This document is a draft proposal completeness checklist for a multiple award construction contract indefinite delivery indefinite quantity contract at Joint Base San Antonio. The checklist outlines the required contents and structure for proposals, including three separate volumes for executed contracting documents, executive experience and technical approach, and past performance. Volume I must include a Standard Form 1442, exceptions to the solicitation, authorized personnel and company information, and bonding and teaming documents. Volume II needs six construction project references adhering to relevancy requirements, a team experience matrix if applicable, and a management effectiveness plan. Volume III requires up to eight past performance reports and satisfaction surveys meeting recency and relevancy standards. Comments on this draft solicitation are requested from industry by 4:00 pm local San Antonio time on May 6, 2021 and shall be sent only to the identified Contracting Officer and Contract Specialist via email.
View the file
Other files for this federal contract opportunity
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 12 – Proposal Completeness Checklist
Contractor:____________________________________ Date:____________
FA31621R0017 Page 1 of 3
CHECKLIST FOR PROPOSAL PACKAGE
SOLICITATION PART YES NO Notes
Proposal Submitted Timely IAW solicitation as noted in BetaSam.gov BetaSam.gov Solicitation
Notice; SF1442, Block 13A (unless amended).
Three (3) separate Volumes (three-ring loose-leaf binders):
Volume I – Executed Contracting Documents Volume II – Executive Experience and Technical Volume III – Past Performance
Attachment ___ Section L – 2.4.2
Each volume has a single cover sheet to include the following:
a) Volume Number
b) Title
c) Copy Number
d) Solicitation Identification and
e) Offeror’s Name (duplicate on spine of each binder)
Section L – 2.3
Proposal meets page size instructions.
• Proposal is on 8 1/2” x 11” paper, white or ivory stock;
• Charts, tables or diagrams do not exceed 11” x 17”;
• All pages of each part appropriately numbered and identified with the Request for Proposal (RFP) number.
Section L - 2.4
Each Volume contain a more detailed table of contents to delineate the subparagraphs within that file
• Tab indexing used to identify sections.
Section L - 2.4.1
Draf t
Contractor:____________________________________ Date:____________
FA31621R0017 Page 2 of 3
Each Volume conforms to the Page Limitation
• Volume II adheres to the 40 Page Limit.
• Volume III adheres to the 32 Page Limit.
Attachment ___ Section L - 2.4.2 Table
One (1) Electronic copy (CD/DVD)
• Electronic Documents are in PDF Format
• Title of documents include corresponding Volume/Title, offeror’s Cage code (i.e. “Volume I – Executed Contracting Contracting”)
Attachment ___ Section L – 2.1
Volume I contains all required documents:
Tab A
• Executed Standard Form 1442
Tab B
• Exceptions to the Solicitation (Attachment 8)
Tab C
• Authorized Offeror Personnel & Company Information
• Notarized Bonding Letter from Surety
• Signed Teaming Agreements (if applicable)
Attachment ___ Section L - 3.1
Volume II contains all required documents:
Tab A
• Six (6) DB Project References (See Attachment 13)
• All fields in the attachment are complete
• The project references meet the relevancy requirements in paragraph 3.1.1.1.1
Attachment ___ Section L - 3.1.1.1
Draf t
SORENSEN, ANDREW S CIV USAF AETC 502 CONS/JBKAD
Verify language is exactly six in 3.1.1.1. just like in 3.1.1.1.1
Contractor:____________________________________ Date:____________
FA31621R0017 Page 3 of 3
• Team Experience Matrix (See Attachment X) is included (only applicable when using teaming partner for Project References)
Tab B
Management Effectiveness and Capabilities plan.
Section L - 3.1.2
Volume III contains all required documents:
Tab A
• Up to eight (8) Past Performance Reports (See
Attachment 16)
• The reports represent projects that meet the Recency requirements
• The reports represent projects that meet Relevancy requirements
Tab B
• Up to eight (8) Quality and Satisfaction Survey (one for each Past Performance Report – See Attachment XX).
• Only Sections 1 and 2 of the Quality and Satisfaction
Survey are complete.
Section L - 3.1.3.1.1
Section L - 3.1.3.1.2.1