Contractor shall provide inside storage for all GFP with complete protection from the weather elements.
3.2. Government Furnished Material (GFM) – Contractor shall provide inside storage for all GFM with complete protection from the weather elements, stowed in the original shipping containers when not in use.
3.2.1. GFM Dimension Data – Sleeve dimensions are listed on the applicable
Data Sheets referenced in 1.2.1. of this specification.
3.3. General – Contractor shall provide all labor, equipment, and materials, except for any GFM, required to evaluate, repair, test, inspect, preserve, package, pack and mark any of the propulsion shafts outlined on the applicable drawings and data sheets referenced in this specification as may be required by the Contracting
Officer.
3.4. Shaft Receipt : Upon receipt of each shaft, the Contractor shall:
SPEC NUMBER: R-243-0459
REV: A (12/12); Change 3 (2/01/22)
a. Uncrate and remove any preservative and all existing protective shaft coverings.
b. Remove all corrosion and thoroughly clean the shaft and bore to facilitate a detailed Pre-repair Inspection.
c. Provide Contracting Officer with a “propulsion shaft arrival” Condition
Found Report (CFR) containing the arrival date and time of the propulsion shaft and name of person who signed for the GFP. CFR shall also contain a listing of all identification type markings or numbering and location of markings on the propulsion shaft.
3.5. Pre-repair Inspection: After completing the requirements in section 3.4 of this specification, the Contractor shall perform a Pre-repair Inspection in accordance with chapter 3 of the NAVSEA Technical Repair Standard, reference 2.2.3.a. of this specification.
3.5.1. All references to the various departments of Naval Sea Systems Command
(NAVSEA) shall be changed to read the “SFLC Contracting Officer” for any contract referencing this specification.
3.5.2. As per NAVSEA CWP Letter No. 372, ref. 2.2.3.c. of this specification, in-service one-time Ultrasonic Testing (UT) inspection requirement of surface ship main propulsion shafts for both fixed and controllable pitch propeller is no longer required and shall not be accomplished.
3.5.3. Initial action of Pre-repair Inspection shall be the determination of the installed shaft sleeve condition and their ability to meet the criteria outlined in section 3.9.1 of this specification. If they “do” meet the criteria, then they shall remain on the shaft and be repaired in lieu of removal / replacement. If it is determined that the shaft sleeves “do not” meet the criteria, then the sleeves shall be removed as part of the Pre-repair Inspection. The
Contracting Officer shall be informed within 3 business days of this determination / action via CFR detailing specifics of why the sleeves did not meet the criteria. This CFR shall be provided prior to completion of the Pre-repair Inspection and submission of the Pre-repair Inspection Report.
3.6. Tests and Inspections – All applicable test and inspection procedures, and acceptance criteria shall be in accordance with the references cited in section 2.0 of this specification.
3.6.1. Chemical Composition – If the Chemical Composition of the propulsion shaft received for overhaul is not known, (i.e. marked on fwd end of as rcvd propulsion shaft), the Contractor shall determine the chemical composition and material class of the propulsion shaft by taking a sample from the forward face. The findings shall be included in the Pre-repair and Post
Repair Inspection Reports.
SPEC NUMBER: R-243-0459
REV: A (12/12); Change 3 (2/01/22)
3.6.2. Packaging Inspection – The Contractor shall conduct a thorough inspection of the shaft packaging (Shipping Crate), to ascertain any needed repairs up to and including complete replacement of the shipping container / skid. If as received condition allows for re-use with minimal repairs, the
Contractor shall confirm that the shaft packaging conforms to the
Phytosanitary Requirements for Wood Packaging Material (WPM) IAW paragraph C2.1.1. of DoDD 4140.01-M-1, Compliance for Defense
Packaging, Ref. 2.2.1.d. of this specification.
3.7. Pre-repair Inspection Report: Based on the findings from the Pre-repair
Inspection, the Contractor shall prepare a report detailing the pre-repair condition of each shaft. The report shall include but not be limited to the following:
a. Serial number and part number/drawing number (if known).
b. Total Indicated Runout (TIR).
c. All Dimensional Data.
d. Detailed bore ID Dimensions at ends, middle & quarter length locations, as applicable.
e. Non-destructive testing results.
f. Detailed drawings of and digital photographs showing location and severity of all surface defects.
g. As received condition of shaft shipping container / skid with digital photographs.
h. Verification that shipping container/skid meets requirements in 2.2.1.d.
3.7.2. Submission of Pre-repair Inspection Report – The Contractor shall submit a Pre-repair Inspection Report along with a Repair Plan that outlines proposed repairs to the Contracting Officer for review and approval. The methods and procedures to accomplish these repairs shall be in accordance with this specification and the references listed in sections 2.2, 2.3, and 2.4.
a. The Repair Plan shall include a detailed breakdown of all labor hours with associated skill sets, and associated material costs required to complete the overhaul of the propulsion shaft, including repair of and / or replacement cost of the shipping container / skid.
3.8. Approval to proceed with repairs – The Pre-repair Inspection Report and
Repair Plan shall be submitted to the Contracting Officer for approval. No further work shall be accomplished or will be authorized until the submitted report is reviewed and approved in writing by the Contracting Officer.
3.9. Bearing Sleeves
SPEC NUMBER: R-243-0459
REV: A (12/12); Change 3 (2/01/22)
3.9.1. Use of Installed Bearing Sleeves – If the following conditions can be met, then the propulsion shafts sleeves shall remain installed upon the shaft and the sleeve roughness / damage, shall be removed by taking a skim cut on a lathe or hand smoothing.
a. Sleeves are minimally worn, pitted, or otherwise minimally damaged.
b. Sleeves can be machined smooth so that the sleeve diameters will not be reduced by more than 0.060 inch from the minimum designed outside diameter (OD) as listed on the applicable drawing.
c. Sleeves are constructed of Copper Nickel (CuNi),
d. Propulsion Shaft can otherwise be repaired without removing the sleeve(s).
NOTE: Repair by hand-smoothing shall be used as a last resort and kept to a minimum to avoid flat spots. All defects that the Contractor proposes to dress up or correct by hand-smoothing shall be detailed on the Pre-repair Inspection Report and Repair Plan and shall be approved by the Contracting Officer before repairs are authorized.
3.9.2. Installation of New Sleeves – Newly installed sleeves shall be concentric with the axis of rotation to within 0.002” TIR.
a. Sleeves shall be secured to the shaft by the shrink fit specified on the drawing. Any other method of securing shaft sleeves to the shaft is prohibited. In the event a shrink fit is not specified, refer to Table 59F on sheet 8 of the NAVSEA Standard Drawing, reference 2.3.2.k of this specification.
b. Prior to sleeve installation, the shaft journal OD, Surface finish dimension, Sleeve inside diameter (ID) and Sleeve inside surface finish dimension shall be measured and recorded for inclusion in the final inspection report.
c. After installation and finish machining of shaft sleeve(s) OD.
Contractor personnel qualified in accordance with Section 1 of
NAVSEA T9074-AS-GIB-010/271, reference 2.2.3.b. of this specification, shall perform a liquid dye penetrant Non Destructive Test
(NDT) inspection of all sleeves for cracks / discontinuities in accordance with NAVSEA T9074-AS-GIB-010/271 Section 5, Group I or Group III.
d. During the NDT process, the Contractor shall pay particular attention to lock-ring and O-ring groove locations. If cracks / discontinuities are detected, a report detailing the specific location(s) and dimensions
(length and depth) of these defects, including recommendations for repair, shall be submitted to the Contracting Officer for review and approval.
SPEC NUMBER: R-243-0459
REV: A (12/12); Change 3 (2/01/22)
3.10. Qualification of Welding Procedures & Personnel – Welding procedures, welders, and welding operations shall be qualified in accordance with section
5.0 of MIL-STD-2191, reference 2.2.2.a. of this specification.
3.10.1. Welding Procedure Specifications, Procedure Qualification Records, and
Welder Performance Qualifications for the material that each of the propulsion shafts listed in section 1.2.1. of this specification are manufactured from shall be submitted to the Contracting Officer for approval.
3.10.2. The welding procedures shall include, as a minimum, the following:
a. Chemical analysis of the shaft.
b. Material specification.
c. Sketch of the defect, a drawing showing location, including dimensions and digital photographs of the defect.
d. Method used to remove the defect and cavity preparation.
e. Method used to inspect the cavity to ensure complete removal of the defect in accordance with T9074-AS-GIB-010/271(1) ref. 2.2.3.b. of this specification.
f. Base metal type and heat treated condition.
g. Filler metal, size and type (specification & AWS designation)Flux or gas, and gas flow rate.
h. Position of weld (down hand only).
i. Arc voltage and current range.
j. Minimum preheat temperature (as a general rule for base material not identified in MIL-STD-2191, reference 2.2.2.a. of this specification, minimum preheat temp. shall be at least 275 degrees F).
k. Maximum interpass temperature.
l. Post heat treatment.
m. Inspection method of completed welds as per T9074-AS-GIB-
010/271(1), ref 2.2.3.b. of this specification.
3.11. Welding of cracks & deep pitting – These repairs shall be in accordance with
MIL-STD-2191, reference 2.2.2.a. of this specification.
a. The welded areas shall be machined flush.
b. Minor pitting not exceeding 1/16 inch depth shall be hand worked or ground to a faired radius.
c. Welding repair of Cracks or Pitting exceeding 1/16 inch depth but less than 1/4 inch depth shall be reviewed on a case by case basis dependent upon shaft size and location of damage.
SPEC NUMBER: R-243-0459
REV: A (12/12); Change 3 (2/01/22)
d. Surface finishes shall be 125 RMS unless otherwise stated.
e. Before heat treatment, review the manufacturer data sheets/user directions for the heat resistant scale preventative chosen. Some of these materials can only be removed by mechanical methods.
3.12. Post Weld Heat Treatment – All shafts which have been welded, shall be stress relief heat treated in accordance with section 10.4.5 of MIL-STD-2191 reference. 2.2.2.a. of this specification.
a. Heat resistant scale preventative – Any anti-scale compound used on finish machined surfaces shall comply with MIL-STD-2191 section
10.4.5.2.
b. “No Carb” heat resisting scale preventative shall not be used on any threaded surfaces as per the manufacturer’s recommendation.
Recommended alternatives are:
1. Protect-O-Metal No. 2 from G.W. Smith & Sons, Inc. 937-253-
5114, www.gwsmithandsons.com
2. Keepbryte, from Kasenite Company, available from many U.S.
suppliers.
c. Any material offered as “equal” shall be submitted to the Contracting
Officer for approval. Documentation detailing the chemical and material analysis shall accompany the submittal.
3.13. Straightening procedures – These repairs shall be in accordance with section
11 of MIL-STD-2191, reference 2.2.2.a. of this specification.
3.13.1. Determine location, magnitude, and type of bend – Prior to initiating straightening processes, the location, magnitude, and type of bend shall be determined. *The entire shaft shall be supported between centers on a lathe with no auxiliary supports.
*NOTE: This procedure shall be used for all TIR checks on shafts overhauled in accordance with this specification.
3.14. Cold Rolling – This procedure shall be accomplished in accordance with section 12 of MIL-STD-2191, ref. 2.2.2.a. of this specification and section 3-4 of NAVSEA S9243-AW-TRS-011/0203-086-501A, ref. 2.2.3.a. of this specification.
a. Cold rolling shall be accomplished in accordance with direction given on the applicable shafting drawing.
b. Any weld repair of either the sleeve fit area at the aftermost bearing of a propeller shaft or to the propeller taper area of a propeller shaft shall require this / these area(s) to be cold rolled.
http://www.gwsmithandsons.com/
SPEC NUMBER: R-243-0459
REV: A (12/12); Change 3 (2/01/22)
3.15. Marking of Weld Repaired Shafts - Shafts that are reconditioned by means of welding, in accordance with an approved procedure, are to be stamped “Welded- S.R.”, along with the attending “Surveyor's identification marks”, so that it will be clear to the installation Surveyor that such shafts have been welded and stress relieved. In cases where the original shaft identification marks have been obliterated, new marks are to be added at this time in a low stress area, i.e.
forward face of shaft.
3.16. Shaft Covering – All shaft coverings shall be glass reinforced plastic (GRP), applied in accordance with MIL-STD-2199B, references 2.2.2.d. and 2.2.2.b. of this specification.
a. The resin used shall be an epoxy in accordance with MIL-R-23461.
b. Thixotropic fillers can be used as specified in section 5.2.1 of MIL-
STD-2199B.
c. Sealing/Fairing compound shall be in accordance with section 5.2.2. of
MIL-STD-2199B.
d. The environmental conditions required in section 5.5 of MIL-STD-
2199B.
e. The sleeve details on the applicable drawing shall be followed.
3.16.1. All shafting flanges, with exception of 225 WLB and 270 WMEC Tail shafts shall be coated/covered/protected in accordance with Appendix A of
MIL-STD-2199B.
a. Coating system shall also be applied to flange O.D. surfaces of 378’
WHEC Stern Tube Shaft Flange, 282’ WMEC Tail Shaft forward flange and both flanges of 282’ WMEC Stern Tube Shaft.
3.16.2. Non-machined Inboard sections of 270 WMEC, 225 WLB and 140
WTGB propulsion shafts shall be painted as follows:
a. Power tool clean surface and prep to SSPC – SP11 surface profile.
b. Apply one coat primer in accordance with MIL-PRF-23236 Type VII
Class 5, 4 – 8 Mils.
c. Apply two coats of paint IAW F-124, DOD-E-24067, 1.5 – 3 Mils per coat. Color of final paint coat shall be Fed Standard Color Code
Number 27880, “soft white”.
3.17. Identification Markings – In accordance with section 3.4.c. of this specification Contractor shall inspect propulsion shaft for identification markings / number(s) and shall provide them to the Contracting Officer as part of the propulsion shaft arrival CFR.
SPEC NUMBER: R-243-0459
REV: A (12/12); Change 3 (2/01/22)
3.17.1. Required markings – The following markings / numbers are the minimum required:
a. Serial number.
b. Drawing and /or part number.
c. Material type and class.
d. Weld repair & stress relief info IAW Sect 3.15. of this specification.
e. Contractor CAGE code & repair date
3.17.2. Serial Number – If propulsion shaft arrives without a serial number, Contractor shall request that one be provided by the Contracting Officer.
This request, if required, shall be included in the propulsion shaft arrival
CFR.
3.17.3. Absence of Markings – If all of the required markings are not stamped upon the forward face of the propulsion shaft, Contractor shall stamp onto the forward face of the propulsion shaft, the missing information, using block letter / numbers. Markings shall be applied neatly and in a semi-circular pattern. Size of the letters / numbering shall be no smaller than 3/16 of an inch and no larger than 7/16 of an inch in size.
3.17.4. Partial Markings – If some of the required markings are not stamped upon the forward face of the propulsion shaft, Contractor shall determine which information needs to be added and shall stamp this information adjacent to any preexisting numbers / letters using the same size, shape and format of the pre-existing letters / numbering.
3.17.5. 210A WMEC Shaft Markings – All required markings shall be stamped into the forward face of both 210A WMEC propulsion shaft sections. In addition, forward shaft section serial number shall be stamped into the “aft face” of the forward shaft section.
3.18. Post Repair Inspections & Tests – Contractor shall perform the following inspections and tests after final machining work is complete. The results shall be recorded on a Post Repair Inspection Report and submitted to the
Contracting Officer for approval.
a. Any areas repaired by welding shall be inspected for cracks and other defects using the methods described in, and in accordance with the inspection requirements of section 7 of MIL-STD-2191, reference
2.2.2.a. of this specification, and the approved welding procedure.
b. Each shaft shall be dimensionally inspected for conformance to the applicable drawing(s) and this specification.
c. TIR inspections shall be conducted in accordance with the procedure outlined in section 11.2.1 of MIL-STD-2191, SPEC NUMBER: R-243-0459
REV: A (12/12); Change 3 (2/01/22) reference 2.2.2.a. of this specification, and section 3-4.13 of
S9243-AW-TRS-011/0203-086-501A, Technical Repair
Standard for Surface Ships Main Propulsion Shafting Overhaul
Procedures, reference 2.2.3.a of this specification, and applicable drawing.
d. 270’ WMEC propulsion shafts sleeves will be allowed a maximum measured TIR of 0.005”. TIR requirements for all other areas of 270’
WMEC propulsion shafts shall be in accordance with paragraph 3.18.c.
of this specification and applicable drawing.
e. Flanges requiring coating system application to OD surface shall have
TIR dimension of flange OD recorded and digitally photographed by
Contractor prior to application of authorized coating system. Recorded dimensions and photographs shall be included within post repair inspection report and provided to CG Quality Assurance (QA) representative during the final QA inspection of the propulsion shaft.
f. Final TIR dimensions shall be conducted and recorded “after” GRP
(fiberglass) covering has been installed.
g. All GRP coated areas of shaft, shall pass a spark test in accordance with section 5.6.1 of MIL-STD-2199, Change Notice 1, reference
2.2.2.d. of this specification.
1. Excessive voltage may damage the GRP and shall not exceed 100 volts per 0.001” of coating thickness. Do not exceed 15,000 VDC or 10,000 VAC, 3-10MHz.
h. Using the findings from the Post Repair Inspection, prepare a report detailing the post repair condition of each shaft. The report shall include but not be limited to the following.
1. Identification markings IAW section 3.15 and 3.17 of this specification.
2. TIR
3. Dimensional data.
4. Bore dimension and condition.
5. Chemical Composition.
6. Non-destructive testing results.
7. Spark test voltage and results.
3.19. Dimensions – All dimensions and dimensional tolerances shall be as indicated on the specified drawing(s).
SPEC NUMBER: R-243-0459
REV: A (12/12); Change 3 (2/01/22)
3.19.1. In the event that a tolerance is not specified on the drawing, the following dimensions shall apply:
a. Fractional dimensions shall not exceed +/- 1/64”
b. Decimal dimensions shall not exceed (x.xx) +/- 0.01”, (x.xxx) +/-
0.001”, (x.xxxx) +/- 0.0005”
c. Angular dimensions shall not exceed +/- 15 minutes.
d. Angular tolerance on all drilled holes shall not exceed +/- 0.001” at the bolt circle.*
*NOTE: This tolerance is only applicable if there is damage to the flange bolt holes that requires weld repair and re-drilling.
3.20. Reports – All reports prepared for submission shall contain, at a minimum, the following information in addition to the specific information called for in the
Pre-repair inspection report described in section 3.5 of this specification and the
Post Repair Inspection Report described in section 3.18 of this specification.
a. Prime contractor company name, address, and telephone number.
b. Testing contractor contact info (if different from above).
c. Contract and delivery/task order number.
d. Test / measuring equipment used, nomenclature, serial number, and calibration date.
3.21. Surface finish standards – All surface finishes shall be in accordance with
SAE-J-448 to the Roughness Height “arithmetical average” (Ra) number indicated on the specified drawing.
3.22. Notifications & Inspections – Contractor shall be responsible for notifying the
Contracting Officer at least ten (10) calendar days prior to being ready for any inspections or testing.
4.0.QUALITY ASSURANCE
4.1. General – Contractor shall provide and maintain an inspection system which shall ensure each item offered to the Coast Guard for acceptance or approval conforms to the contract requirements. The inspection system shall be documented and available for review by the Coast Guard.
4.2. Records – Contractor shall maintain records of all inspections and tests. The records at a minimum shall indicate the nature and number of observations made, the number and type of deficiencies found, and the corrective action taken.
4.3. Calibration System – Contractor, as well as any subcontractors, shall be required to maintain a test equipment calibration program in compliance with
SPEC NUMBER: R-243-0459
REV: A (12/12); Change 3 (2/01/22)
ANSI/NCSL Z540-1-1994. The program shall be documented and traceable to the National Institute of Standards (NIST).
4.4. Responsibility for Inspection – Contractor shall be responsible for the performance of all inspection requirements specified herein. The contractor shall provide space, personnel, and test equipment to perform all of the inspection requirements. All inspection and testing shall be performed at the contractor’s plant or at other facilities acceptable to the Coast Guard. The Coast Guard reserves the right to verify, witness or have any of the inspections performed that are deemed necessary to assure that supplies and services conform to the prescribed requirements.
4.5. Responsibility for Compliance – All items shall meet the provisions of sections
3 & 5 of this specification. The inspections set forth in this specification shall become part of the Contractor’s overall inspection system or quality program.
The absence of any inspection requirements in the specification shall not relieve the Contractor of the responsibility of assuring that all products or supplies submitted to the government for acceptance comply with all requirements of the contract. Sampling for quality conformance does not authorize submission of known defective material (either indicated or actual) nor does it commit the government to acceptance of defective material.
4.6. Tests & Inspections – The inspections/tests required here and in the appropriate subsections outlined in section 3 of this specification are the minimum required and are not intended to supplant any controls, examination, inspections or tests normally employed by the Contractor to assure the quality of the item in question.
4.6.1. The following Post Repair tests and inspections will be witnessed by an SFLC Quality Assurance Representative:
a. Verify marking information IAW section 3.15 and 3.17 of this specification.
b. TIR after final machining and application of fiberglass.
c. Complete Dimensional Inspection.
d. Bore dimension, condition and preservation.
e. Proper application of GRP and sealing fairing compound. In required locations IAW Applicable Dwg, MIL-STD-2199B, SPEC NUMBER: R-243-0459
REV: A (12/12); Change 3 (2/01/22)
```````````````````````````````````````````````` and References
2.2.2.b., 2.2.2.d., of this specification.
f. Spark test of shaft GRP System and verify correct GRP testing voltage.
g. Preservation Inspection.
h. Packaging, Packing and Marking Inspection.
4.7. Failure Responsibility – If the specified item fails to pass any inspection / test, the Contractor shall report the failure and the recommended corrective action to the Contracting Officer. If approved, the corrective action on the materials or processes shall be accomplished in accordance with this section.
4.7.1. General Statements
a. The inspection / test shall be discontinued until all corrective action has been taken.
b. After all corrective actions have been taken the inspection / test shall be repeated unless waived by the Contracting Officer.
c. Acceptance shall be withheld contingent upon satisfactory completion of all inspections / tests.
d. All corrective actions shall be documented as part of the Contractor’s inspection system and submitted for approval to the Contracting
Officer.
e. Each corrective action report shall include, but not be limited to the cause of each defect, corrective action suggested, and the steps taken to prevent a recurrence of each defect.
4.7.2. A copy of any test, inspection or tolerance report shall be turned over to the Quality Assurance Representative upon arrival at the Contractors’ plant.
4.8. Packing Inspection – The Contracting Officer shall be notified prior to the packaging and marking of the completed units in accordance with section 3.21 of this specification.
5.0.PRESERVATION, PACKAGING, PACKING, & MARKING
5.1. Preservation – Cleaning, drying, preservatives, preservation application criteria and methods of preservation shall be in accordance with MIL-DTL-2845(SH), SPEC NUMBER: R-243-0459
REV: A (12/12); Change 3 (2/01/22) section 3.5.1.1 level A, Table I, for finished machined steel shaft surfaces.
Reference 2.2.1.a. of this specification.
5.2. Packaging – Shall be in accordance with MIL-DTL-2845E (SH), section 3.15.4.
& 3.15.4.2.
5.2.1. After second coating of initial preservation film, “Cosmoline”, has dried, all finished steel areas of propulsion shaft not covered with either GRP or paint, i.e. coupling taper, cooper bearing areas, bulkhead seal areas, shaft faces and shafting flange mating faces, shall be wrapped and / or protected with an overlapping, by 1/3rd tape width, full coverage layer of Petrolatum
Impregnated Tape, prior to installation of the remaining packaging material. Where Petrolateum Impregnated Tape meets up with shaft sleeves or previously painted areas of propulsion shaft. Petrolateum impregnated tape shall be wrapped around the entire circumference of the shaft sleeve end or painted surface and beyond the beginning of the shaft sleeve or painted area for a distance of not less than 3”.
a. Petrolatum Impregnated Tape shall meet the requirements of ANSI /
AWWA C217, ref. 2.4.4.a. of this specification and shall be applied in accordance with manufacturer’s requirements and section 4 of NACE
Standard RP0375-2006 Item No. 21013, ref. 2.4.5.a. of this specification.
5.2.2. Flange faces where applicable shall be protected in accordance with MIL-
DTL-2845(SH), section 3.15.5.
5.3. Packing – Shall be in accordance with MIL-DTL-2845(SH), section 3.15.6.
5.4. Technical Reports – A complete copy of the KO, COR Reviewed and QAR
Marked up Final Inspection Report, along with pictures and any other documentation requested by the Contracting Officer shall be packed with the propulsion shaft in accordance with section 3.15.8 of MIL-DTL-2545E(SH), reference 2.2.1.a. of this specification
5.5. Wood Packaging material (WPM) Requirements – All packaging and packing material shall meet the Phytosanitary Requirements for WPM in accordance with paragraph C2.1.1. of DoDD 4140.01-M-1, Compliance for Defense Packaging, Ref. 2.2.1.d. of this specification.
5.5.1. WPM is defined as:
a. wood pallets
b. skids
c. load boards
SPEC NUMBER: R-243-0459
REV: A (12/12); Change 3 (2/01/22)
d. pallet collars
e. wooden boxes
f. reels
g. dunnage
h. crates
i. frames
j. cleats
5.5.2. All new purchases of WPM shall be constructed from heat treated (treated to 56° C. core temperature for 30 Minutes), lumber and certified by an accredited agency recognized by the American Lumber Standard
Committee (ALSC) in accordance with Ref. 2.2.1.d. of this specification.
5.5.3. For existing crating/skid, the Contractor shall determine if the requirements listed in 5.5 are met. If the requirements are not met, the Contractor shall determine if the crating / skid can be brought to meet the requirements or will require replacement.
5.5.4. All solid wood utilized in the manufacture or repair of crating/skids shall have the appropriate markings in accordance with Ref. 2.2.1.d. of this specification.
5.6. Marking – Each preserved, packaged and packed item shall be marked in the upper left-hand side of the two longest sides (two opposite sides if square) of each box. If the lettering is stenciled on, it shall be at least 1” high, in black print lettering on a highly contrasting white painted background.
5.6.1. This marking shall consist of the STOCK NUMBER, ITEM NAME, PART NUMBER, SERIAL NUMBER, CONTRACT NUMBER /
DELIVERY ORDER NUMBER, GROSS WEIGHT (in lbs.), condition code CONDITION “A”, unit of issue with quantity (i.e. 1-EA) and the words COAST GUARD SFLC MATERIAL, REUSABLE CONTAINER
DO NO DESTROY.
5.6.2. Marking shall be laid out in this fashion:
SPEC NUMBER: R-243-0459
REV: A (12/12); Change 3 (2/01/22)
STOCK NUMBER See delivery order/Data sheet
ITEM NAME See delivery order/Data sheet
PART NUMBER See delivery order/Data sheet
SERIAL NUMBER As assigned
CONTRACT NUMBER See Contract
DELIVERY ORDER NUMBER As issued
SHIPPING WEIGHT As determined by contractor
CONDITION CODE CONDITION “A”
QUANTITY & UNIT OF ISSUE 1 – EACH
COAST GUARD SFLC MATERIAL
REUSABLE CONTAINER DO NOT DESTROY
5.7. Bar Coding – Bar code labels shall be supplied on all CLIN’s except for those that require data submissions only.
5.7.1. All bar coded labels shall be in accordance with SFLC specification D-
000-0100.
a. The actual labels shall be Type “V“, Grade “A“, Style “2“, Composition “b” with plastic laminate.
b. Each label shall contain encoded data for the Stock Number.
5.8. Common Carrier Preparation – In addition to the transportation requirements specified in paragraph 3.15.10. of MIL-DTL-2545E(SH), reference 2.2.1.a of this specification. All packaged shaft(s) shall be loaded on a flatbed steel trailer with minimal camber and wooden floor only. No aluminum trailers are authorized. Shaft(s) are very sensitive and shall lay as flat and straight as possible.
5.8.1. Shaft(s) shall be loaded on the deck of the trailer only with no other items loaded on top of the crates.
5.8.2. Shim and secure crates as necessary to keep shaft(s) in a flat, straight position.
5.8.3. Carrier shall re-adjust shims as necessary if other shipped items are loaded or off-loaded which would result in changing the camber of the trailer.
SPEC NUMBER: R-243-0459
REV: A (12/12); Change 3 (2/01/22)
6.0.NOTES
6.1. Government & Commercial Document Sources
6.1.1. Government Documents
a. Department of Defense Single Stock Point (DODSSP)
Building 4, Section D
700 Robins Avenue
Philadelphia, PA 19111-5094
215-697-2667/2179
FAX 215-697-1462
b. DOD & Navy Publications and Forms (Other Than DODSSP)
Naval Publication and Forms Center
5801 Tabor Ave.
Philadelphia, PA 19120
215-697-2197
6.1.2. Commercial Documents
a. Society of Automotive Engineers INC. (SAE)
400 Commonwealth Drive
Warrendale, PA 15096-0001
412-776-4841
FAX 412-776-5760
www.sae.org
b. American Society for Testing & Materials (ASTM)
100 Barr Harbor Drive
PO Box C700
West Conshohocken, PA 19428-2959
610-832-9585
FAX 610-832-9555
www.astm.org
c. American National Standards Institute (ANSI)
25 West 43rd Street
(Between 5th and 6th Avenues) 4th Floor
New York, NY 10036
212-642-4900
FAX 212-398-0023
www.ansi.org
d. American Water Works Association (AWWA)
6666 W. Quincy Avenue
Denver, CO 80235
800-926-7337 (Phone)
303-347-0804 (Fax) http://www.sae.org/ http://www.astm.org/ http://www.ansi.org/
SPEC NUMBER: R-243-0459
REV: A (12/12); Change 3 (2/01/22) https://www.awwa.org/
e. NACE International
15835 Park Ten Place
Houston, TX 77084-4906
800-797-6223 (Phone)
281-228-6300 (Fax) http://www.nace.org/ https://www.awwa.org/ http://www.nace.org/
SPEC NUMBER: R-243-0459
REV: A (12/12); Change 3 (2/01/2022)
Data Sheet 1 of 19
DATA SHEET 001
140 WTGB Propulsion Shaft
Effective Date: 07/12, for use with specification R-243-0459
Drawing # 140 WTGB-243-002 Rev(B),“Propulsion Shafting Arrangement”
GFM Rough Machined Nominal Dimension Data
Sleeves:
Fwd, PC 2 NSN: 3120-01-191-6376 Length 23.00” OD 13.900” ID 12.220”
Aft, PC 3 NSN: 3120-01-192-5796 Length 69.00” OD 13.900” ID 12.220”
Sleeves are manufactured from ASTM-B-369 alloy C96400 centrifugal casting only.
GFP Description
Propulsion Tail Shaft PC 1, NSN: 2010-01-089-8123 Manufactured from forged shaft blanks of MIL-S-23284 Class 2 material.
MARKING DATA
Stock Number 2010-01-089-8123
Item Name Shaft, Propulsion, Ship
Part Number 101-WYTM-243-001-PIECE-1
Contract Number See Contract
Delivery Order Number As Determined
Shipping Weight As Determined
Condition Code “A” Condition
Qty & UI 1 EA
Coast Guard SFLC Material
REUSABLE CONTAINER DO NOT DESTROY
SPEC NUMBER: R-243-0459
REV: A (12/12); Change 3 (2/01/2022)
Data Sheet 2 of 19
DATA SHEET 002
210A WMEC Propulsion Shaft Set, Forward & Aft
Effective Date: 07/12, for use with specification R-243-0459
Drawing # 618WMEC-243-008 REV A “Shafting Arrangement & Details (Water
Lubricated Bearings)”
GFM Rough Machined Nominal Dimension Data
Sleeves, Fwd Prop Shaft
PC 23 NSN: 2010-01-350-5034 Length 34.00” OD 11.60” ID 10.65”
PC 24 NSN: 2010-01-350-8399 Length 26.00” OD 11.60” ID 10.65”
PC 25 NSN: 2010-01-313-8079 Length 7.250” OD 11.875” ID 10.625”
Sleeves, Aft Prop Shaft
PC 26 NSN: 2010-01-313-8079 Length 7.250” OD 11.875” ID 10.625”
PC 14 NSN: 2010-01-154-9900 Length 55.00” OD 12.000” ID 10.685”
PC 15 NSN: 2010-01-154-9899 Length 52.50” OD 12.375” ID 10.750”
Sleeves are manufactured from ASTM-B-369 alloy C96400 centrifugal casting only.
GFP Description
Propulsion Shaft Set PC 1&2 NSN: 2010-01-459-5795 (Repaired as a set) Manufactured from shaft blanks of ABS Grade 2, ASTM A668 Class B, Supplementary Requirement
S4 material.
MARKING DATA
Stock Number 2010-01-459-5795
Item Name Shaft Set, Propulsion, Fwd & Aft
Part Number 618WMEC-244-003
Contract Number See Contract
Delivery Order Number As Determined
Shipping Weight As Determined
Condition Code A Condition
Qty & UI 1 SE Box 1 of 2 and 2 of 2
SPEC NUMBER: R-243-0459
REV: A (12/12); Change 3 (2/01/2022)
Data Sheet 3 of 19
DATA SHEET 003
210B WMEC Propulsion Shaft, Line
Effective Date: 07/12, for use with specification R-243-0459
Drawing # 627WMEC-243-006 REV C Line Shaft
GFM Rough Machined Nominal Dimension Data
Sleeves:
Fwd, PC 2 NSN: 2010-01-187-1763 Length 27.00” OD 10.125” ID 8.000”
Aft, PC 3 NSN: 2010-01-094-8938 Length 37.00” OD 10.125” ID 8.125”
Sleeves are manufactured from ASTM-B-369 alloy C96400 centrifugal casting only.
GFP Description
Line Shaft PC 1, NSN: 2010-01-141-3512 Manufactured from shaft blanks of ABS
Grade 2, ASTM A668 Class B, Supplementary Requirement S4 material.
MARKING DATA
Stock Number 2010-01-141-3512
Item Name Shaft, Propulsion Line
Part Number 627WMEC-243-006
Contract Number See Contract
Delivery Order Number As Determined
Shipping Weight As Determined
Condition Code “A” Condition
Qty & UI 1 EA
SPEC NUMBER: R-243-0459
REV: A (12/12); Change 3 (2/01/2022)
Data Sheet 4 of 19
DATA SHEET 004
210B WMEC Propulsion Shaft, Tail
Effective Date: 07/12, for use with specification R-243-0459
Drawing # 627WMEC-243-007 REV C Tail Shaft
GFM Rough Machined Nominal Dimension Data
Sleeves:
Fwd, PC 2 NSN: 2010-01-222-9353 Length 37.000” OD 10.125” ID 8.625”
Aft, PC 3 NSN: 2010-01-222-9322 Length 52.000” OD 10.125” ID 8.750”
Sleeves are manufactured from ASTM-B-369 alloy C96400 centrifugal casting only.
GFP Description
Tail Shaft PC 1, NSN: 2010-01-092-5810 Manufactured from shaft blanks of ABS Grade
2, ASTM A668 Class B, Supplementary Requirement S4 material.
MARKING DATA
Stock Number 2010-01-092-5810
Item Name Shaft, Propulsion Tail
Part Number 627 WMEC-243-007
Contract Number See Contract
Delivery Order Number As Determined
Shipping Weight As Determined
Condition Code “A” Condition
Qty & UI 1 EA
SPEC NUMBER: R-243-0459
REV: A (12/12); Change 3 (2/01/2022)
Data Sheet 5 of 19
DATA SHEET 005
225 WLB Propulsion Shaft, Tail
Effective Date: 07/12, for use with specification R-243-0459
Drawing # 225B-WLB-243-001 Rev J , Propulsion Shaft
GFM Rough Machined Nominal Dimension Data
Sleeve:
NSN: 2010-01-445-3407 Length 124” OD 18.125” ID 15.875”
Sleeves are manufactured from ASTM-B-369 alloy C96400 centrifugal casting only.
GFP Description
Tail Shaft PC 1, NSN: 2010-01-399-5912 Manufactured from blanks of ASTM-A668
Class E Supplementary Requirement S4, tensile strength minimum 83,000 psi.
*NOTE*: Several shafts have been found to be constructed of material ASTM-A668
Class E, ABS-4C. This class of material requires a different weld procedure due to carbon content in excess of 0.35%. Once chemical analysis is completed the weld procedure will be determined.
MARKING DATA
Stock Number 2010-01-399-5912
Item Name Shaft, Propulsion
Part Number 225BWLB-243-001
Contract Number See Contract
Delivery Order Number As Determined
Shipping Weight As Determined
Condition Code “A” Condition
Qty & UI 1 EA
SPEC NUMBER: R-243-0459
REV: A (12/12); Change 3 (2/01/2022)
Data Sheet 6 of 19
DATA SHEET 006
270 WMEC Propulsion Shaft, Tail
Effective Date: 07/12, for use with specification R-243-0459
Drawing # 905WMEC-243-12 Rev. B (Item 6) Controllable Pitch Propeller, Shafting
Details
GFM Rough Machined Nominal Dimension Data
Sleeves:
PC 2 NSN: 2010-01-340-5362 Length 73.250” OD 12.250” ID 10.560”
PC 3 NSN: 2010-01-345-2314 Length 76.500” OD 12.250” ID 10.560”
PC 4 NSN: 2010-01-345-2315 Length 63.750” OD 12.250” ID 10.560”
PC 5 NSN: 2010-01-340-6083 Length 49.000” OD 12.250” ID 10.500”
Sleeves are manufactured from ASTM-B-369 alloy C96400 centrifugal casting only.
GFP Description
Tail Shaft PC 1, NSN: 2010-01-135-7065 Manufactured from blanks of ABS Grade 2, ASTM A668 Class B, Supplementary Requirement S4 material.
MARKING DATA
Stock Number 2010-01-135-7065
Item Name Shaft, Propulsion Tail
Part Number 905WMEC-243-12
Contract Number See Contract
Delivery Order Number As Determined
Shipping Weight As Determined
Condition Code “A” Condition
Qty & UI 1 EA
SPEC NUMBER: R-243-0459
REV: A (12/12); Change 3 (2/01/2022)
Data Sheet 7 of 19
DATA SHEET 007
282 WMEC Propulsion Shaft, Stern Tube
Effective Date: 09/12, for use with specification R-243-0459
Drawings # 282-WMEC-203-010 Rev. GG, Shafting Details
GFM Rough Machined Nominal Dimension Data
Sleeves:
Fwd, PC 2 NSN: 2010-01-F14-3578 Length 67.250” OD 13.000” ID 11.290”
Aft, PC 7 NSN: 2010-01-F14-3581 Length 96.500” OD 13.875” ID 12.230”
Sleeves are manufactured from ASTM-B-369 alloy C96400 centrifugal casting only.
GFP Description
Stern Tube Shaft, PC 1 on Sht 2 of Dwg 282-WMEC-203-010, NSN: 2010-00-248-6828
Manufactured from shaft blanks of MIL-S-23284 Class 3 material.
MARKING DATA
Stock Number 2010-00-248-6828
Item Name Shaft, Propulsion, Ship
Part Number ATS1-203-2671110SH2
Contract Number See Contract
Delivery Order Number As Determined
Shipping Weight As Determined
Condition Code “A” Condition
Qty & UI 1 EA
SPEC NUMBER: R-243-0459
REV: A (12/12); Change 3 (2/01/2022)
Data Sheet 8 of 19
DATA SHEET 008
282 WMEC Propulsion Shaft, Propeller
Effective Date: 09/12, for use with specification R-243-0459
Drawings # 282-WMEC-203-010 Rev. GG, Shafting Details
GFM Rough Machined Nominal Dimension Data
Sleeves:
Fwd, PC 4 NSN: 2010-01-F14-3579 Length 12.875” OD 15.480” ID 13.810”
Aft, PC 1 NSN: 2010-01-F14-3580 Length 84.6875” OD 15.850” ID 13.890”
Sleeves are manufactured from ASTM-B-369 alloy C96400 centrifugal casting only.
GFP Description
Propeller Shaft, PC 1 on Sht 3 of Dwg 282-WMEC-203-010, NSN: 2010-00-248-6829
Manufactured from shaft blanks of MIL-S-23284 Class 3 material.
MARKING DATA
Stock Number 2010-00-248-6829
Item Name Shaft, Propulsion, Ship
Part Number AST1-203-2671110SH3
Contract Number See Contract
Delivery Order Number As Determined
Shipping Weight As Determined
Condition Code “A” Condition
Qty & UI 1 EA
SPEC NUMBER: R-243-0459
REV: A (12/12); Change 3 (2/01/2022)
Data Sheet 9 of 19
DATA SHEET 009
378 WHEC Propulsion Shaft, Stern Tube
Effective Date: 09/12, for use with specification R-243-0459
Drawings # 378FRAM-W-243-27 Rev F, WHEC Shafting Details
GFM Rough Machined Nominal Dimension Data
Sleeves:
Fwd, PC 2 NSN: 2010-01-141-3516 Length 32.000” OD 20.250” ID 18.000”
Aft, PC 3 NSN: 2010-01-141-3515 Length 50.000” OD 20.375” ID 18.125”
Sleeves are manufactured from ASTM-B-369 alloy C96400 centrifugal casting only.
GFP Description
Stern Tube Shaft PC 2, NSN: 2010-01-140-8901 Manufactured from shaft blanks of
MIL-S-23284 Class 4 material.
MARKING DATA
Stock Number 2010-01-140-8901
Item Name Shaft, Stern Tube
Part Number 378FRAM-W-243-27
Contract Number See Contract
Delivery Order Number As Determined
Shipping Weight As Determined
Condition Code “A” Condition
Qty & UI 1 EA
SPEC NUMBER: R-243-0459
REV: A (12/12); Change 3 (2/01/2022)
Data Sheet 10 of 19
DATA SHEET 010
378 WHEC Propulsion Shaft, Tail (EW) (719-726)
Effective Date: 09/12, for use with specification R-243-0459
Drawings # 378FRAM-W-243-30 Rev C, Tail Shaft Details (Escher Wyss)
GFM Rough Machined Nominal Dimension Data
Sleeves:
Fwd, PC 2 NSN: 2010-01-141-3515 Length 50.000” OD 20.375” ID 18.125”
Aft, PC 3 NSN: 2010-01-141-3517 Length 77.250” OD 23.250” ID 20.875”
Sleeves are manufactured from…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .