Attachment 5 - DNR Campground Electrical Upgrade 2023 Drawings, sheets 6-10.pdf

PDF 3 MB Posted

Attached to
751/25054. RLO; Straits SP - Solar PV & EV Charging Stations
Solicitation number
RFQ 171 250000000183 3
Issued by
Clare County, Michigan

About this file

This file contains engineering drawings for a Department of Natural Resources (DNR) campground electrical upgrade project, specifically sheets 6-10 of the complete drawing set. The drawings depict detailed electrical infrastructure improvements for campground facilities, including power distribution systems, conduit routing, grounding specifications, and electrical panel layouts. The drawings provide technical specifications and site-specific installation details necessary for contractors to understand the scope of electrical work required across multiple campground locations or zones.

The technical drawings establish construction standards, material specifications, and installation methodologies for the electrical upgrade project. Key elements shown include electrical service feeds, circuit configurations, equipment placement, conduit sizing, and grounding requirements. These sheets serve as the contractual basis for determining project costs, labor requirements, material quantities, and construction timelines. The drawings are essential reference documents for bid preparation and project execution, enabling qualified electrical contractors to accurately estimate costs and plan installation sequences for the campground electrical infrastructure improvements.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .