This is a specification document from the Department of Natural Resources (DNR) detailing electric vehicle (EV) charging infrastructure requirements for Straits State Park. The project involves the installation of one Ford Pro DC Fast Charger with two ports near the park entrance to provide convenient public charging access. The charger specifications include CCS1 connectors, 120-ampere dual-port pedestal mount configuration with 20-foot cables, and a rated capacity not exceeding 200 kilowatts at 240-volt AC input. The installation scope encompasses site preparation activities including trenching, concrete pad mounting, and parking stall restriping. The charger will be configured with cellular connectivity to enable remote monitoring and payment processing capabilities. The bidder is responsible for developing the final parking design while ensuring full ADA accessibility compliance and adherence to the charger manufacturer's installation guidelines.
The document does not specify pricing information, set-asides, incumbent contractors, contract term, renewal options, funding sources, or budget amounts. No response deadlines, bid due dates, site visit requirements, or bidder conference details are included in this specification attachment. The focus remains on technical requirements and installation standards necessary to support the EV charging infrastructure deployment at the state park facility.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
The charger(s) will be installed near the entrance to Straits State Park to ensure convenient access for visitors
The installation will include mounting the charger on a pedestal, with provisions for cable management to keep the charging cables organized and easily reachable.
1. Public Chargers: Ford Pro DC Fast Charger supplied by DNR (See spec sheet below)
a. Number of Chargers 1
b. Number of Ports per Charger: 2
c. Connector(s): CCS1
d. Charger Type: 120 A Dual port, pedestal mount, 20ft cable or longer
e. Rated Capacity (DC power): Not to exceed 200A (120 kW)
f. AC Grid Voltage; Input Voltage: 240 V
g. Communications: Cellular connection
h. ADA Compliance Requirements: See EV Parking Design example.
2. Site preparation will include trenching, mounted concrete pads, and restriping parking stalls.
The charger(s) will be configured for network communication to support remote monitoring and payment options. Placement will prioritize ADA accessibility and ease of use for the public
Bidder will be responsible for providing final parking design.
The installation will follow the charger’s specific guidelines for proper setup and compliance with all requirements.