Attachment 5 - Drawings V4 of 5 - 56-24-115 - N Chicago Elevator Upgrades.pdf
PDF 11 MB Posted
- Solicitation number
- 36C77626R0048
About this file
This document is a set of 100% construction documents (architectural drawings and specifications) for an elevator upgrade project at the Captain James A. Lovell Federal Health Care Center in North Chicago, Illinois. The project, identified as VA Project Number 556-24-115 and VA Contract Number 36C252-23-D-0061 (Task Number 36C25224N0331), involves updating and upgrading multiple elevators across several buildings at the VA facility.
The Base Bid scope requires the contractor to provide labor, material, and equipment to modernize eight elevators: P4, P5, and S6 in Building 131; P21 in Building 66; P22 in Building 7; P23 in Building 4; P25 and P26 in Building 195; and cart lifts in the OR/Sterile Processing area of Building 133/133CA. The construction must be executed in separate phases, with each elevator phased individually and coordinated to minimize operational disruption. Critical scheduling constraints include: work conducted during day shifts (8:00 AM to 5:00 PM) unless otherwise coordinated with the Contracting Officer's Representative (COR); only one elevator out of service in the same building at any given time; elevators in Buildings 7 and 66 cannot be shut down concurrently; and all work must be completed and opened for public use each night. Above-ceiling work is restricted to 5:00 PM to 5:00 AM hours. The project incorporates extensive infection control protocols with temporary barrier walls, air pressure monitoring, and Class II precaution measures to protect patients and staff. Design services are provided by Guidon (Consultant) and Specialized Engineering Solutions (Designer of Record), with construction oversight by the VA's Office of Construction and Facilities Management.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
B195-E100 FIRST LEVEL FLOOR PLAN -OVERALL -ELECTRICAL
B195-E101 SECOND LEVEL FLOOR PLAN -OVERALL -ELECTRICAL
B195-E102 THIRD LEVEL FLOOR PLAN -OVERALL -ELECTRICAL
B195-E103 FOURTH LEVEL FLOOR PLAN -OVERALL -ELECTRICAL
B195-E104 ROOF PLAN -OVERALL -ELECTRICAL
B195-E400 ENLARGED FLOOR PLANS -ELECTRICAL
B195-E500 ONE-LINE DIAGRAM
B195-E700 ELECTRICAL SCHEDULES
B66-AE501 STAIR DETAILS
B131-AE130 BASEMENT, FIRST & SECOND FLOOR DEMO & ARCH PLANS
B131-AE131 SECOND & THIRD FLOOR DEMO & ARCH PLANS
B131-AE132 FOURTH & PENTHOUSE DEMO & ARCH PLANS
B133/133CA-AE140 BASEMENT AND SECOND FLOOR DEMO & ARCH ENLARGED PLANS
B195-AE150 FIRST, SECOND & THIRD DEMO & ARCH ENLARGED PLANS
B195-AE151 FOURTH FLOOR & ROOF DEMO & ARCH ENLARGED PLANS
AI201 ELEVATOR PANEL REFERENCES
MECHANICAL
M000 MECHANICAL SYMBOLS AND ABBREVIATIONS
B04-MD102 PENTHOUSE PLAN-OVERALL-MECHANICAL-DEMOLITION
B04-M100 FIRST LEVEL FLOOR PLAN-OVERALL-MECHANICAL
B04-M102 PENTHOUSE PLAN-OVERALL-MECHANICAL
B04-M400 ENLARGED FLOOR PLANS-MECHANICAL
B04-M500 MECHANICAL SCHEDULES AND DETAILS
B07-MD100 BASEMENT LEVEL FLOOR PLAN -OVERALL -MECHANICAL DEMOLITION
B07-M100 BASEMENT LEVEL FLOOR PLAN -OVERALL -MECHANICAL
SHEET LIST
SHEET NUMBER SHEET NAME
General
G000 COVER SHEET
ARCHITECTURAL
GI102 PHASING SCOPE
B4-GI101 LIFE SAFETY PLANS
B07-GI111 LIFE SAFETY PLANS
B66-GI121 LIFE SAFETY PLANS
B131-GI131 LIFE SAFETY PLANS
B133/133CA-GI141 LIFE SAFETY PLANS
B195-GI151 LIFE SAFETY PLANS
B4-AE100 FIRST & SECOND DEMO & ARCH ENLARGED PLANS
B4-AE501 ELEVATOR PIT PLANS
B07-AE110 BASEMENT, FIRST & SECOND DEMO & ARCH ENLARGED PLANS
B07-AE111 MACHINE ROOM DEMO & ARCH ENLARGED PLANS
B66-AE120 BASEMENT, FIRST, SECOND, & ROOF ARCHITECTURAL PLAN
B07-M103 PENTHOUSE LEVEL FLOOR PLAN -OVERALL -MECHANICAL
B07-M400 ENLARGED FLOOR PLANS -MECHANICAL
B07-M500 MECHANICAL SCHEDULES AND DETAILS
B66-M100 BASEMENT LEVEL FLOOR PLAN -OVERALL -MECHANICAL
B66-M103 PENTHOUSE PLAN -OVERALL -MECHANICAL
B66-M400 ENLARGED FLOOR PLANS -MECHANICAL
B66-M500 MECHANICAL SCHEDULES AND DETAILS
B131-MD105 PENTHOUSE LEVEL FLOOR PLAN -OVERALL -MECHANICAL -DEMOLITION
B131-MD400 ENLARGED FLOOR PLANS -MECHANICAL -DEMOLITION
B131-M100 BASEMENT LEVEL FLOOR PLAN -OVERALL -MECHANICAL
B131-M105 PENTHOUSE LEVEL FLOOR PLAN -OVERALL -MECHANICAL
B131-M401 ENLARGED FLOOR PLANS -MECHANICAL
B131-M500 MECHANICAL SCHEDULES AND DETAILS
B133CA-MD103 THIRD LEVEL FLOOR PLAN -OVERALL -MECHANICAL -DEMOLITION
B133CA-MD104 FOURTH LEVEL FLOOR PLAN -OVERALL -MECHANICAL -DEMOLITION
B133CA-M103 THIRD LEVEL FLOOR PLAN -OVERALL -MECHANICAL
B133CA-M104 FOURTH LEVEL FLOOR PLAN -OVERALL -MECHANICAL
B133CA-M400 ENLARGED FLOOR PLANS -MECHANICAL
B133CA-M500 MECHANICAL SCHEDULES AND DETAILS
B195-MD100 FIRST LEVEL FLOOR PLAN -OVERALL -MECHANICAL -DEMOLITION
B195-M100 FIRST LEVEL FLOOR PLAN -OVERALL -MECHANICAL
B195-M400 ENLARGED FLOOR PLANS -MECHANICAL
B195-M500 MECHANICAL SCHEDULES AND DETAILS
ELECTRICAL
E000 ELECTRICAL SYMBOLS AND ABBREVIATIONS
B04-ED100 FIRST LEVEL FLOOR PLAN-OVERALL-ELECTRICAL-DEMOLITION
B04-ED101 SECOND LEVEL FLOOR PLAN-OVERALL-ELECTRICAL-DEMOLITION
B04-ED102 PENTHOUSE PLAN-OVERALL-ELECTRICAL-DEMOLITION
B04-E100 FIRST LEVEL FLOOR PLAN-OVERALL-ELECTRICAL
B04-E101 SECOND LEVEL FLOOR PLAN-OVERALL-ELECTRICAL
B04-E102 PENTHOUSE PLAN-OVERALL-ELECTRICAL
B04-E400 ENLARGED FLOOR PLANS-ELECTRICAL
B04-E500 ONE-LINE DIAGRAM
B04-E700 ELECTRICAL SCHEDULES
B07-ED100 BASEMENT LEVEL FLOOR PLAN -OVERALL -ELECTRICAL -DEMOLITION
B07-ED101 FIRST LEVEL FLOOR PLAN -OVERALL -ELECTRICAL -DEMOLITION
B07-ED102 SECOND LEVEL FLOOR PLAN -OVERALL -ELECTRICAL -DEMOLITION
B07-ED103 PENTHOUSE LEVEL FLOOR PLAN -OVERALL -ELECTRICAL -DEMOLITION
B07-E100 BASEMENT LEVEL FLOOR PLAN -OVERALL -ELECTRICAL
B07-E101 FIRST LEVEL FLOOR PLAN -OVERALL -ELECTRICAL
B07-E102 SECOND LEVEL FLOOR PLAN -OVERALL -ELECTRICAL
B07-E103 PENTHOUSE LEVEL FLOOR PLAN -OVERALL -ELECTRICAL
B07-E400 ENLARGED FLOOR PLANS
B07 -E500 ONE-LINE DIAGRAM
B07 -E700 ELECTRICAL SCHEDULES
B66-ED100 BASEMENT LEVEL FLOOR PLAN -OVERALL -ELECTRICAL -DEMOLITION
B66-ED101 FIRST LEVEL FLOOR PLAN -OVERALL -ELECTRICAL -DEMOLITION
B66-ED102 SECOND LEVEL FLOOR PLAN -OVERALL -ELECTRICAL -DEMOLITION
B66-ED103 PENTHOUSE PLAN -OVERALL -ELECTRICAL -DEMOLITION
B66-E100 BASEMENT LEVEL FLOOR PLAN -OVERALL -ELECTRICAL
B66-E101 FIRST LEVEL FLOOR PLAN -OVERALL -ELECTRICAL
B66-E102 SECOND LEVEL FLOOR PLAN -OVERALL -ELECTRICAL
B66-E103 PENTHOUSE PLAN -OVERALL -ELECTRICAL
B66-E400 ENLARGED FLOOR PLANS -ELECTRICAL
B66-E500 ONE-LINE DIAGRAM
B66-E700 ELECTRICAL SCHEDULES
B131-ED100 BASEMENT LEVEL FLOOR PLAN -OVERALL -ELECTRICAL -DEMOLITION
B131-ED101 FIRST LEVEL FLOOR PLAN -OVERALL -ELECTRICAL -DEMOLITION
B131-ED102 SECOND LEVEL FLOOR PLAN -OVERALL -ELECTRICAL -DEMOLITION
B131-ED103 THIRD LEVEL FLOOR PLAN -OVERALL -ELECTRICAL -DEMOLITION
B131-ED104 FOURTH LEVEL FLOOR PLAN -OVERALL -ELECTRICAL -DEMOLITION
B131-ED105 PENTHOUSE LEVEL FLOOR PLAN -OVERALL -ELECTRICAL -DEMOLITION
B131-E100 BASEMENT LEVEL FLOOR PLAN -OVERALL -ELECTRICAL
B131-E101 FIRST LEVEL FLOOR PLAN -OVERALL -ELECTRICAL
B131-E102 SECOND LEVEL FLOOR PLAN -OVERALL -ELECTRICAL
B131-E103 THIRD LEVEL FLOOR PLAN -OVERALL -ELECTRICAL
B131-E104 FOURTH LEVEL FLOOR PLAN -OVERALL -ELECTRICAL
B131-E105 PENTHOUSE LEVEL FLOOR PLAN -OVERALL -ELECTRICAL
B131-E400 ENLARGED FLOOR PLANS -ELECTRICAL
B131-E500 ONE-LINE DIAGRAM
B131-E700 ELECTRICAL SCHEDULES
B133CA-ED100 BASEMENT LEVEL FLOOR PLAN -OVERALL -ELECTRICAL -DEMOLITION
B133CA-ED101 FIRST LEVEL FLOOR PLAN -OVERALL -ELECTRICAL -DEMOLITION
B133CA-ED102 SECOND LEVEL FLOOR PLAN -OVERALL -ELECTRICAL -DEMOLITION
B133CA-ED103 THIRD LEVEL FLOOR PLAN -OVERALL -ELECTRICAL -DEMOLITION
B133CA-ED104 FOURTH LEVEL FLOOR PLAN -OVERALL -ELECTRICAL -DEMOLITION
B133CA-ED105 PENTHOUSE PLAN -OVERALL -ELECTRICAL -DEMOLITION
B133CA-E100 BASEMENT LEVEL FLOOR PLAN -OVERALL -ELECTRICAL
B133CA-E101 FIRST LEVEL FLOOR PLAN -OVERALL -ELECTRICAL
B133CA-E102 SECOND LEVEL FLOOR PLAN -OVERALL -ELECTRICAL
B133CA-E103 THIRD LEVEL FLOOR PLAN -OVERALL -ELECTRICAL
B133CA-E104 FOURTH LEVEL FLOOR PLAN -OVERALL -ELECTRICAL
B133CA-E400 ENLARGED FLOOR PLANS -ELECTRICAL
B133CA-E500 ONE-LINE DIAGRAM
B133CA-E700 ELECTRICAL SCHEDULES
B195-ED100 FIRST LEVEL FLOOR PLAN -OVERALL -ELECTRICAL -DEMOLITION
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMP
321 4 5 6 7 8 9 10 www.specializedeng.com SES Project :
DESIGNER OF RECORDCONSULTANT
1221 N. Pennsylvania St.
Indianapolis, IN 46202 Phone: 317.800.6388 www.guidondesign.com
GD Project: 23.1019.05 10/03/2025
100% CONSTRUCTION DOCUMENTS 10/03/2025
/3 /2
:0
:3
P
M
A u to d e s k D o c s
/2
.0
V
A L o v e ll
E le v a to r
U p g ra d e /5
-1
.G
R
.r v t
G000
COVER SHEET Elevator Upgrade
3001 Green Bay Road, North Chicago, IL 60064
556-24-115
09/12/2025 MS AEA
23022.012
CAPTAIN JAMES A. LOVELL FEDERAL HEALTH CARE CENTER
ELEVATOR UPGRADE
PROJECT NAME:
3001 Green Bay Road, North Chicago, IL 60064
SITE ADDRESS:
VA PROJECT NUMBER:
556-24-115
VICINITY MAP: SITE MAP:
VA CONTRACT NUMBER:
36C252-23-D-0061
VA TASK NUMBER:
36C25224N0331
B04, 07, 66, 131, 133/133CA, 195
Base Bid:
Contractor shall provide labor, material and equipment to update & upgrade elevators P4, P5, and S6 in buildings 131, P21 in building 66, P22 in building 7, P23 in building 4, P25 & P26 in building 195 and cart lifts in OR/Sterile Processing in building 133/133CA at Veterans Affairs(VA) Captain James A. Lovell Federal Health Care Center(FHCC).
N
Revisions: Date:
1. EACH ELEVATOR WILL BE PHASED SEPERATELY.
2. WHERE MULTIPLE ELEVATORS ARE BEING MODERNIZED IN THE SAME
BUILDING, CONTRACTOR SHALL SEQUENCE WORK SO THAT ONLY ONE
ELEVATOR IS OUT OF SERVICE FOR CONSTRUCTION AT ANY GIVEN TIME.
3. ELEVATORS IN MULTIPLE BUILDINGS CAN BE PHASED CONCURRENTLY WITH
THE EXCEPTION OF BUILDINGS 7 & 66. ELEVATORS IN THESE TWO
BUILDINGS SHALL NOT BE SHUTDOWN CONCURRENTLY.
4. AREAS SURROUNDING OR ADJACENT TO PROJECT AREAS TO BE OCCUPIED
BY STAFF AND VETERANS THROUGHOUT CONSTRUCTION.
5. PROJECT SHALL BE COMPLETED DURING DAY SHIFTS, 8:00 AM TO 5:00 PM.,
UNLESS NOTED OTHERWISE. COORDINATE WITH COR. ALL WORK TO BE
COMPLETED AND OPEN FOR PUBLIC USE AT THE END OF EACH NIGHT'S
WORK.
6. REFER TO SPECIFICATION 01 00 00 FOR INFORMATION ON WORK DURATION
FOR EACH PHASE AND AREA OF WORK.
7. THE SEQUENCE OF PHASES WILL BE DETERMINED BASED UPON
OPERATION OF THE EXISTING ELEVATORS DURING CONSTRUCTION
8. ELEVATOR LOBBIES SHALL BE PHASED TO MINIMIZE INTERUPTION OF
PATIENT/GUEST TRAFFIC
A. FLOORING SHALL BE PREPPED AND INSTALLED IN AREAS TO
MAINTAIN TRAFFIC IN LOBBIES
B. ALL WORK SHALL BE COORDINATED WITH THE VA AND OCCUR
DURING SHIFTS THAT ACCOMODATE OPERATIONS OF THE
ADJACENT CLINICAL AREAS
C. AREAS OF FLOORING BEING REPLACED IN FOR EACH SHIFT
SHALL NOT EXCEED AN AMOUNT THAT CAN BE COMPLETED
DURING A SINGLE SHIFT.
9. COORDINATION OF ASSOCIATED MEP SCOPE AND EQUIPMENT
INSTALLATIONS SHALL BE COORDINATED TO MINIMIZE THE NEED TO SHUT
DOWN MULTIPLE ELEVATORS AT THE SAME TIME.
10. CONSTRUCTION OF WALL AND DOOR TO BE SCHEDULED WITH VA DURING
OFF HOURS FOR SURROUNDING DEPARTMENTS, I.E. NIGHTS & WEEKENDS.
WORK SHALL BE COMPLETED DURING EACH SHIFT AND/OR ISOLATED WHEN
CONSTRUCTION ACTIVITIES ARE PAUSED FOR DAILY OPERATIONS TO
MAINTAIN PEDESTRIAN TRAFFIC ROUTES TO ELEVATORS IN A CLEAN AND
SAFE MANNER.
11. FLOORING REPLACEMENT TO BE SCHEDULED WITH VA DURING OFF HOURS
FOR SURROUNDING DEPARTMENTS, I.E. NIGHTS & WEEKENDS
AREAS FOR DEMOLITION & INSTALLATION SHALL BE DIVIDED INTO SUB
PHASES TO BE COMPLETED WITHIN A SINGLE SHIFT.
12. TEMPORARY INFECTION CONTROL PROTECTION BARRIER ON ALL FLOORS
ABOVE LOWER LEVEL.
13. ALL CEILING TILES REMOVED TO COMPLETE WORK WITHIN THE ICRA
BARRIERS LOCATED ON ARCHITECTURAL PLANS SHALL BE REPLACED AT
THE COMPLETION OF EACH SHIFT TO MAINTAIN SPRINKLER PROTECTION.
14. THE ELEVATOR DOOR IN THE AFFECTED ELEVATOR SHAFT IS REQUIRED TO
BE CLOSED AT THE END OF EACH WORKDAY.
PHASING GENERAL NOTES
A. REFER TO LIST OF REQUIRED INFECTION CONTROL PRECAUTIONS
OUTLINED BY CLASS IN SPECIFICATION 010110 AND ADDITIONAL
INFORMATION.
B. REFER TO DRAWINGS, SPECIFICATIONS AND DOOR HARDWARE SCHEDULE
FOR ADDITIONAL INFORMATION.
C. PROJECT SHALL BE COMPLETED IN SEPARATE PHASES. SEQUENCE OF
PHASES SHALL BE COORDINATED AND APPROVED BY VA PRIOR TO
COMMENCEMENT.
D. COORDINATE FULL SCOPE OF WORK WITH ENGINEERING DRAWINGS AND
FIELD VERIFICATION. CONTRACTOR IS RESPONSIBLE FOR SCOPE OF ABOVE
CEILING WORK REQUIRED ABOVE AND BELOW THE FLOOR PLATE OF THE
PROJECT BOUNDARY.
E. COORDINATE LOCATION OF TEMPORARY INFECTION CONTROL (IC) BARRIER
WALL CONSTRUCTION AND INFECTION CONTROL (IC) MEASURES WITH COR
AND PATIENT SAFETY/ INFECTION CONTROL REPRESENTATIVE.
TEMPORARY IC BARRIER WALL CONSTRUCTION LOCATIONS IN DRAWINGS
ARE APPROXIMATE. CONTRACTOR SHALL PROVIDE DRAWING TO COR AND
PATIENT SAFETY/ INFECTION CONTROL REPRESENTATIVE ONCE ICRA
PROTOCOLS AND PLAN IS APPROVED.
F. SCHEDULE AND TIME OF CONSTRUCTION WORK TO BE APPROVED BY COR
AND NURSING STAFF BEFORE CONSTRUCTION MAY BEGIN. PROVIDE
PHASING INFORMATION FOR ABOVE CEILING WORK IN THE CONTRACTOR
PROVIDED CPM SCHEDULE FOR WORK ALSO REQUIRED ABOVE AND BELOW
THE FLOOR PLATE OF THE PROJECT BOUNDARY.
G. ABOVE CEILING WORK SHALL TAKE PLACE BETWEEN THE HOURS OF 5:00
PM AND 5:00 AM. IN AREAS THAT REQUIRE ABOVE CEILING WORK WHERE
CEILINGS ARE TO REMAIN, CEILING TILES SHALL BE REMOVED AND STORED
IN A SAFE MANNER UNTIL CEILING TILES CAN BE REINSTALLED. DAMAGED
AND BROKEN CEILING TILES SHALL BE REPLACED BY CONTRACTOR.
H. EXIT/ACCESS FOR ADJACENT OPERATIONAL AREAS SHALL BE MAINTAINED
DURING NORMAL BUSINESS HOURS. SEE SPECIFICATION FOR HOURS OF
OPERATION.
I. WORK REQUIRING VIBRATION OR LOAD NOISE SHALL TAKE PLACE
BETWEEN THE HOURS OF 5:00 PM AND 5:00 AM. EVERY EFFORT SHALL BE
MADE TO KEEP NOISE AND VIBRATION TO A MINIMUM.
J. PROVIDE THE FOLLOWING INFECTION CONTROL MEASURES, A 24"X36"
STICKY WALK OFF MAT AND HAND SANITIZER AT EACH TEMPORARY DOOR
LOCATION. MAT SHALL BE REPLACED OR CLEANED AS NECESSARY
K. PROVIDE THE VA AND OSHA REQUIRED TEMPORARY SIGNAGE AT EACH
TEMPORARY DOOR LOCATION.
L. CONTRACTOR SHALL SUPPLY SPILL KIT. SPILL KIT TO INCLUDE SHOP VAC,
MULTI-PURPOSE SPILL CONTROL SORBENTS TO ABSORB NON AGGRESSIVE
LIQUIDS UP TO 30 GALLONS.
M. ALL NEW MATERIAL MOVED THROUGH THE FACILITY SHALL BE COVERED
WITH 4 MIL. POLY SHEET.
N. ALL DEMOLITION MATERIAL SHALL BE REMOVED FROM THE PROJECT
BOUNDARY THROUGH THE FACILITY TO DUMPSTER ALONG VA APPROVED
ROUTE IN ENCLOSED DUMPSTER CART DESIGNED FOR SUCH PURPOSED
WITH A LID.
O. ALL MATERIAL, DEBRIS AND HAZARDOUS MATERIALS SHALL BE PROPERLY
STORED IN DESIGNATED AREAS AND APPROVED CONTAINERS. FLAMMABLE
MATERIALS SHALL NOT BE STORED IN THE FACILITY.
P. PROVIDE CONTAINMENT CART FOR ABOVE CEILING ACCESS OUTSIDE
PROJECT BOUNDARY.
INFECTION CONTROL GENERAL NOTES
TEMPORARY WALLS. SEE PLAN AND PLAN NOTES
TEMPORARY CONSTRUCTION ACCESS DOORS
REFERENCE AREA FOR ABOVE CEILING
WORK ON FLOOR BELOW.
RE: ENGINEERING DRAWINGS FOR FULL
SCOPE OF WORK
BEYOND PROJECT BOUNDARY
PROJECT BOUNDARY
IC / PHASING LEGEND
PUBLIC
SIDE
1 HOUR FIRE RATED METAL DOOR ASSEMBLY
AND FRAME WITH SEALS, TEMPORARY
CONTRACTOR CORE PER OWNER'S
PREFERENCE, HARDWARE AND CLOSER
AIR PRESSURE MONITOR
HAND SANITIZER
SEAL ALL EDGES WITH TAPE
SEAL ALL EDGES WITH TAPE
REFER TO TEMPORARY BARRIER TYPE FOR
REQUIRED CONDITION TO STRUCTURE ABOVE
VA / OSHA TEMPORARY SIGNAGE
FRAMING STUD HEADER
HOLLOW METAL FRAME,
RE: DOOR SCHEDULE
SEALANT, BOTH SIDES
WALL TYPE,
RE: PLANS
HOLLOW METAL FRAME,
RE: DOOR SCHEDULE
WALL TYPE,
RE: PLANS
DOUBLE STUD FRAMING
SEALANT, BOTH SIDES
JAMB ANCHOR
8910 Purdue Road, Suite 320 Indianapolis, IN 46268 Phone: 317.931.9800
100% CONSTRUCTION
DOCUMENTS
TDMT
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
321 4 5 6 7 8 9 10
A CB
D FE
G IH
KEYPLAN
556-24-115ELEVATOR UPGRADES
3001 GREEN BAY RD, NORTH CHICAGO, IL 60064
STAMP
www.specializedeng.com SES Project :
DESIGNER OF RECORDCONSULTANT
1221 N. Pennsylvania St.
Indianapolis, IN 46202 Phone: 317.800.6388 www.guidondesign.com
GD Project : 23.1019.05
10/03/2025
23022.012
A u to d e s k D o c s /2
.0
V
A L o v e ll
E le v a to r
U p g ra d e /E x is ti n g M o d e l_ B u ild in g v
.r v t
/1 /2
:3
:1
P
M
GI102
PHASING SCOPE
1/4" = 1'-0"
TEMPORARY WALL CONSTRUCTION ELEVATION
3" = 1'-0"
DOOR HEAD DETAIL, HM
3" = 1'-0"
DOOR JAMB DETAIL, HM
Revisions: Date:
mschindler Snapshot mschindler Snapshot
TOTAL OCCUPANCY
FEC
EXIT
OCCUPANCY LOAD FACTOR
EXITS REQUIRED
SQUARE FOOTAGE
OCCUPANCY TYPE
EGRESS EXIT SIGNAGE
FIRE EXTINGUISHER CABINET
DIAGONAL DISTANCE
EXIT SEPARATION DISTANCE
EGRESS PATH
2 HR - FIRE SEPARATION
1 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
B
1500 SF
CODE ANALYSIS LEGEND
EXIT
ELEVATOR
P23
EXIT
TRAVEL DISTANCE: 7'-0"
T R
A V
E L
D
IS
T A
N C
E : 1
'-3
TRAVEL DISTANCE: 36'-6"
CONSTRUCTION ACTIVITY - INFECTION RISK: C
PATIENT RISK GROUP: LOW
CLASS OF PRECAUTION MATRIX: II
INFECTION CONTROL PROJECT INFORMATION
8910 Purdue Road, Suite 320 Indianapolis, IN 46268 Phone: 317.931.9800
100% CONSTRUCTION
DOCUMENTS
TDMT
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
321 4 5 6 7 8 9 10
E
A CB
D FE
G IH
KEYPLAN
556-24-115ELEVATOR UPGRADES
3001 GREEN BAY RD, NORTH CHICAGO, IL 60064
STAMP
www.specializedeng.com SES Project :
DESIGNER OF RECORDCONSULTANT
1221 N. Pennsylvania St.
Indianapolis, IN 46202 Phone: 317.800.6388 www.guidondesign.com
GD Project : 23.1019.05
10/03/2025
23022.012
A u to d e s k D o c s /2
.0
V
A L o v e ll
E le v a to r
U p g ra d e /E x is ti n g M o d e l_ B u ild in g v
.r v t
/3
/2
:5
:2
P
M
B4-GI101
LIFE SAFETY PLANS
1/16" = 1'-0"
FIRST FLOOR LIFE SAFETY PLAN - BUILDING 4
N
5 5 10 15 20 25 30 35 40 45
1/16" = 1'-0"
FEETSCALE
Revisions: Date:
mschindler Snapshot
EXIT
OCCUPANCY LOAD FACTOR
EXITS REQUIRED
SQUARE FOOTAGE
OCCUPANCY TYPE
EGRESS EXIT SIGNAGE
FIRE EXTINGUISHER CABINET
DIAGONAL DISTANCE
EXIT SEPARATION DISTANCE
EGRESS PATH
2 HR - FIRE SEPARATION
1 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
B
1500 SF
CODE ANALYSIS LEGEND
ELEVATOR
P-22
EXITEXIT
EXIT
TRAVEL DISTANCE: 4'-6"
TRAVEL DISTANCE: 72'-6" TRAVEL DISTANCE: 101'-5"
T R
A V
E L D
IS
T
A N
C E
CONSTRUCTION ACTIVITY - INFECTION RISK: C
PATIENT RISK GROUP: LOW
CLASS OF PRECAUTION MATRIX: II
INFECTION CONTROL PROJECT INFORMATION
8910 Purdue Road, Suite 320 Indianapolis, IN 46268 Phone: 317.931.9800
100% CONSTRUCTION
DOCUMENTS
TDMT
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
321 4 5 6 7 8 9 10
E
A CB
D FE
G IH
KEYPLAN
556-24-115ELEVATOR UPGRADES
3001 GREEN BAY RD, NORTH CHICAGO, IL 60064
STAMP
www.specializedeng.com SES Project :
DESIGNER OF RECORDCONSULTANT
1221 N. Pennsylvania St.
Indianapolis, IN 46202 Phone: 317.800.6388 www.guidondesign.com
GD Project : 23.1019.05
10/03/2025
23022.012
A u to d e s k D o c s /2
.0
V
A L o v e ll
E le v a to r
U p g ra d e /E x is ti n g M o d e l_ B u ild in g v
.r v t
/3
/2
:5
:5
P
M
B07-GI111
LIFE SAFETY PLANS
3/32" = 1'-0"
FIRST FLOOR PLAN - BUILDING 7
N
5 5 10 15 20 25 30
3/32" = 1'-0"
FEETSCALE
Revisions: Date:
mschindler Snapshot
EXIT
OCCUPANCY LOAD FACTOR
EXITS REQUIRED
SQUARE FOOTAGE
OCCUPANCY TYPE
EGRESS EXIT SIGNAGE
FIRE EXTINGUISHER CABINET
DIAGONAL DISTANCE
EXIT SEPARATION DISTANCE
EGRESS PATH
2 HR - FIRE SEPARATION
1 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
B
1500 SF
CODE ANALYSIS LEGEND
ELEVATOR
P21
EXIT EXIT
EXIT
TRAVEL DISTANCE: 5'-6"
T R
A V
E L
D
IS
T A
N C
E
TRAVEL DISTANCE: 80'-5"TRAVEL DISTANCE: 80'-5"
CONSTRUCTION ACTIVITY - INFECTION RISK: C
PATIENT RISK GROUP: LOW
CLASS OF PRECAUTION MATRIX: II
INFECTION CONTROL PROJECT INFORMATION
8910 Purdue Road, Suite 320 Indianapolis, IN 46268 Phone: 317.931.9800
100% CONSTRUCTION
DOCUMENTS
TDMT
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
321 4 5 6 7 8 9 10
H
A CB
D FE
G IH
KEYPLAN
556-24-115ELEVATOR UPGRADES
3001 GREEN BAY RD, NORTH CHICAGO, IL 60064
STAMP
www.specializedeng.com SES Project :
DESIGNER OF RECORDCONSULTANT
1221 N. Pennsylvania St.
Indianapolis, IN 46202 Phone: 317.800.6388 www.guidondesign.com
GD Project : 23.1019.05
10/03/2025
23022.012
A u to d e s k D o c s /2
.0
V
A L o v e ll
E le v a to r
U p g ra d e /E x is ti n g M o d e l_ B u ild in g v
.r v t
/3
/2
:5
:0
P
M
B66-GI121
LIFE SAFETY PLANS
1/8" = 1'-0"
FIRST FLOOR PLAN - BUILDING 66
N
5 5 10 15 20
1/8" = 1'-0"
FEETSCALE
Revisions: Date:
mschindler Snapshot
EXIT
OCCUPANCY LOAD FACTOR
EXITS REQUIRED
SQUARE FOOTAGE
OCCUPANCY TYPE
EGRESS EXIT SIGNAGE
FIRE EXTINGUISHER CABINET
DIAGONAL DISTANCE
EXIT SEPARATION DISTANCE
EGRESS PATH
2 HR - FIRE SEPARATION
1 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
B
1500 SF
CODE ANALYSIS LEGEND
ELEVATOR
P-5
ELEVATOR
P-4
SERVICE ELEVATOR
S-6
EXIT
EXIT
EXIT
TRAVEL DISTANCE: 38'-3"
TRAVEL DISTANCE: 51'-4" TRAVEL DISTANCE: 142'-11"
TRAVEL DISTANCE: 18'-9"
CONSTRUCTION ACTIVITY - INFECTION RISK: C
PATIENT RISK GROUP: LOW
CLASS OF PRECAUTION MATRIX: II
INFECTION CONTROL PROJECT INFORMATION
8910 Purdue Road, Suite 320 Indianapolis, IN 46268 Phone: 317.931.9800
100% CONSTRUCTION
DOCUMENTS
TDMT
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
321 4 5 6 7 8 9 10
D E
A CB
D FE
G IH
KEYPLAN
556-24-115ELEVATOR UPGRADES
3001 GREEN BAY RD, NORTH CHICAGO, IL 60064
STAMP
www.specializedeng.com SES Project :
DESIGNER OF RECORDCONSULTANT
1221 N. Pennsylvania St.
Indianapolis, IN 46202 Phone: 317.800.6388 www.guidondesign.com
GD Project : 23.1019.05
10/03/2025
23022.012
A u to d e s k D o c s /2
.0
V A
L o v e ll E le v a to r U p g ra d e /E x is ti n g
M o d e l_
B u ild in g v
.r v t
/3
/2
:5
:3
P
M
B131-GI131
LIFE SAFETY PLANS
N
5 5 10 15 20 25 30 35 40 45
1/16" = 1'-0"
FEETSCALE
1/16" = 1'-0"
GROUND FLOOR LIFE SAFETY PLAN - BUILDING 131
Revisions: Date:
mschindler Snapshot
EXIT
OCCUPANCY LOAD FACTOR
EXITS REQUIRED
SQUARE FOOTAGE
OCCUPANCY TYPE
EGRESS EXIT SIGNAGE
FIRE EXTINGUISHER CABINET
DIAGONAL DISTANCE
EXIT SEPARATION DISTANCE
EGRESS PATH
2 HR - FIRE SEPARATION
1 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
B
1500 SF
CODE ANALYSIS LEGEND
FEC
CL-2
CL-1
EXIT
EXIT
TRAVEL DISTANCE: 33'-1"
TRAVEL DISTANCE: 20'-0"
T R
A V E L
D
IS
T A N C
E : 8
9' -1
0"
TRAVEL DISTANCE: 29'-7"
TRAVEL DISTANCE: 86'-3"
TRAVEL DISTANCE: 88'-8"
TRAVEL DISTANCE: 16'-8"
BUILDING 133
BUILDING 133 CA
BUILDING 133
BUILDING 133 CA
CONSTRUCTION ACTIVITY - INFECTION RISK: C
PATIENT RISK GROUP: LOW
CLASS OF PRECAUTION MATRIX: II
INFECTION CONTROL PROJECT INFORMATION
8910 Purdue Road, Suite 320 Indianapolis, IN 46268 Phone: 317.931.9800
100% CONSTRUCTION
DOCUMENTS
TDMT
133/133CA
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
321 4 5 6 7 8 9 10
A
D
AA CB
D FE
G IH
KEYPLAN
556-24-115ELEVATOR UPGRADES
3001 GREEN BAY RD, NORTH CHICAGO, IL 60064
STAMP
www.specializedeng.com SES Project :
DESIGNER OF RECORDCONSULTANT
1221 N. Pennsylvania St.
Indianapolis, IN 46202 Phone: 317.800.6388 www.guidondesign.com
GD Project : 23.1019.05
10/03/2025
23022.012
A u to d e s k D o c s /2
.0
V A
L o v e ll E le v a to r
U p g ra d e
/E x is ti n g
M o d e l_ B u ild in g
C A v
.r v t
/3
/2
:5
:0
P
M
B133/133CA-
GI141
LIFE SAFETY PLANS
2 2 4 6 8 10
1/4" = 1'-0"
FEETSCALE
N
SCALE: 1" = 20'-0"B133/133CA- GI141
1 BASEMENT FLOOR PLAN - BUILDING 133
Revisions: Date:
mschindler Snapshot
EXIT
OCCUPANCY LOAD FACTOR
EXITS REQUIRED
SQUARE FOOTAGE
OCCUPANCY TYPE
EGRESS EXIT SIGNAGE
FIRE EXTINGUISHER CABINET
DIAGONAL DISTANCE
EXIT SEPARATION DISTANCE
EGRESS PATH
2 HR - FIRE SEPARATION
1 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
B
1500 SF
CODE ANALYSIS LEGEND
ELEVATOR
P25
ELEVATOR
P26
EXIT
T R
A V
E L D
IS
T
A N
C E
TRAVEL DISTANCE: 414'-5"EXIT
TRAVEL DISTANCE: 5'-8"
CONSTRUCTION ACTIVITY - INFECTION RISK: C
PATIENT RISK GROUP: LOW
CLASS OF PRECAUTION MATRIX: II
INFECTION CONTROL PROJECT INFORMATION
8910 Purdue Road, Suite 320 Indianapolis, IN 46268 Phone: 317.931.9800
100% CONSTRUCTION
DOCUMENTS
TDMT
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
321 4 5 6 7 8 9 10
AAA CB
D FE
G IH
KEYPLAN
556-24-115ELEVATOR UPGRADES
3001 GREEN BAY RD, NORTH CHICAGO, IL 60064
STAMP
www.specializedeng.com SES Project :
DESIGNER OF RECORDCONSULTANT
1221 N. Pennsylvania St.
Indianapolis, IN 46202 Phone: 317.800.6388 www.guidondesign.com
GD Project : 23.1019.05
10/03/2025
23022.012
A u to d e s k D o c s /2
.0
V A
L o v e ll E le v a to r U p g ra d e /E x is ti n g
M o d e l_
B u ild in g v
.r v t
/3
/2
:5
:1
P
M
B195-GI151
LIFE SAFETY PLANS
SCALE: 3/32" = 1'-0"B195-GI151
1 FIRST FLOOR PLAN - BUILDING 195
5 5 10 15 20 25 30
3/32" = 1'-0"
FEETSCALE
N
Revisions: Date:
mschindler Snapshot
| G000 - COVER SHEET |
| GI102 - PHASING SCOPE |
| B4-GI101 - LIFE SAFETY PLANS |
| B07-GI111 - LIFE SAFETY PLANS |
| B66-GI121 - LIFE SAFETY PLANS |
| B131-GI131 - LIFE SAFETY PLANS |
| B133/133CA-GI141 - LIFE SAFETY PLANS |
| B195-GI151 - LIFE SAFETY PLANS |
File details come from the government source that posted it. Updated .