Attachment 4_Technical Specifications.pdf

PDF 2 MB Posted

Attached to
Nez Perce Clearwater NF - GAC Site Preparation Construction
Solicitation number
1240LU26Q0027
Issued by

About this file

This is a Technical Specifications document for the Grangeville Air Center Site Improvements project in Grangeville, Idaho, comprising a comprehensive construction manual with multiple divisions covering all aspects of the site preparation and infrastructure installation work.

The project involves construction of modular building pads, utility connections, and associated site improvements under a single prime contract with stipulated pricing. Key work includes gravel pads and a lift station for sanitary sewer, new transformers and electrical connection panels, water and sanitary sewer utility connections, site earthwork and grading, crushed base course placement, and asphalt paving. The specifications cover Division 01 (General Requirements including administrative procedures, quality assurance, temporary facilities, and waste management); Division 02-03 (Selective demolition and cast-in-place concrete); Division 26 (comprehensive electrical work including power conductors, grounding, raceways, panelboards, metering, wiring devices, LED lighting, and surge protection); Divisions 31-33 (earthwork, exterior improvements, and utilities for water, sanitary sewer, and grinder pump stations); and landscape seeding. The USDA Forest Service is the contracting agency with Mosaic Architecture as the architect and Zachary Pileggi/Susan Graves as the Contracting Officer Representatives. The contract requires compliance with current editions of NFPA 70 (National Electric Code), ASTM standards, AWWA specifications, ACI standards, and applicable local, state, and federal codes. Submittals must be in electronic PDF format, with specific requirements for shop drawings, product data, operation and maintenance manuals, warranties, and record documents. Performance period runs from October 1, 2026 to June 1, 2027, with a projected construction cost between $250,000 and $500,000.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT MANUAL FOR:

Grangeville Air Center Site Improvements

Grangeville,ID

Volume 1

Date: November 19, 2021

100% CONSTRUCTION DOCUMENTS

ARCHITECT

MOSAIC ARCHITECTURE, P.C.

428 N Last Chance Gulch Helena, Montana 59601

Phone: 406-449-2013 www.mosaicarch.com

1240LU21F0039 / Grangeville Air Center TABLE OF CONTENTS

TABLE OF CONTENTS

THE FOLLOWING LISTED DOCUMENTS COMPRISE THE TABLE OF CONTENTS FOR THE USDA FOREST SERVICE - GRANGEVILLE AIR CENTER – SITE IMPROVEMENTS, GRANGEVILLE, IDAHO. WHERE THE NUMERICAL SEQUENCE OF SECTIONS OR DIVISIONS IS INTERRUPTED, SUCH INTERRUPTIONS ARE

INTENTIONAL.

TECHNICAL SPECIFICATIONS

DIVISION 01 - GENERAL REQUIREMENTS

01 1000 - SUMMARY

01 2105 - SUBSTITUTION PROCEDURE

01 2300 - ALTERNATES

01 3000 - ADMINISTRATIVE REQUIREMENTS

01 4000 - QUALITY REQUIREMENTS

01 5000 - TEMPORARY FACILITIES AND CONTROLS

01 5813 - TEMPORARY PROJECT SIGNAGE

01 6000 - PRODUCT REQUIREMENTS

01 7000 - EXECUTION AND CLOSEOUT REQUIREMENTS

01 7419 - CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL

01 7800 - CLOSEOUT SUBMITTALS

01 7900 - DEMONSTRATION AND TRAINING

DIVISION 02 - EXISTING CONDITIONS

02 4113 - SELECTIVE SITE DEMOLITION

DIVISION 03 - EXISTING CONDITIONS

03 3000 - CAST-IN-PLACE CONCRETE (SITE)

DIVISION 26 – ELECTRICAL AND LIGHTING

26 0010 - GENERAL ELECTRICAL REQUIREMENTS

26 0519 - ELECTRICAL POWER CONDUCTORS AND CABLES

26 0526 - GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS

26 0529 - HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS

26 0533 - RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS

26 0553 - IDENTIFICATION FOR ELECTRICAL SYSTEMS

26 2416 - PANELBOARDS

26 2713 - ELECTRICITY UTILITY METERING

26 2726 - WIRING DEVICES

26 4313 - SURGE PROTECTION

26 5100 – LED LIGHTING

1240LU21F0039 / Grangeville Air Center TABLE OF CONTENTS

DIVISION 31 – EARTHWORK

31 2000 - EARTH MOVING

31 2333 - TRENCHING AND BACKFILLING

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 1100 - CRUSHED BASE COURSE

32 1216 - ASPHALT PAVING

32 9219 – SEEDING

DIVISION 33 – UTILITIES

33 1000 - WATER UTILITIES

33 3000 - SANITARY SEWERAGE UTILITIES

33 3213 - GRINDER PUMP STATIONS

SECTION 01 1000

SUMMARY

PART 1 GENERAL

1.01 PROJECT

A. Project Name: Grangeville Air Center – Site Improvements B. USDA Forest Service COR Name: Zachary Pileggi / Susan Graves C. Architect's Name: Mosaic Architecture.

The Project consists of main components for the construction of the modular building pads and utility requirements.

Gravel pads and lift station for sanitary sewer.

New transformer associated to the modular buildings and electrical connection panels.

New utility connections for modular buildings.

1.02 CONTRACT DESCRIPTION

A. Contract Type: A single prime contract based on a Stipulated Price as described in construction documents drawings and specifications.

1.03 WORK BY OWNER

A. Items noted NIC (Not in Contract) will be supplied and installed by Forest Service. After substantial completion. Some items include:

1. Modular Trailers (36’ x 64’)

2. Modular Trailer connections to stubbed utilities.

1.04 OWNER OCCUPANCY

A. Forest Service intends to utilize the Project upon Substantial Completion.

B. Cooperate with US Forest Service to minimize conflict and to facilitate Grangeville Airport operations in neighboring facilities.

1.05 CONTRACTOR USE OF SITE AND PREMISES

A. Construction Operations: Limited to areas noted on Drawings.

1. Locate and conduct construction activities in ways that will limit disturbance to site.

B. Provide access to and from site as required by law and by USFS and Grangeville Airport:

1. Emergency Building Exits During Construction: Keep all exits required by code open during construction period; provide temporary exit signs if exit routes are temporarily altered.

2. Do not obstruct roadways, sidewalks, or other public ways without permit.

C. Existing building spaces may not be used for storage.

D. Utility Outages and Shutdown:

1. Coordinate any disruption of service to adjacent buildings with the US Forest Service and adjacent building occupants. Contractor shall give the USDA Forest Service 48 hour notice of any planned disruption of service.

2. Prevent accidental disruption of utility services to other facilities.

END OF SECTION 01 1000

1240LU21F0039 / Grangeville Air Center 01 1000 - 1 Summary

1240LU21F0039 / Grangeville Air Center 01 2105 - 1 Substitution Procedure

SECTION 01 2105

SUBSTITUTION PROCEDURE

PART 1 GENERAL

1.01 SECTION INCLUDES

A. Section includes administrative and procedural requirements for substitutions.

1.02 DEFINITIONS

A. Substitutions: Changes proposed by contractor in products, materials, equipment and methods of construction from those required by the contract documents.

1.03 SUBMITTALS

A. See Section 01 3000 - Administrative Requirements, for submittal procedures.

B. Substitution Requests: Submit electronic copy of request for consideration. Identify product or fabrication or installation method to be replaced. Include Specification Section number and title and drawing numbers and titles.

1. Documentation: Show compliance with requirements for substitution and the following, as applicable:

a. Statement indicating why specified product, fabrication or installation cannot be provided, if applicable.,

b. Coordination of information, including a list of changes or modifications needed to other parts of the work and to construction performed by Owner and separate contractors that will be necessary to accommodate proposed substitution.

c. Detailed comparison of significant qualities or proposed substitution with those of the work specified. Include annotated copy of applicable specification section. Significant qualities may include attributes such as performance, weight, size, durability, visual effect, substantial design characteristics, warranties and specific features and requirements indicated. Indicate deviations, if any, from work specified.

d. Product data, including drawings and descriptions of products and fabrication and installation procedures.

e. Samples, where applicable or requested.

f. Certificates and qualification data, where applicable and requested.

g. List of similar installations for completed project names and addresses and names and addresses of Architects and Owners.

h. Material test reports from qualified testing agency indicating and interpreting test results for compliance with requirements indicated.

i. Research reports evidencing compliance with building code in effect for project, from

ICC-ES.

j. Detailed comparison of Contractor's construction schedule using proposed substitution from products specified in work, including effect of overall contract time.

If specified product or methods of construction cannot be provided within the contract time, include letter from manufacturer, or manufacturer's letterhead, stating date of receipt of purchase order, lack of availability, or delay in delivery.

k. Cost information, including a proposal change, if any, in contract sum.

l. Contractors’ certification that proposed substitution complies with requirements in the contract documents except as indicated in substitution request, is compatible with related materials, and is appropriate for applications indicated.

m. Contractors’ waiver of rights to additional payment or time that may subsequently become necessary because of failure of proposed substitution to produce indicated results.

1240LU21F0039 / Grangeville Air Center 01 2105 - 2 Substitution Procedure

2. Architect's Action: If necessary, Architect will request additional information or documentation for evaluation within 7 days of receipt of a request substitution. Architect will notify Contractor of acceptance or rejection of proposed substitution within 15 days of receipt of request, or seven days of receipt of additional information or documentation, whichever is later.

a. Forms of Acceptance: Addendum, Change Order, Construction Change Directive, or

Architect's Supplemental Instructions for minor changes in the work.

b. Use product specified if Architect does not issue a decision on use of a proposed substitution within time indicated.

1.04 QUALITY ASSURANCE

A. Compatibility of Substitutions: Investigate and document compatibility of proposed substitution with related products and materials. Engage qualified testing agency to perform compatibility tests of recommended by manufacturer.

PART 2 PRODUCTS

2.01 PRODUCTS

A. Substitutions for Cause: Submit requests for substitution immediately upon discovery of need for change, but not later than 15 days prior to time required for preparation and review of related Submittal.

1. Conditions: Architect will consider Contractor's request for substitution when the following conditions are satisfied.

a. Requested substitution is consistent with the Contract Documents and will produce indicated results.

b. Requested substitution will not adversely affect Contractor's construction schedule.

c. Requested substitution has received necessary approvals of authorities having jurisdiction.

d. Requested substitution is compatible with other portions of the work.

e. Requested substitution has been coordinated with other portions of the work.

f. Requested substitution provides specified warranty.

g. If requested substitution involves more than one contractor, requested substitution has been coordinated with other portions of the work, is uniform and consistent, is compatible with other products, and is acceptable to all contractors involved.

h. Requested substitution will provide identical visual effect to specified products in every regard.

2. Substitution for Convenience: Not allowed.

PART 3 - NOT USED

END OF SECTION

SECTION 01 2300

ALTERNATES

PART 1 GENERAL

1.01 SECTION INCLUDES

A. Description of Alternates.

1.02 ACCEPTANCE OF ALTERNATES

A. Alternates quoted on Bid Forms will be reviewed and accepted or rejected at Forest Service COR’s option. Accepted Alternates will be identified in the Owner-Contractor Agreement.

B. Coordinate related work and modify surrounding work to integrate the Work of each Alternate.

1.03 SCHEDULE OF ALTERNATES

A. Alternate No. 1 - Base Bid: Includes water & sanitary sewer and electrical hookups for temporary campers. These areas are protected with concrete islands within an area of new gravel. See drawings for details.

PART 2 PRODUCTS - NOT USED

PART 3 EXECUTION - NOT USED

END OF SECTION 01 2300

1240LU21F0039 / Grangeville Air Center 01 2300 - 1 Alternates

1240LU21F0039 / Grangeville Air Center 01 3000 - 1 Administrative Requirements

SECTION 01 3000

ADMINISTRATIVE REQUIREMENTS

PART 1 GENERAL

1.01 SECTION INCLUDES

A. Electronic document submittals.

B. Preconstruction meeting.

C. Progress meetings.

D. Construction progress schedule.

E. Submittals for review, information, and project closeout.

PART 2 PRODUCTS - NOT USED

PART 3 EXECUTION

3.01 ELECTRONIC DOCUMENT SUBMITTAL

A. All documents transmitted for purposes of administration of the contract are to be in electronic (PDF) format.

1. Besides submittals for review, information, and closeout, this procedure applies to requests for information (RFI's) progress documentation, contract modification documents (e.g. supplementary instructions, change proposals, change orders), applications for payment, field reports and meeting minutes, and any other document any participant wishes to make part of the project record.

3.02 PRECONSTRUCTION MEETING

A. Attendance Required:

1. Forest Service.

2. Mosaic Architecture.

3. Electrical Engineer/Electric Company

4. Contractor and All major sub-contractors.

5. County Utility Representative and Airport Board Representative

B. Agenda:

1. Execution of Forest Service-Contractor Agreement.

2. Submission of executed bonds and insurance certificates.

3. Distribution of Contract Documents.

4. Submission of list of subcontractors, list of products, schedule of values, and progress schedule.

5. Designation of personnel representing the parties to Contract and <1|A/E|>.

6. Procedures and processing of field decisions, submittals, substitutions, applications for payments, proposal request, Change Orders, and Contract closeout procedures.

7. Scheduling.

C. Contractor will record minutes and distribute copies within seven days after meeting to participates, with one copy to Owner, participants, and those affected by decisions made.

3.03 PROGRESS MEETINGS

A. Schedule and administer meetings throughout progress of the work at maximum bi-monthly intervals.

B. Attendance Required:

1. Contractor.

2. Forest Service.

3. Mosaic Architecture.

4. Contractor's superintendent.

1240LU21F0039 / Grangeville Air Center 01 3000 - 2 Administrative Requirements

C. Agenda:

1. Review minutes of previous meetings.

2. Review of work progress.

3. Field observations, problems, and decisions.

4. Identification of problems that impede, or will impede, planned progress.

5. Review of submittals schedule and status of submittals.

6. Maintenance of progress schedule.

7. Corrective measures to regain projected schedules.

8. Planned progress during succeeding work period.

9. Maintenance of quality and work standards.

10. Effect of proposed changes on progress schedule and coordination.

11. Other business relating to work.

D. Record minutes and distribute copies within two days after meeting to participants, with two copies to Mosaic Architecture, Forest Service, participants, and those affected by decisions made.

3.04 CONSTRUCTION PROGRESS SCHEDULE - SEE SECTION 01 3216

A. If preliminary schedule requires revision after review, submit revised schedule within 10 days.

B. Within 20 days after review of preliminary schedule, submit draft of proposed complete schedule for review.

C. Within 10 days after joint review, submit complete schedule.

D. Submit updated schedule with each Application for Payment.

3.05 SUBMITTALS FOR REVIEW

A. When the following are specified in individual sections, submit them for review:

1. Product data.

2. Shop drawings.

3. Samples for selection.

4. Samples for verification.

B. Submit to Mosaic Architecture for review for the limited purpose of checking for compliance with information given and the design concept expressed in Contract Documents.

C. Samples will be reviewed for aesthetic, color, or finish selection.

D. After review, provide copies and distribute in accordance with SUBMITTAL PROCEDURES article below and for record documents purposes described in Section 01 7800 - Closeout Submittals.

3.06 SUBMITTALS FOR INFORMATION

A. When the following are specified in individual sections, submit them for information:

1. Design data.

2. Certificates.

3. Test reports.

4. Inspection reports.

5. Manufacturer's field reports.

6. Other types indicated.

B. Submit for Mosaic Architecture's knowledge as contract administrator or for Forest Service.

1240LU21F0039 / Grangeville Air Center 01 3000 - 3 Administrative Requirements

3.07 SUBMITTALS FOR PROJECT CLOSEOUT

A. Submit Correction Punch List for Substantial Completion.

B. Submit Final Correction Punch List for Substantial Completion.

C. When the following are specified in individual sections, submit them at project closeout in compliance with requirements of Section 01 7800 - Closeout Submittals:

1. Project record documents.

2. Operation and maintenance data.

3. Warranties.

4. Bonds.

5. Other types as indicated.

D. Submit for Forest Service's benefit during and after project completion.

3.08 SUBMITTAL PROCEDURES

A. Shop Drawing Procedures:

1. Prepare accurate, drawn-to-scale, original shop drawing documentation by interpreting the

Contract Documents and coordinating related work.

2. Generic, non-project-specific information submitted as shop drawings do not meet the requirements for shop drawings.

B. Transmit each submittal with a copy of approved submittal form.

C. Transmit each submittal with approved form.

D. Sequentially number the transmittal form. Revise submittals with original number and a sequential alphabetic suffix.

E. Identify Project, Contractor, Subcontractor or supplier, pertinent drawings and detail number, and specification section number, as appropriate on each copy.

F. Apply Contractor's stamp, signed or initialed certifying that review, approval, verification of products required, field dimensions, adjacent construction work, and coordination of information is in accordance with the requirements of the work and contract documents.

G. Schedule submittals to expedite the project, and coordinate submission of related items.

H. For each submittal for review, allow 15 days excluding delivery time to and from the contractor.

I. Identify variations from contract documents and product or system limitations that may be detrimental to successful performance of the complete work.

J. Provide space for Contractor and Mosaic Architecture review stamps.

K. When revised for resubmission, identify all changes made since previous submission.

L. Distribute reviewed submittals as appropriate. Instruct parties to promptly report any inability to comply with requirements.

M. Submittals not requested will not be recognized or processed.

1240LU21F0039 / Grangeville Air Center 01 4000 - 1 Quality Requirements

SECTION 01 4000

QUALITY REQUIREMENTS

PART 1 GENERAL

1.01 SECTION INCLUDES

A. References and standards.

B. Testing and inspection agencies and services.

C. Control of installation.

D. Mock-ups.

E. Tolerances.

1.02 REFERENCE STANDARDS

A. ASTM C1021 - Standard Practice for Laboratories Engaged in Testing of Building Sealants

2008 (Reapproved 2014).

B. ASTM C1077 - Standard Practice for Agencies Testing Concrete and Concrete Aggregates for

Use in Construction and Criteria for Testing Agency Evaluation 2017.

C. ASTM C1093 - Standard Practice for Accreditation of Testing Agencies for Masonry 2015a, with Editorial Revision (2016).

D. ASTM D3740 - Standard Practice for Minimum Requirements for Agencies Engaged in the

Testing and/or Inspection of Soil and Rock as Used in Engineering Design and Construction 2012a.

E. ASTM E329 - Standard Specification for Agencies Engaged in Construction Inspection, Testing, or Special Inspection 2018.

F. ASTM E543 - Standard Specification for Agencies Performing Nondestructive Testing 2015.

G. IAS AC89 - Accreditation Criteria for Testing Laboratories 2017.

1.03 REFERENCES AND STANDARDS

A. For products and workmanship specified by reference to a document or documents not included in the Project Manual, also referred to as reference standards, comply with requirements of the standard, except when more rigid requirements are specified or are required by applicable codes.

B. Comply with reference standard of date of issue current on date of Contract Documents, except where a specific date is established by applicable code.

C. Obtain copies of standards where required by product specification sections.

D. Maintain copy at project site during submittals, planning, and progress of the specific work, until

Substantial Completion.

E. Should specified reference standards conflict with Contract Documents, request clarification from Mosaic Architecture before proceeding.

F. Neither the contractual relationships, duties, or responsibilities of the parties in Contract nor those of Mosaic Architecture shall be altered from Contract Documents by mention or inference otherwise in any reference document.

1.04 TESTING AND INSPECTION AGENCIES AND SERVICES

A. Forest Service will employ and pay for services of an independent testing agency to perform other specified testing.

B. Employment of agency in no way relieves Contractor of obligation to perform Work in accordance with requirements of Contract Documents.

1240LU21F0039 / Grangeville Air Center 01 4000 - 2 Quality Requirements

PART 2 PRODUCTS - NOT USED

PART 3 EXECUTION

3.01 CONTROL OF INSTALLATION

A. Monitor quality control over suppliers, manufacturers, products, services, site conditions, and workmanship, to produce work of specified quality.

B. Comply with manufacturers' instructions, including each step in sequence.

C. Should manufacturers' instructions conflict with Contract Documents, request clarification from

Mosaic Architecture before proceeding.

D. Comply with specified standards as minimum quality for the work except where more stringent tolerances, codes, or specified requirements indicate higher standards or more precise workmanship.

E. Have work performed by persons qualified to produce required and specified quality.

F. Verify that field measurements are as indicated on shop drawings or as instructed by the manufacturer.

G. Secure products in place with positive anchorage devices designed and sized to withstand stresses, vibration, physical distortion, and disfigurement.

3.02 TOLERANCES

A. Monitor fabrication and installation tolerance control of products to produce acceptable Work. Do not permit tolerances to accumulate.

B. Comply with manufacturers' tolerances. Should manufacturers' tolerances conflict with Contract Documents, request clarification from Mosaic Architecture before proceeding.

C. Adjust products to appropriate dimensions; position before securing products in place.

3.03 TESTING AND INSPECTION

A. Testing Agency Duties:

1. Provide qualified personnel at site. Cooperate with Mosaic Architecture and Contractor in performance of services.

2. Perform specified sampling and testing of products in accordance with specified standards.

3. Ascertain compliance of materials and mixes with requirements of Contract Documents.

4. Promptly notify Mosaic Architecture and Contractor of observed irregularities or non-compliance of Work or products.

5. Perform additional tests and inspections required by Mosaic Architecture.

6. Submit reports of all tests/inspections specified.

B. Limits on Testing/Inspection Agency Authority:

1. Agency may not release, revoke, alter, or enlarge on requirements of Contract

Documents.

2. Agency may not approve or accept any portion of the Work.

3. Agency may not assume any duties of Contractor.

4. Agency has no authority to stop the Work.

C. Contractor Responsibilities:

1. Deliver to agency at designated location, adequate samples of materials proposed to be used that require testing, along with proposed mix designs.

2. Cooperate with laboratory personnel, and provide access to the Work and to manufacturers' facilities.

3. Provide incidental labor and facilities:

a. To provide access to Work to be tested/inspected.

b. To obtain and handle samples at the site or at source of Products to be tested/inspected.

1240LU21F0039 / Grangeville Air Center 01 4000 - 3 Quality Requirements

c. To facilitate tests/inspections.

d. To provide storage and curing of test samples.

4. Notify Mosaic Architecture and laboratory 24 hours prior to expected time for operations requiring testing/inspection services.

5. Employ services of an independent qualified testing laboratory and pay for additional samples, tests, and inspections required by Contractor beyond specified requirements.

6. Arrange with Forest Service's agency and pay for additional samples, tests, and inspections required by Contractor beyond specified requirements.

D. Re-testing required because of non-compliance with specified requirements shall be performed by the same agency on instructions by Mosaic Architecture.

E. Re-testing required because of non-compliance with specified requirements shall be paid for by Contractor.

3.04 DEFECT ASSESSMENT

A. Replace Work or portions of the Work not complying with specified requirements.

B. If, in the opinion of Contracting Officer, it is not practical to remove and replace the work, Forest

Service will direct an appropriate remedy or adjust payment.

1240LU21F0039 / Grangeville Air Center 01 5000 - 1 Temporary Facilities and Controls

SECTION 01 5000

TEMPORARY FACILITIES AND CONTROLS

PART 1 GENERAL

1.01 SECTION INCLUDES

A. Temporary utilities.

B. Temporary telecommunications services.

C. Temporary sanitary facilities.

D. Temporary Controls: Barriers, enclosures, and fencing.

E. Waste removal facilities and services.

F. Project identification sign.

G. Field offices.

1.02 TEMPORARY UTILITIES

A. Provide and pay for all electrical power, lighting, and water required for construction purposes.

B. Use trigger-operated nozzles for water hoses, to avoid waste of water.

1.03 TELECOMMUNICATIONS SERVICES

A. Provide, maintain, and pay for telecommunications services to field office at time of project mobilization.

1.04 TEMPORARY SANITARY FACILITIES

A. Provide and maintain required facilities and enclosures. Provide at time of project mobilization.

B. Maintain daily in clean and sanitary condition.

1.05 BARRIERS

A. Provide barriers to prevent unauthorized entry to construction areas, to prevent access to areas that could be hazardous to workers or the public, to allow for owner's use of site and to protect existing facilities and adjacent properties from damage from construction operations and demolition.

B. Provide barricades and covered walkways required by governing authorities for public rights-of-way and for public access to existing building.

C. Protect non-owned vehicular traffic, stored materials, site, and structures from damage.

1.06 VEHICULAR ACCESS AND PARKING

A. Coordinate access and haul routes with governing authorities and Forest Service.

B. Provide and maintain access to fire hydrants, free of obstructions.

C. Provide means of removing mud from vehicle wheels before entering streets.

D. Provide temporary parking areas to accommodate construction personnel. When site space is not adequate, provide additional off-site parking.

1.07 WASTE REMOVAL

A. Provide waste removal facilities and services as required to maintain the site in clean and orderly condition.

B. Provide containers with lids. Remove trash from site periodically.

C. If materials to be recycled or re-used on the project must be stored on-site, provide suitable non-combustible containers; locate containers holding flammable material outside the structure unless otherwise approved by the authorities having jurisdiction.

1240LU21F0039 / Grangeville Air Center 01 5000 - 2 Temporary Facilities and Controls

1.08 PROJECT IDENTIFICATION

A. Provide project identification sign of design and construction indicated on drawings.

B. Erect on site at location indicated.

C. No other signs are allowed without Forest Service permission except those required by law.

1.09 FIELD OFFICES

A. Office: Weathertight, with lighting, electrical outlets, heating, cooling equipment, and equipped with sturdy furniture, drawing rack, and drawing display table.

B. Provide space for Project meetings, with table and chairs to accommodate 6 persons.

C. Locate offices a minimum distance of 30 feet from existing and new structures.

PART 2 PRODUCTS - NOT USED

PART 3 EXECUTION - NOT USED

1240LU21F0039 / Grangeville Air Center 01 5813 - 1 Temporary Project Signage

SECTION 01 5813

TEMPORARY PROJECT SIGNAGE

PART 1 GENERAL

1.01 SECTION INCLUDES

A. Project identification sign.

1.02 QUALITY ASSURANCE

A. Sign Painter: Experienced as a professional sign painter for minimum three years.

B. Finishes, Painting: Adequate to withstand weathering, fading, and chipping for duration of construction.

1.03 SUBMITTALS

A. See Section 01 3000 - Administrative Requirements for submittal procedures.

B. Shop Drawing: Show content, layout, lettering, color, foundation, structure, sizes and grades of members.

PART 2 PRODUCTS

2.01 SIGN MATERIALS

A. Structure and Framing: New, metal or wood, structurally adequate.

B. Sign Backer: Exterior grade plywood with medium density overlay, minimum 3/4-inch thick, standard large sizes to minimize joints.

C. Rough Hardware: Galvanized.

D. Lettering: Exterior quality paint, contrasting colors.

2.02 PROJECT IDENTIFICATION SIGN

A. One painted sign, 48 sq ft area, bottom 6 feet above ground.

B. Content:

1. Project title, logo and name of Forest Service as indicated on Contract Documents.

2. Names and titles of Mosaic Architecture and Consultants.

3. Name of Prime Contractor and major Subcontractors.

C. Graphic Design, Colors, Style of Lettering: Designated by Mosaic Architecture.

PART 3 EXECUTION

3.01 INSTALLATION

A. Install project identification sign within 14 days after date fixed by Notice to Proceed.

B. Install sign surface plumb and level, with butt joints. Anchor securely.

1240LU21F0039 / Grangeville Air Center 01 6000 - 1 Product Requirements

SECTION 01 6000

PRODUCT REQUIREMENTS

PART 1 GENERAL

1.01 SECTION INCLUDES

A. General product requirements.

B. Transportation, handling, storage, and protection.

C. Product option requirements.

D. Substitution limitations.

E. Maintenance materials, including extra materials, spare parts, tools, and software.

1.02 SUBMITTALS

A. Proposed Products List: Submit list of major products proposed for use, with name of manufacturer, trade name, and model number of each product.

1. Submit within 15 days after date of Agreement.

2. For products specified only by reference standards, list applicable reference standards.

B. Product Data Submittals: Submit manufacturer's standard published data. Mark each copy to identify applicable products, models, options, and other data. Supplement manufacturers' standard data to provide information specific to this Project.

C. Shop Drawing Submittals: Prepared specifically for this Project; indicate utility and electrical characteristics, utility connection requirements, and location of utility outlets for service for functional equipment and appliances.

D. Sample Submittals: Illustrate functional and aesthetic characteristics of the product, with integral parts and attachment devices. Coordinate sample submittals for interfacing work.

1. For selection from standard finishes, submit samples of the full range of the manufacturer's standard colors, textures, and patterns.

1.03 QUALITY ASSURANCE

A. Source Limitations: To the fullest extent possible, provide products of the same kind and from a single source.

B. Compatibility of Options: When the contractor is given the option of selecting between two or more products for use on the project, the product selected shall be compatible with products previously selected, even if previously selected products were also options.

C. Nameplates: Except for the required labels and operating data, do not attach or imprint manufacturer's or producers’ nameplates or trademarks on exposed surfaces of products which will be exposed to view in occupied spaces or on the exterior.

1. Labels: Locate required product labels and stamps on concealed surface or where required for observation after installation, on an acceptable surface that is not conspicuous.

2. Equipment Nameplates: Provide a permanent nameplate on each item of service connected or power operated equipment. Locate on an easily accessible surface which is inconspicuous in occupied space. The nameplates shall contain, as applicable, the following information and other essential operating data:

a. Name of product and manufacturer.

b. Model and serial number.

c. Capacity.

d. Speed.

e. Rating.

1240LU21F0039 / Grangeville Air Center 01 6000 - 2 Product Requirements

1.04 PRODUCT, DELIVERY, STORAGE AND HANDLING

A. Should space on site be inadequate for storage of equipment and materials to be incorporated in the work, the contractor and all sub-contractor will be required to provide off-site storage for such materials and equipment.

1. Locations and facilities for off-site storage shall be identified for the Owner and Architect.

2. Off-Site storage shall be governed by the requirements of Article 9.3.2 of the General

Conditions.

B. Deliver, store and handle products in accordance with the manufacturer's recommendations, using means and methods that will prevent damage, deterioration and loss, including theft.

1. Schedule delivery to minimize long-term storage at the site and to prevent overcrowding of construction spaces.

2. Coordinate delivery and installation time to ensure minimum holding time of items that are flammable, hazardous, easily damaged, or sensitive to deterioration, theft and other losses.

3. Deliver products to the site in the manufacturer's original sealed container and other packaging system, complete with labels and instructions for handling, storing, unpacking, protecting and installing.

4. Inspect products upon delivery to ensure compliance with the construction documents and to ensure that products are undamaged and properly protected.

5. Store products in a manner that will facilitate inspection and measurement of quantity or counting of units.

6. Store heavy materials away from the project structure in a manner that will not endanger the supporting construction.

7. Store products subject to damage by the elements above ground, under cover in a weather tight enclosure with ventilation adequate to prevent condensation.

PART 2 PRODUCTS

2.01 NEW PRODUCTS

A. Provide new products unless specifically required or permitted by Contract Documents.

B. Use of products having any of the following characteristics is not permitted:

1. Made using or containing CFC's or HCFC's.

2. Made of wood from newly cut old growth timber.

3. Containing lead, cadmium, or asbestos.

C. Where other criteria are met, Contractor shall give preference to products that:

1. If used on interior, have lower emissions, as defined in Section 01 6116.

2. If wet-applied, have lower VOC content, as defined in Section 01 6116.

3. Have longer documented life span under normal use.

4. Result in less construction waste.

5. Are made of recycled materials.

2.02 PRODUCT OPTIONS

A. Products Specified by Reference Standards or by Description Only: Use any product meeting those standards or description.

B. Products Specified by Naming One or More Manufacturers: Use a product of one of the manufacturers named and meeting specifications, no options or substitutions allowed.

C. Products Specified by Naming One or More Manufacturers with a Provision for

Substitutions: Submit a request for substitution for any manufacturer not named.

2.03 MAINTENANCE MATERIALS

A. Furnish extra materials, spare parts, tools, and software of types and in quantities specified in individual specification sections.

B. Deliver to Project site; obtain receipt prior to final payment.

1240LU21F0039 / Grangeville Air Center 01 6000 - 3 Product Requirements

PART 3 EXECUTION

3.01 SUBSTITUTION LIMITATIONS

A. Substitutions may be considered when a product becomes unavailable through no fault of the Contractor.

B. Document each request with complete data substantiating compliance of proposed substitution with Contract Documents.

C. A request for substitution constitutes a representation that the submitter:

1. Has investigated proposed product and determined that it meets or exceeds the quality level of the specified product.

2. Agrees to provide the same warranty for the substitution as for the specified product.

3. Agrees to coordinate installation and make changes to other work that may be required for the work to be complete with no additional cost to Owner.

4. Waives claims for additional costs to time extension that may subsequently become apparent.

D. Substitutions will not be considered when they are indicated or implied on shop drawings or product data submittals, without separate written request, or when acceptance will require revision to the Contract Documents.

3.02 TRANSPORTATION AND HANDLING

A. Package products for shipment in manner to prevent damage; for equipment, package to avoid loss of factory calibration.

B. If special precautions are required, attach instructions prominently and legibly on outside of packaging.

C. Coordinate schedule of product delivery to designated prepared areas in order to minimize site storage time and potential damage to stored materials.

D. Transport and handle products in accordance with manufacturer's instructions.

E. Transport materials in covered trucks to prevent contamination of product and littering of surrounding areas.

F. Promptly inspect shipments to ensure that products comply with requirements, quantities are correct, and products are undamaged.

G. Provide equipment and personnel to handle products by methods to prevent soiling, disfigurement, or damage, and to minimize handling.

H. Arrange for the return of packing materials, such as wood pallets, where economically feasible.

3.03 STORAGE AND PROTECTION

A. Designate receiving/storage areas for incoming products so that they are delivered according to installation schedule and placed convenient to work area in order to minimize waste due to excessive materials handling and misapplication. See Section 01 7419.

B. Store and protect products in accordance with manufacturers' instructions.

C. Store with seals and labels intact and legible.

D. Store sensitive products in weathertight, climate-controlled enclosures in an environment favorable to product.

E. For exterior storage of fabricated products, place on sloped supports above ground.

F. Protect products from damage or deterioration due to construction operations, weather, precipitation, humidity, temperature, sunlight and ultraviolet light, dirt, dust, and other contaminants.

G. Comply with manufacturer's warranty conditions, if any.

H. Cover products subject to deterioration with impervious sheet covering. Provide ventilation to prevent condensation and degradation of products.

1240LU21F0039 / Grangeville Air Center 01 6000 - 4 Product Requirements

I. Prevent contact with material that may cause corrosion, discoloration, or staining.

J. Provide equipment and personnel to store products by methods to prevent soiling, disfigurement, or damage.

K. Arrange storage of products to permit access for inspection. Periodically inspect to verify products are undamaged and are maintained in acceptable condition.

1240LU21F0039 / Grangeville Air Center 01 7000 - 1 Execution and Closeout Requirements

SECTION 01 7000

EXECUTION AND CLOSEOUT REQUIREMENTS

PART 1 GENERAL

1.01 SECTION INCLUDES

A. Examination, preparation, and general installation procedures.

B. Pre-installation meetings.

C. Cutting and patching.

D. Surveying for laying out the work.

E. Cleaning and protection.

F. Starting of systems and equipment.

G. Demonstration and instruction of Forest Service personnel.

H. Closeout procedures, including Contractor's Correction Punch List, except payment procedures.

I. General requirements for maintenance service.

1.02 SUBMITTALS

A. See Section 01 3000 - Administrative Requirements, for submittal procedures.

B. Survey work: Submit name, address, and telephone number of Surveyor before starting survey work.

1. On request, submit documentation verifying accuracy of survey work.

2. Submit a copy of site drawing signed by the Land Surveyor, that the elevations and locations of the work are in compliance with Contract Documents.

3. Submit surveys and survey logs for the project record.

C. Cutting and Patching: Submit written request in advance of cutting or alteration that affects:

1. Structural integrity of any element of Project.

2. Integrity of weather exposed or moisture resistant element.

3. Efficiency, maintenance, or safety of any operational element.

4. Visual qualities of sight exposed elements.

5. Work of Forest Service or separate Contractor.

1.03 QUALIFICATIONS

A. For surveying work, employ a land surveyor registered in the State in which the Project is located and acceptable to Mosaic Architecture. Submit evidence of surveyor's Errors and Omissions insurance coverage in the form of an Insurance Certificate. Employ only individual(s) trained and experienced in collecting and recording accurate data relevant to ongoing construction activities,

1.04 PROJECT CONDITIONS

A. Ventilate enclosed areas to assist cure of materials, to dissipate humidity, and to prevent accumulation of dust, fumes, vapors, or gases.

B. Dust Control: Execute work by methods to minimize raising dust from construction operations. Provide positive means to prevent air-borne dust from dispersing into atmosphere and over adjacent property.

C. Noise Control: Provide methods, means, and facilities to minimize noise produced by construction operations.

D. Pollution Control: Provide methods, means, and facilities to prevent contamination of soil, water, and atmosphere from discharge of noxious, toxic substances, and pollutants produced by construction operations. Comply with federal, state, and local regulations.

1240LU21F0039 / Grangeville Air Center 01 7000 - 2 Execution and Closeout

1.05 COORDINATION

A. Coordinate scheduling, submittals, and work of the various sections of the Project Manual to ensure efficient and orderly sequence of installation of interdependent construction elements, with provisions for accommodating items installed later.

B. Notify affected utility companies and comply with their requirements.

C. Verify that utility requirements and characteristics of new operating equipment are compatible with building utilities. Coordinate work of various sections having interdependent responsibilities for installing, connecting to, and placing in service, such equipment.

D. Coordinate space requirements, supports, and installation of mechanical and electrical work that are indicated diagrammatically on drawings. Follow routing indicated for pipes, ducts, and conduit, as closely as practicable; place runs parallel with lines of building. Utilize spaces efficiently to maximize accessibility for other installations, for maintenance, and for repairs.

E. In finished areas except as otherwise indicated, conceal pipes, ducts, and wiring within the construction. Coordinate locations of fixtures and outlets with finish elements.

F. Coordinate completion and clean-up of work of separate sections.

G. After Forest Service occupancy of premises, coordinate access to site for correction of defective work and work not in accordance with Contract Documents, to minimize disruption of Forest Service's activities.

PART 2 PRODUCTS

2.01 PATCHING MATERIALS

A. New Materials: As specified in product sections; match existing products and work for patching and extending work.

B. Type and Quality of Existing Products: Determine by inspecting and testing products where necessary, referring to existing work as a standard.

C. Product Substitution: For any proposed change in materials, submit request for substitution described in Section 01 6000 - Product Requirements.

PART 3 EXECUTION

3.01 EXAMINATION

A. Verify that existing site conditions and substrate surfaces are acceptable for subsequent work. Start of work means acceptance of existing conditions.

B. Verify that existing substrate is capable of structural support or attachment of new work being applied or attached.

C. Examine and verify specific conditions described in individual specification sections.

D. Take field measurements before confirming product orders or beginning fabrication, to minimize waste due to over-ordering or misfabrication.

E. Verify that utility services are available, of the correct characteristics, and in the correct locations.

F. Prior to Cutting: Examine existing conditions prior to commencing work, including elements subject to damage or movement during cutting and patching. After uncovering existing work, assess conditions affecting performance of work. Beginning of cutting or patching means acceptance of existing conditions.

3.02 PREPARATION

A. Clean substrate surfaces prior to applying next material or substance.

B. Seal cracks or openings of substrate prior to applying next material or substance.

C. Apply manufacturer required or recommended substrate primer, sealer, or conditioner prior to applying any new material or substance in contact or bond.

1240LU21F0039 / Grangeville Air Center 01 7000 - 3 Execution and Closeout

3.03 LAYING OUT THE WORK

A. Verify locations of survey control points prior to starting work.

B. Promptly notify Mosaic Architecture of any discrepancies discovered.

C. Establish elevations, lines and levels. Locate and lay out by instrumentation and similar appropriate means:

1. Site improvements including pavements; stakes for grading, fill and topsoil placement;

utility locations, slopes, and invert elevations.

2. Grid or axis for structures.

3. Building foundation, column locations, ground floor elevations.

D. Periodically verify layouts by same means.

E. Maintain a complete and accurate log of control and survey work as it progresses.

3.04 GENERAL INSTALLATION REQUIREMENTS

A. Install products as specified in individual sections, in accordance with manufacturer's instructions and recommendations, and so as to avoid waste due to necessity for replacement.

B. Make vertical elements plumb and horizontal elements level, unless otherwise indicated.

C. Install equipment and fittings plumb and level, neatly aligned with adjacent vertical and horizontal lines, unless otherwise indicated.

D. Make consistent texture on surfaces, with seamless transitions, unless otherwise indicated.

E. Make neat transitions between different surfaces, maintaining texture and appearance.

3.05 CUTTING AND PATCHING

A. Whenever possible, execute the work by methods that avoid cutting or patching.

B. Perform whatever cutting and patching is necessary to:

1. Complete the work.

2. Fit products together to integrate with other work.

3. Provide openings for penetration of mechanical, electrical, and other services.

4. Match work that has been cut to adjacent work.

5. Repair areas adjacent to cuts to required condition.

6. Repair new work damaged by subsequent work.

7. Remove samples of installed work for testing when requested.

8. Remove and replace defective and non-complying work.

C. Execute work by methods that avoid damage to other work and that will provide appropriate surfaces to receive patching and finishing. In existing work, minimize damage and restore to original condition.

D. Employ original installer to perform cutting for weather exposed and moisture resistant elements, and sight exposed surfaces.

E. Cut rigid materials using masonry saw or core drill. Pneumatic tools not allowed without prior approval.

F. Restore work with new products in accordance with requirements of Contract Documents.

G. Fit work air tight to pipes, sleeves, ducts, conduit, and other penetrations through surfaces.

H. Patching:

1. Finish patched surfaces to match finish that existed prior to patching. On continuous surfaces, refinish to nearest intersection or natural break. For an assembly, refinish entire unit.

2. Match color, texture, and appearance.

3. Repair patched surfaces that are damaged, lifted, discolored, or showing other imperfections due to patching work. If defects are due to condition of substrate, repair substrate prior to repairing finish.

1240LU21F0039 / Grangeville Air Center 01 7000 - 4 Execution and Closeout

3.06 PROGRESS CLEANING

A. Maintain areas free of waste materials, debris, and rubbish. Maintain site in a clean and orderly condition.

B. Remove debris and rubbish from pipe chases, plenums, attics, crawl spaces, and other closed or remote spaces, prior to enclosing the space.

C. Broom and vacuum clean interior areas prior to start of surface finishing, and continue cleaning to eliminate dust.

D. Collect and remove waste materials, debris, and trash/rubbish from site periodically and dispose off-site; do not burn or bury.

3.07 PROTECTION OF INSTALLED WORK

A. Protect installed work from damage by construction operations.

B. Provide special protection where specified in individual specification sections.

C. Provide temporary and removable protection for installed products. Control activity in immediate work area to prevent damage.

D. Provide protective coverings at walls, projections, jambs, sills, and soffits of openings.

E. Remove protective coverings when no longer needed; reuse or recycle coverings if possible.

3.08 SYSTEM STARTUP

A. Coordinate schedule for start-up of various equipment and systems.

B. Verify tests, meter readings, and specified electrical characteristics agree with those required by the equipment or system manufacturer.

C. Verify that wiring and support components for equipment are complete and tested.

D. Execute start-up under supervision of applicable Contractor personnel and manufacturer's representative in accordance with manufacturers' instructions.

E. Submit a written report that equipment or system has been properly installed and is functioning correctly.

3.09 DEMONSTRATION AND INSTRUCTION

A. See Section 01 7900 - Demonstration and Training.

B. Demonstrate start-up, operation, control, adjustment, trouble-shooting, servicing, maintenance, and shutdown of each item of equipment at scheduled time, at equipment location.

C. Provide a qualified person who is knowledgeable about the Project to perform demonstration and instruction of Owner's personnel.

3.10 ADJUSTING

A. Adjust operating products and equipment to ensure smooth and unhindered operation.

3.11 FINAL CLEANING

A. Use cleaning materials that are nonhazardous.

B. Clean interior and exterior glass, surfaces exposed to view; remove temporary labels, stains and foreign substances, polish transparent and glossy surfaces, vacuum carpeted and soft surfaces.

C. Remove all labels that are not permanent. Do not paint or otherwise cover fire test labels or nameplates on mechanical and electrical equipment.

D. Clean equipment and fixtures to a sanitary condition with cleaning materials appropriate to the surface and material being cleaned.

E. Clean filters of operating equipment.

F. Clean site; sweep paved areas, rake clean landscaped surfaces.

1240LU21F0039 / Grangeville Air Center 01 7000 - 5 Execution and Closeout

G. Remove waste, surplus materials, trash/rubbish, and construction facilities from the site;

dispose of in legal manner; do not burn or bury.

3.12 CLOSEOUT PROCEDURES

A. Accompany Project Coordinator on preliminary inspection to determine items to be listed for completion or correction in the Contractor's Correction Punch List for Contractor's Notice of Substantial Completion.

B. Notify Mosaic Architecture when work is considered ready for Mosaic Architecture's Substantial Completion inspection.

C. Submit written certification containing Contractor's Correction Punch List, that Contract Documents have been reviewed, work has been inspected, and that work is complete in accordance with Contract Documents and ready for Mosaic Architecture's Substantial Completion inspection.

D. Conduct Substantial Completion inspection and create Final Correction Punch List containing Mosaic Architecture's and Contractor's comprehensive list of items identified to be completed or corrected and submit to Mosaic Architecture.

E. Correct items of work listed in Final Correction Punch List and comply with requirements for access to Forest Service-occupied areas.

F. Notify Mosaic Architecture when work…