Attachment 3 - Drawings V2 of 5 - 56-24-115 - N Chicago Elevator Upgrades.pdf

PDF 12 MB Posted

Attached to
J035--Elevator Upgrade NRM Construction Project 556-24-115 James A. Lovell Federal Health Care Center, North Chicago, IL 60064
Solicitation number
36C77626R0048
Issued by

About this file

These are 100% construction documents (architectural plans and specifications) for an Elevator Upgrades project at the VA Lovell Federal Health Care Center in North Chicago, Illinois (Project 556-24-115). The drawings, prepared by Guidon Design and Specialized Engineering Solutions, detail demolition and architectural plans for elevator upgrades across multiple buildings (4, 7, 66, 131, 133/133CA, and 195) with a document issue date of October 3, 2025.

The construction documents include detailed enlarged floor plans showing demolition and new architectural layouts for elevators across basement, first, second, third, and roof floors depending on building configuration. Specific elevators addressed include P-23, P-22, P-21, P-4, P-5, S-6, P-25, P-26, and cart lifts CL-1 and CL-2, with dimensional specifications and equipment details provided. Work scope encompasses removal of existing flooring to concrete slab, existing ladders and pit ladders, and comprehensive interior finishes including elevator cab panel repainting, flooring and ceiling panel replacement, lighting lens replacement, cab padding replacement, and new ceiling systems. Additional work includes new stair access to mechanical platforms with railings, new pit ladders with field verification of pit depth, temporary infection control barriers with edge guard systems in public lobbies, and patching and painting of affected wall areas. All demolition and new construction activities must result in as-new condition finishes, with coordination required among fire protection, electrical, and structural trades, and adherence to ABA accessibility requirements and flooring manufacturer tolerances.

View the file

Other files

File Type Posted
36C77626R0048 0005.docx DOCX document
FAR 52.222-90 - Addressing DEI Discrimination by Federal Contractors - APR 2026.docx DOCX document
RFI Responses - Elevator Upgrade N Chicago.pdf PDF
36C77626R0048 0004.docx DOCX document
36C77626R0048 0003.docx DOCX document
36C77626R0048 0002.docx DOCX document
Attachment 2 - Elevator Site Visit Sign In - 556-24-115.pdf PDF
Attachment 1 - Site Visit Agenda - 556-24-115.pdf PDF
Site Visit Instructions Rev 03272026.pdf PDF
36C77626R0048 0001.docx DOCX document
Attachment 9 - PCRA - 556-24-115.pdf PDF
Attachment 4 - Drawings V3 of 5 - 56-24-115 - N Chicago Elevator Upgrades.pdf PDF
Attachment 5 - Drawings V4 of 5 - 56-24-115 - N Chicago Elevator Upgrades.pdf PDF
36C77626R0048_1.docx DOCX document
Attachment 13 - Site Visit Instructions - 556-24-115.docx DOCX document
Attachment 7 - Statement of Work - 556-24-115.docx DOCX document
Attachment 10 - DBA WD IL20260009 01092026.pdf PDF
Attachment 12 - RFI Tracking Sheet - 36C77626R0048.docx DOCX document
Attachment 2 - Drawings V1 of 5 - 56-24-115 - N Chicago Elevator Upgrades.pdf PDF
Attachment 1 - Specifications - 556-24-115 - N Chicago Elevator Upgrades.pdf PDF
Attachment 8 - ICRA Combined Docs - 556-24-115.pdf PDF
Attachment 6 - Drawings V5 of 5 - 56-24-115 - N Chicago Elevator Upgrades.pdf PDF
Attachment 11 - Limitations on Subcontracting.docx DOCX document
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ELEVATOR DEPTH WIDTH HEIGHT

P-23 7' - 7" 5' - 4" V.I.F.

ARCHITECTURAL GENERAL NOTES

1. EXISTING FLOORING TO BE REMOVED DOWN TO CONCRETE SLAB TYP.

MINIMIZE DAMAGE TO SUBSTRATE.

2. EXISTING LADDER TO BE REMOVED. SEE FIGURE 1.

3. REMOVE EXISTING PIT LADDER.

#DEMOLITION PLAN NOTES

A. COORDINATE DEMOLITION WITH NEW CONSTRUCTION. ALL DEMOLITION

AND REPAIR NECESSARY TO COMPLETE NEW AND REMODEL

CONSTRUCTION SHALL BE PROVIDED. CONTRACTOR SHALL REMOVE

EXISTING IMPROVEMENTS WHETHER OR NOT SPECIFICALLY INDICATED ON

THE DRAWINGS TO FACILITATE THE COMPLETION OF ALL REQUIRED WORK.

CONTRACTOR SHALL VISIT THE SITE AND VERIFY ALL QUANTITIES AND

ITEMS REQUIRED TO BE REMOVED.

B. REFER TO ARCHITECTURAL SYMBOLS ON SHEET AE001 FOR DEMOLITION

SYSTEMS AND DRAWING NOMENCLATURE.

C. EXISTING STRUCTURE WITHIN THE PROJECT BOUNDARY SHALL REMAIN

UNLESS OTHERWISE NOTED.

D. SURFACES TO BE CUT AND CONDITIONS UNDER WHICH CUTTING IS TO BE

PREFORMED SHALL BE REVIEWED BY CONTRACTOR PRIOR TO CUTTING TO

VERIFY NO UNSAFE OR UNSATISFACTORY CONDITIONS EXIST. SUCH

CONDITIONS SHALL BE RECTIFIED BEFORE WORK MAY PROCEED.

E. EXTENTS OF DEMOLITION SHALL BE COORDINATED WITH THE

ARCHITECTURAL FLOOR PLANS AND ENGINEERING DRAWINGS FOR

ADDITIONAL INFORMATION.

F. DIMENSIONS SHOWN FOR EXISTING CONSTRUCTION TO BE DEMOLISHED

ARE APPROXIMATE AND ARE INTENDED TO GIVE A GENERAL SCOPE OF

WORK TO BE REMOVED OR TEMPORARILY REMOVED TO ACCOMMODATE

NEW CONSTRUCTION. COORDINATE DEMOLITION WORK WITH DESIGN

INTENT OF NEW CONSTRUCTION TO PROVIDE ADEQUATE AREA FOR THIS

WORK.

G. CONTRACTORS SHALL REMOVE INDICATED DEMOLITION OF CONSTRUCTION

ASSEMBLIES IN THEIR ENTIRETY, UNLESS OTHERWISE NOTED, TO

ACCOMMODATE NEW CONSTRUCTION.

H. MAKE ALL DEMOLITION CLEAN AND COMPLETE IN A MANNER TO RECEIVE

NEW FINISHES. DEMOLITION SHOULD BE PERFORMED IN A MANNER SUCH

THAT THE CONTRACTOR CAN SEAMLESSLY PATCH NEW WORK TO BE

SMOOTH AND UNDETECTABLE.

I. COORDINATE FULL SCOPE OF DEMOLITION WORK WITH ENGINEERING AND

VENDOR DRAWINGS.

J. CONTRACTOR RESPONSIBLE FOR IDENTIFYING UTILITIES THAT NEED TO BE

ISOLATED OR MADE SAFE PRIOR TO DEMOLITION.

DEMOLITION GENERAL NOTES

1. SIGNAGE/TEMPORARY CONTROLS AS REQUIRED.

2. TEMPORARY INFECTION CONTROL WALL AND DOOR UTILIZE EDGE GUARD

SYSTEM IN ALL PUBLIC LOBBIES.

3. PATCH & PAINT EXISTING WALLS AS REQUIRED.

4. AREA OF NEW FINISH FLOORING, MATCH EXISTING.

5. TEMPORARY INFECTION CONTROL BARRIER.

6. NEW ROOM SIGNAGE MACHINE ROOM - RM#.

7. REPAINT EXISTING ELEVATOR CAB PANELS, MATCH EXISTING.

8. REPLACE ELEVATOR CAB FLOORING, MATCH EXISTING.

9. REPLACE ELEVATOR CEILING PANELS, MATCH EXISTING.

10. REPLACE CAB LIGHTING LENSES, MATCH EXISTING.

11. REPLACE CAB PADDING AND HANGERS FOR PAD PROTECTION WITHIN THE

ELEVATOR CAB, MATCH EXISTING.

12. REPLACE EXISTING CEILING WITH NEW SYSTEM, COORDINATE WITH

ELEVATOR SPECIFICATIONS.

13. NEW STAIR ACCESS TO MECHANICAL PLATFORM.

14. RAILINGS TO REMAIN.

15. NEW RAILINGS.

16. NEW PIT LADDER.

ARCHITECTURAL PLAN NOTES

A. REFERENCE FIRE PROTECTION AND ELECTRICAL FOR COORDINATION

ITEMS. COORDINATE AS REQUIRED INCLUDING NECESSARY FRAMING,

BLOCKING, ETC.

B. ALL AREAS DIRECTLY AFFECTED BY DEMOLITION/NEW CONSTRUCTION

ACTIVITIES TO BE AS-NEW CONDITION.

C. PROVIDE MINIMUM CLEARANCES AT ALL DOORS PER ABA REQUIREMENTS.

D. LEVEL AND INFILL FLOOR SLAB TO RECEIVE NEW FLOORING. REFER TO

SPECIFICATIONS AND FLOORING MANUFACTURER'S TOLERANCES FOR

ADDITIONAL INFORMATION.

E. FLOORING SUBCONTRACTOR SHALL ASSUME ELEVATOR LOBBY FLOORS

WILL REQUIRE A FULL SKIM COAT OF CONCRETE SLAB IN PREPARATION

FOR FLOORING FINISH.

F. PROVIDE METAL PLATE ON UNDERSIDE OF FLOOR SLAB WHERE CONCRETE

INFILL IS REQUIRED AND CHIP AWAY CONCRETE AT FLOOR LEVEL TO

CREATE A SLOPED OPENING/LIP TO PATCH PENETRATIONS AND PREVENT

CONCRETE INFILL CORE FROM FALLING THROUGH OPENING TO FLOOR

BELOW.

G. THE REPLACEMENT OF CEILING TILES AT THE END OF EACH SHIFT IS

REQUIRED FOR WORK AREAS OUTSIDE OF RATED CONSTRUCTION

BARRIER.

H. THE ELEVATOR DOOR IN THE AFFECTED ELEVATOR SHAFT IS REQUIRED TO

BE CLOSED AT THE END OF EACH WORK DAY.

ELEVATOR

P23

IC

7' - 8" 2

ELEVATOR

P23

ELEVATOR

P23

IC

" 3

ELEVATOR

P23

7' - 8"

MACHINE ROOM

MACHINE ROOM

8910 Purdue Road, Suite 320 Indianapolis, IN 46268 Phone: 317.931.9800

100% CONSTRUCTION

DOCUMENTS

TDMT

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

321 4 5 6 7 8 9 10

E

A CB

D FE

G IH

KEYPLAN

556-24-115ELEVATOR UPGRADES

3001 GREEN BAY RD, NORTH CHICAGO, IL 60064

STAMP

www.specializedeng.com SES Project :

DESIGNER OF RECORDCONSULTANT

1221 N. Pennsylvania St.

Indianapolis, IN 46202 Phone: 317.800.6388 www.guidondesign.com

GD Project : 23.1019.05

10/03/2025

23022.012

A u to d e s k D o c s /2

.0

V

A L o v e ll

E le v a to r

U p g ra d e /E x is ti n g M o d e l_ B u ild in g v

.r v t

/3

/2

:5

:2

P

M

B4-AE100

FIRST & SECOND DEMO & ARCH

ENLARGED PLANS

N

3/16" = 1'-0"

FIRST FLOOR DEMOLITION ENLARGED ELEVATOR PLAN - BUILDING 4

3/16" = 1'-0"

FIRST FLOOR ARCHITECTURAL ENLARGED ELEVATOR PLAN - BUILDING 4

N

N

N

3/16" = 1'-0"

SECOND FLOOR DEMOLITION ENLARGED ELEVATOR PLAN - BUILDING 4

3/16" = 1'-0"

SECOND FLOOR ARCHITECTURAL ENLARGED ELEVATOR PLAN - BUILDING 4

2 2 4 6 8 10 12 14

3/16" = 1'-0"

FEETSCALE

HALL LANTERNS N/A

SMOKE DETECTOR

HALL POSITION INDICATOR WITH LANTERNS N/A

HALL POSITION INDICATOR N/A

CAR TRAVEL LANTERN N/A

CAR POSITION INDICATOR N

SIGNALING DEVICES (ALARM BELL) N

AUXILIARY CAR STATION

MAIN CAR STATION N

FIREFIGHTERS' HALL STATION N

ACCESS SWITCHES N

HALL PUSHBUTTONS N

HALL CALL/OPERATION STATIONS

OPERATING DEVICES

VA ADVISE IF INTERIORS TO BE CHANGED ?

CAR ENCLOSURE

HEAT DETECTOR

SPRINKLER

OUTLET N

LIGHT SWITCH A

LIGHT A

SUMP PIT/COVER

SUMP N/A

SCAVENGER N

PIPING SUPPORT N

PIPING R

SHUT-OFF VALVE N

CYLINDER R

PLUNGER R

STOP SWITCHES N

SELECTOR TENSION SHEAVE

GOVERNOR TENSION SHEAVE

COUNTERWEIGHT BUFFER

CAR BUFFER R

ACCESS LADDER A

PIT

SPRINKLERS

SMOKE DETECTOS

ENCLOSURE

WIRING AND TRAVELING CABLES N

NORMAL AND FINAL TERMINAL DEVICES N

COUNTERWEIGHT GUIDE SHOES

COUNTERWEIGHT FRAME

DEFLECTOR SHEAVES

COUNTERWEIGHT GUIDE RAILS

MAIN GUIDE RAILS (CAR) R

HOISTWAY

ACCESS

HOIST BEAMS

LADDERS/STAIRS R

HEATING/AIR CONDITIONING N

TRAP DOOR

ENCLOSURE R

HEAT DETECTOR

SMOKE DETECTORS R

SPRINKLERS ?

DISCONNECT SWITCH N

VENITLATION

ACCESS R

LIGHTING A

PIPING SUPPORT N

PIPING R

MUFFLER N

SHUT-OFF VALVE N

PUMP UNIT N

ROPE GRIPPER

WIRING N

GOVERNOR ROPE

GOVERNOR

SELECTOR N

ENCODER

CONTROLLER N

SLEEVES AND GUARDS

SUPPORT BEAMS AND TIE DOWNS

HOIST ROPES

HOIST MACHINE

MACHINE ROOM

VOICE ANNOUNCING N

EMERGENCY LIGHTING N

DOOR RESTRICTOR N

TOP EXIT CONTACT N

WORK LIGHT AND RECEPTACLE N

TOP CONTROL STATION N

DOOR PROTECTION DEVICE N

DOOR CONTACT

DOOR OPERATOR N

DOOR UNLOCKING DEVICE

DOOR CLUTCH

DOOR HEADER

DOOR TRACK

DOOR HANGERS

DOORS

DOOR EQUIPMENT N

TOE GUARD N

FLOORING ?

ROLLER GUIDES

SILLS R

GUIDE SHOES N

CAR GUIDE RAILS R

LOAD WEIGHING DEVICE N

PLUNGER ISLOLATION

ISOLATION

SAFETY DEVICES

PLATFORM R

FRAME R

CAR

FLOOR IDENTIFICATION N

ACCESS N

GIBS N

INTERLOCKS N

VISION PANELS

CLOSERS N

HANGER ROLLERS N

HANGERS AND TRACKS R

DUST COVERS

SILLS R

TRANSOMS

ASTRAGALS R

SIGHT GUARDS R

DOOR PANELS R

FRAMES R

HOISTWAY ENTRANCE

ELEVATOR P23

BUILDING 4

3/16" = 1'-0"

ROOF FLOOR ARCHITECTURAL ENLARGED ELEVATOR PLAN - BUILDING 4

3/16" = 1'-0"

ROOF FLOOR DEMOLITION ENLARGED ELEVATOR PLAN - BUILDING 4

N

N

Revisions: Date:

mschindler Snapshot mschindler Snapshot

B4-AE501

ARCHITECTURAL GENERAL NOTES

1. EXISTING FLOORING TO BE REMOVED DOWN TO CONCRETE SLAB TYP.

MINIMIZE DAMAGE TO SUBSTRATE.

2. EXISTING LADDER TO BE REMOVED. SEE FIGURE 1.

3. REMOVE EXISTING PIT LADDER.

#DEMOLITION PLAN NOTES

A. COORDINATE DEMOLITION WITH NEW CONSTRUCTION. ALL DEMOLITION

AND REPAIR NECESSARY TO COMPLETE NEW AND REMODEL

CONSTRUCTION SHALL BE PROVIDED. CONTRACTOR SHALL REMOVE

EXISTING IMPROVEMENTS WHETHER OR NOT SPECIFICALLY INDICATED ON

THE DRAWINGS TO FACILITATE THE COMPLETION OF ALL REQUIRED WORK.

CONTRACTOR SHALL VISIT THE SITE AND VERIFY ALL QUANTITIES AND

ITEMS REQUIRED TO BE REMOVED.

B. REFER TO ARCHITECTURAL SYMBOLS ON SHEET AE001 FOR DEMOLITION

SYSTEMS AND DRAWING NOMENCLATURE.

C. EXISTING STRUCTURE WITHIN THE PROJECT BOUNDARY SHALL REMAIN

UNLESS OTHERWISE NOTED.

D. SURFACES TO BE CUT AND CONDITIONS UNDER WHICH CUTTING IS TO BE

PREFORMED SHALL BE REVIEWED BY CONTRACTOR PRIOR TO CUTTING TO

VERIFY NO UNSAFE OR UNSATISFACTORY CONDITIONS EXIST. SUCH

CONDITIONS SHALL BE RECTIFIED BEFORE WORK MAY PROCEED.

E. EXTENTS OF DEMOLITION SHALL BE COORDINATED WITH THE

ARCHITECTURAL FLOOR PLANS AND ENGINEERING DRAWINGS FOR

ADDITIONAL INFORMATION.

F. DIMENSIONS SHOWN FOR EXISTING CONSTRUCTION TO BE DEMOLISHED

ARE APPROXIMATE AND ARE INTENDED TO GIVE A GENERAL SCOPE OF

WORK TO BE REMOVED OR TEMPORARILY REMOVED TO ACCOMMODATE

NEW CONSTRUCTION. COORDINATE DEMOLITION WORK WITH DESIGN

INTENT OF NEW CONSTRUCTION TO PROVIDE ADEQUATE AREA FOR THIS

WORK.

G. CONTRACTORS SHALL REMOVE INDICATED DEMOLITION OF CONSTRUCTION

ASSEMBLIES IN THEIR ENTIRETY, UNLESS OTHERWISE NOTED, TO

ACCOMMODATE NEW CONSTRUCTION.

H. MAKE ALL DEMOLITION CLEAN AND COMPLETE IN A MANNER TO RECEIVE

NEW FINISHES. DEMOLITION SHOULD BE PERFORMED IN A MANNER SUCH

THAT THE CONTRACTOR CAN SEAMLESSLY PATCH NEW WORK TO BE

SMOOTH AND UNDETECTABLE.

I. COORDINATE FULL SCOPE OF DEMOLITION WORK WITH ENGINEERING AND

VENDOR DRAWINGS.

J. CONTRACTOR RESPONSIBLE FOR IDENTIFYING UTILITIES THAT NEED TO BE

ISOLATED OR MADE SAFE PRIOR TO DEMOLITION.

DEMOLITION GENERAL NOTES

1. SIGNAGE/TEMPORARY CONTROLS AS REQUIRED.

2. TEMPORARY INFECTION CONTROL WALL AND DOOR UTILIZE EDGE GUARD

SYSTEM IN ALL PUBLIC LOBBIES.

3. PATCH & PAINT EXISTING WALLS AS REQUIRED.

4. AREA OF NEW FINISH FLOORING, MATCH EXISTING.

5. TEMPORARY INFECTION CONTROL BARRIER.

6. NEW ROOM SIGNAGE MACHINE ROOM - RM#.

7. REPAINT EXISTING ELEVATOR CAB PANELS, MATCH EXISTING.

8. REPLACE ELEVATOR CAB FLOORING, MATCH EXISTING.

9. REPLACE ELEVATOR CEILING PANELS, MATCH EXISTING.

10. REPLACE CAB LIGHTING LENSES, MATCH EXISTING.

11. REPLACE CAB PADDING AND HANGERS FOR PAD PROTECTION WITHIN THE

ELEVATOR CAB, MATCH EXISTING.

12. REPLACE EXISTING CEILING WITH NEW SYSTEM, COORDINATE WITH

ELEVATOR SPECIFICATIONS.

13. NEW STAIR ACCESS TO MECHANICAL PLATFORM.

14. RAILINGS TO REMAIN.

15. NEW RAILINGS.

16. NEW PIT LADDER, VERIFY PIT DEPTH IN FIELD.

ARCHITECTURAL PLAN NOTES

A. REFERENCE FIRE PROTECTION AND ELECTRICAL FOR COORDINATION

ITEMS. COORDINATE AS REQUIRED INCLUDING NECESSARY FRAMING,

BLOCKING, ETC.

B. ALL AREAS DIRECTLY AFFECTED BY DEMOLITION/NEW CONSTRUCTION

ACTIVITIES TO BE AS-NEW CONDITION.

C. PROVIDE MINIMUM CLEARANCES AT ALL DOORS PER ABA REQUIREMENTS.

D. LEVEL AND INFILL FLOOR SLAB TO RECEIVE NEW FLOORING. REFER TO

SPECIFICATIONS AND FLOORING MANUFACTURER'S TOLERANCES FOR

ADDITIONAL INFORMATION.

E. FLOORING SUBCONTRACTOR SHALL ASSUME ELEVATOR LOBBY FLOORS

WILL REQUIRE A FULL SKIM COAT OF CONCRETE SLAB IN PREPARATION

FOR FLOORING FINISH.

F. PROVIDE METAL PLATE ON UNDERSIDE OF FLOOR SLAB WHERE CONCRETE

INFILL IS REQUIRED AND CHIP AWAY CONCRETE AT FLOOR LEVEL TO

CREATE A SLOPED OPENING/LIP TO PATCH PENETRATIONS AND PREVENT

CONCRETE INFILL CORE FROM FALLING THROUGH OPENING TO FLOOR

BELOW.

G. THE REPLACEMENT OF CEILING TILES AT THE END OF EACH SHIFT IS

REQUIRED FOR WORK AREAS OUTSIDE OF RATED CONSTRUCTION

BARRIER.

H. THE ELEVATOR DOOR IN THE AFFECTED ELEVATOR SHAFT IS REQUIRED TO

BE CLOSED AT THE END OF EACH WORK DAY.

0' - 4 1/2"

EXISTING PIT WALL

BRACKETS AS

RECOMMENDED BY

MANUFACTURER

B4-AE501 4

V .I .F

BASEMENT

0' - 1" 1' - 4" 0' - 1"

1' - 6"

8910 Purdue Road, Suite 320 Indianapolis, IN 46268 Phone: 317.931.9800

100% CONSTRUCTION

DOCUMENTS

TDMT

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

321 4 5 6 7 8 9 10

E

A CB

D FE

G IH

KEYPLAN

556-24-115ELEVATOR UPGRADES

3001 GREEN BAY RD, NORTH CHICAGO, IL 60064

STAMP

www.specializedeng.com SES Project :

DESIGNER OF RECORDCONSULTANT

1221 N. Pennsylvania St.

Indianapolis, IN 46202 Phone: 317.800.6388 www.guidondesign.com

GD Project : 23.1019.05

10/03/2025

23022.012

A u to d e s k D o c s /2

.0

V

A L o v e ll

E le v a to r

U p g ra d e /E x is ti n g M o d e l_ B u ild in g v

.r v t

/3

/2

:5

:2

P

M

B4-AE501

ELEVATOR PIT PLANS

3/16" = 1'-0"

ELEVATOR PIT PLAN - EXISTING

3/16" = 1'-0"

ELEVATOR PIT PLAN - NEW

3" = 1'-0"

PIT LADDER ENLARGED PLAN

1" = 1'-0"

PIT LADDER ELEVATION

Revisions: Date:

mschindler Snapshot

ARCHITECTURAL GENERAL NOTES

1. EXISTING FLOORING TO BE REMOVED DOWN TO CONCRETE SLAB TYP.

MINIMIZE DAMAGE TO SUBSTRATE.

#DEMOLITION PLAN NOTES

A. COORDINATE DEMOLITION WITH NEW CONSTRUCTION. ALL DEMOLITION

AND REPAIR NECESSARY TO COMPLETE NEW AND REMODEL

CONSTRUCTION SHALL BE PROVIDED. CONTRACTOR SHALL REMOVE

EXISTING IMPROVEMENTS WHETHER OR NOT SPECIFICALLY INDICATED ON

THE DRAWINGS TO FACILITATE THE COMPLETION OF ALL REQUIRED WORK.

CONTRACTOR SHALL VISIT THE SITE AND VERIFY ALL QUANTITIES AND

ITEMS REQUIRED TO BE REMOVED.

B. REFER TO ARCHITECTURAL SYMBOLS ON SHEET AE001 FOR DEMOLITION

SYSTEMS AND DRAWING NOMENCLATURE.

C. EXISTING STRUCTURE WITHIN THE PROJECT BOUNDARY SHALL REMAIN

UNLESS OTHERWISE NOTED.

D. SURFACES TO BE CUT AND CONDITIONS UNDER WHICH CUTTING IS TO BE

PREFORMED SHALL BE REVIEWED BY CONTRACTOR PRIOR TO CUTTING TO

VERIFY NO UNSAFE OR UNSATISFACTORY CONDITIONS EXIST. SUCH

CONDITIONS SHALL BE RECTIFIED BEFORE WORK MAY PROCEED.

E. EXTENTS OF DEMOLITION SHALL BE COORDINATED WITH THE

ARCHITECTURAL FLOOR PLANS AND ENGINEERING DRAWINGS FOR

ADDITIONAL INFORMATION.

F. DIMENSIONS SHOWN FOR EXISTING CONSTRUCTION TO BE DEMOLISHED

ARE APPROXIMATE AND ARE INTENDED TO GIVE A GENERAL SCOPE OF

WORK TO BE REMOVED OR TEMPORARILY REMOVED TO ACCOMMODATE

NEW CONSTRUCTION. COORDINATE DEMOLITION WORK WITH DESIGN

INTENT OF NEW CONSTRUCTION TO PROVIDE ADEQUATE AREA FOR THIS

WORK.

G. CONTRACTORS SHALL REMOVE INDICATED DEMOLITION OF CONSTRUCTION

ASSEMBLIES IN THEIR ENTIRETY, UNLESS OTHERWISE NOTED, TO

ACCOMMODATE NEW CONSTRUCTION.

H. MAKE ALL DEMOLITION CLEAN AND COMPLETE IN A MANNER TO RECEIVE

NEW FINISHES. DEMOLITION SHOULD BE PERFORMED IN A MANNER SUCH

THAT THE CONTRACTOR CAN SEAMLESSLY PATCH NEW WORK TO BE

SMOOTH AND UNDETECTABLE.

I. COORDINATE FULL SCOPE OF DEMOLITION WORK WITH ENGINEERING AND

VENDOR DRAWINGS.

J. CONTRACTOR RESPONSIBLE FOR IDENTIFYING UTILITIES THAT NEED TO BE

ISOLATED OR MADE SAFE PRIOR TO DEMOLITION.

DEMOLITION GENERAL NOTES

ELEVATOR DEPTH WIDTH HEIGHT

P-22 3' - 11" 5' - 8" 7' - 4"

1. SIGNAGE/TEMPORARY CONTROLS AS REQUIRED.

2. TEMPORARY INFECTION CONTROL WALL AND DOOR UTILIZE EDGE GUARD

SYSTEM IN ALL PUBLIC LOBBIES.

3. PATCH & PAINT EXISTING WALLS AS REQUIRED.

4. AREA OF NEW FINISH FLOORING, MATCH EXISTING.

5. TEMPORARY INFECTION CONTROL BARRIER.

6. NEW ROOM SIGNAGE MACHINE ROOM - RM#.

7. REPAINT EXISTING ELEVATOR CAB PANELS, MATCH EXISTING.

8. REPLACE ELEVATOR CAB FLOORING, MATCH EXISTING.

9. REPLACE ELEVATOR CEILING PANELS, MATCH EXISTING.

10. REPLACE CAB LIGHTING LENSES, MATCH EXISTING.

11. REPLACE CAB PADDING AND HANGERS FOR PAD PROTECTION WITHIN THE

ELEVATOR CAB, MATCH EXISTING.

12. REPLACE EXISTING CEILING WITH NEW SYSTEM, COORDINATE WITH

ELEVATOR SPECIFICATIONS.

ARCHITECTURAL PLAN NOTES

A. REFERENCE FIRE PROTECTION AND ELECTRICAL FOR COORDINATION

ITEMS. COORDINATE AS REQUIRED INCLUDING NECESSARY FRAMING,

BLOCKING, ETC.

B. ALL AREAS DIRECTLY AFFECTED BY DEMOLITION/NEW CONSTRUCTION

ACTIVITIES TO BE AS-NEW CONDITION.

C. PROVIDE MINIMUM CLEARANCES AT ALL DOORS PER ABA REQUIREMENTS.

D. LEVEL AND INFILL FLOOR SLAB TO RECEIVE NEW FLOORING. REFER TO

SPECIFICATIONS AND FLOORING MANUFACTURER'S TOLERANCES FOR

ADDITIONAL INFORMATION.

E. FLOORING SUBCONTRACTOR SHALL ASSUME ELEVATOR LOBBY FLOORS

WILL REQUIRE A FULL SKIM COAT OF CONCRETE SLAB IN PREPARATION

FOR FLOORING FINISH.

F. PROVIDE METAL PLATE ON UNDERSIDE OF FLOOR SLAB WHERE CONCRETE

INFILL IS REQUIRED AND CHIP AWAY CONCRETE AT FLOOR LEVEL TO

CREATE A SLOPED OPENING/LIP TO PATCH PENETRATIONS AND PREVENT

CONCRETE INFILL CORE FROM FALLING THROUGH OPENING TO FLOOR

BELOW.

G. THE REPLACEMENT OF CEILING TILES AT THE END OF EACH SHIFT IS

REQUIRED FOR WORK AREAS OUTSIDE OF RATED CONSTRUCTION

BARRIER.

H. THE ELEVATOR DOOR IN THE AFFECTED ELEVATOR SHAFT IS REQUIRED TO

BE CLOSED AT THE END OF EACH WORK DAY.

ELEVATOR

P-22

CORRIDOR

CO-B-01A

OFFICE

OFFICE

CORRIDOR

ELEVATOR

P-22 JAN

131A

OFFICE

351 ft²

CONFERENCE

245 TOILET

ELEVATOR

P-22

TEL/DATA

CORRIDOR

CORRIDOR

351 ft²

CONFERENCE

ELEVATOR

P-22 CORRIDOR

CO-B-01A

7' - 0"

5 1

IC

11712

23' - 4"

4' - 11 1/8"

OFFICE

CORRIDOR

ELEVATOR

P-22 JAN

131A

OFFICE

6' - 8"

2 1

IC

42' - 1 13/16"

351 ft²

CONFERENCE

245 TOILET

ELEVATOR

P-22

TEL/DATA

CORRIDOR

5CORRIDOR

351 ft²

CONFERENCE

6' - 11"

5 1

IC

22' - 1 9/16"

8910 Purdue Road, Suite 320 Indianapolis, IN 46268 Phone: 317.931.9800

100% CONSTRUCTION

DOCUMENTS

TDMT

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

321 4 5 6 7 8 9 10

E

A CB

D FE

G IH

KEYPLAN

556-24-115ELEVATOR UPGRADES

3001 GREEN BAY RD, NORTH CHICAGO, IL 60064

STAMP

www.specializedeng.com SES Project :

DESIGNER OF RECORDCONSULTANT

1221 N. Pennsylvania St.

Indianapolis, IN 46202 Phone: 317.800.6388 www.guidondesign.com

GD Project : 23.1019.05

10/03/2025

23022.012

A u to d e s k D o c s /2

.0

V

A L o v e ll

E le v a to r

U p g ra d e /E x is ti n g M o d e l_ B u ild in g v

.r v t

/3

/2

:5

:5

P

M

B07-AE110

BASEMENT, FIRST & SECOND

DEMO & ARCH ENLARGED PLANS

N

N

N

3/16" = 1'-0"

BASEMENT DEMOLITION ENLARGED ELEVATOR PLAN - BUILDING 7

3/16" = 1'-0"

FIRST FLOOR DEMOLITION ENLARGED ELEVATOR PLAN - BUILDING 7

3/16" = 1'-0"

SECOND FLOOR DEMOLITION ENLARGED ELEVATOR PLAN - BUILDING 7

N

NN

3/16" = 1'-0"

BASEMENT ARCHITECTURAL ENLARGED ELEVATOR PLAN - BUILDING 7

3/16" = 1'-0"

FIRST FLOOR ARCHITECTURAL ENLARGED ELEVATOR PLAN - BUILDING 7

3/16" = 1'-0"

SECOND FLOOR ARCHITECTURAL ENLARGED ELEVATOR PLAN - BUILDING 7

2 2 4 6 8 10 12 14

3/16" = 1'-0"

FEETSCALE

HALL LANTERNS N/A

SMOKE DETECTOR R

HALL POSITION INDICATOR WITH LANTERNS N/A

HALL POSITION INDICATOR N/A

CAR TRAVEL LANTERN N

CAR POSITION INDICATOR N

SIGNALING DEVICES (ALARM BELL) N

AUXILIARY CAR STATION

MAIN CAR STATION N

FIREFIGHTERS' HALL STATION N

ACCESS SWITCHES N

HALL PUSHBUTTONS N

HALL CALL/OPERATION STATIONS

OPERATING DEVICES

VA ADVISE IF INTERIORS TO BE CHANGED ?

CAR ENCLOSURE

HEAT DETECTOR

SPRINKLER

OUTLET A

LIGHT SWITCH A

LIGHT A

SUMP PIT/COVER N

SUMP R

SCAVENGER

PIPING SUPPORT

PIPING

SHUT-OFF VALVE

CYLINDER

PLUNGER

STOP SWITCHES N

SELECTOR TENSION SHEAVE N

GOVERNOR TENSION SHEAVE N

COUNTERWEIGHT BUFFER R

CAR BUFFER R

ACCESS LADDER A

PIT

SPRINKLERS

SMOKE DETECTOS

ENCLOSURE

WIRING AND TRAVELING CABLES N

NORMAL AND FINAL TERMINAL DEVICES N

COUNTERWEIGHT GUIDE SHOES N

COUNTERWEIGHT FRAME R

DEFLECTOR SHEAVES N

COUNTERWEIGHT GUIDE RAILS R

MAIN GUIDE RAILS (CAR) R

HOSITWAY

ACCESS ?

HOIST BEAMS

LADDERS/STAIRS R

HEATING/AIR CONDITIONING N/A

TRAP DOOR

ENCLOSURE R

HEAT DETECTOR R

SMOKE DETECTORS R

SPRINKLERS ?

DISCONNECT SWITCH N

VENITLATION

ACCESS R

LIGHTING A

PIPING SUPPORT

PIPING

MUFFLER

SHUT-OFF VALVE

PUMP UNIT

ROPE GRIPPER ?

WIRING N

GOVERNOR ROPE N

GOVERNOR N

SELECTOR N

ENCODER N

CONTROLLER N

SLEEVES AND GUARDS N

SUPPORT BEAMS AND TIE DOWNS N

HOIST ROPES N

HOIST MACHINE N

MACHINE ROOM

VOICE ANNOUNCING N

EMERGENCY LIGHTING N

DOOR RESTRICTOR N

TOP EXIT CONTACT N

WORK LIGHT AND RECEPTACLE N

TOP CONTROL STATION N

DOOR PROTECTION DEVICE N

DOOR CONTACT N

DOOR OPERATOR N

DOOR UNLOCKING DEVICE N

DOOR CLUTCH N

DOOR HEADER

DOOR TRACK

DOOR HANGERS

DOORS N

DOOR EQUIPMENT

TOE GUARD N

FLOORING ?

ROLLER GUIDES

SILLS R

GUIDE SHOES N

CAR GUIDE RAILS R

LOAD WEIGHING DEVICE N

PLUNGER ISLOLATION

ISOLATION R

SAFETY DEVICES A

PLATFORM R

FRAME R

CAR

FLOOR IDENTIFICATION N

ACCESS N

GIBS N

INTERLOCKS N

VISION PANELS

CLOSERS R

HANGER COVERS R

HANGER ROLLERS N

HANGERS AND TRACKS R

DUST COVERS

SILLS R

TRANSOMS

ASTRAGALS R

SIGHT GUARDS R

DOOR PANELS R

FRAMES R

HOISTWAY ENTRANCE

ELEVATOR P22

BUILDING 7

Revisions: Date:

mschindler Snapshot

MINIMIZE DAMAGE TO SUBSTRATE.

#DEMOLITION PLAN NOTES

A. COORDINATE DEMOLITION WITH NEW CONSTRUCTION. ALL DEMOLITION

AND REPAIR NECESSARY TO COMPLETE NEW AND REMODEL

CONSTRUCTION SHALL BE PROVIDED. CONTRACTOR SHALL REMOVE

EXISTING IMPROVEMENTS WHETHER OR NOT SPECIFICALLY INDICATED ON

THE DRAWINGS TO FACILITATE THE COMPLETION OF ALL REQUIRED WORK.

CONTRACTOR SHALL VISIT THE SITE AND VERIFY ALL QUANTITIES AND

ITEMS REQUIRED TO BE REMOVED.

B. REFER TO ARCHITECTURAL SYMBOLS ON SHEET AE001 FOR DEMOLITION

SYSTEMS AND DRAWING NOMENCLATURE.

C. EXISTING STRUCTURE WITHIN THE PROJECT BOUNDARY SHALL REMAIN

UNLESS OTHERWISE NOTED.

D. SURFACES TO BE CUT AND CONDITIONS UNDER WHICH CUTTING IS TO BE

PREFORMED SHALL BE REVIEWED BY CONTRACTOR PRIOR TO CUTTING TO

VERIFY NO UNSAFE OR UNSATISFACTORY CONDITIONS EXIST. SUCH

CONDITIONS SHALL BE RECTIFIED BEFORE WORK MAY PROCEED.

E. EXTENTS OF DEMOLITION SHALL BE COORDINATED WITH THE

ARCHITECTURAL FLOOR PLANS AND ENGINEERING DRAWINGS FOR

ADDITIONAL INFORMATION.

F. DIMENSIONS SHOWN FOR EXISTING CONSTRUCTION TO BE DEMOLISHED

ARE APPROXIMATE AND ARE INTENDED TO GIVE A GENERAL SCOPE OF

WORK TO BE REMOVED OR TEMPORARILY REMOVED TO ACCOMMODATE

NEW CONSTRUCTION. COORDINATE DEMOLITION WORK WITH DESIGN

INTENT OF NEW CONSTRUCTION TO PROVIDE ADEQUATE AREA FOR THIS

WORK.

G. CONTRACTORS SHALL REMOVE INDICATED DEMOLITION OF CONSTRUCTION

ASSEMBLIES IN THEIR ENTIRETY, UNLESS OTHERWISE NOTED, TO

ACCOMMODATE NEW CONSTRUCTION.

H. MAKE ALL DEMOLITION CLEAN AND COMPLETE IN A MANNER TO RECEIVE

NEW FINISHES. DEMOLITION SHOULD BE PERFORMED IN A MANNER SUCH

THAT THE CONTRACTOR CAN SEAMLESSLY PATCH NEW WORK TO BE

SMOOTH AND UNDETECTABLE.

I. COORDINATE FULL SCOPE OF DEMOLITION WORK WITH ENGINEERING AND

VENDOR DRAWINGS.

J. CONTRACTOR RESPONSIBLE FOR IDENTIFYING UTILITIES THAT NEED TO BE

ISOLATED OR MADE SAFE PRIOR TO DEMOLITION.

DEMOLITION GENERAL NOTES

ELEVATOR DEPTH WIDTH HEIGHT

P-22 3' - 11" 5' - 8" 7' - 4"

1. SIGNAGE/TEMPORARY CONTROLS AS REQUIRED.

2. TEMPORARY INFECTION CONTROL WALL AND DOOR UTILIZE EDGE GUARD

SYSTEM IN ALL PUBLIC LOBBIES.

3. PATCH & PAINT EXISTING WALLS AS REQUIRED.

4. AREA OF NEW FINISH FLOORING, MATCH EXISTING.

5. TEMPORARY INFECTION CONTROL BARRIER.

6. NEW ROOM SIGNAGE MACHINE ROOM - RM#.

7. REPAINT EXISTING ELEVATOR CAB PANELS, MATCH EXISTING.

8. REPLACE ELEVATOR CAB FLOORING, MATCH EXISTING.

9. REPLACE ELEVATOR CEILING PANELS, MATCH EXISTING.

10. REPLACE CAB LIGHTING LENSES, MATCH EXISTING.

11. REPLACE CAB PADDING AND HANGERS FOR PAD PROTECTION WITHIN THE

ELEVATOR CAB, MATCH EXISTING.

12. REPLACE EXISTING CEILING WITH NEW SYSTEM, COORDINATE WITH

ELEVATOR SPECIFICATIONS.

ARCHITECTURAL PLAN NOTES

A. REFERENCE FIRE PROTECTION AND ELECTRICAL FOR COORDINATION

ITEMS. COORDINATE AS REQUIRED INCLUDING NECESSARY FRAMING,

BLOCKING, ETC.

B. ALL AREAS DIRECTLY AFFECTED BY DEMOLITION/NEW CONSTRUCTION

ACTIVITIES TO BE AS-NEW CONDITION.

C. PROVIDE MINIMUM CLEARANCES AT ALL DOORS PER ABA REQUIREMENTS.

D. LEVEL AND INFILL FLOOR SLAB TO RECEIVE NEW FLOORING. REFER TO

SPECIFICATIONS AND FLOORING MANUFACTURER'S TOLERANCES FOR

ADDITIONAL INFORMATION.

E. FLOORING SUBCONTRACTOR SHALL ASSUME ELEVATOR LOBBY FLOORS

WILL REQUIRE A FULL SKIM COAT OF CONCRETE SLAB IN PREPARATION

FOR FLOORING FINISH.

F. PROVIDE METAL PLATE ON UNDERSIDE OF FLOOR SLAB WHERE CONCRETE

INFILL IS REQUIRED AND CHIP AWAY CONCRETE AT FLOOR LEVEL TO

CREATE A SLOPED OPENING/LIP TO PATCH PENETRATIONS AND PREVENT

CONCRETE INFILL CORE FROM FALLING THROUGH OPENING TO FLOOR

BELOW.

G. THE REPLACEMENT OF CEILING TILES AT THE END OF EACH SHIFT IS

REQUIRED FOR WORK AREAS OUTSIDE OF RATED CONSTRUCTION

BARRIER.

H. THE ELEVATOR DOOR IN THE AFFECTED ELEVATOR SHAFT IS REQUIRED TO

BE CLOSED AT THE END OF EACH WORK DAY.

ELEVATOR

P-22

MACHINE ROOM

ELEVATOR

P-22

MACHINE ROOM

8910 Purdue Road, Suite 320 Indianapolis, IN 46268 Phone: 317.931.9800

100% CONSTRUCTION

DOCUMENTS

TDMT

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

321 4 5 6 7 8 9 10

E

A CB

D FE

G IH

KEYPLAN

556-24-115ELEVATOR UPGRADES

3001 GREEN BAY RD, NORTH CHICAGO, IL 60064

STAMP

www.specializedeng.com SES Project :

DESIGNER OF RECORDCONSULTANT

1221 N. Pennsylvania St.

Indianapolis, IN 46202 Phone: 317.800.6388 www.guidondesign.com

GD Project : 23.1019.05

10/03/2025

23022.012

A u to d e s k D o c s /2

.0

V

A L o v e ll

E le v a to r

U p g ra d e /E x is ti n g M o d e l_ B u ild in g v

.r v t

/3

/2

:5

:5

P

M

B07-AE111

MACHINE ROOM DEMO & ARCH

ENLARGED PLANS

N

N

2 2 4 6 8 10 12 14

3/16" = 1'-0"

FEETSCALE

HALL LANTERNS N/A

SMOKE DETECTOR R

HALL POSITION INDICATOR WITH LANTERNS N/A

HALL POSITION INDICATOR N/A

CAR TRAVEL LANTERN N

CAR POSITION INDICATOR N

SIGNALING DEVICES (ALARM BELL) N

AUXILIARY CAR STATION

MAIN CAR STATION N

FIREFIGHTERS' HALL STATION N

ACCESS SWITCHES N

HALL PUSHBUTTONS N

HALL CALL/OPERATION STATIONS

OPERATING DEVICES

VA ADVISE IF INTERIORS TO BE CHANGED ?

CAR ENCLOSURE

HEAT DETECTOR

SPRINKLER

OUTLET A

LIGHT SWITCH A

LIGHT A

SUMP PIT/COVER N

SUMP R

SCAVENGER

PIPING SUPPORT

PIPING

SHUT-OFF VALVE

CYLINDER

PLUNGER

STOP SWITCHES N

SELECTOR TENSION SHEAVE N

GOVERNOR TENSION SHEAVE N

COUNTERWEIGHT BUFFER R

CAR BUFFER R

ACCESS LADDER A

PIT

SPRINKLERS

SMOKE DETECTOS

ENCLOSURE

WIRING AND TRAVELING CABLES N

NORMAL AND FINAL TERMINAL DEVICES N

COUNTERWEIGHT GUIDE SHOES N

COUNTERWEIGHT FRAME R

DEFLECTOR SHEAVES N

COUNTERWEIGHT GUIDE RAILS R

MAIN GUIDE RAILS (CAR) R

HOSITWAY

ACCESS ?

HOIST BEAMS

LADDERS/STAIRS R

HEATING/AIR CONDITIONING N/A

TRAP DOOR

ENCLOSURE R

HEAT DETECTOR R

SMOKE DETECTORS R

SPRINKLERS ?

DISCONNECT SWITCH N

VENITLATION

ACCESS R

LIGHTING A

PIPING SUPPORT

PIPING

MUFFLER

SHUT-OFF VALVE

PUMP UNIT

ROPE GRIPPER ?

WIRING N

GOVERNOR ROPE N

GOVERNOR N

SELECTOR N

ENCODER N

CONTROLLER N

SLEEVES AND GUARDS N

SUPPORT BEAMS AND TIE DOWNS N

HOIST ROPES N

HOIST MACHINE N

MACHINE ROOM

VOICE ANNOUNCING N

EMERGENCY LIGHTING N

DOOR RESTRICTOR N

TOP EXIT CONTACT N

WORK LIGHT AND RECEPTACLE N

TOP CONTROL STATION N

DOOR PROTECTION DEVICE N

DOOR CONTACT N

DOOR OPERATOR N

DOOR UNLOCKING DEVICE N

DOOR CLUTCH N

DOOR HEADER

DOOR TRACK

DOOR HANGERS

DOORS N

DOOR EQUIPMENT

TOE GUARD N

FLOORING ?

ROLLER GUIDES

SILLS R

GUIDE SHOES N

CAR GUIDE RAILS R

LOAD WEIGHING DEVICE N

PLUNGER ISLOLATION

ISOLATION R

SAFETY DEVICES A

PLATFORM R

FRAME R

CAR

FLOOR IDENTIFICATION N

ACCESS N

GIBS N

INTERLOCKS N

VISION PANELS

CLOSERS R

HANGER COVERS R

HANGER ROLLERS N

HANGERS AND TRACKS R

DUST COVERS

SILLS R

TRANSOMS

ASTRAGALS R

SIGHT GUARDS R

DOOR PANELS R

FRAMES R

HOISTWAY ENTRANCE

ELEVATOR P22

BUILDING 7

3/16" = 1'-0"

MACHINE ROOM DEMOLITION ENLARGED ELEVATOR PLAN - BUILDING 7

3/16" = 1'-0"

MACHINE ROOM ARCHITECTURAL ENLARGED ELEVATOR PLAN - BUILDING 7

Revisions: Date:

mschindler Snapshot

DN

1. EXISTING FLOORING TO BE REMOVED DOWN TO CONCRETE SLAB TYP.

MINIMIZE DAMAGE TO SUBSTRATE.

2. EXISTING LADDER TO BE REMOVED. SEE FIGURE 1.

3. REMOVE EXISTING PIT LADDER.

#DEMOLITION PLAN NOTES

A. COORDINATE DEMOLITION WITH NEW CONSTRUCTION. ALL DEMOLITION

AND REPAIR NECESSARY TO COMPLETE NEW AND REMODEL

CONSTRUCTION SHALL BE PROVIDED. CONTRACTOR SHALL REMOVE

EXISTING IMPROVEMENTS WHETHER OR NOT SPECIFICALLY INDICATED ON

THE DRAWINGS TO FACILITATE THE COMPLETION OF ALL REQUIRED WORK.

CONTRACTOR SHALL VISIT THE SITE AND VERIFY ALL QUANTITIES AND

ITEMS REQUIRED TO BE REMOVED.

B. REFER TO ARCHITECTURAL SYMBOLS ON SHEET AE001 FOR DEMOLITION

SYSTEMS AND DRAWING NOMENCLATURE.

C. EXISTING STRUCTURE WITHIN THE PROJECT BOUNDARY SHALL REMAIN

UNLESS OTHERWISE NOTED.

D. SURFACES TO BE CUT AND CONDITIONS UNDER WHICH CUTTING IS TO BE

PREFORMED SHALL BE REVIEWED BY CONTRACTOR PRIOR TO CUTTING TO

VERIFY NO UNSAFE OR UNSATISFACTORY CONDITIONS EXIST. SUCH

CONDITIONS SHALL BE RECTIFIED BEFORE WORK MAY PROCEED.

E. EXTENTS OF DEMOLITION SHALL BE COORDINATED WITH THE

ARCHITECTURAL FLOOR PLANS AND ENGINEERING DRAWINGS FOR

ADDITIONAL INFORMATION.

F. DIMENSIONS SHOWN FOR EXISTING CONSTRUCTION TO BE DEMOLISHED

ARE APPROXIMATE AND ARE INTENDED TO GIVE A GENERAL SCOPE OF

WORK TO BE REMOVED OR TEMPORARILY REMOVED TO ACCOMMODATE

NEW CONSTRUCTION. COORDINATE DEMOLITION WORK WITH DESIGN

INTENT OF NEW CONSTRUCTION TO PROVIDE ADEQUATE AREA FOR THIS

WORK.

G. CONTRACTORS SHALL REMOVE INDICATED DEMOLITION OF CONSTRUCTION

ASSEMBLIES IN THEIR ENTIRETY, UNLESS OTHERWISE NOTED, TO

ACCOMMODATE NEW CONSTRUCTION.

H. MAKE ALL DEMOLITION CLEAN AND COMPLETE IN A MANNER TO RECEIVE

NEW FINISHES. DEMOLITION SHOULD BE PERFORMED IN A MANNER SUCH

THAT THE CONTRACTOR CAN SEAMLESSLY PATCH NEW WORK TO BE

SMOOTH AND UNDETECTABLE.

I. COORDINATE FULL SCOPE OF DEMOLITION WORK WITH ENGINEERING AND

VENDOR DRAWINGS.

J. CONTRACTOR RESPONSIBLE FOR IDENTIFYING UTILITIES THAT NEED TO BE

ISOLATED OR MADE SAFE PRIOR TO DEMOLITION.

DEMOLITION GENERAL NOTES

ELEVATOR DEPTH WIDTH HEIGHT

P-21 7' - 7" 5' - 0" 8' - 1"

1. SIGNAGE/TEMPORARY CONTROLS AS REQUIRED.

2. TEMPORARY INFECTION CONTROL WALL AND DOOR UTILIZE EDGE GUARD

SYSTEM IN ALL PUBLIC LOBBIES.

3. PATCH & PAINT EXISTING WALLS AS REQUIRED.

4. AREA OF NEW FINISH FLOORING, MATCH EXISTING.

5. TEMPORARY INFECTION CONTROL BARRIER.

6. NEW ROOM SIGNAGE MACHINE ROOM - RM#.

7. REPAINT EXISTING ELEVATOR CAB PANELS, MATCH EXISTING.

8. REPLACE ELEVATOR CAB FLOORING, MATCH EXISTING.

9. REPLACE ELEVATOR CEILING PANELS, MATCH EXISTING.

10. REPLACE CAB LIGHTING LENSES, MATCH EXISTING.

11. REPLACE CAB PADDING AND HANGERS FOR PAD PROTECTION WITHIN THE

ELEVATOR CAB, MATCH EXISTING.

12. REPLACE EXISTING CEILING WITH NEW SYSTEM, COORDINATE WITH

ELEVATOR SPECIFICATIONS.

13. NEW STAIR ACCESS TO MECHANICAL PLATFORM.

14. RAILINGS TO REMAIN.

15. NEW RAILINGS.

16. NEW PIT LADDER, VERIFY PIT DEPTH IN FIELD.

ARCHITECTURAL PLAN NOTES

A. REFERENCE FIRE PROTECTION AND ELECTRICAL FOR COORDINATION

ITEMS. COORDINATE AS REQUIRED INCLUDING NECESSARY FRAMING,

BLOCKING, ETC.

B. ALL AREAS DIRECTLY AFFECTED BY DEMOLITION/NEW CONSTRUCTION

ACTIVITIES TO BE AS-NEW CONDITION.

C. PROVIDE MINIMUM CLEARANCES AT ALL DOORS PER ABA REQUIREMENTS.

D. LEVEL AND INFILL FLOOR SLAB TO RECEIVE NEW FLOORING. REFER TO

SPECIFICATIONS AND FLOORING MANUFACTURER'S TOLERANCES FOR

ADDITIONAL INFORMATION.

E. FLOORING SUBCONTRACTOR SHALL ASSUME ELEVATOR LOBBY FLOORS

WILL REQUIRE A FULL SKIM COAT OF CONCRETE SLAB IN PREPARATION

FOR FLOORING FINISH.

F. PROVIDE METAL PLATE ON UNDERSIDE OF FLOOR SLAB WHERE CONCRETE

INFILL IS REQUIRED AND CHIP AWAY CONCRETE AT FLOOR LEVEL TO

CREATE A SLOPED OPENING/LIP TO PATCH PENETRATIONS AND PREVENT

CONCRETE INFILL CORE FROM FALLING THROUGH OPENING TO FLOOR

BELOW.

G. THE REPLACEMENT OF CEILING TILES AT THE END OF EACH SHIFT IS

REQUIRED FOR WORK AREAS OUTSIDE OF RATED CONSTRUCTION

BARRIER.

H. THE ELEVATOR DOOR IN THE AFFECTED ELEVATOR SHAFT IS REQUIRED TO

BE CLOSED AT THE END OF EACH WORK DAY.

ELEVATOR

P21

1' - 0"

ELEVATOR

P21

IC

10 11

7 9 8

ELEVATOR

P21

IC

3' - 0"

ELEVATOR

P21

11' - 4"

ELEVATOR

P21

IC

ELEVATOR

P21

2' - 0"

7' - 6"

1' - 0"

ELEVATOR

MECHANICAL

ELEVATOR

MECHANICAL

2' - 0"

B66-AE501

8910 Purdue Road, Suite 320 Indianapolis, IN 46268 Phone: 317.931.9800

100% CONSTRUCTION

DOCUMENTS

TDMT

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

321 4 5 6 7 8 9 10

H

A CB

D FE

G IH

KEYPLAN

556-24-115ELEVATOR UPGRADES

3001 GREEN BAY RD, NORTH CHICAGO, IL 60064

STAMP

www.specializedeng.com SES Project :

DESIGNER OF RECORDCONSULTANT

1221 N. Pennsylvania St.

Indianapolis, IN 46202 Phone: 317.800.6388 www.guidondesign.com

GD Project : 23.1019.05

10/03/2025

23022.012

A u to d e s k D o c s /2

.0

V

A L o v e ll

E le v a to r

U p g ra d e /E x is ti n g M o d e l_ B u ild in g v

.r v t

/3

/2

:5

:0

P

M

B66-AE120

BASEMENT, FIRST, SECOND, &

ROOF ARCHITECTURAL PLAN

2 2 4 6 8 10 12 14

3/16" = 1'-0"

FEETSCALE

N

N

NN

N

N

3/16" = 1'-0"

DEMO BASEMENT ELEVATOR ENLARGED PLAN - BUILDING 66

3/16" = 1'-0"

BASEMENT ELEVATOR ARCHITECTURAL ENLARGED PLAN - BUILDING 66

3/16" = 1'-0"

DEMO FIRST FLOOR ELEVATOR ENLARGED PLAN - BUILDING 66

3/16" = 1'-0"

FIRST FLOOR ELEVATOR ARCHITECTURAL ENLARGED PLAN - BUILDING 66

3/16" = 1'-0"

DEMO SECOND FLOOR ELEVATOR ENLARGED PLAN - BUILDING 66

3/16" = 1'-0"

SECOND FLOOR ELEVATOR ARCHITECTURAL ENLARGED PLAN - BUILDING 66

HALL LANTERNS

SMOKE DETECTOR

HALL POSITION INDICATOR WITH LANTERNS

HALL POSITION INDICATOR N

CAR TRAVEL LANTERN N

CAR POSITION INDICATOR N

SIGNALING DEVICES (ALARM BELL) N

AUXILIARY CAR STATION

MAIN CAR STATION N

FIREFIGHTERS' HALL STATION N

ACCESS SWITCHES N

HALL PUSHBUTTONS N

HALL CALL/OPERATION STATIONS

OPERATING DEVICES

VA ADVISE IF INTERIORS TO BE CHANGED ?

CAR ENCLOSURE

HEAT DETECTOR

SPRINKLER

OUTLET A

LIGHT SWITCH A

LIGHT

SUMP PIT/COVER

SUMP N/A

SCAVENGER

PIPING SUPPORT

PIPING

SHUT-OFF VALVE

CYLINDER

PLUNGER

STOP SWITCHES N

SELECTOR TENSION SHEAVE N

GOVERNOR TENSION SHEAVE N

COUNTERWEIGHT BUFFER R

CAR BUFFER R

ACCESS LADDER R

PIT

SPRINKLERS

SMOKE DETECTOS

ENCLOSURE

WIRING AND TRAVELING CABLES N

NORMAL AND FINAL TERMINAL DEVICES N

COUNTERWEIGHT GUIDE SHOES N

COUNTERWEIGHT FRAME R

DEFLECTOR SHEAVES N

COUNTERWEIGHT GUIDE RAILS R

MAIN GUIDE RAILS (CAR) R

HOISTWAY

ACCESS

HOIST BEAMS N/A

LADDERS/STAIRS R

HEATING/AIR CONDITIONING N

TRAP DOOR

ENCLOSURE R

HEAT DETECTOR ?

SMOKE DETECTORS R

SPRINKLERS ?

DISCONNECT SWITCH N

VENITLATION

ACCESS R

LIGHTING A

PIPING SUPPORT

PIPING

MUFFLER

SHUT-OFF VALVE

PUMP UNIT

ROPE GRIPPER ?

WIRING N

GOVERNOR ROPE N

GOVERNOR N

SELECTOR N

ENCODER N

CONTROLLER N

SLEEVES AND GUARDS N

SUPPORT BEAMS AND TIE DOWNS N

HOIST ROPES N

HOIST MACHINE N

MACHINE ROOM

VOICE ANNOUNCING N

EMERGENCY LIGHTING N

DOOR RESTRICTOR N

TOP EXIT CONTACT N

WORK LIGHT AND RECEPTACLE N

TOP CONTROL STATION N

DOOR PROTECTION DEVICE N

DOOR CONTACT N

DOOR OPERATOR N

DOOR UNLOCKING DEVICE

DOOR CLUTCH N

DOOR HEADER R

DOOR TRACK R

DOOR HANGERS N

DOORS N

DOOR EQUIPMENT

TOE GUARD N

FLOORING ?

ROLLER GUIDES

SILLS R

GUIDE SHOES N

CAR GUIDE RAILS R

LOAD WEIGHING DEVICE N

PLUNGER ISLOLATION

ISOLATION R

SAFETY DEVICES A

PLATFORM R

FRAME R

CAR

FLOOR IDENTIFICATION N

ACCESS N

GIBS N

INTERLOCKS N

VISION PANELS

CLOSERS N

HANGER ROLLERS N

HANGERS AND TRACKS R

DUST COVERS R

SILLS R

TRANSOMS

ASTRAGALS

SIGHT GUARDS

DOOR PANELS R

FRAMES R

HOISTWAY ENTRANCE

ELEVATOR 21

BUILDING 66

3/16" = 1'-0"

ROOF FLOOR ELEVATOR DEMOLITION ENLARGED PLAN - BUILDING 66

3/16" = 1'-0"

ROOF FLOOR ELEVATOR ARCHITECTURAL ENLARGED PLAN - BUILDING 66

N

N

FIGURE 1

Revisions: Date:

mschindler Snapshot

B66-AE501

6 EQUAL TREADS

5' - 6"3' - 5"

3' - 0"

2' - 0"

/2

/2

0' - 0 1/2"

DN3

B66-AE501

FLOOR MOUNTED

STAIR SUPPORT

AS REQUIRED BY

MANUFACTURER

B66-AE501

NEW RAILING,

RISER MOUNTED

E

Q U

A L R

IS

E

R S

EXISTING RAILING

TO REMAIN

STEEL ANGLE

MOUNTING TO

EXISTING CMU WALL

NEW RAILING,

RISER MOUNTED

FLOOR MOUNTED

STAIR SUPPORT

AS REQUIRED BY

MANUFACTURER

BAR GRATING OPEN

RISER TREADS

1 1/2" DIAMETER

METAL RAIL

4x4x3/8" STEEL ANGLE

FASTENED INTO

EXISTING CMU WALL

BAR GRATE STAIR LANDINGEXISTING PLATFORM

8910 Purdue Road, Suite 320 Indianapolis, IN 46268 Phone: 317.931.9800

100% CONSTRUCTION

DOCUMENTS

TDMT

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

321 4 5 6 7 8 9 10

556-24-115ELEVATOR UPGRADES

3001 GREEN BAY RD, NORTH CHICAGO, IL 60064

STAMP

www.specializedeng.com SES Project :

DESIGNER OF RECORDCONSULTANT

1221 N. Pennsylvania St.

Indianapolis, IN 46202 Phone: 317.800.6388 www.guidondesign.com

GD Project : 23.1019.05

10/03/2025

23022.012

A u to d e s k D o c s /2

.0

V

A L o v e ll

E le v a to r

U p g ra d e /E x is ti n g M o d e l_ B u ild in g v

.r v t

/3

/2

:5

:0

P

M

B66-AE501

STAIR DETAILS

1/2" = 1'-0"

ELEVATOR MACHINE PLATFORM STAIR

1/2" = 1'-0"

STAIR SECTION 1

1/2" = 1'-0"

STAIR SECTION 2

1" = 1'-0"

STAIR BASE

1 1/2" = 1'-0"

STAIR LANDING TO PLATFORM

Revisions: Date:

mschindler Snapshot

ELEVATOR

P-5

ELEVATOR

P-4

SERVICE ELEVATOR

S-6

SERVICE ELEVATOR

S-6

ELEVATOR

P-5

ELEVATOR

P-4

15' - 9"

1' - 0"

3 4

IC

IC

30' - 2"

9' - 10"

8' - 10" 8' - 6"

ELEVATOR

P-5

ELEVATOR

P-4

SERVICE ELEVATOR

S-6

ELEVATOR

P-5

ELEVATOR

P-4

SERVICE ELEVATOR

S-6

1 2

3' - 0"

15' - 10"

IC

IC

90' - 7"

6' - 2" 3

40' - 1"

9' - 10"

9' - 0"

10' - 1"

10' - 11"

20' - 6"

31' - 5" 7' - 10"

ARCHITECTURAL GENERAL NOTES

1. EXISTING FLOORING TO BE REMOVED DOWN TO CONCRETE SLAB TYP.

MINIMIZE DAMAGE TO SUBSTRATE.

#DEMOLITION PLAN NOTES

A. COORDINATE DEMOLITION WITH NEW CONSTRUCTION. ALL DEMOLITION

AND REPAIR NECESSARY TO COMPLETE NEW AND REMODEL

CONSTRUCTION SHALL BE PROVIDED. CONTRACTOR SHALL REMOVE

EXISTING IMPROVEMENTS WHETHER OR NOT SPECIFICALLY INDICATED ON

THE DRAWINGS TO FACILITATE THE COMPLETION OF ALL REQUIRED WORK.

CONTRACTOR SHALL VISIT THE SITE AND VERIFY ALL QUANTITIES AND

ITEMS REQUIRED TO BE REMOVED.

B. REFER TO ARCHITECTURAL SYMBOLS ON SHEET AE001 FOR DEMOLITION

SYSTEMS AND DRAWING NOMENCLATURE.

C. EXISTING STRUCTURE WITHIN THE PROJECT BOUNDARY SHALL REMAIN

UNLESS OTHERWISE NOTED.

D. SURFACES TO BE CUT AND CONDITIONS UNDER WHICH CUTTING IS TO BE

PREFORMED SHALL BE REVIEWED BY CONTRACTOR PRIOR TO CUTTING TO

VERIFY NO UNSAFE OR UNSATISFACTORY CONDITIONS EXIST. SUCH

CONDITIONS SHALL BE RECTIFIED BEFORE WORK MAY PROCEED.

E. EXTENTS OF DEMOLITION SHALL BE COORDINATED WITH THE

ARCHITECTURAL FLOOR PLANS AND ENGINEERING DRAWINGS FOR

ADDITIONAL INFORMATION.

F. DIMENSIONS SHOWN FOR EXISTING CONSTRUCTION TO BE DEMOLISHED

ARE APPROXIMATE AND ARE INTENDED TO GIVE A GENERAL SCOPE OF

WORK TO BE REMOVED OR TEMPORARILY REMOVED TO ACCOMMODATE

NEW CONSTRUCTION. COORDINATE DEMOLITION WORK WITH DESIGN

INTENT OF NEW CONSTRUCTION TO PROVIDE ADEQUATE AREA FOR THIS

WORK.

G. CONTRACTORS SHALL REMOVE INDICATED DEMOLITION OF CONSTRUCTION

ASSEMBLIES IN THEIR ENTIRETY, UNLESS OTHERWISE NOTED, TO

ACCOMMODATE NEW CONSTRUCTION.

H. MAKE ALL DEMOLITION CLEAN AND COMPLETE IN A MANNER TO RECEIVE

NEW FINISHES. DEMOLITION SHOULD BE PERFORMED IN A MANNER SUCH

THAT THE CONTRACTOR CAN SEAMLESSLY PATCH NEW WORK TO BE

SMOOTH AND UNDETECTABLE.

I. COORDINATE FULL SCOPE OF DEMOLITION WORK WITH ENGINEERING AND

VENDOR DRAWINGS.

J. CONTRACTOR RESPONSIBLE FOR IDENTIFYING UTILITIES THAT NEED TO BE

ISOLATED OR MADE SAFE PRIOR TO DEMOLITION.

DEMOLITION GENERAL NOTES

ELEVATOR DEPTH WIDTH HEIGHT

P-4 7' - 4" 5' - 4" 7' - 4 1/2"

P-5 7' - 4" 5' - 4" 7' - 4 1/2"

S-6 7' - 4" 6' - 8" 7' - 4 1/2"

1. SIGNAGE/TEMPORARY CONTROLS AS REQUIRED.

2. TEMPORARY INFECTION CONTROL WALL AND DOOR UTILIZE EDGE GUARD

SYSTEM IN ALL PUBLIC LOBBIES.

3. PATCH & PAINT EXISTING WALLS AS REQUIRED.

4. AREA OF NEW FINISH FLOORING, MATCH EXISTING.

5. TEMPORARY INFECTION CONTROL BARRIER.

6. NEW ROOM SIGNAGE MACHINE ROOM - RM#.

7. REPAINT EXISTING ELEVATOR CAB PANELS, MATCH EXISTING.

8. REPLACE ELEVATOR CAB FLOORING, MATCH EXISTING.

9. REPLACE ELEVATOR CEILING PANELS, MATCH EXISTING.

10. REPLACE CAB LIGHTING LENSES, MATCH EXISTING.

11. REPLACE CAB PADDING AND HANGERS FOR PAD PROTECTION WITHIN THE

ELEVATOR CAB, MATCH EXISTING.

12. REPLACE EXISTING CEILING WITH NEW SYSTEM, COORDINATE WITH

ELEVATOR SPECIFICATIONS.

ARCHITECTURAL PLAN NOTES

A. REFERENCE FIRE PROTECTION AND ELECTRICAL FOR COORDINATION

ITEMS. COORDINATE AS REQUIRED INCLUDING NECESSARY FRAMING,

BLOCKING, ETC.

B. ALL AREAS DIRECTLY AFFECTED BY DEMOLITION/NEW CONSTRUCTION

ACTIVITIES TO BE AS-NEW CONDITION.

C. PROVIDE MINIMUM CLEARANCES AT ALL DOORS PER ABA REQUIREMENTS.

D. LEVEL AND INFILL FLOOR SLAB TO RECEIVE NEW FLOORING. REFER TO

SPECIFICATIONS AND FLOORING MANUFACTURER'S TOLERANCES FOR

ADDITIONAL INFORMATION.

E. FLOORING SUBCONTRACTOR SHALL ASSUME ELEVATOR LOBBY FLOORS

WILL REQUIRE A FULL SKIM COAT OF CONCRETE SLAB IN PREPARATION

FOR FLOORING FINISH.

F. PROVIDE METAL PLATE ON UNDERSIDE OF FLOOR SLAB WHERE CONCRETE

INFILL IS REQUIRED AND CHIP AWAY CONCRETE AT FLOOR LEVEL TO

CREATE A SLOPED OPENING/LIP TO PATCH PENETRATIONS AND PREVENT

CONCRETE INFILL CORE FROM FALLING THROUGH OPENING TO FLOOR

BELOW.

G. THE REPLACEMENT OF CEILING TILES AT THE END OF EACH SHIFT IS

REQUIRED FOR WORK AREAS OUTSIDE OF RATED CONSTRUCTION

BARRIER.

H. THE ELEVATOR DOOR IN THE AFFECTED ELEVATOR SHAFT IS REQUIRED TO

BE CLOSED AT THE END OF EACH WORK DAY.

8910 Purdue Road, Suite 320 Indianapolis, IN 46268 Phone: 317.931.9800

100% CONSTRUCTION

DOCUMENTS

TDMT

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

321 4 5 6 7 8 9 10

D E

A CB

D FE

G IH

KEYPLAN

556-24-115ELEVATOR UPGRADES

3001 GREEN BAY RD, NORTH CHICAGO, IL 60064

STAMP

www.specializedeng.com SES Project :

DESIGNER OF RECORDCONSULTANT

1221 N. Pennsylvania St.

Indianapolis, IN 46202 Phone: 317.800.6388 www.guidondesign.com

GD Project : 23.1019.05

10/03/2025

23022.012

A u to d e s k D o c s /2

.0

V A

L o v e ll E le v a to r U p g ra d e /E x is ti n g

M o d e l_

B u ild in g v

.r v t

/3

/2

:5

:3

P

M

B131-AE130

BASEMENT, FIRST & SECOND

FLOOR DEMO & ARCH PLANS

N

N

2 2 4 6 8 10 12 14

3/16" = 1'-0"

FEETSCALE

3/16" = 1'-0"

GROUND DEMOLITION ENLARGED ELEVATOR PLAN - BUILDING 131

3/16" = 1'-0"

GROUND ARCHITECTURAL ENLARGED ELEVATOR PLAN - BUILDING 131

3/16" = 1'-0"

FIRST FLOOR DEMOLITION ENLARGED ELEVATOR PLAN - BUILDING 131

3/16" = 1'-0"

FIRST FLOOR ARCHITECTURAL ENLARGED ELEVATOR PLAN - BUILDING 131

N

N

HALL LANTERNS N N N

SMOKE DETECTOR R R R

HALL POSITION INDICATOR WITH...

HALL POSITION INDICATOR N N N

CAR TRAVEL LANTERN

CAR POSITION INDICATOR N N N

SIGNALING DEVICES (ALARM BELL) N N N

AUXILIARY CAR STATION N N N

MAIN CAR STATION N N N

FIREFIGHTERS' HALL STATION N N N

ACCESS SWITCHES N N N

HALL PUSHBUTTONS N N N

HALL CALL/OPERATION STATIONS

OPERATING DEVICES

VA ADVISE IF INTERIORS TO BE CHANGED ? ? ?

CAR ENCLOSURE

HEAT DETECTOR

SPRINKLER ? ? ?

OUTLET A A A

LIGHT SWITCH A A A

LIGHT A A A

SUMP PIT/COVER N/A N/A N/A

SUMP N/A N/A N/A

SCAVENGER

PIPING SUPPORT

PIPING

SHUT-OFF VALVE

CYLINDER

PLUNGER

STOP SWITCHES N N N

SELECTOR TENSION SHEAVE

GOVERNOR TENSION SHEAVE R R R

COUNTERWEIGHT BUFFER R R R

CAR BUFFER R R R

ACCESS LADDER N N N

PIT

SPRINKLERS

SMOKE DETECTOS

ENCLOSURE

WIRING AND TRAVELING CABLES N N N

NORMAL AND FINAL TERMINAL DEVICES N N N

COUNTERWEIGHT GUIDE SHOES N N N

COUNTERWEIGHT FRAME R R R

DEFLECTOR SHEAVES N N N

COUNTERWEIGHT GUIDE RAILS R R R

MAIN GUIDE RAILS (CAR) R R R

HOISTWAY

ACCESS

HOIST BEAMS ? ? ?

LADDERS/STAIRS R R R

HEATING/AIR CONDITIONING N N N

TRAP DOOR

ENCLOSURE R R R

HEAT DETECTOR ? ? ?

SMOKE DETECTORS R R R

SPRINKLERS ? ? ?

DISCONNECT SWITCH N N N

VENITLATION

ACCESS R R R

LIGHTING A A A

PIPING SUPPORT

PIPING

MUFFLER

SHUT-OFF VALVE

PUMP UNIT

ROPE GRIPPER ? ? ?

WIRING N N N

GOVERNOR ROPE N N N

GOVERNOR N N N

SELECTOR N N N

ENCODER N N N

CONTROLLER N N N

SLEEVES AND GUARDS N N N

SUPPORT BEAMS AND TIE DOWNS N N N

HOIST ROPES N N N

HOIST MACHINE N N N

MACHINE ROOM

VOICE ANNOUNCING N N N

EMERGENCY LIGHTING N N N

DOOR RESTRICTOR N N N

TOP EXIT CONTACT N N N

WORK LIGHT AND RECEPTACLE N N N

TOP CONTROL STATION N N N

DOOR PROTECTION DEVICE N N N

DOOR CONTACT N N N

DOOR OPERATOR N N N

DOOR UNLOCKING DEVICE

DOOR CLUTCH N N N

DOOR HEADER R R R

DOOR TRACK R R R

DOOR HANGERS N N N

DOORS N N N

DOOR EQUIPMENT

TOE GUARD N N N

FLOORING ? ? ?

ROLLER GUIDES

SILLS R R R

GUIDE SHOES N N N

CAR GUIDE RAILS R R R

LOAD WEIGHING DEVICE N N N

PLUNGER ISLOLATION

ISOLATION R R R

SAFETY DEVICES A A A

PLATFORM R R R

FRAME R R R

CAR

FLOOR IDENTIFICATION N N N

ACCESS N N N

GIBS N N N

INTERLOCKS N N N

VISION PANELS

CLOSERS N N N

HANGER ROLLERS N N N

HANGERS AND TRACKS N N N

DUST COVERS R R R

SILLS R R R

TRANSOMS

ASTRAGALS

SIGHT GUARDS

DOOR PANELS R R R

FRAMES R R R

HOISTWAY ENTRANCE

ELEVATOR P4 ELEVATOR P5 ELEVATOR S6

BUILDING 131

Revisions: Date:

mschindler Snapshot

MINIMIZE DAMAGE TO SUBSTRATE.

#DEMOLITION PLAN NOTES

A. COORDINATE DEMOLITION WITH NEW CONSTRUCTION. ALL DEMOLITION

AND REPAIR NECESSARY TO COMPLETE NEW AND REMODEL

CONSTRUCTION SHALL BE PROVIDED. CONTRACTOR SHALL REMOVE

EXISTING IMPROVEMENTS WHETHER OR NOT SPECIFICALLY INDICATED ON

THE DRAWINGS TO FACILITATE THE COMPLETION OF ALL REQUIRED WORK.

CONTRACTOR SHALL VISIT THE SITE AND VERIFY ALL QUANTITIES AND

ITEMS REQUIRED TO BE REMOVED.

B. REFER TO ARCHITECTURAL SYMBOLS ON SHEET AE001 FOR DEMOLITION

SYSTEMS AND DRAWING NOMENCLATURE.

C. EXISTING STRUCTURE WITHIN THE PROJECT BOUNDARY SHALL REMAIN

UNLESS OTHERWISE NOTED.

D. SURFACES TO BE CUT AND CONDITIONS UNDER WHICH CUTTING IS TO BE

PREFORMED SHALL BE REVIEWED BY CONTRACTOR PRIOR TO CUTTING TO

VERIFY NO UNSAFE OR UNSATISFACTORY CONDITIONS EXIST. SUCH

CONDITIONS SHALL BE RECTIFIED BEFORE WORK MAY PROCEED.

E. EXTENTS OF DEMOLITION SHALL BE COORDINATED WITH THE

ARCHITECTURAL FLOOR PLANS AND ENGINEERING DRAWINGS FOR

ADDITIONAL INFORMATION.

F. DIMENSIONS SHOWN FOR EXISTING CONSTRUCTION TO BE DEMOLISHED

ARE APPROXIMATE AND ARE INTENDED TO GIVE A GENERAL SCOPE OF

WORK TO BE REMOVED OR TEMPORARILY REMOVED TO ACCOMMODATE

NEW CONSTRUCTION. COORDINATE DEMOLITION WORK WITH DESIGN

INTENT OF NEW CONSTRUCTION TO PROVIDE ADEQUATE AREA FOR THIS

WORK.

G. CONTRACTORS SHALL REMOVE INDICATED DEMOLITION OF CONSTRUCTION

ASSEMBLIES IN THEIR ENTIRETY, UNLESS OTHERWISE NOTED, TO

ACCOMMODATE NEW CONSTRUCTION.

H. MAKE ALL DEMOLITION CLEAN AND COMPLETE IN A MANNER TO RECEIVE

NEW FINISHES. DEMOLITION SHOULD BE PERFORMED IN A MANNER SUCH

THAT THE CONTRACTOR CAN SEAMLESSLY PATCH NEW WORK TO BE

SMOOTH AND UNDETECTABLE.

I. COORDINATE FULL SCOPE OF DEMOLITION WORK WITH ENGINEERING AND

VENDOR DRAWINGS.

J. CONTRACTOR RESPONSIBLE FOR IDENTIFYING UTILITIES THAT NEED TO BE

ISOLATED OR MADE SAFE PRIOR TO DEMOLITION.

DEMOLITION GENERAL NOTES

ELEVATOR DEPTH WIDTH HEIGHT

P-4 7' - 4" 5' - 4" 7' - 4 1/2"

P-5 7' - 4" 5' - 4" 7' - 4 1/2"

S-6 7' - 4" 6' - 8" 7' - 4 1/2"

1. SIGNAGE/TEMPORARY CONTROLS AS REQUIRED.

2. TEMPORARY INFECTION CONTROL WALL AND DOOR UTILIZE EDGE GUARD

SYSTEM IN ALL PUBLIC LOBBIES.

3. PATCH & PAINT EXISTING WALLS AS REQUIRED.

4. AREA OF NEW FINISH FLOORING, MATCH EXISTING.

5. TEMPORARY INFECTION CONTROL BARRIER.

6. NEW ROOM SIGNAGE MACHINE ROOM - RM#.

7. REPAINT EXISTING ELEVATOR CAB PANELS, MATCH EXISTING.

8. REPLACE ELEVATOR CAB FLOORING, MATCH EXISTING.

9. REPLACE ELEVATOR CEILING PANELS, MATCH EXISTING.

10. REPLACE CAB LIGHTING LENSES, MATCH EXISTING.

11. REPLACE CAB PADDING AND HANGERS FOR PAD PROTECTION WITHIN THE

ELEVATOR CAB, MATCH EXISTING.

12. REPLACE EXISTING CEILING WITH NEW SYSTEM, COORDINATE WITH

ELEVATOR SPECIFICATIONS.

ARCHITECTURAL PLAN NOTES

A. REFERENCE FIRE PROTECTION AND ELECTRICAL FOR COORDINATION

ITEMS. COORDINATE AS REQUIRED INCLUDING NECESSARY FRAMING,

BLOCKING, ETC.

B. ALL AREAS DIRECTLY AFFECTED BY DEMOLITION/NEW CONSTRUCTION

ACTIVITIES TO BE AS-NEW CONDITION.

C. PROVIDE MINIMUM CLEARANCES AT ALL DOORS PER ABA REQUIREMENTS.

D. LEVEL AND INFILL FLOOR SLAB TO RECEIVE NEW FLOORING. REFER TO

SPECIFICATIONS AND FLOORING MANUFACTURER'S TOLERANCES FOR

ADDITIONAL INFORMATION.

E. FLOORING SUBCONTRACTOR SHALL ASSUME ELEVATOR LOBBY FLOORS

WILL REQUIRE A FULL SKIM COAT OF CONCRETE SLAB IN PREPARATION

FOR FLOORING FINISH.

F. PROVIDE METAL PLATE ON UNDERSIDE OF FLOOR SLAB WHERE CONCRETE

INFILL IS REQUIRED AND CHIP AWAY CONCRETE AT FLOOR LEVEL TO

CREATE A SLOPED OPENING/LIP TO PATCH PENETRATIONS AND PREVENT

CONCRETE INFILL CORE FROM FALLING THROUGH OPENING TO FLOOR

BELOW.

G. THE REPLACEMENT OF CEILING TILES AT THE END OF EACH SHIFT IS

REQUIRED FOR WORK AREAS OUTSIDE OF RATED CONSTRUCTION

BARRIER.

H. THE ELEVATOR DOOR IN THE AFFECTED ELEVATOR SHAFT IS REQUIRED TO

BE CLOSED AT THE END OF EACH WORK DAY.

ELEVATOR

P-5

ELEVATOR

P-4

SERVICE ELEVATOR

S-6

ELEVATOR

P-5

ELEVATOR

P-4

SERVICE ELEVATOR

S-6

1' - 0"

15' - 9"

1 53

IC

IC

50' - 9"

21' - 6"

13' - 0"

16' - 3"

9' - 0"

9' - 5"

7' - 11"

1' - 11"

ELEVATOR

P-5

ELEVATOR

P-4

SERVICE ELEVATOR

S-6

SERVICE ELEVATOR

S-6

15' - 9"

ELEVATOR

P-5

ELEVATOR

P-4

SERVICE ELEVATOR

S-6

IC

IC

6' - 2"

26' - 4"

56' - 10"

8' - 8"

8' - 0"

9' - 11"

37' - 8"

8910 Purdue Road, Suite 320 Indianapolis, IN 46268 Phone: 317.931.9800

100% CONSTRUCTION

DOCUMENTS

TDMT

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

321 4 5 6 7 8 9 10

D E

A CB

D FE

G IH

KEYPLAN

556-24-115ELEVATOR UPGRADES

3001 GREEN BAY RD, NORTH CHICAGO, IL 60064

STAMP

www.specializedeng.com SES Project :

DESIGNER OF RECORDCONSULTANT

1221 N. Pennsylvania St.

Indianapolis, IN 46202 Phone: 317.800.6388 www.guidondesign.com

GD Project : 23.1019.05

10/03/2025

23022.012

A u to d e s k D o c s /2

.0

V A

L o v e ll E le v a to r U p g ra d e /E x is ti n g

M o d e l_

B u ild in g v

.r v t

/3

/2

:5

:4

P

M

B131-AE131

SECOND & THIRD FLOOR DEMO &

ARCH PLANS

N

N

2 2 4 6 8 10 12 14

3/16" = 1'-0"

FEETSCALE

N

N

HALL LANTERNS N N N

SMOKE DETECTOR R R R

HALL POSITION INDICATOR WITH...

HALL POSITION INDICATOR N N N

CAR TRAVEL LANTERN

CAR POSITION INDICATOR N N N

SIGNALING DEVICES (ALARM BELL) N N N

AUXILIARY CAR STATION N N N

MAIN CAR STATION N N N

FIREFIGHTERS' HALL STATION N N N

ACCESS SWITCHES N N N

HALL PUSHBUTTONS N N N

HALL CALL/OPERATION STATIONS

OPERATING DEVICES

VA ADVISE IF INTERIORS TO BE CHANGED ? ? ?

CAR ENCLOSURE

HEAT DETECTOR

SPRINKLER ? ? ?

OUTLET A A A

LIGHT SWITCH A A A

LIGHT A A A

SUMP PIT/COVER N/A N/A N/A

SUMP N/A N/A N/A

SCAVENGER

PIPING SUPPORT

PIPING

SHUT-OFF VALVE

CYLINDER

PLUNGER

STOP SWITCHES N N N

SELECTOR TENSION SHEAVE

GOVERNOR TENSION SHEAVE R R R

COUNTERWEIGHT BUFFER R R R

CAR BUFFER R R R

ACCESS LADDER N N N

PIT

SPRINKLERS

SMOKE DETECTOS

ENCLOSURE

WIRING AND TRAVELING CABLES N N N

NORMAL AND FINAL TERMINAL DEVICES N N N

COUNTERWEIGHT GUIDE SHOES N N N

COUNTERWEIGHT FRAME R R R

DEFLECTOR SHEAVES N N N

COUNTERWEIGHT GUIDE RAILS R R R

MAIN GUIDE RAILS (CAR) R R R

HOISTWAY

ACCESS

HOIST BEAMS ? ? ?

LADDERS/STAIRS R R R

HEATING/AIR CONDITIONING N N N

TRAP DOOR

ENCLOSURE R R R

HEAT DETECTOR ? ? ?

SMOKE DETECTORS R R R

SPRINKLERS ? ? ?

DISCONNECT SWITCH N N N

VENITLATION

ACCESS R R R

LIGHTING A A A

PIPING SUPPORT

PIPING

MUFFLER

SHUT-OFF VALVE

PUMP UNIT

ROPE GRIPPER ? ? ?

WIRING N N N

GOVERNOR ROPE N N N

GOVERNOR N N N

SELECTOR N N N

ENCODER N N N

CONTROLLER N N N

SLEEVES AND GUARDS N N N

SUPPORT BEAMS AND TIE DOWNS N N N

HOIST ROPES N N N

HOIST MACHINE N N N

MACHINE ROOM

VOICE ANNOUNCING N N N

EMERGENCY LIGHTING N N N

DOOR RESTRICTOR N N N

TOP EXIT CONTACT N N N

WORK LIGHT AND RECEPTACLE N N N

TOP CONTROL STATION N N N

DOOR PROTECTION DEVICE N N N

DOOR CONTACT N N N

DOOR OPERATOR N N N

DOOR UNLOCKING DEVICE

DOOR CLUTCH N N N

DOOR HEADER R R R

DOOR TRACK R R R

DOOR HANGERS N N N

DOORS N N N

DOOR EQUIPMENT

TOE GUARD N N N

FLOORING ? ? ?

ROLLER GUIDES

SILLS R R R

GUIDE SHOES N N N

CAR GUIDE RAILS R R R

LOAD WEIGHING DEVICE N N N

PLUNGER ISLOLATION

ISOLATION R R R

SAFETY DEVICES A A A

PLATFORM R R R

FRAME R R R

CAR

FLOOR IDENTIFICATION N N N

ACCESS N N N

GIBS N N N

INTERLOCKS N N N

VISION PANELS

CLOSERS N N N

HANGER ROLLERS N N N

HANGERS AND TRACKS N N N

DUST COVERS R R R

SILLS R R R

TRANSOMS

ASTRAGALS

SIGHT GUARDS

DOOR PANELS R R R

FRAMES R R R

HOISTWAY ENTRANCE

ELEVATOR P4 ELEVATOR P5 ELEVATOR S6

BUIL…