Attachment 4 - ENV 564 Review Sheet RPL Chillers at B-1258 and B-1259 NUWC Phase 1.docx

DOCX document 18 KB Posted

Attached to
Naval Undersea Warfare Center Building 1258 / 1259 Replace Chillers - the Naval Station Newport, Newport, RI
Solicitation number
N4008524R1367
Issued by

About this file

This document is the Environmental Project Review Board Results for the Naval Undersea Warfare Center (NUWC) Building 1258 and 1259 Chiller Replacement Phase 1 project at Naval Station Newport in Rhode Island. The project involves the replacement of one 315-ton chiller in Building 1258 and one 360-ton chiller in Building 1259, along with related incidental work. Key requirements include: following the Naval Station Newport Instruction 5090.10 on Ozone Depleting Substances, conducting an asbestos survey for any disturbed building materials, and obtaining concurrence from the State Historic Preservation Officer. No soil, wetland, or drinking/wastewater impacts were identified. A Stormwater Permit and Soil Erosion and Sediment Control Plan are required. Only contractors holding a specific list of MACC contracts with the Naval Facilities Engineering Command are allowed to bid on this solicitation, which has the number N4008524R1367.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NAVSTA Newport Environmental Project Review Board Results

Date:
April 20, 2024

SR:

Project Name:
ENV 564 B-1258 & B-1259 NUWC Chiller Replacement Phase 1
Brief SOW:
1258 NUWC Built: 7/1/1987, 1259 NUWC Built: 7/1/1987
Hazardous Waste:
Mark Rielly of the Environmental Office must sign all Bill of Ladings or manifests for waste disposal.
Hazardous Material:
Michelle Davis of the Environmental Office must review and approve all Safety Data Sheets before work begins.
Cultural Resources:
State Historic Preservation Officer Concurrence Required. ⃝YES ⃝NO
Coastal Zone:
RICRMC Concurrence Required. ⃝YES ⃝NO

Covered by General Consistency Permit. ⃝YES ⃝NO ⃝N/A

Wetlands:
n/a
Drinking Water:
n/a
Waste Water:
n/a
Stormwater:
Stormwater Permit Required. ⃝YES ⃝NO

Soil Erosion & Sediment Control Plan Required. ⃝YES ⃝NO

Clean Air:
* Yes, Work must be performed iaw local instruction 5090.10 Series OZONE DEPLETING SUBSTANCES.
Environmental Restoration:
No
Soil Management:
Must Follow Soil Management Plan. ⃝YES ⃝NO
ACM/LBP/PCB:
Hazardous Material Survey (PCBs, Asbestos, Lead, etc.) Required. ** ⃝YES ⃝NO
Additional Permitting:
ACoE required. ⃝YES ⃝NO WQC required. ⃝YES ⃝NO

Dredge required. ⃝YES ⃝NO, Other Required. ⃝YES ⃝NO

NEPA:
EA or EIS required. ⃝YES ⃝NO

CATX Required. ⃝YES ⃝NO, Checklist Required. ⃝YES ⃝NO NEPA Documentation Not Required. ⃝YES ⃝NO

Additional Comments:
* Revise drawings to require contractor to follow local instruction 5090.10 Series OZONE DEPLETING SUBSTANCES.

* * Only an asbestos survey is required based on the age of these buildings. No asbestos survey was performed and there is no requirement in drawings or spec for the contractor to perform an asbestos survey. Revise drawings under General Notes to require the contractor perform an asbestos survey for any building materials that will be disturbed.

The project is approved as noted.