This is a pricing schedule for Amendment 0002 to Solicitation No. 1240LU26Q0027 for Grangeville Air Center Site Improvements located on Nez Perce-Clearwater National Forests in Idaho County, Idaho, dated March 13, 2026. The schedule outlines 14 base line items and one option item organized by construction divisions with unit quantities and pricing structure but without populated unit cost or item cost fields for bidder completion.

Base work encompasses general requirements (mobilization), selective demolition of helipads and incidental pavements, electrical and lighting infrastructure (120/240V service, transformer connections, and lift station controls), earthwork operations (1,050 cubic yards of leveling and grading plus 166 linear feet of 18-inch precast concrete pipe installation), exterior improvements (155 cubic yards of crushed aggregate base course and 10 pipe bollards), and utility installations including water service (190 linear feet), sanitary sewerage (145 linear feet), and a grinder pump with lift station. The optional item consists of RV trailer hook-ups (2 units). Bidders must complete vendor identification information including name, representative contact, SAM UEI number, phone, and email, with separate line totals for base price and total price including the option item.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amendment 0002 dated 3/13/26 Solicitation No. 1240LU26Q0027

Grangeville Air Center Site Improvements Nez Perce- Clearwater National Forests

Idaho County, Idaho

SCHEDULE OF ITEMS AND PRICES

BASE ITEMS Description Unit Quantity Unit Cost Item Cost

Division 1 General Requirements

Item 1 Mobilization LS 1

Division 2 Existing conditions

Item 2 Selective Demolition (Helipads and incidental pavements)

LS 1

Division 26 Electrical and lighting

Item 26A 120/240 Service, panel, metering, and power to modulars, pedestals, pole lights, buried conduit

LS 1

Item 26B Transformer and connection fees (With Utility) LS 1

Item 26C Lift Station Pump Electrical and control panel LS 1

Division 31 Earthwork

Item 31A Earth Moving – Leveling and Grading CY 1050

Item 31B Install 18” Precast Structural concrete pipe LF 166

Division 32 Exterior Improvements

Item 32 A Crushed Aggregate Base course (trailer pads) CY 155

Item 32 B Pipe Bollards EA 10

Division 33 Utilities

Item 33 A

Water service 1-1/2” Water service, Vaults(2), and connections to city water

LF 190

Item 33 B Sanitary Sewerage utilities – 4” pvc connection, vault (2), and connection to city sewer service

LF 145

Item 33 C Grinder Pump and lift station LS 1 xxxx xxxx TOTAL BASE PRICE

Option Item

RV trailer hook ups (2) LS 1 xxxx xxxx TOTAL PRICE