This document is a set of 100% construction documents (architectural drawings and specifications) for an elevator upgrade project at the Captain James A. Lovell Federal Health Care Center in North Chicago, Illinois. The project, identified as VA Project Number 556-24-115 and VA Contract Number 36C252-23-D-0061 (Task Number 36C25224N0331), involves updating and upgrading multiple elevators across several buildings at the VA facility.

The Base Bid scope requires the contractor to provide labor, material, and equipment to modernize eight elevators: P4, P5, and S6 in Building 131; P21 in Building 66; P22 in Building 7; P23 in Building 4; P25 and P26 in Building 195; and cart lifts in the OR/Sterile Processing area of Building 133/133CA. The construction must be executed in separate phases, with each elevator phased individually and coordinated to minimize operational disruption. Critical scheduling constraints include: work conducted during day shifts (8:00 AM to 5:00 PM) unless otherwise coordinated with the Contracting Officer's Representative (COR); only one elevator out of service in the same building at any given time; elevators in Buildings 7 and 66 cannot be shut down concurrently; and all work must be completed and opened for public use each night. Above-ceiling work is restricted to 5:00 PM to 5:00 AM hours. The project incorporates extensive infection control protocols with temporary barrier walls, air pressure monitoring, and Class II precaution measures to protect patients and staff. Design services are provided by Guidon (Consultant) and Specialized Engineering Solutions (Designer of Record), with construction oversight by the VA's Office of Construction and Facilities Management.

View the file

Other files

File Type Posted
36C77626R0048 0005.docx DOCX document
FAR 52.222-90 - Addressing DEI Discrimination by Federal Contractors - APR 2026.docx DOCX document
RFI Responses - Elevator Upgrade N Chicago.pdf PDF
36C77626R0048 0004.docx DOCX document
36C77626R0048 0003.docx DOCX document
36C77626R0048 0002.docx DOCX document
Attachment 2 - Elevator Site Visit Sign In - 556-24-115.pdf PDF
Attachment 1 - Site Visit Agenda - 556-24-115.pdf PDF
Site Visit Instructions Rev 03272026.pdf PDF
36C77626R0048 0001.docx DOCX document
Attachment 3 - Drawings V2 of 5 - 56-24-115 - N Chicago Elevator Upgrades.pdf PDF
Attachment 9 - PCRA - 556-24-115.pdf PDF
Attachment 4 - Drawings V3 of 5 - 56-24-115 - N Chicago Elevator Upgrades.pdf PDF
36C77626R0048_1.docx DOCX document
Attachment 13 - Site Visit Instructions - 556-24-115.docx DOCX document
Attachment 7 - Statement of Work - 556-24-115.docx DOCX document
Attachment 10 - DBA WD IL20260009 01092026.pdf PDF
Attachment 12 - RFI Tracking Sheet - 36C77626R0048.docx DOCX document
Attachment 2 - Drawings V1 of 5 - 56-24-115 - N Chicago Elevator Upgrades.pdf PDF
Attachment 1 - Specifications - 556-24-115 - N Chicago Elevator Upgrades.pdf PDF
Attachment 8 - ICRA Combined Docs - 556-24-115.pdf PDF
Attachment 6 - Drawings V5 of 5 - 56-24-115 - N Chicago Elevator Upgrades.pdf PDF
Attachment 11 - Limitations on Subcontracting.docx DOCX document
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

B195-E100 FIRST LEVEL FLOOR PLAN -OVERALL -ELECTRICAL

B195-E101 SECOND LEVEL FLOOR PLAN -OVERALL -ELECTRICAL

B195-E102 THIRD LEVEL FLOOR PLAN -OVERALL -ELECTRICAL

B195-E103 FOURTH LEVEL FLOOR PLAN -OVERALL -ELECTRICAL

B195-E104 ROOF PLAN -OVERALL -ELECTRICAL

B195-E400 ENLARGED FLOOR PLANS -ELECTRICAL

B195-E500 ONE-LINE DIAGRAM

B195-E700 ELECTRICAL SCHEDULES

B66-AE501 STAIR DETAILS

B131-AE130 BASEMENT, FIRST & SECOND FLOOR DEMO & ARCH PLANS

B131-AE131 SECOND & THIRD FLOOR DEMO & ARCH PLANS

B131-AE132 FOURTH & PENTHOUSE DEMO & ARCH PLANS

B133/133CA-AE140 BASEMENT AND SECOND FLOOR DEMO & ARCH ENLARGED PLANS

B195-AE150 FIRST, SECOND & THIRD DEMO & ARCH ENLARGED PLANS

B195-AE151 FOURTH FLOOR & ROOF DEMO & ARCH ENLARGED PLANS

AI201 ELEVATOR PANEL REFERENCES

MECHANICAL

M000 MECHANICAL SYMBOLS AND ABBREVIATIONS

B04-MD102 PENTHOUSE PLAN-OVERALL-MECHANICAL-DEMOLITION

B04-M100 FIRST LEVEL FLOOR PLAN-OVERALL-MECHANICAL

B04-M102 PENTHOUSE PLAN-OVERALL-MECHANICAL

B04-M400 ENLARGED FLOOR PLANS-MECHANICAL

B04-M500 MECHANICAL SCHEDULES AND DETAILS

B07-MD100 BASEMENT LEVEL FLOOR PLAN -OVERALL -MECHANICAL DEMOLITION

B07-M100 BASEMENT LEVEL FLOOR PLAN -OVERALL -MECHANICAL

SHEET LIST

SHEET NUMBER SHEET NAME

General

G000 COVER SHEET

ARCHITECTURAL

GI102 PHASING SCOPE

B4-GI101 LIFE SAFETY PLANS

B07-GI111 LIFE SAFETY PLANS

B66-GI121 LIFE SAFETY PLANS

B131-GI131 LIFE SAFETY PLANS

B133/133CA-GI141 LIFE SAFETY PLANS

B195-GI151 LIFE SAFETY PLANS

B4-AE100 FIRST & SECOND DEMO & ARCH ENLARGED PLANS

B4-AE501 ELEVATOR PIT PLANS

B07-AE110 BASEMENT, FIRST & SECOND DEMO & ARCH ENLARGED PLANS

B07-AE111 MACHINE ROOM DEMO & ARCH ENLARGED PLANS

B66-AE120 BASEMENT, FIRST, SECOND, & ROOF ARCHITECTURAL PLAN

B07-M103 PENTHOUSE LEVEL FLOOR PLAN -OVERALL -MECHANICAL

B07-M400 ENLARGED FLOOR PLANS -MECHANICAL

B07-M500 MECHANICAL SCHEDULES AND DETAILS

B66-M100 BASEMENT LEVEL FLOOR PLAN -OVERALL -MECHANICAL

B66-M103 PENTHOUSE PLAN -OVERALL -MECHANICAL

B66-M400 ENLARGED FLOOR PLANS -MECHANICAL

B66-M500 MECHANICAL SCHEDULES AND DETAILS

B131-MD105 PENTHOUSE LEVEL FLOOR PLAN -OVERALL -MECHANICAL -DEMOLITION

B131-MD400 ENLARGED FLOOR PLANS -MECHANICAL -DEMOLITION

B131-M100 BASEMENT LEVEL FLOOR PLAN -OVERALL -MECHANICAL

B131-M105 PENTHOUSE LEVEL FLOOR PLAN -OVERALL -MECHANICAL

B131-M401 ENLARGED FLOOR PLANS -MECHANICAL

B131-M500 MECHANICAL SCHEDULES AND DETAILS

B133CA-MD103 THIRD LEVEL FLOOR PLAN -OVERALL -MECHANICAL -DEMOLITION

B133CA-MD104 FOURTH LEVEL FLOOR PLAN -OVERALL -MECHANICAL -DEMOLITION

B133CA-M103 THIRD LEVEL FLOOR PLAN -OVERALL -MECHANICAL

B133CA-M104 FOURTH LEVEL FLOOR PLAN -OVERALL -MECHANICAL

B133CA-M400 ENLARGED FLOOR PLANS -MECHANICAL

B133CA-M500 MECHANICAL SCHEDULES AND DETAILS

B195-MD100 FIRST LEVEL FLOOR PLAN -OVERALL -MECHANICAL -DEMOLITION

B195-M100 FIRST LEVEL FLOOR PLAN -OVERALL -MECHANICAL

B195-M400 ENLARGED FLOOR PLANS -MECHANICAL

B195-M500 MECHANICAL SCHEDULES AND DETAILS

ELECTRICAL

E000 ELECTRICAL SYMBOLS AND ABBREVIATIONS

B04-ED100 FIRST LEVEL FLOOR PLAN-OVERALL-ELECTRICAL-DEMOLITION

B04-ED101 SECOND LEVEL FLOOR PLAN-OVERALL-ELECTRICAL-DEMOLITION

B04-ED102 PENTHOUSE PLAN-OVERALL-ELECTRICAL-DEMOLITION

B04-E100 FIRST LEVEL FLOOR PLAN-OVERALL-ELECTRICAL

B04-E101 SECOND LEVEL FLOOR PLAN-OVERALL-ELECTRICAL

B04-E102 PENTHOUSE PLAN-OVERALL-ELECTRICAL

B04-E400 ENLARGED FLOOR PLANS-ELECTRICAL

B04-E500 ONE-LINE DIAGRAM

B04-E700 ELECTRICAL SCHEDULES

B07-ED100 BASEMENT LEVEL FLOOR PLAN -OVERALL -ELECTRICAL -DEMOLITION

B07-ED101 FIRST LEVEL FLOOR PLAN -OVERALL -ELECTRICAL -DEMOLITION

B07-ED102 SECOND LEVEL FLOOR PLAN -OVERALL -ELECTRICAL -DEMOLITION

B07-ED103 PENTHOUSE LEVEL FLOOR PLAN -OVERALL -ELECTRICAL -DEMOLITION

B07-E100 BASEMENT LEVEL FLOOR PLAN -OVERALL -ELECTRICAL

B07-E101 FIRST LEVEL FLOOR PLAN -OVERALL -ELECTRICAL

B07-E102 SECOND LEVEL FLOOR PLAN -OVERALL -ELECTRICAL

B07-E103 PENTHOUSE LEVEL FLOOR PLAN -OVERALL -ELECTRICAL

B07-E400 ENLARGED FLOOR PLANS

B07 -E500 ONE-LINE DIAGRAM

B07 -E700 ELECTRICAL SCHEDULES

B66-ED100 BASEMENT LEVEL FLOOR PLAN -OVERALL -ELECTRICAL -DEMOLITION

B66-ED101 FIRST LEVEL FLOOR PLAN -OVERALL -ELECTRICAL -DEMOLITION

B66-ED102 SECOND LEVEL FLOOR PLAN -OVERALL -ELECTRICAL -DEMOLITION

B66-ED103 PENTHOUSE PLAN -OVERALL -ELECTRICAL -DEMOLITION

B66-E100 BASEMENT LEVEL FLOOR PLAN -OVERALL -ELECTRICAL

B66-E101 FIRST LEVEL FLOOR PLAN -OVERALL -ELECTRICAL

B66-E102 SECOND LEVEL FLOOR PLAN -OVERALL -ELECTRICAL

B66-E103 PENTHOUSE PLAN -OVERALL -ELECTRICAL

B66-E400 ENLARGED FLOOR PLANS -ELECTRICAL

B66-E500 ONE-LINE DIAGRAM

B66-E700 ELECTRICAL SCHEDULES

B131-ED100 BASEMENT LEVEL FLOOR PLAN -OVERALL -ELECTRICAL -DEMOLITION

B131-ED101 FIRST LEVEL FLOOR PLAN -OVERALL -ELECTRICAL -DEMOLITION

B131-ED102 SECOND LEVEL FLOOR PLAN -OVERALL -ELECTRICAL -DEMOLITION

B131-ED103 THIRD LEVEL FLOOR PLAN -OVERALL -ELECTRICAL -DEMOLITION

B131-ED104 FOURTH LEVEL FLOOR PLAN -OVERALL -ELECTRICAL -DEMOLITION

B131-ED105 PENTHOUSE LEVEL FLOOR PLAN -OVERALL -ELECTRICAL -DEMOLITION

B131-E100 BASEMENT LEVEL FLOOR PLAN -OVERALL -ELECTRICAL

B131-E101 FIRST LEVEL FLOOR PLAN -OVERALL -ELECTRICAL

B131-E102 SECOND LEVEL FLOOR PLAN -OVERALL -ELECTRICAL

B131-E103 THIRD LEVEL FLOOR PLAN -OVERALL -ELECTRICAL

B131-E104 FOURTH LEVEL FLOOR PLAN -OVERALL -ELECTRICAL

B131-E105 PENTHOUSE LEVEL FLOOR PLAN -OVERALL -ELECTRICAL

B131-E400 ENLARGED FLOOR PLANS -ELECTRICAL

B131-E500 ONE-LINE DIAGRAM

B131-E700 ELECTRICAL SCHEDULES

B133CA-ED100 BASEMENT LEVEL FLOOR PLAN -OVERALL -ELECTRICAL -DEMOLITION

B133CA-ED101 FIRST LEVEL FLOOR PLAN -OVERALL -ELECTRICAL -DEMOLITION

B133CA-ED102 SECOND LEVEL FLOOR PLAN -OVERALL -ELECTRICAL -DEMOLITION

B133CA-ED103 THIRD LEVEL FLOOR PLAN -OVERALL -ELECTRICAL -DEMOLITION

B133CA-ED104 FOURTH LEVEL FLOOR PLAN -OVERALL -ELECTRICAL -DEMOLITION

B133CA-ED105 PENTHOUSE PLAN -OVERALL -ELECTRICAL -DEMOLITION

B133CA-E100 BASEMENT LEVEL FLOOR PLAN -OVERALL -ELECTRICAL

B133CA-E101 FIRST LEVEL FLOOR PLAN -OVERALL -ELECTRICAL

B133CA-E102 SECOND LEVEL FLOOR PLAN -OVERALL -ELECTRICAL

B133CA-E103 THIRD LEVEL FLOOR PLAN -OVERALL -ELECTRICAL

B133CA-E104 FOURTH LEVEL FLOOR PLAN -OVERALL -ELECTRICAL

B133CA-E400 ENLARGED FLOOR PLANS -ELECTRICAL

B133CA-E500 ONE-LINE DIAGRAM

B133CA-E700 ELECTRICAL SCHEDULES

B195-ED100 FIRST LEVEL FLOOR PLAN -OVERALL -ELECTRICAL -DEMOLITION

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

100% CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMP

321 4 5 6 7 8 9 10 www.specializedeng.com SES Project :

DESIGNER OF RECORDCONSULTANT

1221 N. Pennsylvania St.

Indianapolis, IN 46202 Phone: 317.800.6388 www.guidondesign.com

GD Project: 23.1019.05 10/03/2025

100% CONSTRUCTION DOCUMENTS 10/03/2025

/3 /2

:0

:3

P

M

A u to d e s k D o c s

/2

.0

V

A L o v e ll

E le v a to r

U p g ra d e /5

-1

.G

R

.r v t

G000

COVER SHEET Elevator Upgrade

3001 Green Bay Road, North Chicago, IL 60064

556-24-115

09/12/2025 MS AEA

23022.012

CAPTAIN JAMES A. LOVELL FEDERAL HEALTH CARE CENTER

ELEVATOR UPGRADE

PROJECT NAME:

3001 Green Bay Road, North Chicago, IL 60064

SITE ADDRESS:

VA PROJECT NUMBER:

556-24-115

VICINITY MAP: SITE MAP:

VA CONTRACT NUMBER:

36C252-23-D-0061

VA TASK NUMBER:

36C25224N0331

B04, 07, 66, 131, 133/133CA, 195

Base Bid:

Contractor shall provide labor, material and equipment to update & upgrade elevators P4, P5, and S6 in buildings 131, P21 in building 66, P22 in building 7, P23 in building 4, P25 & P26 in building 195 and cart lifts in OR/Sterile Processing in building 133/133CA at Veterans Affairs(VA) Captain James A. Lovell Federal Health Care Center(FHCC).

N

Revisions: Date:

1. EACH ELEVATOR WILL BE PHASED SEPERATELY.

2. WHERE MULTIPLE ELEVATORS ARE BEING MODERNIZED IN THE SAME

BUILDING, CONTRACTOR SHALL SEQUENCE WORK SO THAT ONLY ONE

ELEVATOR IS OUT OF SERVICE FOR CONSTRUCTION AT ANY GIVEN TIME.

3. ELEVATORS IN MULTIPLE BUILDINGS CAN BE PHASED CONCURRENTLY WITH

THE EXCEPTION OF BUILDINGS 7 & 66. ELEVATORS IN THESE TWO

BUILDINGS SHALL NOT BE SHUTDOWN CONCURRENTLY.

4. AREAS SURROUNDING OR ADJACENT TO PROJECT AREAS TO BE OCCUPIED

BY STAFF AND VETERANS THROUGHOUT CONSTRUCTION.

5. PROJECT SHALL BE COMPLETED DURING DAY SHIFTS, 8:00 AM TO 5:00 PM.,

UNLESS NOTED OTHERWISE. COORDINATE WITH COR. ALL WORK TO BE

COMPLETED AND OPEN FOR PUBLIC USE AT THE END OF EACH NIGHT'S

WORK.

6. REFER TO SPECIFICATION 01 00 00 FOR INFORMATION ON WORK DURATION

FOR EACH PHASE AND AREA OF WORK.

7. THE SEQUENCE OF PHASES WILL BE DETERMINED BASED UPON

OPERATION OF THE EXISTING ELEVATORS DURING CONSTRUCTION

8. ELEVATOR LOBBIES SHALL BE PHASED TO MINIMIZE INTERUPTION OF

PATIENT/GUEST TRAFFIC

A. FLOORING SHALL BE PREPPED AND INSTALLED IN AREAS TO

MAINTAIN TRAFFIC IN LOBBIES

B. ALL WORK SHALL BE COORDINATED WITH THE VA AND OCCUR

DURING SHIFTS THAT ACCOMODATE OPERATIONS OF THE

ADJACENT CLINICAL AREAS

C. AREAS OF FLOORING BEING REPLACED IN FOR EACH SHIFT

SHALL NOT EXCEED AN AMOUNT THAT CAN BE COMPLETED

DURING A SINGLE SHIFT.

9. COORDINATION OF ASSOCIATED MEP SCOPE AND EQUIPMENT

INSTALLATIONS SHALL BE COORDINATED TO MINIMIZE THE NEED TO SHUT

DOWN MULTIPLE ELEVATORS AT THE SAME TIME.

10. CONSTRUCTION OF WALL AND DOOR TO BE SCHEDULED WITH VA DURING

OFF HOURS FOR SURROUNDING DEPARTMENTS, I.E. NIGHTS & WEEKENDS.

WORK SHALL BE COMPLETED DURING EACH SHIFT AND/OR ISOLATED WHEN

CONSTRUCTION ACTIVITIES ARE PAUSED FOR DAILY OPERATIONS TO

MAINTAIN PEDESTRIAN TRAFFIC ROUTES TO ELEVATORS IN A CLEAN AND

SAFE MANNER.

11. FLOORING REPLACEMENT TO BE SCHEDULED WITH VA DURING OFF HOURS

FOR SURROUNDING DEPARTMENTS, I.E. NIGHTS & WEEKENDS

AREAS FOR DEMOLITION & INSTALLATION SHALL BE DIVIDED INTO SUB

PHASES TO BE COMPLETED WITHIN A SINGLE SHIFT.

12. TEMPORARY INFECTION CONTROL PROTECTION BARRIER ON ALL FLOORS

ABOVE LOWER LEVEL.

13. ALL CEILING TILES REMOVED TO COMPLETE WORK WITHIN THE ICRA

BARRIERS LOCATED ON ARCHITECTURAL PLANS SHALL BE REPLACED AT

THE COMPLETION OF EACH SHIFT TO MAINTAIN SPRINKLER PROTECTION.

14. THE ELEVATOR DOOR IN THE AFFECTED ELEVATOR SHAFT IS REQUIRED TO

BE CLOSED AT THE END OF EACH WORKDAY.

PHASING GENERAL NOTES

A. REFER TO LIST OF REQUIRED INFECTION CONTROL PRECAUTIONS

OUTLINED BY CLASS IN SPECIFICATION 010110 AND ADDITIONAL

INFORMATION.

B. REFER TO DRAWINGS, SPECIFICATIONS AND DOOR HARDWARE SCHEDULE

FOR ADDITIONAL INFORMATION.

C. PROJECT SHALL BE COMPLETED IN SEPARATE PHASES. SEQUENCE OF

PHASES SHALL BE COORDINATED AND APPROVED BY VA PRIOR TO

COMMENCEMENT.

D. COORDINATE FULL SCOPE OF WORK WITH ENGINEERING DRAWINGS AND

FIELD VERIFICATION. CONTRACTOR IS RESPONSIBLE FOR SCOPE OF ABOVE

CEILING WORK REQUIRED ABOVE AND BELOW THE FLOOR PLATE OF THE

PROJECT BOUNDARY.

E. COORDINATE LOCATION OF TEMPORARY INFECTION CONTROL (IC) BARRIER

WALL CONSTRUCTION AND INFECTION CONTROL (IC) MEASURES WITH COR

AND PATIENT SAFETY/ INFECTION CONTROL REPRESENTATIVE.

TEMPORARY IC BARRIER WALL CONSTRUCTION LOCATIONS IN DRAWINGS

ARE APPROXIMATE. CONTRACTOR SHALL PROVIDE DRAWING TO COR AND

PATIENT SAFETY/ INFECTION CONTROL REPRESENTATIVE ONCE ICRA

PROTOCOLS AND PLAN IS APPROVED.

F. SCHEDULE AND TIME OF CONSTRUCTION WORK TO BE APPROVED BY COR

AND NURSING STAFF BEFORE CONSTRUCTION MAY BEGIN. PROVIDE

PHASING INFORMATION FOR ABOVE CEILING WORK IN THE CONTRACTOR

PROVIDED CPM SCHEDULE FOR WORK ALSO REQUIRED ABOVE AND BELOW

THE FLOOR PLATE OF THE PROJECT BOUNDARY.

G. ABOVE CEILING WORK SHALL TAKE PLACE BETWEEN THE HOURS OF 5:00

PM AND 5:00 AM. IN AREAS THAT REQUIRE ABOVE CEILING WORK WHERE

CEILINGS ARE TO REMAIN, CEILING TILES SHALL BE REMOVED AND STORED

IN A SAFE MANNER UNTIL CEILING TILES CAN BE REINSTALLED. DAMAGED

AND BROKEN CEILING TILES SHALL BE REPLACED BY CONTRACTOR.

H. EXIT/ACCESS FOR ADJACENT OPERATIONAL AREAS SHALL BE MAINTAINED

DURING NORMAL BUSINESS HOURS. SEE SPECIFICATION FOR HOURS OF

OPERATION.

I. WORK REQUIRING VIBRATION OR LOAD NOISE SHALL TAKE PLACE

BETWEEN THE HOURS OF 5:00 PM AND 5:00 AM. EVERY EFFORT SHALL BE

MADE TO KEEP NOISE AND VIBRATION TO A MINIMUM.

J. PROVIDE THE FOLLOWING INFECTION CONTROL MEASURES, A 24"X36"

STICKY WALK OFF MAT AND HAND SANITIZER AT EACH TEMPORARY DOOR

LOCATION. MAT SHALL BE REPLACED OR CLEANED AS NECESSARY

K. PROVIDE THE VA AND OSHA REQUIRED TEMPORARY SIGNAGE AT EACH

TEMPORARY DOOR LOCATION.

L. CONTRACTOR SHALL SUPPLY SPILL KIT. SPILL KIT TO INCLUDE SHOP VAC,

MULTI-PURPOSE SPILL CONTROL SORBENTS TO ABSORB NON AGGRESSIVE

LIQUIDS UP TO 30 GALLONS.

M. ALL NEW MATERIAL MOVED THROUGH THE FACILITY SHALL BE COVERED

WITH 4 MIL. POLY SHEET.

N. ALL DEMOLITION MATERIAL SHALL BE REMOVED FROM THE PROJECT

BOUNDARY THROUGH THE FACILITY TO DUMPSTER ALONG VA APPROVED

ROUTE IN ENCLOSED DUMPSTER CART DESIGNED FOR SUCH PURPOSED

WITH A LID.

O. ALL MATERIAL, DEBRIS AND HAZARDOUS MATERIALS SHALL BE PROPERLY

STORED IN DESIGNATED AREAS AND APPROVED CONTAINERS. FLAMMABLE

MATERIALS SHALL NOT BE STORED IN THE FACILITY.

P. PROVIDE CONTAINMENT CART FOR ABOVE CEILING ACCESS OUTSIDE

PROJECT BOUNDARY.

INFECTION CONTROL GENERAL NOTES

TEMPORARY WALLS. SEE PLAN AND PLAN NOTES

TEMPORARY CONSTRUCTION ACCESS DOORS

REFERENCE AREA FOR ABOVE CEILING

WORK ON FLOOR BELOW.

RE: ENGINEERING DRAWINGS FOR FULL

SCOPE OF WORK

BEYOND PROJECT BOUNDARY

PROJECT BOUNDARY

IC / PHASING LEGEND

PUBLIC

SIDE

1 HOUR FIRE RATED METAL DOOR ASSEMBLY

AND FRAME WITH SEALS, TEMPORARY

CONTRACTOR CORE PER OWNER'S

PREFERENCE, HARDWARE AND CLOSER

AIR PRESSURE MONITOR

HAND SANITIZER

SEAL ALL EDGES WITH TAPE

SEAL ALL EDGES WITH TAPE

REFER TO TEMPORARY BARRIER TYPE FOR

REQUIRED CONDITION TO STRUCTURE ABOVE

VA / OSHA TEMPORARY SIGNAGE

FRAMING STUD HEADER

HOLLOW METAL FRAME,

RE: DOOR SCHEDULE

SEALANT, BOTH SIDES

WALL TYPE,

RE: PLANS

HOLLOW METAL FRAME,

RE: DOOR SCHEDULE

WALL TYPE,

RE: PLANS

DOUBLE STUD FRAMING

SEALANT, BOTH SIDES

JAMB ANCHOR

8910 Purdue Road, Suite 320 Indianapolis, IN 46268 Phone: 317.931.9800

100% CONSTRUCTION

DOCUMENTS

TDMT

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

321 4 5 6 7 8 9 10

A CB

D FE

G IH

KEYPLAN

556-24-115ELEVATOR UPGRADES

3001 GREEN BAY RD, NORTH CHICAGO, IL 60064

STAMP

www.specializedeng.com SES Project :

DESIGNER OF RECORDCONSULTANT

1221 N. Pennsylvania St.

Indianapolis, IN 46202 Phone: 317.800.6388 www.guidondesign.com

GD Project : 23.1019.05

10/03/2025

23022.012

A u to d e s k D o c s /2

.0

V

A L o v e ll

E le v a to r

U p g ra d e /E x is ti n g M o d e l_ B u ild in g v

.r v t

/1 /2

:3

:1

P

M

GI102

PHASING SCOPE

1/4" = 1'-0"

TEMPORARY WALL CONSTRUCTION ELEVATION

3" = 1'-0"

DOOR HEAD DETAIL, HM

3" = 1'-0"

DOOR JAMB DETAIL, HM

Revisions: Date:

mschindler Snapshot mschindler Snapshot

TOTAL OCCUPANCY

FEC

EXIT

OCCUPANCY LOAD FACTOR

EXITS REQUIRED

SQUARE FOOTAGE

OCCUPANCY TYPE

EGRESS EXIT SIGNAGE

FIRE EXTINGUISHER CABINET

DIAGONAL DISTANCE

EXIT SEPARATION DISTANCE

EGRESS PATH

2 HR - FIRE SEPARATION

1 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREA

B

1500 SF

CODE ANALYSIS LEGEND

EXIT

ELEVATOR

P23

EXIT

TRAVEL DISTANCE: 7'-0"

T R

A V

E L

D

IS

T A

N C

E : 1

'-3

TRAVEL DISTANCE: 36'-6"

CONSTRUCTION ACTIVITY - INFECTION RISK: C

PATIENT RISK GROUP: LOW

CLASS OF PRECAUTION MATRIX: II

INFECTION CONTROL PROJECT INFORMATION

8910 Purdue Road, Suite 320 Indianapolis, IN 46268 Phone: 317.931.9800

100% CONSTRUCTION

DOCUMENTS

TDMT

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

321 4 5 6 7 8 9 10

E

A CB

D FE

G IH

KEYPLAN

556-24-115ELEVATOR UPGRADES

3001 GREEN BAY RD, NORTH CHICAGO, IL 60064

STAMP

www.specializedeng.com SES Project :

DESIGNER OF RECORDCONSULTANT

1221 N. Pennsylvania St.

Indianapolis, IN 46202 Phone: 317.800.6388 www.guidondesign.com

GD Project : 23.1019.05

10/03/2025

23022.012

A u to d e s k D o c s /2

.0

V

A L o v e ll

E le v a to r

U p g ra d e /E x is ti n g M o d e l_ B u ild in g v

.r v t

/3

/2

:5

:2

P

M

B4-GI101

LIFE SAFETY PLANS

1/16" = 1'-0"

FIRST FLOOR LIFE SAFETY PLAN - BUILDING 4

N

5 5 10 15 20 25 30 35 40 45

1/16" = 1'-0"

FEETSCALE

Revisions: Date:

mschindler Snapshot

EXIT

OCCUPANCY LOAD FACTOR

EXITS REQUIRED

SQUARE FOOTAGE

OCCUPANCY TYPE

EGRESS EXIT SIGNAGE

FIRE EXTINGUISHER CABINET

DIAGONAL DISTANCE

EXIT SEPARATION DISTANCE

EGRESS PATH

2 HR - FIRE SEPARATION

1 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREA

B

1500 SF

CODE ANALYSIS LEGEND

ELEVATOR

P-22

EXITEXIT

EXIT

TRAVEL DISTANCE: 4'-6"

TRAVEL DISTANCE: 72'-6" TRAVEL DISTANCE: 101'-5"

T R

A V

E L D

IS

T

A N

C E

CONSTRUCTION ACTIVITY - INFECTION RISK: C

PATIENT RISK GROUP: LOW

CLASS OF PRECAUTION MATRIX: II

INFECTION CONTROL PROJECT INFORMATION

8910 Purdue Road, Suite 320 Indianapolis, IN 46268 Phone: 317.931.9800

100% CONSTRUCTION

DOCUMENTS

TDMT

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

321 4 5 6 7 8 9 10

E

A CB

D FE

G IH

KEYPLAN

556-24-115ELEVATOR UPGRADES

3001 GREEN BAY RD, NORTH CHICAGO, IL 60064

STAMP

www.specializedeng.com SES Project :

DESIGNER OF RECORDCONSULTANT

1221 N. Pennsylvania St.

Indianapolis, IN 46202 Phone: 317.800.6388 www.guidondesign.com

GD Project : 23.1019.05

10/03/2025

23022.012

A u to d e s k D o c s /2

.0

V

A L o v e ll

E le v a to r

U p g ra d e /E x is ti n g M o d e l_ B u ild in g v

.r v t

/3

/2

:5

:5

P

M

B07-GI111

LIFE SAFETY PLANS

3/32" = 1'-0"

FIRST FLOOR PLAN - BUILDING 7

N

5 5 10 15 20 25 30

3/32" = 1'-0"

FEETSCALE

Revisions: Date:

mschindler Snapshot

EXIT

OCCUPANCY LOAD FACTOR

EXITS REQUIRED

SQUARE FOOTAGE

OCCUPANCY TYPE

EGRESS EXIT SIGNAGE

FIRE EXTINGUISHER CABINET

DIAGONAL DISTANCE

EXIT SEPARATION DISTANCE

EGRESS PATH

2 HR - FIRE SEPARATION

1 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREA

B

1500 SF

CODE ANALYSIS LEGEND

ELEVATOR

P21

EXIT EXIT

EXIT

TRAVEL DISTANCE: 5'-6"

T R

A V

E L

D

IS

T A

N C

E

TRAVEL DISTANCE: 80'-5"TRAVEL DISTANCE: 80'-5"

CONSTRUCTION ACTIVITY - INFECTION RISK: C

PATIENT RISK GROUP: LOW

CLASS OF PRECAUTION MATRIX: II

INFECTION CONTROL PROJECT INFORMATION

8910 Purdue Road, Suite 320 Indianapolis, IN 46268 Phone: 317.931.9800

100% CONSTRUCTION

DOCUMENTS

TDMT

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

321 4 5 6 7 8 9 10

H

A CB

D FE

G IH

KEYPLAN

556-24-115ELEVATOR UPGRADES

3001 GREEN BAY RD, NORTH CHICAGO, IL 60064

STAMP

www.specializedeng.com SES Project :

DESIGNER OF RECORDCONSULTANT

1221 N. Pennsylvania St.

Indianapolis, IN 46202 Phone: 317.800.6388 www.guidondesign.com

GD Project : 23.1019.05

10/03/2025

23022.012

A u to d e s k D o c s /2

.0

V

A L o v e ll

E le v a to r

U p g ra d e /E x is ti n g M o d e l_ B u ild in g v

.r v t

/3

/2

:5

:0

P

M

B66-GI121

LIFE SAFETY PLANS

1/8" = 1'-0"

FIRST FLOOR PLAN - BUILDING 66

N

5 5 10 15 20

1/8" = 1'-0"

FEETSCALE

Revisions: Date:

mschindler Snapshot

EXIT

OCCUPANCY LOAD FACTOR

EXITS REQUIRED

SQUARE FOOTAGE

OCCUPANCY TYPE

EGRESS EXIT SIGNAGE

FIRE EXTINGUISHER CABINET

DIAGONAL DISTANCE

EXIT SEPARATION DISTANCE

EGRESS PATH

2 HR - FIRE SEPARATION

1 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREA

B

1500 SF

CODE ANALYSIS LEGEND

ELEVATOR

P-5

ELEVATOR

P-4

SERVICE ELEVATOR

S-6

EXIT

EXIT

EXIT

TRAVEL DISTANCE: 38'-3"

TRAVEL DISTANCE: 51'-4" TRAVEL DISTANCE: 142'-11"

TRAVEL DISTANCE: 18'-9"

CONSTRUCTION ACTIVITY - INFECTION RISK: C

PATIENT RISK GROUP: LOW

CLASS OF PRECAUTION MATRIX: II

INFECTION CONTROL PROJECT INFORMATION

8910 Purdue Road, Suite 320 Indianapolis, IN 46268 Phone: 317.931.9800

100% CONSTRUCTION

DOCUMENTS

TDMT

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

321 4 5 6 7 8 9 10

D E

A CB

D FE

G IH

KEYPLAN

556-24-115ELEVATOR UPGRADES

3001 GREEN BAY RD, NORTH CHICAGO, IL 60064

STAMP

www.specializedeng.com SES Project :

DESIGNER OF RECORDCONSULTANT

1221 N. Pennsylvania St.

Indianapolis, IN 46202 Phone: 317.800.6388 www.guidondesign.com

GD Project : 23.1019.05

10/03/2025

23022.012

A u to d e s k D o c s /2

.0

V A

L o v e ll E le v a to r U p g ra d e /E x is ti n g

M o d e l_

B u ild in g v

.r v t

/3

/2

:5

:3

P

M

B131-GI131

LIFE SAFETY PLANS

N

5 5 10 15 20 25 30 35 40 45

1/16" = 1'-0"

FEETSCALE

1/16" = 1'-0"

GROUND FLOOR LIFE SAFETY PLAN - BUILDING 131

Revisions: Date:

mschindler Snapshot

EXIT

OCCUPANCY LOAD FACTOR

EXITS REQUIRED

SQUARE FOOTAGE

OCCUPANCY TYPE

EGRESS EXIT SIGNAGE

FIRE EXTINGUISHER CABINET

DIAGONAL DISTANCE

EXIT SEPARATION DISTANCE

EGRESS PATH

2 HR - FIRE SEPARATION

1 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREA

B

1500 SF

CODE ANALYSIS LEGEND

FEC

CL-2

CL-1

EXIT

EXIT

TRAVEL DISTANCE: 33'-1"

TRAVEL DISTANCE: 20'-0"

T R

A V E L

D

IS

T A N C

E : 8

9' -1

0"

TRAVEL DISTANCE: 29'-7"

TRAVEL DISTANCE: 86'-3"

TRAVEL DISTANCE: 88'-8"

TRAVEL DISTANCE: 16'-8"

BUILDING 133

BUILDING 133 CA

BUILDING 133

BUILDING 133 CA

CONSTRUCTION ACTIVITY - INFECTION RISK: C

PATIENT RISK GROUP: LOW

CLASS OF PRECAUTION MATRIX: II

INFECTION CONTROL PROJECT INFORMATION

8910 Purdue Road, Suite 320 Indianapolis, IN 46268 Phone: 317.931.9800

100% CONSTRUCTION

DOCUMENTS

TDMT

133/133CA

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

321 4 5 6 7 8 9 10

A

D

AA CB

D FE

G IH

KEYPLAN

556-24-115ELEVATOR UPGRADES

3001 GREEN BAY RD, NORTH CHICAGO, IL 60064

STAMP

www.specializedeng.com SES Project :

DESIGNER OF RECORDCONSULTANT

1221 N. Pennsylvania St.

Indianapolis, IN 46202 Phone: 317.800.6388 www.guidondesign.com

GD Project : 23.1019.05

10/03/2025

23022.012

A u to d e s k D o c s /2

.0

V A

L o v e ll E le v a to r

U p g ra d e

/E x is ti n g

M o d e l_ B u ild in g

C A v

.r v t

/3

/2

:5

:0

P

M

B133/133CA-

GI141

LIFE SAFETY PLANS

2 2 4 6 8 10

1/4" = 1'-0"

FEETSCALE

N

SCALE: 1" = 20'-0"B133/133CA- GI141

1 BASEMENT FLOOR PLAN - BUILDING 133

Revisions: Date:

mschindler Snapshot

EXIT

OCCUPANCY LOAD FACTOR

EXITS REQUIRED

SQUARE FOOTAGE

OCCUPANCY TYPE

EGRESS EXIT SIGNAGE

FIRE EXTINGUISHER CABINET

DIAGONAL DISTANCE

EXIT SEPARATION DISTANCE

EGRESS PATH

2 HR - FIRE SEPARATION

1 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREA

B

1500 SF

CODE ANALYSIS LEGEND

ELEVATOR

P25

ELEVATOR

P26

EXIT

T R

A V

E L D

IS

T

A N

C E

TRAVEL DISTANCE: 414'-5"EXIT

TRAVEL DISTANCE: 5'-8"

CONSTRUCTION ACTIVITY - INFECTION RISK: C

PATIENT RISK GROUP: LOW

CLASS OF PRECAUTION MATRIX: II

INFECTION CONTROL PROJECT INFORMATION

8910 Purdue Road, Suite 320 Indianapolis, IN 46268 Phone: 317.931.9800

100% CONSTRUCTION

DOCUMENTS

TDMT

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

321 4 5 6 7 8 9 10

AAA CB

D FE

G IH

KEYPLAN

556-24-115ELEVATOR UPGRADES

3001 GREEN BAY RD, NORTH CHICAGO, IL 60064

STAMP

www.specializedeng.com SES Project :

DESIGNER OF RECORDCONSULTANT

1221 N. Pennsylvania St.

Indianapolis, IN 46202 Phone: 317.800.6388 www.guidondesign.com

GD Project : 23.1019.05

10/03/2025

23022.012

A u to d e s k D o c s /2

.0

V A

L o v e ll E le v a to r U p g ra d e /E x is ti n g

M o d e l_

B u ild in g v

.r v t

/3

/2

:5

:1

P

M

B195-GI151

LIFE SAFETY PLANS

SCALE: 3/32" = 1'-0"B195-GI151

1 FIRST FLOOR PLAN - BUILDING 195

5 5 10 15 20 25 30

3/32" = 1'-0"

FEETSCALE

N

Revisions: Date:

mschindler Snapshot

G000 - COVER SHEET
GI102 - PHASING SCOPE
B4-GI101 - LIFE SAFETY PLANS
B07-GI111 - LIFE SAFETY PLANS
B66-GI121 - LIFE SAFETY PLANS
B131-GI131 - LIFE SAFETY PLANS
B133/133CA-GI141 - LIFE SAFETY PLANS
B195-GI151 - LIFE SAFETY PLANS

File details come from the government source that posted it. Updated .