Text version
PPW
| COMPANY & LOCATION: | PROPOSAL VERSION NO.: | |
| PREPARER NAME: | DATE PREPARED: | 20-May-2020 |
| REFERENCE ITEM | TYPE | ITEM DESCRIPTION | ESTIMATED QUANTITY | UNIT | UNIT PRICE | Total Price (Estimated Quantity x Unit Price) |
| DELIVERABLES | ||||||
| 001 | REP | Draft Project Management Plan | 1 | EA | $0.00 | |
| 002 | REP | Final Project Management Plan | 1 | EA | $0.00 | |
| 003 | REP | Kickoff Meeting Minutes | 1 | EA | $0.00 | |
| 004 | REP | Quarterly Project Management Review Meeting Minutes | 1 | EA | $0.00 | |
| 005 | REP | Regulatory Agency Meeting Minutes | 8 | EA | $0.00 | |
| 006 | REP | RAB Meeting Minutes | 2 | EA | $0.00 | |
| 007 | REP | Contract Closure Meeting | 1 | EA | $0.00 | |
| 008 | REP | Monthly Utility Invoicing Summary | 13 | EA | $0.00 | |
| 009 | REP | DFSP Norwalk Remedial Systems Quarterly Status Report , September 1, 2020 through September 30, 2020 | 1 | EA | $0.00 | |
| 010 | REP | DFSP Norwalk Remedial Systems Quarterly Status Report | 4 | EA | $0.00 | |
| 011 | REP | El Toro Pipeline Release Site LNAPL Gauging, Recovery and Disposal Quarterly Report, September 1, 2020 through September 30, 2020 | 1 | EA | $0.00 | |
| 012 | REP | El Toro Pipeline Release Site LNAPL Gauging, Recovery and Disposal Quarterly Report | 4 | EA | $0.00 | |
| 013 | REP | El Toro Pipeline Release Site Remediation System Quarterly Status Report, September 1, 2020 through September 30, 2020 | 1 | EA | $0.00 | |
| 014 | REP | El Toro Pipeline Release Site Remediation System Quarterly Status Report | 4 | EA | $0.00 | |
| 015 | REP | DFSP Norwalk Semi-Annual Groundwater Monitoring Data Summary Report | 1 | EA | $0.00 | |
| 016 | REP | DFSP Norwalk Semi-Annual Groundwater Monitoring Report | 4 | EA | $0.00 | |
| 017 | REP | El Toro Pipeline Release Site Quarterly Groundwater Monitoring Report for 20 Wells | 1 | EA | $0.00 | |
| 018 | REP | El Toro Pipeline Release Site Quarterly Groundwater Monitoring Report for 39 Wells | 4 | EA | $0.00 | |
| 019 | REP | Facility Compliance Quarterly Summary Report , September 1, 2020 through September 30, 2020 | 1 | EA | $0.00 | |
| 020 | REP | Facility Compliance Quarterly Summary Report | 4 | EA | $0.00 | |
| 021 | REP | Facility Maintenance Monthly Summary Report | 13 | EA | $0.00 | |
| SERVICES | ||||||
| 022 | SVC | Asbestos Site Supervisor or Safety Officer price per hour | 40 | EA | $0.00 | |
| 023 | SVC | Asbestos worker price per hour | 40 | EA | $0.00 | |
| 024 | SVC | Biologist/Botanist 1 price per hour | 20 | EA | $0.00 | |
| 025 | SVC | Biologist/Botanist 2 price per hour | 20 | EA | $0.00 | |
| 026 | SVC | Buyer price per hour | 100 | EA | $0.00 | |
| 027 | SVC | Certified Industrial Hygenist price per hour | 40 | EA | $0.00 | |
| 028 | SVC | Chemist 1 price per hour | 220 | EA | $0.00 | |
| 029 | SVC | Chemist 2 price per hour | 100 | EA | $0.00 | |
| 030 | SVC | Chemist 3 price per hour | 50 | EA | $0.00 | |
| 031 | SVC | Cost Accountant price per hour | 200 | EA | $0.00 | |
| 032 | SVC | Drafter (including CAD, hardware & software) price per hour | 400 | EA | $0.00 | |
| 033 | SVC | Engineer 1 (Staff) price per hour | 1200 | EA | $0.00 | |
| 034 | SVC | Engineer 2 (Project) price per hour | 1000 | EA | $0.00 | |
| 035 | SVC | Engineer 3 (Senior) price per hour | 400 | EA | $0.00 | |
| 036 | SVC | Environmental Scientist 1 price per hour | 1200 | EA | $0.00 | |
| 037 | SVC | Environmental Scientist 2 price per hour | 1000 | EA | $0.00 | |
| 038 | SVC | Environmental Scientist 3 price per hour | 400 | EA | $0.00 | |
| 039 | SVC | Environmental Technician price per hour | 1000 | EA | $0.00 | |
| 040 | SVC | Geologist 1 price per hour | 1200 | EA | $0.00 | |
| 041 | SVC | Geologist 2 price per hour | 1000 | EA | $0.00 | |
| 042 | SVC | Geologist 3 price per hour | 400 | EA | $0.00 | |
| 043 | SVC | Health and Safety Officer price per hour | 40 | EA | $0.00 | |
| 044 | SVC | Heavy Equipment operator price per hour | 80 | EA | $0.00 | |
| 045 | SVC | Hydrogeologist 1 price per hour | 100 | EA | $0.00 | |
| 046 | SVC | Hydrogeologist 2 price per hour | 80 | EA | $0.00 | |
| 047 | SVC | Laborer price per hour | 300 | EA | $0.00 | |
| 048 | SVC | Project Manager price per hour | 800 | EA | $0.00 | |
| 049 | SVC | QA/QC Officer price per hour | 200 | EA | $0.00 | |
| 050 | SVC | Remediation System Operator price per hour | 240 | EA | $0.00 | |
| 051 | SVC | Secretary price per hour | 200 | EA | $0.00 | |
| 052 | SVC | Site Labor Foreman price per hour | 80 | EA | $0.00 | |
| 053 | SVC | Toxicologist 1 price per hour | 160 | EA | $0.00 | |
| 054 | SVC | Toxicologist 2 price per hour | 80 | EA | $0.00 | |
| 055 | SVC | Toxicologist 3 price per hour | 40 | EA | $0.00 | |
| 056 | SVC | Traffic Control Engineer price per hour | 80 | EA | $0.00 | |
| FACILITY MAINTENANCE | ||||||
| 057 | SVC | Laborer/Contractor (Line riding, inspections) | 180 | EA | $0.00 | |
| 058 | SVC | Electrician | 120 | EA | $0.00 | |
| 059 | SVC | Laborer (e.g. trash picker) | 100 | EA | $0.00 | |
| 060 | SVC | Maintenance Mechanic | 40 | EA | $0.00 | |
| DRILLING, WELL INSTALLATION, AND OTHER INVESTIGATION SERVICES | ||||||
| 061 | DRL | Mobilization Cost for HSA drill rig (soil boring/probe/well install) | 4 | EA | $0.00 | |
| 062 | DRL | Mobilization Cost for Rotosonic drill rig (soil boring/probe/well install) | 2 | EA | $0.00 | |
| 063 | DRL | HSA boring, price of 2 1/4" ID, up to 20 feet | 1 | EA | $0.00 | |
| 064 | DRL | HSA boring, cost per foot of 2 1/4" ID, from 21 to 40 feet | 20 | FT | $0.00 | |
| 065 | DRL | HSA boring, cost per foot of 2 1/4" ID, 41 to 80 feet | 40 | FT | $0.00 | |
| 066 | DRL | HSA boring, cost per foot of 2 1/4" ID, 81 to 150 feet | 70 | FT | $0.00 | |
| 067 | DRL | HSA boring, price of 4 1/4" ID, up to 20 feet | 1 | EA | $0.00 | |
| 068 | DRL | HSA boring, cost per foot of 4 1/4" ID, from 21 to 40 feet | 20 | FT | $0.00 | |
| 069 | DRL | HSA boring, cost per foot of 4 1/4" ID, 41 to 80 feet | 40 | FT | $0.00 | |
| 070 | DRL | HSA boring, cost per foot of 4 1/4" ID, 81 to 150 feet | 70 | FT | $0.00 | |
| 071 | DRL | HSA boring, price of 8 1/4" ID, up to 20 feet | 2 | EA | $0.00 | |
| 072 | DRL | HSA boring, cost per foot of 8 1/4" ID, from 21 to 40 feet | 40 | FT | $0.00 | |
| 073 | DRL | HSA boring, cost per foot of 8 1/4" ID, 41 to 80 feet | 80 | FT | $0.00 | |
| 074 | DRL | HSA boring, cost per foot of 8 1/4" ID, 81 to 150 feet | 70 | FT | $0.00 | |
| 075 | DRL | Sonic boring, price of 4" ID, up to 20 feet | 1 | EA | $0.00 | |
| 076 | DRL | Sonic boring, cost per foot of 4" ID, from 21 to 40 feet | 20 | FT | $0.00 | |
| 077 | DRL | Sonic boring, cost per foot of 4" ID, 41 to 80 feet | 40 | FT | $0.00 | |
| 078 | DRL | Sonic boring, cost per foot of 4" ID, 81 to 150 feet | 70 | FT | $0.00 | |
| 079 | DRL | Sonic boring, price of 6" ID, up to 20 feet | 2 | EA | $0.00 | |
| 080 | DRL | Sonic boring, cost per foot of 6" ID, from 21 to 40 feet | 40 | FT | $0.00 | |
| 081 | DRL | Sonic boring, cost per foot of 6" ID, 41 to 80 feet | 80 | FT | $0.00 | |
| 082 | DRL | Sonic boring, cost per foot of 6" ID, 81 to 150 feet | 70 | FT | $0.00 | |
| 083 | DRL | Sonic boring, price of 8" ID, up to 20 feet | 2 | EA | $0.00 | |
| 084 | DRL | Sonic boring, cost per foot of 8" ID, from 21 to 40 feet | 40 | FT | $0.00 | |
| 085 | DRL | HSA boring, cost per foot of 8" ID, 41 to 80 feet | 80 | FT | $0.00 | |
| 086 | DRL | HSA boring, cost per foot of 8" ID, 81 to 150 feet | 70 | FT | $0.00 | |
| 087 | DRL | Monitoring well installation, cost of 2" SCH 40 PVC including all materials, up to 20 feet, in HSA or Sonic boring | 2 | EA | $0.00 | |
| 088 | DRL | Monitoring well installation, cost per foot of 2" SCH 40 PVC monitoring well from 21 to 40 feet, in HSA or Sonic boring | 20 | FT | $0.00 | |
| 089 | DRL | Monitoring well installation, cost per foot of 2" SCH 40 PVC monitoring well from 41 to 80 feet, in HSA or Sonic boring | 40 | FT | $0.00 | |
| 090 | DRL | Monitoring well installation, cost per foot of 2" SCH 40 PVC monitoring well from 81 to 150 feet, in HSA or Sonic boring | 70 | FT | $0.00 | |
| 091 | DRL | Monitoring well installation, additional cost per foot, 2" 304 Stainless Steel in place of SCH 40 PVC, in HSA or Sonic boring | 80 | FT | $0.00 | |
| 092 | DRL | Monitoring well installation, cost per 4" SCH 40 PVC monitoring well up to 20 feet, in HSA or Sonic boring | 40 | EA | $0.00 | |
| 093 | DRL | Monitoring well installation, cost per 4" SCH 40 PVC monitoring well from 21 to 40 feet, in HSA or Sonic boring | 40 | FT | $0.00 | |
| 094 | DRL | Monitoring well installation, cost per 4" SCH 40 PVC monitoring well from 41 to 80 feet, in HSA or Sonic boring | 80 | FT | $0.00 | |
| 095 | DRL | Monitoring well installation, cost per 4" SCH 40 PVC monitoring well from 81 to 150 feet, in HSA or Sonic boring | 70 | FT | $0.00 | |
| 096 | DRL | Monitoring well installation, additional price per foot of 4" 304 Stainless Steel in place of SCH 40 PVC, in HSA or Sonic boring | 80 | FT | $0.00 | |
| 097 | DRL | Monitoring Well, Install flush mount box for 2" or 4" well | 10 | EA | $0.00 | |
| 098 | DRL | Monitoring Well, Install above grade (4x4 pad), steel casing casing | 10 | EA | $0.00 | |
| 099 | DRL | Mobilization Cost, Well Decommissioning | 2 | EA | $0.00 | |
| 100 | DRL | Decommission 2" dia. vertical well, grout in place, remove top 5' of casing, cost per foot | 120 | EA | $0.00 | |
| 101 | DRL | Decommission 4" dia. vertical well, grout in place, remove top 5' of casing, cost per foot | 120 | EA | $0.00 | |
| 102 | DRL | Decommission 6" dia. vertical well, grout in place, remove top 5' of casing, cost per foot | 40 | EA | $0.00 | |
| 103 | DRL | Decommission 2" dia. vertical well, overdrill and grout, cost per foot | 80 | EA | $0.00 | |
| 104 | DRL | Decommission 4" dia. vertical well, overdrill and grout, cost per foot | 80 | EA | $0.00 | |
| 105 | DRL | Decommission 6" dia. vertical well, overdrill and grout, cost per foot | 40 | EA | $0.00 | |
| 106 | DRL | Well Development, 2" dia. including all equipment and supplies, per well | 4 | EA | $0.00 | |
| 107 | DRL | Well Development, 4" dia. including all equipment and supplies, per well | 20 | EA | $0.00 | |
| 108 | DRL | Well Inspection - Down Hole Camera Inspection, vertical well, to include report of findings, per Half Day | 1 | EA | $0.00 | |
| 109 | DRL | DPT (Direct Push Technology) Drilling, Mobilization price | 1 | EA | $0.00 | |
| 110 | DRL | DPT BORING, price per day, including all tooling | 1 | EA | $0.00 | |
| 111 | DRL | DPT SOIL SURVEY - Price per unit (10 points/unit) - up to 5 feet depth, per day | 1 | EA | $0.00 | |
| 112 | DRL | SOIL & GAS SURVEY - Price per unit (10 points/unit) - greater than 5 to 15 feet depth, DPT Rig, per day | 1 | EA | $0.00 | |
| 113 | DRL | SOIL & GAS SURVEY - Price per unit (10 points/unit) - up to 5 feet depth, hand auger, including report of findings | 1 | EA | $0.00 | |
| 114 | DRL | SOIL & GAS SURVEY - Price per unit (10 points/unit) - greater than 5 to 15 feet depth, hand auger, per day | 1 | EA | $0.00 | |
| 115 | DRL | SURVEY - Boring/Well location survey (price per 10) | 4 | EA | $0.00 | |
| 116 | DRL | SURVEY - Physical Survey price per half day (includes surveyor, crew, and equipment) | 2 | EA | $0.00 | |
| 117 | DRL | UTILITY CLEARANCE - Geophysical/GPR Survey, Price per unit (10,000 linear feet) to include in report of findings | 2 | EA | $0.00 | |
| MISCELLANEOUS | ||||||
| 118 | MIS | Brass Long-shackle monitoring well locks, keyed alike, each | 12 | EA | $0.00 | |
| 119 | MIS | Backhoe Loader, 2WD, 14 ft boom, multipurpose bucket, per week | 1 | |||
| 120 | MIS | Backhoe Loader, 4WD, 14 ft boom, multipurpose bucket, per week | 1 | |||
| 121 | MIS | Disposal, Hazardous (for VOCs) per gallon | 110 | EA | $0.00 | |
| 122 | MIS | Disposal, Hazardous (for heavy metals) per gallon | 110 | EA | $0.00 | |
| 123 | MIS | Disposal, Hazardous (for VOCs) per Drum | 2 | EA | $0.00 | |
| 124 | MIS | Disposal, Hazardous (for heavy metals) per Drum | 2 | EA | $0.00 | |
| 125 | MIS | Disposal, Non-hazardous soil, per Ton | 300 | EA | $0.00 | |
| 126 | MIS | Camera, Digital (Nikon SRL or equivalent) price per day | 10 | EA | $0.00 | |
| 127 | MIS | Digitial Photographic documentation - Electronic Submittal to DLA | 10 | EA | $0.00 | |
| 128 | MIS | Disposable Bailers, each | 40 | EA | $0.00 | |
| 129 | MIS | Disposable Tubing (3/8-in, 500ft) | 1000 | EA | $0.00 | |
| 130 | MIS | Drum, 55-Gallon DOT Approved, Steel or Plastic | 55 | EA | $0.00 | |
| 131 | MIS | Dump Truck, 5-7 CY with operator, price per day | 1 | EA | $0.00 | |
| 132 | MIS | Contractor's processing and payment of various permits and fees (i.e. applications, regulatory assessments, easements, right of entry, utilities), per $1000 value | 10 | EA | $0.00 | |
| 133 | MIS | EPA 5035 Sample Container or equivalent, per each 8260 analysis | 300 | EA | $0.00 | |
| 134 | MIS | Excavator delivery | 1 | EA | $0.00 | |
| 135 | MIS | Excavator, minimum 19,000-lbs up to 25,000-lbs, price per day | 1 | EA | $0.00 | |
| 136 | MIS | Excavator, Mini-excavator (3500 lb) delivery | 1 | EA | $0.00 | |
| 137 | MIS | Excavator, Mini-excavator (3500 lb) price per day | 1 | EA | $0.00 | |
| 138 | MIS | Flame Ionization Detector price per day | 20 | EA | $0.00 | |
| 139 | MIS | Frac Tank (double walled 20,000 gallon capacity) price per month | 3 | EA | $0.00 | |
| 140 | MIS | Frac Tank delivery charge | 1 | EA | $0.00 | |
| 141 | MIS | Subcontract Tank Cleaning (Frac Tank) - 1 each | 1 | EA | $0.00 | |
| 142 | MIS | Generator (4000 watt) price per day | 20 | EA | $0.00 | |
| 143 | MIS | HDPE fittings (flanged and welded fittings and valves) - 1 LOT | 1 | EA | $0.00 | |
| 144 | MIS | HDPE piping (1.5-in to 2-in diameter) per 10 feet | 1 | EA | $0.00 | |
| 145 | MIS | Hydroseeding - per 100 sf (includes all labor and materials using standard seed mixes) | 8 | EA | $0.00 | |
| 146 | MIS | Lawn mower, walk-behind, rental price per day | 5 | EA | $0.00 | |
| 147 | MIS | Monitoring well skimming sock 1.5"x2', 20 per pack, including installation materials up to 70 ft | 10 | EA | $0.00 | |
| 148 | MIS | Oil/Water interface probe price per day | 20 | EA | $0.00 | |
| 149 | MIS | Oxygen Analyzer / Explosimeter Combustible Gas Monitor price per day | 5 | EA | $0.00 | |
| 150 | MIS | Photoionization Detector price per day | 20 | EA | $0.00 | |
| 151 | MIS | Pickup Truck (1/2 ton) price per day including fuel | 300 | EA | $0.00 | |
| 152 | MIS | PVC Piping, 1" or 2" diameter, price per foot | 1 | EA | $0.00 | |
| 153 | MIS | PVC Piping, 4" diameter, price per foot | 100 | EA | $0.00 | |
| 154 | MIS | PVC Piping, 6" diameter, price per foot | 100 | EA | $0.00 | |
| 155 | MIS | Pressure washer (gas or electric) rental price per day | 3 | EA | $0.00 | |
| 156 | MIS | Roll-Off Container with liner and cover, Delivery and monthly rental, 20 CY, price per bin | 10 | EA | $0.00 | |
| 157 | MIS | Rough Terrain/Off-Road Utility Vehicle (e.g. Gator) price per day | 2 | EA | $0.00 | |
| 158 | MIS | Silt Fence price per 50 feet (Installed) | 4 | EA | $0.00 | |
| 159 | MIS | Skid steer rental price per day | 5 | EA | $0.00 | |
| 160 | MIS | Straw Bale, including installation | 20 | EA | $0.00 | |
| 161 | MIS | Straw Wattle (8.5"x25' or equivalent), includes installation | 4 | EA | $0.00 | |
| 162 | MIS | Super Silt Fence price per 50 feet, includes installation | 4 | EA | $0.00 | |
| 163 | MIS | Tedlar Bags price per dozen | 10 | EA | $0.00 | |
| 164 | MIS | Temporary Berms or Spill Containment (12'x50'), each | 1 | EA | $0.00 | |
| 165 | MIS | Temporary restroom & sink, delivery, installed, with service price per week | 2 | EA | $0.00 | |
| 166 | MIS | Traffic control, Traffic control devices (including arrow board and cones) 1 truck including fuel and 1 laborer price per day | 4 | EA | $0.00 | |
| 167 | MIS | Troll 9500 Water Quality Meter w/200 feet of cable or equivalent, price per week | 4 | EA | $0.00 | |
| 168 | MIS | Utility truck price per day including fuel | 15 | EA | $0.00 | |
| 169 | MIS | Vacuum truck (70 BBL) with operator price per half day | 24 | EA | $0.00 | |
| 170 | MIS | Water level meter price per day | 24 | EA | $0.00 | |
| 171 | MIS | Water tank (single walled 2,500 gallon) price per month | 4 | EA | $0.00 | |
| 172 | MIS | Water Tank delivery charge | 1 | EA | $0.00 | |
| 173 | MIS | Water truck with operator price per day | 12 | EA | $0.00 | |
| 174 | MIS | Well Caps (2-in and 4-in) | 20 | EA | $0.00 | |
| 175 | MIS | Dumpster/Bin 3-yd or 4-yd, per month | 12 | EA | $0.00 | |
| ANALYTICAL TESTING | ||||||
| 176 | LAB | ASTM D1298 API gravity liquid Petroleum Products | 1 | EA | $0.00 | |
| 177 | LAB | CA-WET (STLC - extraction only) | 4 | EA | $0.00 | |
| 178 | LAB | CA-WET (STLC - CCR Metals Title 22 - 6010/7470/7471 only) | 4 | EA | $0.00 | |
| 179 | LAB | EPA 160.1 (Total Dissolved Solids (TDS)) | 36 | EA | $0.00 | |
| 180 | LAB | EPA 160.2 (Total Suspended Solids (TSS)) | 36 | EA | $0.00 | |
| 181 | LAB | EPA 300.0 (Anions including SO4, NO2, NO3, Cl) | 72 | EA | $0.00 | |
| 182 | LAB | EPA 350.1 (Ammonia as Nitrogen) | 12 | EA | $0.00 | |
| 183 | LAB | EPA 353.2 (Nitrate-Nitrite Nitrogen) | 12 | EA | $0.00 | |
| 184 | LAB | EPA 351.4 (TKN) | 12 | EA | $0.00 | |
| 185 | LAB | EPA 365.3 (Total Phosphorous) | 12 | EA | $0.00 | |
| 186 | LAB | EPA 376.2 (Sulfide, Dissolved) | 12 | EA | $0.00 | |
| 187 | LAB | EPA 410.4 (COD) | 12 | EA | $0.00 | |
| 188 | LAB | EPA 537 (PFAS/PFOA in Water) | 100 | EA | $0.00 | |
| 189 | LAB | EPA 537 Modified (PFAS/PFOA in Soil) | 100 | EA | $0.00 | |
| 190 | LAB | EPA 6010/7470/7471 (CCR Metals Title 22 - 6010/7470/7471) | 6 | EA | $0.00 | |
| 191 | LAB | EPA 6010 (Individual Metal 6010) | 36 | EA | $0.00 | |
| 192 | LAB | EPA 1010 (Ignitability) | 12 | EA | $0.00 | |
| 193 | LAB | EPA 1311 (TCLP - extraction only) | 4 | EA | $0.00 | |
| 194 | LAB | EPA 1311 (TCLP - Full Toxicity Characterization) | 4 | EA | $0.00 | |
| 195 | LAB | EPA 1311/6010B/C/7471A (TCLP Metals) | 4 | EA | $0.00 | |
| 196 | LAB | EPA 1311/8270C/D (TCLP SVOCs) | 4 | EA | $0.00 | |
| 197 | LAB | EPA 1311/ZHE/8260B/C (TCLP VOCs) | 4 | EA | $0.00 | |
| 198 | LAB | EPA 1664 (N-Hexane Extractable Material) | 12 | EA | $0.00 | |
| 199 | LAB | EPA 1668A (PCB) | 6 | EA | $0.00 | |
| 200 | LAB | EPA 7196A/7199 (Hexavalent Chromium) | 12 | EA | $0.00 | |
| 201 | LAB | EPA 7470 / 7471 (Mercury) | 12 | EA | $0.00 | |
| 202 | LAB | EPA 8015B/C (Extractables) | 100 | EA | $0.00 | |
| 203 | LAB | EPA 8015B/C (Purgeables) | 100 | EA | $0.00 | |
| 204 | LAB | EPA 8015B/C (Purgeables) with silica gel cleanup | 400 | EA | $0.00 | |
| 205 | LAB | EPA 8015B/C Carbon Chain Speciation, C4-C44 | 400 | EA | $0.00 | |
| 206 | LAB | EPA 8081/A (Organochlorine Pesticides (OCP)) | 4 | EA | $0.00 | |
| 207 | LAB | EPA 8151A (Chlorinated Herbicides ) | 4 | EA | $0.00 | |
| 208 | LAB | EPA 8260B/5035 (VOCs 8260B/5035 +Oxygenates +TPHG) | 200 | EA | $0.00 | |
| 209 | LAB | EPA 8260B/C (VOCs (BTEX/MTBE/Naphthalene only)) | 120 | EA | $0.00 | |
| 210 | LAB | EPA 8260B/C (Full list) | 12 | EA | $0.00 | |
| 211 | LAB | EPA 8260M BTEX and oxygenates in air | 48 | EA | $0.00 | |
| 212 | LAB | EPA 8270C/D (SVOCs) | 4 | EA | $0.00 | |
| 213 | LAB | EPA 8270C/D SIM (PAH-SIM) | 4 | EA | $0.00 | |
| 214 | LAB | EPA 9023 (Total Extractable Organic Halides (EOX)) | 12 | EA | $0.00 | |
| 215 | LAB | EPA 9045 (pH) | 12 | EA | $0.00 | |
| 216 | LAB | EPA 9014 (Cyanide in water) | 12 | EA | $0.00 | |
| 217 | LAB | Oil Viscosity per ASTM D7152 - 11(2016) | 2 | EA | $0.00 | |
| 218 | LAB | SM5210 (BOD) | 12 | EA | $0.00 | |
| 219 | LAB | SM5310 B/C/D (TOC ) | 12 | EA | $0.00 | |
| 220 | LAB | SM5520B/G (Oil and Grease) | 24 | EA | $0.00 | |
| 221 | LAB | SM5540 (Surfactant) | 24 | EA | $0.00 | |
| 222 | LAB | TO-15 (VOCs) in Air, including summa can rental | 48 | EA | $0.00 | |
| 223 | LAB | TO-17 (VOCs) in Air, with sorbent tubes | 12 | EA | $0.00 | |
| 224 | Decimal multiplier applied to unit price for Reference Items 022-056 for Level B Personal Protective Equipment, as defined by 29 CFR 1910.120 App B | |||||
| 225 | Decimal multiplier applied to unit price for Reference Items 022-056 for Level C Personal Protective Equipment, as defined by 29 CFR 1910.120 App B | |||||
| 226 | Decimal multiplier applied to unit price for Reference Items 176-223 for 24 hour expedited turn around time | |||||
| 227 | Decimal multiplier applied to unit price for Reference Items 176-223 for 72 hour expedited turn around time | |||||
| 228 | Decimal multiplier applied to unit price for Reference Items 176-223 for 5 day expedited turn around time | |||||
| Yearly Estimated Price | $0.00 | |||||
| Base Period Price | $0.00 | |||||
| Option Period Price | $0.00 | |||||
| Total Evaluated Price | $0.00 |
| Instructions to Complete Form: Offeror must fill out all cells shaded in green. Other cells are locked for editing. Offeror must identify all assumptions and exceptions in Section I of Technical Management Proposal. | |
| NOTES | |
| SVC | Services |
| DRL | Drilling and Well Installation |
| REP | Reporting |
| MIS | Miscellaneous |
| LAB | Laboratory Services |
&"-,Bold"SPE60320R0515 California Environmental Services DFSP Norwalk, Norwalk , California Attachment #5
&9Page &P of &N