Attachment 5. SERC Solar Agrivoltaic Bid Schedule.xlsx

XLSX spreadsheet 17 KB Posted

Attached to
333302-26RF-0010008 Design Build - SERC Solar Arrays for Agrivoltaics Research
Solicitation number
333302-26RF-0010008
Issued by

About this file

This is a Bid Schedule template for a design-build contract to construct a 2.0 MW solar photovoltaic (PV) system for agrivoltaic research at the Smithsonian Environmental Research Center (SERC) in Edgewater, Maryland. The total estimated cost range is between $5,000,000 and $10,000,000. The base bid encompasses all design and construction work for four distinct solar array configurations on approximately 12 acres of agricultural land located behind the Woodlawn House on Contees Wharf Road. Bidders must provide cost breakdowns organized by construction divisions, including material, labor, and equipment line items, with allowances for overhead, profit, and performance bond costs.

The schedule includes two priced options in addition to the base bid. Option 1 covers one year of operation and maintenance (O&M) services for the 2.0 MW agrivoltaic system with the potential to extend for up to four additional one-year periods. Option 2 provides for installation of an agricultural water well system as described in the request for proposals and statement of work. All cost entries in the template are currently blank placeholders requiring bidder completion. A mandatory site visit and pre-proposal meeting is scheduled for Monday, May 4, 2026, at 9:00 AM at the SERC Schmidt Conference Center, with contact to Christine Grant at grantca@si.edu for scheduling. Questions should be submitted in sequential word format.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid

TitleSERC Solar Arrays for Agrivoltaic Research
FacilitySERC
Project Number2482101
Solctition Number333302-26RF-001008
Total Estimated cost range is between $5,000,000 and $10,000,000.
Base Bid
BASE BID: All work associated with the design and construction of a 2.0 MW set of solar arrays for agrivoltaic research as described in the request for proposals and statement of work.
DescriptionMaterialLaborEquipmentTotal
Div. 0 Design Cost$ - 0$ - 0$ - 0$ - 0
Div. 1 General Conditions$ - 0$ - 0$ - 0$ - 0
Div. 2 Existing Conditions$ - 0$ - 0$ - 0$ - 0
Div. 3 Concrete$ - 0$ - 0$ - 0$ - 0
Div. 4 Masonry$ - 0$ - 0$ - 0$ - 0
Div. 5 Metals$ - 0$ - 0$ - 0$ - 0
Div. 6 Wood, Plastics and Composites$ - 0$ - 0$ - 0$ - 0
Div. 7 Thermal and Moisture Prot.$ - 0$ - 0$ - 0$ - 0
Div. 8 Openings$ - 0$ - 0$ - 0$ - 0
Div. 9 Finishes$ - 0$ - 0$ - 0$ - 0
Div. 10 Specialties$ - 0$ - 0$ - 0$ - 0
Div. 11. Equipment$ - 0$ - 0$ - 0$ - 0
Div. 12 Furnishings$ - 0$ - 0$ - 0$ - 0
Div. 13 Special Construction$ - 0$ - 0$ - 0$ - 0
Div. 14 Conveying Systems$ - 0$ - 0$ - 0$ - 0
Div. 21 Fire Suppression$ - 0$ - 0$ - 0$ - 0
Div. 22 Plumbing$ - 0$ - 0$ - 0$ - 0
Div. 23 HVAC$ - 0$ - 0$ - 0$ - 0
Div. 26 Electrical$ - 0$ - 0$ - 0$ - 0
Div. 27 Communications$ - 0$ - 0$ - 0$ - 0
Div. 28 Electronic Safety & Security$ - 0$ - 0$ - 0$ - 0
Div. 31. Earthwork$ - 0$ - 0$ - 0$ - 0
Div. 32 Exterior Improvements$ - 0$ - 0$ - 0$ - 0
Div. 33 Utilities$ - 0$ - 0$ - 0$ - 0

BASE BID SUBTOTAL $ - 0

Overhead and Profit
Performance Bond

Total $ - 0

BASE BID Total $ - 0

Option 1
Option 1: Operation and Maintenance of the 2.0 MW Agrivoltaic System. Provide O&M services for a period of one (1) year with the opportunity to exercise further options to extend this service for up to four (4) additional one-year periods.
DescriptionMaterialLaborEquipmentTotal
Div. 1 General Conditions$ - 0$ - 0$ - 0$ - 0
Subcontractor/O&M Work$ - 0$ - 0$ - 0$ - 0

Subtotal $ - 0

Overhead and Profit
Performance Bond

Total Option 1 $ - 0

Option 2
Option 2: Installation of the Agricultural Water Well System as desribed in the request for proposals and statement of work.
DescriptionMaterialLaborEquipmentTotal
Div. 1 General Conditions$ - 0$ - 0$ - 0$ - 0
Subcontractor/Well System Work$ - 0$ - 0$ - 0$ - 0

Subtotal $ - 0

Overhead and Profit
Performance Bond

Total Option 2 $ - 0

B-&P