Attachment 5 - QASP.pdf

PDF 297 KB Posted

Attached to
Safety, Health, and Environmental and Emergency Management Training
Solicitation number
N0018925Q0091
Issued by

About this file

This is a Quality Assurance Surveillance Plan (QASP) for a Fire Protection and Life Safety Training Contract. The QASP outlines how the government will monitor and evaluate contractor performance through systematic quality assurance methods.

The plan establishes specific surveillance items including: attendance sheet submission within 3 days of course completion, course completion reports within 30 days containing final grades and test materials, student critiques with a 95% collection requirement, key personnel qualifications and continuity requirements, periodic audits of course content and instructor competency, and invoice submission within 5 working days after travel. The QASP designates the Contracting Officer's Representative (COR) as responsible for technical administration and surveillance, utilizing methods such as customer feedback, periodic audits, and routine inspections. Performance standards generally require 0% error rates for accuracy and timeliness across most deliverables. The COR must maintain complete quality assurance documentation for the life of the contract.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)

FOR

FIRE PROTECTION AND LIFE SAFETY TRAINING CONTRACT

PURPOSE

This Quality Assurance Surveillance Plan (QASP) is a Government developed and applied document used to make sure that systematic quality assurance methods are used in the administration of the Performance Based Service Contract (PBSC) standards included in this contract and in subsequent task orders issued thereunder. The intent is to ensure that the Contractor performs in accordance with performance metrics set forth in the contract documents, that the Government receives the quality of services called for in the contract and that the Government only pays for the acceptable level of services received.

AUTHORITY

Authority for issuance of this QASP is provided under the Federal Acquisition Regulation (FAR) 52.212-4 “CONTRACT TERMS AND CONDITIONS – COMMERCIAL ITEMS (OCT 2003), paragraph (a), which provides for inspections and acceptance of the articles, services, and documentation called for in task orders to be accomplished by the Contracting Officer or his duly authorized representative.

SCOPE

The Quality Assurance Surveillance Plan (QASP) is put in place to provide Government surveillance oversight of the Contractor’s quality control efforts to assure that they are timely, effective and are delivering the results specified in the contract or task order. The QASP is not intended to duplicate the Contractor’s Management Plan.

GOVERNMENT RESOURCES

The following definitions for Government resources are applicable to this plan:

Contracting Officer - A person duly appointed with the authority to enter into, administer, or terminate contracts and make related determinations and findings on behalf of the Government.

Contracting Officer’s Representative (COR) - An individual designated in writing by the Contracting Officer to act as his authorized representative to assist in administering a contract. The source and authority for a COR is the Contracting Officer. COR limitations are contained in the written letter of appointment.

Enclosure (8)

5. RESPONSIBILITIES

The Government resources shall have responsibilities for the implementation of this QASP as follows:

Contracting Officer – The Contracting Officer ensures performance of all necessary actions for effective contracting, ensures compliance with the terms of the contract and safeguards the interests of the United States in the contractual relationship. It is the Contracting Officer that assures the Contractor receives impartial, fair, and equitable treatment under the contract. The Contracting Officer is ultimately responsible for the final determination of the adequacy of the Contractor’s performance.

Contracting Officer’s Representative (COR) - The COR is responsible for technical administration of the project and assures proper Government surveillance of the Contractor’s performance. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf. Any changes that the Contractor deems may affect contract, price, terms, or conditions shall be referred to the Contracting Officer for action.

METHODS OF QA SURVEILLANCE

The below listed methods of surveillance shall be used in the administration of this

QASP.

Customer Feedback – Customer feedback may be obtained from students’ critique. The COR shall maintain a summary log of all formally received critiques as well as a copy of each critique in a documentation file.

Periodic Audits – The COR will conduct periodic audits of the class to ensure adherence with the Performance Work Statement (PWS), to ensure the accuracy of the information presented by the instructor, and to ensure the professionalism and competency of the instructor. Audits may be performed by the COR, the course supervisor, or a designated representative.

Routine Inspection - The COR will inspect the documentation that is received from the instructor after every convening of the course. The COR will also monitor that the contractor is in compliance with all terms of the contract.

FAR 52.222-50 - The contractor's implementation of the clause at FAR 52.222-50, Combating Trafficking in Persons, will be a surveillance item. Non-compliance with the trafficking in persons requirements will be brought to the immediate attention of the contracting officer (see DFARS PGI 222.1703).

7. IDENTIFIED QA SURVEILLANCE ITEMS

a. NAVSAFENVTRACEN Attendance Sheet (REF: PWS, Paragraph 5.1.10.1):

Contractor shall email the student attendance sheet with grades annotated, any drop/failures annotated, and all walk-ins to the course manager within three (3) days at the conclusion of the course.

b. Course Completion Report (REF: PWS, Paragraph 5.1.10): Contractor shall submit to the COR within 30 days of the completion of each course, a report containing the following information: the final student attendance sheet with grades, student test answer sheets, instructor comments/observations and a copy of the test administered.

Measurement/Metric – Accuracy and timeliness

Performance Standard – Accuracy – all of the above information must be submitted for each class Timeliness – within 30 calendar days the completion of the course

Maximum Error Rate – Accuracy - 0% Timeliness – 0%

c. Student Critiques (REF: PWS/Paragraph 5.1.10): Student critiques are a valuable source of feedback to the quality of the instruction provided. The instructor shall encourage every student to complete and submit a student critique using the NAVSAFENVTRACEN online learning portal (SAKAI) at the end of every class.

Measurement/Metric – Quantity

Performance Standard – The instructor shall collect critiques from at least 95% of those students in attendance.

Maximum Error Rate – 5%

d. Key Personnel (REF: PWS, paragraphs 7.1.1 & 7.1.4): The contractor is required to provide instructors who meet the instructor qualifications of the contract and that these instructors remain constant throughout the duration of the contract to ensure continuity of the training.

Measurement/Metric – Timeliness

Performance Standard – Contractor shall make the necessary corrections either within

30 calendar days of notification or before the next class convening, whichever occurs first.

Maximum Error Rate – 0%

e. Audits (REF: PWS, paragraph 9.2): The contactor’s course and instructors shall be audited periodically to ensure the accuracy of the information presented and the professionalism and competency of the instructor.

Measurement/Metric - Timeliness

Performance Standard – Contractor shall make the necessary corrections either within 30 days of notification or before the next class convening, whichever occurs first.

Maximum Error Rate – 0%

f. Invoices (REF: PWS/Paragraph 5.1.12): All invoices for completed course of instructions shall be submitted to the COR.

Measurement/Metric –– Accuracy and Timeliness

Performance Standard – Accuracy – Completed invoices will include the fixed price cost for the convenings taught, as well as any reimbursement for travel and per diem.

Timeliness – within five (5) working days after return from travel.

Maximum Error Rate – Accuracy – 0% Timeliness – 0%

8. DOCUMENTATION

The COR will, in addition to providing documentation to the Contracting Officer, maintain a complete Quality Assurance File. All such records will be retained for the life of this contract.

ATTACHMENTS

QASP Matrix

File details come from the government source that posted it. Updated .