NAVSTA Newport Environmental Project Review Board Results
SR:
| Project Name: |
| ENV 564 B-1258 & B-1259 NUWC Chiller Replacement Phase 1 |
| Brief SOW: |
| 1258 NUWC Built: 7/1/1987, 1259 NUWC Built: 7/1/1987 |
| Hazardous Waste: |
| Mark Rielly of the Environmental Office must sign all Bill of Ladings or manifests for waste disposal. |
| Hazardous Material: |
| Michelle Davis of the Environmental Office must review and approve all Safety Data Sheets before work begins. |
| Cultural Resources: |
| State Historic Preservation Officer Concurrence Required. ⃝YES ⃝NO |
| Coastal Zone: |
| RICRMC Concurrence Required. ⃝YES ⃝NO |
Covered by General Consistency Permit. ⃝YES ⃝NO ⃝N/A
| Stormwater: |
| Stormwater Permit Required. ⃝YES ⃝NO |
Soil Erosion & Sediment Control Plan Required. ⃝YES ⃝NO
| Clean Air: |
| * Yes, Work must be performed iaw local instruction 5090.10 Series OZONE DEPLETING SUBSTANCES. |
| Environmental Restoration: |
| No |
| Soil Management: |
| Must Follow Soil Management Plan. ⃝YES ⃝NO |
| ACM/LBP/PCB: |
| Hazardous Material Survey (PCBs, Asbestos, Lead, etc.) Required. ** ⃝YES ⃝NO |
| Additional Permitting: |
| ACoE required. ⃝YES ⃝NO WQC required. ⃝YES ⃝NO |
Dredge required. ⃝YES ⃝NO, Other Required. ⃝YES ⃝NO
| NEPA: |
| EA or EIS required. ⃝YES ⃝NO |
CATX Required. ⃝YES ⃝NO, Checklist Required. ⃝YES ⃝NO NEPA Documentation Not Required. ⃝YES ⃝NO
| Additional Comments: |
| * Revise drawings to require contractor to follow local instruction 5090.10 Series OZONE DEPLETING SUBSTANCES. |
* * Only an asbestos survey is required based on the age of these buildings. No asbestos survey was performed and there is no requirement in drawings or spec for the contractor to perform an asbestos survey. Revise drawings under General Notes to require the contractor perform an asbestos survey for any building materials that will be disturbed.
The project is approved as noted.
| EV Staff Present: |
| ⃝CS ⃝BB ⃝DD ⃝DM ⃝EM ⃝MD ⃝MR ⃝PC ⃝SK |