This is Amendment Number 004 to Solicitation 333302-26RF-0010008 for the Solar Arrays for Agrivoltaics Research Project at Smithsonian Environmental Research Center (SERC). The amendment clarifies concept design submission requirements, revises fencing treatment, introduces pricing options, and replaces the bid schedule. The proposal due date is June 22, 2026, at 3:00 PM ET.
The concept design submission must include an estimate of annual electrical energy production (kWh) based on the proposed system configuration and demonstrate the offeror's technical approach regarding layout, configuration, components, and performance characteristics. Perimeter fencing has been removed from the base bid scope in its entirety, eliminating all associated specifications for height, subsurface embedment, gate width, and site enclosure. Offerors must provide Option 3—a deductive price for removal of approximately 0.5 MW DC of installed system capacity as a discrete, constructible segment—and Option 4—an additive price for perimeter fencing (approximately 8 feet in height with chain link or equivalent material, including at least one non-powered access gate with a minimum 25-foot clear width). Optional site visits are available June 9–11 and June 16–18 between 12:00 p.m. and 4:00 p.m. by appointment only for reference purposes, with no additional requests for information accepted as a result. The Government reserves the right to award the base bid alone or include any combination of additive and deductive options. Attachment 5 (Bid Schedule) is replaced entirely with Attachment 5R. All other terms, conditions, requirements, and submission deadlines remain unchanged. Offerors must acknowledge this amendment in their proposal.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
33330226RF0010008
x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
OCON
Washington DC 20013-7012 PO Box 37012
MRC 1200
OCON
OCON
Washington DC 20013-7012 PO Box 37012
MRC 1200
SMITHSONIAN INSTITUTION
04/21/20260004
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
04/21/2026
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
This is Amendment Number 004 to Solicitation 333302-26RF-0010008 for the Solar Arrays for
Agrivoltaics Research Project at Smithsonian Environmental Research Center (SERC).
This Amendment formally incorporates modifications to the Solicitation. These changes shall be considered part of the Solicitation and govern proposal preparation.
THE PROPOSAL DUE DATE IS JUNE 22, 2026, AT 3:00PM ET
All remaining aspects of RPF 333302-26RF-0010008 shall remain unchanged.
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Christine Grant
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
Amendment Number 004 to Solicitation 333302-26RF-0010008
Agrivoltaics Research Project Smithsonian Environmental Research Center (SERC)
Clarifications, Revision to Fencing Requirements, Addition of Pricing Options, Bid Schedule Replacement, and Site Visit Availability
1. Purpose of Amendment
This Amendment is issued to clarify the requirements for the Concept Design Submission and to revise the treatment of perimeter fencing within the solicitation. Specifically, the Amendment removes fencing from the Base Bid scope, eliminates the previously prescribed subsurface embedment requirement, and establishes new additive and deductive pricing options to provide greater flexibility in proposal evaluation and contract award. In addition, this Amendment replaces the Bid Schedule to reflect these changes and ensures that all revisions remain consistent with the evaluation framework set forth in Section M.
2. Concept Design Submission – Clarification
The Concept Design Submission shall include an estimate of annual electrical energy production (kWh) based on the proposed system configuration. The Concept Design shall demonstrate the Offeror’s technical approach, including layout, configuration, components, and performance characteristics. The Concept Design will be evaluated under Section M as part of the pre-award Technical Evaluation.
3. Project Objectives Clarification
The project supports agrivoltaics research and renewable energy generation. No specific prioritization between these objectives is prescribed.
4. Site Visit (Optional)
Offerors may elect to visit the project site to better inform their Concept Design and proposal. Options to visit the site are available on June 9–11 and June 16-18 between 12:00 p.m. and 4:00 p.m. Interested Offerors shall coordinate scheduling with the Government Point of Contact identified in the solicitation. Site visits will be conducted by appointment only. This site visit is for reference purposes only, no additional RFIs will be accepted as a result of the visit.
5. Revision to Fencing Requirements
DELETE the requirement for permanent perimeter fencing in its entirety, including all associated specifications for height, subsurface embedment, gate width, and site enclosure.
Offerors shall not include fencing in the Base Bid.
6. Pricing Options
Offerors shall provide the following options:
a. Option 3 – Deductive: 0.5 MW DC Capacity Reduction
Provide a deductive price for removal of approximately 0.5 MW DC of installed system capacity, corresponding generally to one of the agrivoltaic array groupings. The Offeror shall identify the specific portion of the system proposed for removal in the Concept Design Submission. The selected portion shall represent a discrete and constructible segment of the proposed design, and the remaining system shall be a complete and functional installation. The portion selected for this option should result in the maximum reasonable cost reduction.
b. Option 4 – Additive: Perimeter Fencing
Provide an additive price for the design and installation of perimeter fencing enclosing the agrivoltaics project area. The fencing system shall provide continuous enclosure of the agrivoltaics site, including research and operational areas, and shall be constructed of chain link fencing or an equivalent durable material suitable for agricultural and outdoor environments, subject to Government acceptance. The fencing shall be approximately 8 feet in height and shall include at least one non-powered access gate with a minimum clear width of 25 feet to accommodate equipment access. The alignment, layout, and installation approach shall be proposed by the Offeror and included in the Concept Design Submission.
No minimum subsurface embedment requirement is prescribed.
7. Bid Schedule Replacement
Attachment 5 is replaced in its entirety. Offerors shall use the revised Bid Schedule provided with this Amendment. See Attachment 5R.
8. Evaluation of Options
The Government reserves the right to award the Base Bid alone or include any combination of additive and deductive options, as determined to be in the best interest of the Government.
9. Acknowledgement
Offerors shall acknowledge this Amendment in their proposal.
10. No Other Changes
All other terms, conditions, requirements, and submission deadlines of Solicitation 333302- 26RF-0010008 remain unchanged.