This document is a preproposal conference presentation for the Smithsonian Environmental Research Center (SERC) Agrivoltaics Research Project. The Smithsonian Institution is seeking a Design-Build contractor to design, permit, construct, and commission a 2.0 MW DC agrivoltaics photovoltaic system on a 12-acre site within the SERC campus in Edgewater, Maryland. The system will be interconnected to the Baltimore Gas and Electric (BGE) electrical distribution system and is expected to offset approximately 85% of SERC's annual electricity consumption. The project includes four distinct solar panel configurations with varying heights and row spacing to enable agricultural research and education underneath and between the arrays.

Proposals are due by June 22, 2026, at 3:00 PM ET, with Request for Information (RFI) submissions due by May 18, 2026, at 3:00 PM ET. The base bid covers all site infrastructure improvements and system commissioning, excluding operation and maintenance. Two options are available: Option 1 provides operation and maintenance services for one year with extensions available for up to four additional years, and Option 2 includes an agricultural water well system and distribution network for year-round irrigation. Technical proposals will be evaluated on design-build team past performance (quality and relevance of similar completed projects), schedule and plan of accomplishment, and concept design submission responsiveness to the Statement of Work. Cost proposals will be evaluated for completeness, reasonableness, and compatibility with the technical approach. Award will be made to the responsive and responsible offeror providing the best value to the Smithsonian Institution.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Smithsonian Environmental Research Center (SERC)

Agrivoltaics Research Platform Preproposal Conference and Site Visit

May 4, 2026

SERC AgV – Agenda SERC Agrivoltaics Research Project Preproposal Conference

9:00 – 10:00: Presentation of Project Overview Brief and Information from BGE

10:00 – 12:00: Site Visit

Key Smithsonian Personnel:

• Christine Grant, Contracting Officer

• Mark Manning, Pre-Construction Project Manager

• Ray Jones, Contracting Officer’s Technical Representative

• Jacob Bradd, SERC Facilities Site Representative

• Pat Megonigal, SERC Deputy Director (Research POC)

• Brian Coyle, SERC Executive Officer

SERC AgV – BGE Developers & Contractors Resource Link

Developers & Contractors | BGE - An Exelon Company

Key BGE Personnel:

• James Mirabile, Principal Engineer of Green Power Connection Team

• Autumn Patton-Sanders, Senior Large Account Representative https://www.bge.com/smart-energy/my-green-power-connection/developers-contractors https://www.bge.com/smart-energy/my-green-power-connection/developers-contractors https://www.bge.com/smart-energy/my-green-power-connection/developers-contractors

SERC AgV – Project Introduction

1. Supports SERC and Smithsonian science and education mission

– Creates a living laboratory for collaborative agrivoltaics research and education

2. Demonstration of dual use solution for energy & food security and farm preservation

– Renewable energy is a critical enabler for resilience

3. Design-Build Project for a 2.0 MW Photovoltaics System at SERC

– Contributes to regional grid decarbonization

4. Contribution to GHG reductions via SRECs

5. Project would deliver long-term cost savings for SERC and Smithsonian

– Lowers electric procurement costs and reduces exposure to electricity price volatility

• Proposals are due by June 22, 2026, at 3:00 PM ET

• RFIs requested by May 18, 2026, at 3:00 PM ET

SERC AgV – Science, Research & Education Benefits for SI and SERC SERC Agrivoltaics Research Platform Preproposal Conference

Support SERC's Mission for Research and Education

• Study the effects of solar fields on biodiversity, ecosystem function, but primarily agriculture research

• Conduct vital research and inter-institutional collaborations on land management and agrivoltaics

• Edgewater campus agrivoltaics and renewable energy research infrastructure will enhance SERC’s convening role and collaborative impact

• Educate students, policy makers, industry and the public on dual use renewable energy and integrated climate solutions that preserve farmland

• Deliver renewable energy generation capable of offsetting ~85% of SERC's aggregate annual electricity consumption, supporting the advancement of AgV research

SERC AgV – Project Site SERC Agrivoltaics Research Platform Preproposal Conference

Project Site covers ~12 acres within SERC Campus

• Not visible from roads, houses or waterfront

• Covers ~3% of the Contee Conservation Easement

• Good location for scientific access and for educational tours

• Proximity to electrical service and roadway

• GPS Coordinates:

38°53’51.24”N,76°32’49.70”W

Electrical Connection

Project Site

Access Road

An Ambitious Agrivoltaics Research Platform

• 12-acre site enclosed by chain link fence

• Four different panel configurations to test different types of farming

• Perimeter spacing of ~30 feet between panels and fence

• New well for irrigation (option)

3: Wide Row Single Axis Tracking

Panel height – 6’ Row spacing – 35’

4: Elevated Fixed Fixed Panel

Elevated – 8’ Row spacing - 20’

2: Elevated SAT Single Axis Tracking

Panel height – 8’ Row spacing - 20’

1: Traditional Single Axis Tracking

Panel height – 6’ Row spacing – 20’

Morash and Pavao-Zuckerman (2026) Energy Policy

Western Maryland AgV Smithsonian AgV

Easternshore AgV

SERC AgV – Base Bid and Options

BASE BID: Design, permitting, construction and commissioning of all site infrastructure improvements and a 2.0 MW DC agrivoltaics system interconnected to the BGE electrical distribution system. Note: system O&M is not included in the base bid.

OPTION 1: Operation and Maintenance of the agrivoltaics system for one year, with a further option for up to four (4) additional years.

OPTION 2: Agricultural Water Well System: A well and distribution system to each array suitable for year-round usage for agricultural watering purposes only as specified above.

SERC AgV – Technical Evaluation Factors

(RFP Section M – Evaluation Factors for Award)

• Award will be made to the responsive and responsible Offeror whose proposal provides the best value to the Smithsonian Institution

• Cost proposals will be evaluated for completeness, reasonableness, and compatibility with the technical approach

Technical proposals will be evaluated using the following factors, listed in order of importance:

1. Design-Build Team Past Performance –Quality, relevance, and success of similar completed projects

2. Schedule and Plan of Accomplishment –Offeror’s understanding of the work and ability to perform it in a timely and effective manner

3. Concept Design Submission –Responsiveness to the Statement of Work and overall technical quality

SERC AgV – Procurement Reminders

• This pre-proposal briefing is informational only

• Offerors shall rely on the written RFP and any issued amendments

• All communications and questions shall comply with the RFP instructions

Thank you for your interest in the SERC Agrivoltaics Research Project

SERC AgV – Project Site Street View

Campus Area Wayfinding Information

From the pre-brief location the visit will be held near the

Woodlawn House. Parking is outlined in the second picture.

No parking along road or in the circle, it is for emergency services.

Site Visit Location

Pre-Brief

Parking

SERC AgV – Project Site Street View (2)

Woodlawn Area Wayfinding Information

Follow the trail down to the informational sign. See trail start in next image.

The road start will be at the bottom of the circle; there will be cones to identify the viewing area further down the trail.

Trail Start

Trail Information Sign

SERC Solar Project- Pre-Proposal Conf Brief_4MAY26
Smithsonian Environmental Research Center (SERC)�� Agrivoltaics Research Platform� Preproposal Conference�and Site Visit
SERC AgV – Agenda�SERC Agrivoltaics Research Project Preproposal Conference
SERC AgV – BGE Developers & Contractors Resource Link�SERC Agrivoltaics Research Project Preproposal Conference
SERC AgV – Project Introduction�SERC Agrivoltaics Research Project Preproposal Conference
SERC AgV – Science, Research & Education Benefits for SI and SERC�SERC Agrivoltaics Research Platform Preproposal Conference
SERC AgV – Project Site�SERC Agrivoltaics Research Platform Preproposal Conference
�An Ambitious Agrivoltaics Research Platform
Slide 8
Slide 9
Slide 10
Slide 11
SERC AgV – Base Bid and Options �SERC Agrivoltaics Research Project Preproposal Conference
SERC AgV – Technical Evaluation Factors�SERC Agrivoltaics Research Project Preproposal Conference
SERC AgV – Procurement Reminders�SERC Agrivoltaics Research Project Preproposal Conference