Attachment 5 - National Total Bare Cost Example - DRAFT.pdf

PDF 698 KB Posted

Attached to
Joint Base San Antonio Multiple Award Construction Contract (MACC) IDIQ
Solicitation number
Not on record
Issued by

About this file

This document contains a draft solicitation for a Joint Base San Antonio Multiple Award Construction Contract (MACC) IDIQ opportunity and related attachments. The draft solicitation seeks industry comments on construction services for facilities located on Joint Base San Antonio. Comments must be submitted via email to the named Contracting Officer and Contract Specialist no later than May 6, 2021 at 4:00 p.m. local San Antonio time. The Department of the Air Force Air Education and Training Command is the issuing agency. Attachment 5 provides examples of how total bare construction costs are calculated using RS Means cost data when there are no equipment costs involved and when material, labor, and equipment costs are included.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 5

13 Jan 2020

Figure 1: RS MEANS (National) Total Bare Cost Example shows how the (National) total bare cost is calculated when there are no equipment costs.

Figure 2: RS MEANS (National) Total Bare Cost Example shows (National) total bare cost when material labor and equipment are added.