This document contains a draft reference template for contractors to provide details on relevant past project experience and performance as required for a Joint Base San Antonio Multiple Award Construction Contract Indefinite Delivery Indefinite Quantity (MACC IDIQ) solicitation. The template requests information on up to 25 previous projects, including award and completion dates, values, sizes, scopes of work, challenges, and references. It also provides a draft notice for the MACC IDIQ solicitation seeking industry comments by May 6, 2021 on the draft document. The solicitation will be issued by the Air Force Air Education and Training Command for construction services at Joint Base San Antonio.
View the file
Other files for this federal contract opportunity
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 13 – DB Experience Project Reference (Present as many projects as requested by the agency in the
RFP)
EXAMPLE PROJECT KEY NUMBER
Project No.
PROJECT SAMPLE REFERENCE FOR:
Prime Joint Venture Teaming Partner Designer of Record
TITLE AND LOCATION (City and State) Contract No. Task Order (if applicable)
DoD Agency or Private/Commercial Entity:
Project Title:
Location (i.e. JBSA Lackland, San Antonio, Texas)
COMPLETE THE TYPE OF PROJECT INFORMATION
Trades Included as part of the Scope of Project:
Electrical Carpentry Insulation Roofing Plumbing
Flooring (Tile) Cement/Concrete Work Flooring (Carpet/Laminate)
Fire Suppression HVAC Repair/Installation Dry Wall/Ceiling Installation
HazMat Abatement Remediation (Asbestos/Mold/Lead-based Paint)
Other (Explain):
Divisions Included as part of the Scope of Project:
Architectural Structural Mechanical Fire Protection
Electrical Civil Work Other (explain):
PROJECT INFORMATION
Award Date Completion Date Period of Performance (Actual)
Award Amount Final Contract Amount Project Size (Sq. Ft) to
DRAFT
If Final Amount is different from Contract Amount, please explain reason.
If PoP had to be extended beyond original PoP on Awardee, please explain reason.
Project Owner Point Of Contact Name Point Of Contact (Email & Telephone Number)
Enter Owner (i.e. 502 CES;
JBSA Lackland)
Enter validated/current POC Enter validated/current information
k. Provide a detailed description of the project and the relevancy to the project requirements of this RFP. Include a description of the design-effort.
Provide a detailed description of what work your firm self-performed on this project.
Provide a detailed description of challenges faces, actions taken, and result achieved.
| Project No: |
| Award DateRow1: |
| Completion DateRow1: |
| Award AmountRow1: |
| Final Contract AmountRow1: |
| Project Size Sq FtRow1: |
| If Final Amount is different from Contract Amount please explain reasonRow1: |
| If PoP had to be extended beyond original PoP on Awardee please explain reasonRow1: |
| Enter Owner ie 502 CES JBSA Lackland: |
| Enter validatedcurrent POC: |
| Enter validatedcurrent information: |
| k Provide a detailed description of the project and the relevancy to the project requirements of this RFP Include a description of the designeffortRow1: |
| Provide a detailed description of what work your firm selfperformed on this projectRow1: |
| Provide a detailed description of challenges faces actions taken and result achievedRow1: |
| Check Box1: Off |
| Check Box2: Off |
| Check Box3: Off |
| Check Box4: Off |
| Check Box5: Off |
| Check Box6: Off |
| Check Box7: Off |
| Check Box8: Off |
| Check Box9: Off |
| Check Box10: Off |
| Check Box11: Off |
| Check Box12: Off |
| Check Box13: Off |
| Check Box14: Off |
| Check Box15: Off |
| Check Box16: Off |
| Check Box17: Off |
| Check Box18: Off |
| Check Box19: Off |
| Check Box20: Off |
| Check Box21: Off |
| Check Box22: Off |
| Check Box23: Off |
| Check Box24: Off |
| Text25: |
| Text26: |
| Text27: |
| Text28: |
| Text29: |
| Text30: |
| Date31_af_date: |
| Date32_af_date: |