Attachment 5 - 1258-1259 Chillers_Bid Schedule.pdf
PDF 94 KB Posted
- Attached to
- Naval Undersea Warfare Center Building 1258 / 1259 Replace Chillers - the Naval Station Newport, Newport, RI
- Solicitation number
- N4008524R1367
About this file
This document is an Attachment 5 - Bid Schedule for the replacement of chillers at Buildings 1258 and 1259 at the Naval Undersea Warfare Center (NUWC) in Newport, RI.
The solicitation is for the replacement of one 315-ton chiller in Building 1258 and one 360-ton chiller in Building 1259, along with associated work. The document provides two contract line items (CLINs) for the chiller replacements, with the offeror required to provide lump sum pricing for each CLIN. The total price for the two CLINS combined is requested. The work must be performed in accordance with the Naval Station Newport Instruction 5090.10 on Ozone Depleting Substances, and an asbestos survey is required for all disturbed substances. The solicitation is limited to the MACC holders listed in the related federal contract opportunity.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bldg. 1258 and 1259 NUWC Chiller Replacement eProjects# 1785109
DOCUMENT 00 22 13.00 20
SUPPLEMENTARY INSTRUCTIONS TO OFFERORS
PART 1 GENERAL
1.1 CONTRACT LINE ITEMS
The terms Offeror and Bidder and versions thereof (offer/bid) have the same definition as used within this contract.
Provide the Contract Line Item (CLIN) lump sum price for the following items:
CLIN 0001 - Price includes the following:
CLIN 0001A. Provide for replacement of chiller at B1258 and all associated work.
CLIN DESCRIPTION PRICE FOR CLIN
0001A 0001A B1258 Chiller Replacement
CLIN 0001B - Provide for replacement of chiller at B1259 and all associated work.
CLIN DESCRIPTION PRICE FOR CLIN
0001B
0001B B1259 Chiller Replacement
CLIN 0001 GRAND TOTAL OF CLIN 0001A + 0001B: $______________
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
Not used.