Attachment 7 - Material Approval (AF3000) - DRAFT.pdf
PDF 656 KB Posted
- Attached to
- Joint Base San Antonio Multiple Award Construction Contract (MACC) IDIQ Federal contract opportunity
- Solicitation number
- Not on record
About this file
This document is a draft material approval submittal form to be used by contractors for submitting shop drawings, equipment data, manufacturer's literature, certificates, and material samples to the government for approval in accordance with the terms of a contract.
The form requires contractors to list items to be approved along with the relevant specification section and drawing number, and to describe the material including type, model number, catalog number, and manufacturer. Space is provided for government representatives to approve or disapprove each item. The contractor certifies that materials comply with all contract specifications. Government contracting and engineering offices then indicate whether they recommend approval or disapproval of the submittal and materials.
View the file
Other files for this federal contract opportunity
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
For Evaluation and Action
(YYYYMMDD)
(YYYYMMDD)
(YYYYMMDD)
(YYYYMMDD)
(YYYYMMDD)
Form Approved OMB No 9000-0062 Expires May 31, 2005
MATERIAL APPROVAL SUBMITTAL
(See Instructions on Reverse)
Public reporting burden for this collection of information is estimated to average 20 minutes per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to the Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project OMB No 9000-0062, Washington DC 20503. Please DO NOT RETURN your form to either of these addresses. Send your completed form to: SAF/AQCP, 1060 Air Force Pentagon, Washington DC 20330-1060.
TO: (Contracting Officer) FROM: (Contractor) DATE
CONTRACT NUMBER SUBMISSION NUMBER SUBMITTAL
NEW RESUBMITTAL
PREVIOUS SUBMISSION NUMBER PROJECT NUMBER
TO BE COMPLETED BY CONTRACTOR FOR GOVERNMENT USE ONLY
ITEM SPECIFICATION SECTION/ DESCRIPTION OF MATERIAL AP-
PROVED
DISAP-
PROVED
SEE
REVERSE INITIAL
BY COMPLETING THIS FORM, THE UNDERSIGNED CONTRACTOR CERTIFIES THAT
THE MATERIAL COMPLIES WITH ALL SPECIFICATIONS OF SUBJECT CONTRACT.
DATE
TYPE OR PRINT NAME AND TITLE SIGNATURE
FOR GOVERNMENT USE ONLY
TO: (Base Civil Engineering Officer)
DATE TYPE OR PRINT NAME AND GRADE SIGNATURE
TO: (AF Contracting Office)
RECOMMEND APPROVAL DISAPPROVAL AS INDICATED ABOVE AND SUBJECT TO ANY APPLICABLE COMMENTS ON THE REVERSE
DATE TYPE OR PRINT NAME AND GRADE SIGNATURE
TO: (Contractor)
DISAPROVED AS INDICATED ABOVE AND SUBJECT TO ANY APPLICABLE COMMENTS ON THE REVERSE SIDE. REQUESTAPPROVED
RESUBMITTAL ON DISAPPROVED ITEMS WITHIN DAYS OF DATE SHOWN BELOW.
DATE TYPE OR PRINT NAME AND GRADE
SIGNATURE
AF IMT 3000, 20030901, V1 PREVIOUS EDITION IS OBSOLETE.
NO. PARA NO./DRAWING NO. (Include Type, Model Number, Catalog Number, Mfg., etc.)
DRAFT
COMMENTS
(Number to correspond with applicable Item Number on reverse)
INSTRUCTIONS TO CONTRACTORS
1. The term "material" is defined as articles, supplies, raw materials, equipment, parts, components, and end items that are to be incorporated into the work required by the contract.
2. This form is to be used by contractors for submitting Shop Drawings, Equipment Data, Manufacturer's Literature and Certificates and samples of Materials to the Government for approval in accordance with the provisions of this contract. Unless otherwise specified, it is to be prepared in 4 copies, signed, and provided to the contracting officer with appropriate attachments.
3. Item(s) to be approved will be clearly tabbed or identified. Data pertaining to item(s) to be approved will be clearly identified or tabbed, particularly where documents are voluminous, in order to properly evaluate the materials or articles to be incorporated in the work. Each attachment will be numbered to correspond with the item number shown on the face of this form.
4. Requests submitted shall be numbered consecutively, by contract, in the space entitled "Submission No.". This number, in addition to the Contract No., will be used to identify each Material Approval Submittal. Resubmissions will be indicated in the appropriate block and the insertion of previous submission number and data in addition to a new submission number. A single submission should be used for all work of a section of the specifications, but in NO instance should the submission include work for more than one (1) contract. Submittals requiring priority handling will be submitted by separate submittal using the form and so marked across the face of the form.
5. This Material Approval Submittal is not valid unless it is signed by the contracting officer. This approval is required as called for by the contracting officer under the terms of this contract.
AF IMT 3000, 20030901, V1 (REVERSE)
DRAFT
| TO Contracting Officer: |
| FROM Contractor: |
| YYYYMMDD: |
| CONTRACT NUMBER: |
| SUBMISSION NUMBER: |
| NEW: Off |
| RESUBMITTAL: Off |
| PREVIOUS SUBMISSION NUMBER: |
| PROJECT NUMBER: |
| ITEM NORow1: |
| SPECIFICATION SECTION PARA NODRAWING NORow1: |
| DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow1: |
| INITIAL: |
| ITEM NORow2: |
| SPECIFICATION SECTION PARA NODRAWING NORow2: |
| DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow2: |
| INITIAL_2: |
| ITEM NORow3: |
| SPECIFICATION SECTION PARA NODRAWING NORow3: |
| DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow3: |
| INITIAL_3: |
| ITEM NORow4: |
| SPECIFICATION SECTION PARA NODRAWING NORow4: |
| DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow4: |
| INITIAL_4: |
| ITEM NORow5: |
| SPECIFICATION SECTION PARA NODRAWING NORow5: |
| DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow5: |
| INITIAL_5: |
| ITEM NORow6: |
| SPECIFICATION SECTION PARA NODRAWING NORow6: |
| DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow6: |
| INITIAL_6: |
| ITEM NORow7: |
| SPECIFICATION SECTION PARA NODRAWING NORow7: |
| DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow7: |
| INITIAL_7: |
| ITEM NORow8: |
| SPECIFICATION SECTION PARA NODRAWING NORow8: |
| DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow8: |
| INITIAL_8: |
| ITEM NORow9: |
| SPECIFICATION SECTION PARA NODRAWING NORow9: |
| DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow9: |
| INITIAL_9: |
| ITEM NORow10: |
| SPECIFICATION SECTION PARA NODRAWING NORow10: |
| DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow10: |
| INITIAL_10: |
| ITEM NORow11: |
| SPECIFICATION SECTION PARA NODRAWING NORow11: |
| DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow11: |
| INITIAL_11: |
| YYYYMMDD_2: |
| THE MATERIAL COMPLIES WITH ALL SPECIFICATIONS OF SUBJECT CONTRACT: |
| FOR GOVERNMENT USE ONLY: |
| For Evaluation and Action: |
| YYYYMMDD_3: |
| TYPE OR PRINT NAME AND GRADE: |
| AF Contracting Office: |
| YYYYMMDD_4: |
| DISAPPROVAL AS INDICATED ABOVE AND SUBJECT TO ANY APPLICABLE COMMENTS ON THE REVERSE: |
| TO Contractor: |
| DAYS OF DATE SHOWN BELOW: |
| YYYYMMDD_5: |
| TYPE OR PRINT NAME AND GRADE_2: |
| COMMENTS Number to correspond with applicable Item Number on reverseRow1: |
| Check Box1: Off |
| Check Box2: Off |
| Check Box3: Off |
| Check Box4: Off |
| Check Box5: Off |
| Check Box6: Off |
| Check Box7: Off |
| Check Box8: Off |
| Check Box9: Off |
| Check Box10: Off |
| Check Box11: Off |
| Check Box12: Off |
| Check Box13: Off |
| Check Box14: Off |
| Check Box15: Off |
| Check Box16: Off |
| Check Box17: Off |
| Check Box18: Off |
| Check Box19: Off |
| Check Box20: Off |
| Check Box21: Off |
| Check Box22: Off |
| Check Box23: Off |
| Check Box24: Off |
| Check Box25: Off |
| Check Box26: Off |
| Check Box27: Off |
| Check Box28: Off |
| Check Box29: Off |
| Check Box30: Off |
| Check Box31: Off |
| Check Box32: Off |
| Check Box33: Off |
| Check Box34: Off |
| Check Box35: Off |
| Check Box36: Off |
| Check Box37: Off |
File details come from the government source that posted it. Updated .