Amend003_PlansDetailsE102_E400.pdf
PDF 420 KB Posted
- Solicitation number
- 1240LU26Q0027
- Issued by
-
Department of Agriculture Forest Service
About this file
These are electrical construction documents for the Grangeville Air Center project located at 104 Airport Road, Grangeville, Idaho. The documents include an enlarged site plan (Sheet E102) and detailed electrical specifications (Sheet E400) prepared by Mosaic Architecture dated November 19, 2021, at 100% construction document phase.
The project requires a comprehensive electrical infrastructure installation including: a pad-mount utility transformer with concrete pad and bollard protection; a 600-ampere, 120/240-volt, single-phase, three-wire panelboard (Panel SP) with 22,000 AIC rating and NEMA 3R enclosure containing 42 circuit locations; three 200-ampere power pedestals (Milbank U5200-XL or equivalent) for modular buildings, each with three 100-ampere, two-pole breakers rated at 10,000 AIC; meter base and CT enclosure mounted on Unistrut framing per Avista Utilities standards; a lift station control panel with associated power and control wiring; hand holes with conduits for future expansion; and one LED pole light fixture (Lithonia DSX0-LED-P1-30K-T3M) with round pole, photo cell, and motion sensor. All electrical raceways require minimum 24 inches of clean, compacted cover and must be coordinated with civil plans to avoid underground utilities. The electrical contractor is responsible for all cutting, patching, and site coordination work. An additive alternate (Item 8) includes provision for a back-to-back RV-style pedestal (Milbank U5220-XL-75 or equivalent). Total estimated electrical demand is 239 amperes with connected load of 269 amperes.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
J J J J J J
J
J J
J
J
P1
MODULAR
BLDG
MODULAR
BLDG
UTILITY TRANSFORMER
H
8 8
SP-5,7
SP-1,3
SP-10,12
SP-2,4 SP-6,8
H
P1
H
PANEL SP
P2 P2
METER
LIFT STATION
LIFT STATION
CONTROL PANEL
SP-17
EP1
H
HHH
10 10 10
GENERAL ELECTRICAL NOTES
A. IT IS ABSOLUTELY NECESSARY FOR ALL TRADES INVOLVED TO COORDINATE
WITH EACH OTHER AND VERIFY THAT THERE ARE NO CONFLICTS IN
LOCATION OF DUCTS, CONDUITS, DIFFUSERS, BOXES, AND OTHER ITEMS
THROUGHOUT THIS PROJECT BEFORE FINAL PLACEMENT OF MATERIALS.
B. EC SHALL REVIEW A FULL SET OF PLANS, WITH EMPHASIS ON CIVIL TO
ENSURE THAT TRENCHING WORK DOES NOT AFFECT UNDER GROUND
UTILITIES.
C. EC TO PROVIDE A CIRCUIT CONSISTING OF #10'S THROUGH OUT IN 1" PVC
FOR ALL SITE BASED POWER CONSUMING DEVICES: LIGHTS, SIGNS, ETC.,
UNO. PROVIDE DIMMING CONTROL CONDUCTORS FROM THE LCP TO ALL
LIGHT FIXTURES AND ROUTE THE SERVING CIRCUITS, POWERING LIGHT
FIXTURES THROUGH THE LIGHTING CONTROL PANEL PRIOR TO
CONNECTING TO PANELBOARD LISTED.
D. ALL BUILDING EXTERIOR RECEPTACLES SHALL BE: GFI STYLE, WEATHER
RESISTIVE CONSTRUCTION AND FEATURE A WEATHERPROOF-IN-USE
COVER, UNO ON PLANS.
E. ALL ELECTRICAL RACEWAYS ROUTED ON SITE SHALL HAVE A MINIMUM OF
24” OF CLEAN, PROPERLY COMPACTED COVER LOCATED OVER THEM.
F. LINES SHOWN ON THE PLAN FROM ELECTRICAL BASED DEVICES TO THE
BUILDING REPRESENT THE PROPOSED ROUTING PATH FOR RACEWAYS. EC
TO SELECT BEST PATH WHEN ROUTING FOR THE LEAST IMPACT ON SITE OR
BUILDING.
G. EC TO SEE CIVIL PLANS FOR LOCATIONS OF ALL UNDERGROUND UTILITIES
AND SLEEVES PRIOR TO PROCEEDING WITH ANY WORK. EC SHALL UTILIZE
ALL SLEEVES FOR SITE LIGHTING ROUTING.
H. ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR ALL CUTTING OF
SIDEWALKS, PAVEMENT, FLOORS, WALLS, CEILINGS, ROOFS, ETC. TO
PERFORM THE REQUIRED WORK DEPICTED IN THESE DOCUMENTS. THE
CONTRACTOR IS RESPONSIBLE FOR ALL PATCHING OF HOLES TO MATCH
ADJACENT SURFACES AND TO THE SATISFACTION OF THE
ARCHITECT/ENGINEER.
P
R E E
NI
GN
ELANOISSEF
O R R
EG
ISTERED
S
T A
TE OF ID
A
H O
STE
VE
N
S
L
HT
R A
18100
G
DATE:
SHEET:
428 N. Last Chance Gulch Helena, Montana 59601
406.449.2013phone
406.449.2036fax www.mosaicarch.com
D A
T E
S T
A M
P a r c h i t e c t u r e - p l a n n i n g - d e s i g n
3/
/2
:0 1:
NOV 19, 2021
E102
ENLARGED SITE PLAN
104 AIRPORT ROAD
GRANGEVILLE, ID
GRANGEVILLE AIR
CENTER
C O
N S
T R
U C
T I O
N D
O C
U M
E N
T S
KEY NOTES:#
N.T.S.1 SITE DEVELOPMENT PLAN 5C Copy 1
1. COORDINATE UTILITY TRANSFORMER LOCATION WITH UTILITY AND PROVIDE
CONCRETE PAD IN ACCORDANCE WITH UTILITY REQUIREMENTS. ROUTE
CONDUITS SO THAT PRIMARY CABLES ENTER THE TRANSFORMER FROM
BELOW IN THE LEFT PORTION OF THE TRANSFORMER ENCLOSURE, AND THAT
THE SECONDARY CABLES WILL LEAVE BELOW THE TRANSFORMER ON THE
RIGHT PORTION OF THE TRANSFORMER ENCLOSURE. PROVIDE BOLLARDS AT
EACH CORNER OF THE TRANSFORMER (SEE CIVIL PLANS).
2. PROVIDE UNISTRUT STRUCTURE TO MOUNT METER, PANELBOARD AND LIFT
STATION CONTROL PANEL (SEE DETAIL 2 ON SHEET E400). PROVIDE METER
BASE (IN ACCORDANCE WITH AVISTA UTILITIES STANDARDS/REQUIREMENTS),
AND 1" BURIED CONDUIT BETWEEN METER BASE AND THE TRANSFORMER.
COORDINATE ALL REQUIREMENTS WITH UTILITY. UTILITY WILL INSTALL: CT'S
WITHIN THE TRANSFORMER ENCLOSURE, METER AND CABLING BETWEEN THE
TWO.
3. PROVIDE 600A, 120/240V, SINGLE PHASE, THREE WIRE, 42-LOCATION
PANELBOARD WITH 600A MAIN BREAKER, 22,000 AIC RATING AND NEMA 3R
ENCLOSURE. LABEL PANEL SP.
4. PROVIDE 200A POWER PEDESTAL FOR EACH MODULAR BUILDING (MILBANK
U5200-XL OR EQUIVALENT) WITH THREE TWO-POLE, 100A BREAKERS WITH
10,000 AIC RATING. SEE CIVIL PLANS FOR BOLLARDS. PROVIDE CONNECTIONS
FROM THE (3) BREAKERS IN THE PEDESTAL TO THE POWER FEED ON (3)
MODULAR BUILDING SECTIONS.
5. PROVIDE HAND HOLE WITH (2) 2-1/2" CONDUITS WITH PULL STRINGS FOR
FUTURE MODULAR BUILDINGS. SEAL CONDUITS TO AVOID ENTRANCE OF
MOISTURE AND VERMIN.
6. MOUNT LIFT STATION CONTROL PANEL ON UNISTRUT FRAME NEAR PANEL SP.
PROVIDE POWER AND CONTROLS TO LIFT STATION IN ACCORDANCE WITH
DETAIL 3 ON SHEET E400.
7. PROVIDE HAND HOLE WITH (2) 3" CONDUITS WITH PULL STRINGS FOR FUTURE
LOADS TO THE NORTH (SEE DETAIL 3 ON SHEET E401).
8. BID AS ADDITIVE ALTERNATE 1: PROVIDE BACK-TO-BACK RV STYLE PEDESTAL
FOR CAMPER TRAILERS (MILBANK U5220-XL-75 OR EQUIVALENT). INSTALL IN
ACCORDANCE WITH DETAIL 4 ON SHEET E400.
9. PROVIDE POLE LIGHT WITH ROUND POLE AND INTEGRAL PHOTO CELL / HIGH-
LOW MOTION SENSOR.
10. HANDHOLE WITH 3" BURIED CONDUIT WITH PULL STRING FOR COMM CABLES.
VERIFY LOCATIONS WITH CIVIL AND OWNER.
# DATE REVISION
1 Date 1 Revision 1
Notes:
Total Est. Demand: 239 A
Total Conn.: 269 A
Receptacle 24000 VA 70.83% 17000 VA Total Est. Demand: 57470 VA
Power 40320 VA 100.00% 40320 VA Total Conn. Load: 64440 VA
Lighting 120 VA 125.00% 150 VA
Load Classification Connected Load Demand Factor Estimated Demand Panel Totals
Legend:
Total Amps: 269 A 268 A
Total Load: 32280 VA 32160 VA
41 SPACE -- -- 1 -- 42
39 SPACE -- -- 1 -- 0
2 30 A -- SPD
37 SPACE -- -- 1 -- -- 1 -- -- SPACE 38
35 SPACE -- -- 1 -- -- 1 -- -- SPACE 36
33 SPACE -- -- 1 -- -- 1 -- -- SPACE 34
31 SPACE -- -- 1 -- -- 1 -- -- SPACE 32
29 SPARE -- 20 A 1 0 0 1 20 A -- SPARE 30
27 SPARE -- 20 A 1 0 0 1 20 A -- SPARE 28
25 SPARE -- 20 A 1 0 0 1 20 A -- SPARE 26
23 SPARE -- 20 A 1 0 0 24
21 SPARE -- 20 A 1 0 0
2 30 A -- SPARE
19 SPARE -- 20 A 1 0 0 20
17 Lighting Lighting 20 A 1 120 0
2 60 A -- SPARE
15 0 0 16
FUTURE POWER PEDESTAL -- 200 A 2
0 0
2 100 A -- SPARE
11 0 960 12
FUTURE POWER PEDESTAL -- 200 A 2
0 960 2 30 A Power LIFT STATION PUMP
7 9600 6000 8
POWER PEDESTAL P1 Power 200 A 2
9600 6000 2 100 A Receptacle RV POWER PEDESTAL P2
3 9600 6000 4
POWER PEDESTAL P1 Power 200 A 2
9600 6000 2 100 A Receptacle RV POWER PEDESTAL P2
CKT Circuit Description Load
Classification Trip Poles A B Poles Trip Load
Classification Circuit Description CKT
Notes:
Enclosure: MCB Rating: 600 A
Mounting: Surface Wires: 3 Mains Rating: 600 A
Supply From: Phases: 1 Mains Type: MCB
Location: Volts: 120/240 Single A.I.C. Rating: 22,000
Branch Panel: SP
N
G
BOND NEUTRAL TO GND
AT THIS LOCATION ONLY
INCOMING SERVICE NEUTRAL
AND EQUIPMENT GROUND
CONDUCTORS
#6 CU
UFER GND
GROUNDING CONDUCTOR:
20-FT #4 BARE CU CONDUCTOR
SNAKED AROUND IN CONCRETE
SLAB BEING INSTALLED FOR
NEAREST TRAILER. WIRE TIE TO
STRUCTURAL REBAR IN
CONCRETE.
REBAR (TYP)
10'
BETWEEN
GND
RODS
MAIN PANEL
10' LONG
GROUND
RODS
SCH. 80 PVC SLEEVE
PRECAST WET
WELL WALL
BY CIVIL
SEAL ALL WALL
PENETRATIONS
PUMP MOTOR
FEED OR LEVEL
CONTROL
CONDUCTORS
M
IN
B
U R
Y (A
L L C
O N
D U
IT
S
TO DUPLEX
PUMP PANEL
BY CIVIL
REVERSIBLE SPLICES
SUITABLE FOR WET
LOCATIONS
SEAL-OFF
ANSI TIER 22 HANDHOLE WITH GASKETED COVER AND PENTA-HEAD
COVER BOLTS, HUBBELL QUAZITE, BOX P/N PG2424BG24, w/ COVERS
P/N PG2424HH0017P (PUMP MOTORS) AND P/N PG2424HH0014P
(CONTROLS) OR EQUAL.
CONTRACTOR TO DETERMINE EXACT SIZE FOR THE HANDHOLE BOX
PER N.E.C. BASED ON THE NUMBER OF CONDUITS AND CONDUCTORS
CORD GRIP SUITABLE FOR CLASS I, DIV.
1, GROUP D LOCATIONS, COOPER
CROUSE-HINDS CGBS OR EQUAL
NEMA 4 JUNCTION BOX
SIZED TO FIT CONDUCTORS
PER THE N.E.C.
SCH. 80 PVC
ACCESS HATCH IN PAD.
SCH. 80 PVC BELL END
KELLEMS, HD STAINLESS CORD
GRIP W/ UNIVERSAL EYE, SIZE
PER MFR PROVIDED CABLE
SIZE.
DRILL AND EPOXY BOLT INTO
COVER
STAINLESS HOOK
24" MIN.
CONCRETE
ENCASEMENT
FINISH GRADE
DIRECT BURY, UNMETERED, 120/240V, POWER OUTLET
PEDESTAL WITH LUGS TO ACCOMMODATE (2) 350KCMIL
WIRES PER PHASE/NEUTRAL AND (2) #2/0 WIRES ON THE
GROUND. NEMA 3R, 8.69" W x 11.25" D, #16 GAUGE
GALVANIZED STEEL BODY WITH GREY POWDER COAT
FINISH WILL ACCEPT UP TO (3) 2-1/2" CONDUITS.
(MILBANK NO. U5210-XL-75 OR EQUIVALENT) .
3/4" PVC, WITH CIRCUIT WIRING,
TO BRANCH DISCONNECT
TRANSITION
TO 3/4" PVC
3/4" RGS
40"
M A
X
POWER TO LIFT STATION
BURIED CONDUITS TO
VARIOUS LOADS (TYP)
ENCASE RGS IN
MIN. 12" DIA. X 24"
DEEP CONCRETE
(TYP)
4" RGS
(TYP. OF 2)
CAP TOPS
OF POSTS
METER BASE
PER UTILITY
REQUIREMENTS
PANEL BOARD NEMA 3R
ENCLOSURE SQUARE D, OAE
P1000 HOT DIPPED
GALVANIZED UNISTRUT OR
EQUAL (TYP.)
FINISHED GRADE
M
IN
LIGHTNING
ARRESTOR
STYLE SDP
L
INCOMING POWER
FROM UTILITY XFMR
NEMA 3R
SERVICE
ENTRANCE
RATED
PANEL SP
LIFT
STATION
CONTROL
PANEL
6NS
2NS
PANEL
SP
(1) 3" C.O. 5' FROM PAD
120/240V, 1PH, 3W
PAD-MOUNT TRANSFORMER
PER UTILITY REQUIREMENTS
M METER BASE PER UTILITY
REQUIREMENTS
KEY NOTES:#
1. CONFIRM ALL REQUIREMENTS WITH LOCAL ELECTRICAL UTILITY FOR
TRANSFORMER PADS, CONDUITS, & LOCATIONS PRIOR TO WORK STARTING.
2. MOUNT C/T ENCLOSURE AND METER BASE ON UNISTRUT FRAME NEAR
TRANSFORMER. PROVIDE 1" CONDUIT BETWEEN C/T ENCLOSURE AND
METER BASE. C/Ts AND METER PROVIDED BY UTILITY.
3. CTs PROVIDED INSIDE TRANSFORMER ENCLOSURE BY UTILITY.
2NS
0.3NS
1NS 1NS
LFT
STN
CNTL
0.3S
P1
1NS1NS1NS
P1
1NS1NS1NS
P2 P2
M
J J J J J J
1 2
P
R E E
NI
GN
ELANOISSEF
O R R
EG
ISTERED
S
T A
TE OF ID
A
H O
STE
VE
N
S
L
HT
R A
18100
G
DATE:
SHEET:
428 N. Last Chance Gulch Helena, Montana 59601
406.449.2013phone
406.449.2036fax www.mosaicarch.com
D A
T E
S T
A M
P a r c h i t e c t u r e - p l a n n i n g - d e s i g n
3/
/2
:0 1:
NOV 19, 2021
E400
DETAILS/ONE LINE
104 AIRPORT ROAD
GRANGEVILLE, ID
GRANGEVILLE AIR
CENTER
C O
N S
T R
U C
T I O
N D
O C
U M
E N
T S
N.T.S.5
GROUNDING AND BONDING RISER DIAGRAM
N.T.S.3
SITE POWER - LIFT STATION
N.T.S.4
POWER POST DETAIL - METAL
N.T.S.2
UNISTRUT MOUNTING DETAIL - PANELBOARD, METER BASE
N.T.S.1
ONE LINE DIAGRAM
# DATE REVISION
1 Date 1 Revision 1
6NS 600 4W 2 3" 2#350 1#350 1#1
2NS 200 4W 1 2-1/2" 2#3/0 1#3/0 1#4
1NS 100 4W 1 1-1/2" 2#2 1#2 1#8
0.3S 30 3W 1 3/4" 2#10 - 1#10
0.3NS 30 4W 1 3/4" 2#10 1#10 1#10
CONDUIT
PHASE QTY
AND AWG
NEUTRAL
AWG
GROUND
AWG
FEEDER
NUMBER
AMPS
WIRE QTY
PER
CONDUIT
SETS IN
PARALLEL
75 DEG COPPER
FEEDER NUMBER KEY:
A = ALUMINUM CONDUCTORS
N = INCLUDES NEUTRAL CONDUCTOR
S = SINGLE PHASE
NOTE: GROUNDING CONDUCTOR IS SIZED ACCORDING TO NEC
250.122 TABLE, UNLESS FEEDER NUMBER IS FOLLOWED BY AN
ASTERISK (*) INDICATING THAT THE GROUNDING CONDUCTOR IS
SIZED ACCORDING TO NEC 250.66 TABLE.
SCHEDULE IS BASED ON 75 DEGREE C. COPPER CONDUCTORS IN NEC 310.60 TABLE.
FEEDER SCHEDULE - COPPER
1. PROVIDE FUSING.
2. VERIFY FINISH WITH CONTRACTING OFFICER.
NOTES:
EP1 LED 38 4,376 3000
SINGLE-HEAD, ROUND POLE, TYPE III MEDIUM
DISTRIBUTION, LIGHT WITH INTEGRAL
PHOTO CELL/HIGH-LOW MOTION SENSOR
LITHONIA
DSX0-LED-P1-30K-T3M-MVOLT-RPA-SF-
PIRF1FC3V-BAA-DBLXD
16' POLE 120 1
TYPE LAMPS
LOAD
(W)
OUTPUT
(LM, NOMINAL)
CCT
(K)
DESCRIPTIONS MFR
CATALOG NO.
OR SERIES
MOUNTING VOLTAGE NOTES
LUMINAIRE SCHEDULE
| Sheets |
| E102 - ENLARGED SITE PLAN |
| E400 - DETAILS/ONE LINE |
File details come from the government source that posted it. Updated .