Attachment 5 - National Total Bare Cost Example - DRAFT.pdf
PDF 698 KB Posted
- Attached to
- Joint Base San Antonio Multiple Award Construction Contract (MACC) IDIQ Federal contract opportunity
- Solicitation number
- Not on record
About this file
This document contains a draft solicitation for a Joint Base San Antonio Multiple Award Construction Contract (MACC) IDIQ opportunity and related attachments. The draft solicitation seeks industry comments on construction services for facilities located on Joint Base San Antonio. Comments must be submitted via email to the named Contracting Officer and Contract Specialist no later than May 6, 2021 at 4:00 p.m. local San Antonio time. The Department of the Air Force Air Education and Training Command is the issuing agency. Attachment 5 provides examples of how total bare construction costs are calculated using RS Means cost data when there are no equipment costs involved and when material, labor, and equipment costs are included.
View the file
Other files for this federal contract opportunity
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 5
13 Jan 2020
Figure 1: RS MEANS (National) Total Bare Cost Example shows how the (National) total bare cost is calculated when there are no equipment costs.
Figure 2: RS MEANS (National) Total Bare Cost Example shows (National) total bare cost when material labor and equipment are added.