Attachment 13 - DB Experience Project Reference - DRAFT.pdf

PDF 716 KB Posted

Attached to
Joint Base San Antonio Multiple Award Construction Contract (MACC) IDIQ Federal contract opportunity
Solicitation number
Not on record
Issued by
Department of the Air Force Air Education and Training Command

About this file

This document contains a draft reference template for contractors to provide details on relevant past project experience and performance as required for a Joint Base San Antonio Multiple Award Construction Contract Indefinite Delivery Indefinite Quantity (MACC IDIQ) solicitation. The template requests information on up to 25 previous projects, including award and completion dates, values, sizes, scopes of work, challenges, and references. It also provides a draft notice for the MACC IDIQ solicitation seeking industry comments by May 6, 2021 on the draft document. The solicitation will be issued by the Air Force Air Education and Training Command for construction services at Joint Base San Antonio.

View the file

Other files for this federal contract opportunity

Other files attached to Joint Base San Antonio Multiple Award Construction Contract (MACC) IDIQ, newest first.
File Type Posted
DRAFT_Solicitation - FA301621R0017.pdf PDF
Attachment 1 - MACC Revised Specifications 14 April 2021 - DRAFT.pdf PDF
Attachment 4 DRAFT - Construction Cost Estimate Breakdown.xls XLS spreadsheet
Attachment 11 - SF1413 - DRAFT.pdf PDF
Attachment 12 - Proposal Completeness Checklist -DRAFT.pdf PDF
Attachment 16 - Past Performance Information Sheet - DRAFT.pdf PDF
Attachment 18 - Section L Instructions to Offerors _Rev 03MAR2021 - DRAFT.pdf PDF
Attachment 5 - National Total Bare Cost Example - DRAFT.pdf PDF
Attachment 7 - Material Approval (AF3000) - DRAFT.pdf PDF
Attachment 10 - Base Access Request Form - DRAFT.pdf PDF
Attachment 15 - Quality and Satisfaction Survey - DRAFT.pdf PDF
Attachment 2 - Contract Progress Schedule (AF 3064) - DRAFT.xls XLS spreadsheet
Attachment 9 - Warranty Call Worksheet - DRAFT.pdf PDF
Attachment 14 - Solicitation Exceptions - DRAFT.pdf PDF
Attachment 3 - Contract Insurance Compliance Notification - DRAFT.pdf PDF
Attachment 6 - Contract Progress Report (AF 3065) - DRAFT.pdf PDF
Attachment 8 - Progress Payment Request - DRAFT.xlsx XLSX spreadsheet
Attachment 17 - Teaming Experience Matrix -DRAFT.pdf PDF
Attachment 19 - Section M Evaluation Factors for Award_Rev 03MAR2021 - DRAFT.pdf PDF
Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 13 – DB Experience Project Reference (Present as many projects as requested by the agency in the

RFP)

EXAMPLE PROJECT KEY NUMBER

Project No.

PROJECT SAMPLE REFERENCE FOR:

Prime Joint Venture Teaming Partner Designer of Record

TITLE AND LOCATION (City and State) Contract No. Task Order (if applicable)

DoD Agency or Private/Commercial Entity:

Project Title:

Location (i.e. JBSA Lackland, San Antonio, Texas)

COMPLETE THE TYPE OF PROJECT INFORMATION

Trades Included as part of the Scope of Project:

Electrical Carpentry Insulation Roofing Plumbing

Flooring (Tile) Cement/Concrete Work Flooring (Carpet/Laminate)

Fire Suppression HVAC Repair/Installation Dry Wall/Ceiling Installation

HazMat Abatement Remediation (Asbestos/Mold/Lead-based Paint)

Other (Explain):

Divisions Included as part of the Scope of Project:

Architectural Structural Mechanical Fire Protection

Electrical Civil Work Other (explain):

PROJECT INFORMATION

Award Date Completion Date Period of Performance (Actual)

Award Amount Final Contract Amount Project Size (Sq. Ft) to

DRAFT

If Final Amount is different from Contract Amount, please explain reason.

If PoP had to be extended beyond original PoP on Awardee, please explain reason.

Project Owner Point Of Contact Name Point Of Contact (Email & Telephone Number)

Enter Owner (i.e. 502 CES;

JBSA Lackland)

Enter validated/current POC Enter validated/current information

k. Provide a detailed description of the project and the relevancy to the project requirements of this RFP. Include a description of the design-effort.

Provide a detailed description of what work your firm self-performed on this project.

Provide a detailed description of challenges faces, actions taken, and result achieved.

Project No:
Award DateRow1:
Completion DateRow1:
Award AmountRow1:
Final Contract AmountRow1:
Project Size Sq FtRow1:
If Final Amount is different from Contract Amount please explain reasonRow1:
If PoP had to be extended beyond original PoP on Awardee please explain reasonRow1:
Enter Owner ie 502 CES JBSA Lackland:
Enter validatedcurrent POC:
Enter validatedcurrent information:
k Provide a detailed description of the project and the relevancy to the project requirements of this RFP Include a description of the designeffortRow1:
Provide a detailed description of what work your firm selfperformed on this projectRow1:
Provide a detailed description of challenges faces actions taken and result achievedRow1:
Check Box1: Off
Check Box2: Off
Check Box3: Off
Check Box4: Off
Check Box5: Off
Check Box6: Off
Check Box7: Off
Check Box8: Off
Check Box9: Off
Check Box10: Off
Check Box11: Off
Check Box12: Off
Check Box13: Off
Check Box14: Off
Check Box15: Off
Check Box16: Off
Check Box17: Off
Check Box18: Off
Check Box19: Off
Check Box20: Off
Check Box21: Off
Check Box22: Off
Check Box23: Off
Check Box24: Off
Text25:
Text26:
Text27:
Text28:
Text29:
Text30:
Date31_af_date:
Date32_af_date: