Attachment 2_ScheduleOfItemsPrices.pdf

PDF 151 KB Posted

Attached to
Nez Perce Clearwater NF - GAC Site Preparation Construction
Solicitation number
1240LU26Q0027
Issued by

About this file

This is a Schedule of Items & Prices pricing template for Solicitation No. 1240LU26Q0027, a federal construction project for site improvements at Grangeville Air Center located in the Nez Perce-Clearwater National Forests in Idaho County, Idaho. The template requires vendors to provide unit costs and item costs for 13 base line items organized across six construction divisions and one optional item.

The base items include: mobilization (Division 1); selective demolition of helipads and incidental pavements (Division 2); electrical and lighting work including 120/240 service installation, transformer connection fees, and lift station pump electrical components (Division 26); earthwork consisting of 1,050 cubic yards of earth moving for leveling and grading (Division 31); exterior improvements including 155 linear feet of crushed aggregate base course for trailer pads and 10 pipe bollards (Division 32); and utilities work comprising 190 linear feet of water service installation with vaults and connections, 145 linear feet of sanitary sewerage utilities with vault installation and connections, and a grinder pump and lift station (Division 33). An optional item for two RV trailer hook-ups is also included. Vendors must complete the form with their name, authorized representative, SAM UEI number, phone number, and email address, and calculate both the total base price and total price including the optional item.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation No. 1240LU26Q0027 Grangeville Air Center Site Improvements

Nez Perce- Clearwater National Forests Idaho County, Idaho

SCHEDULE OF ITEMS & PRICES

BASE ITEMS Description Unit Quantity Unit Cost Item Cost

Division 1 General Requirements

Item 1 Mobilization LS 1

Division 2 Existing conditions

Item 2 Selective Demolition (Helipads and incidental pavements)

LS 1

Division 26 Electrical and lighting

Item 26A 120/240 Service, panel, metering, and power to modulars, pedestals, pole lights, buried conduit

LS 1

Item 26B Transformer and connection fees (With Utility) LS 1

Item 26C Lift Station Pump Electrical and control panel LS 1

Division 31 Earthwork

Item 31 Earth Moving – Leveling and Grading CY 1050

Division 32 Exterior Improvements

Item 32 A Crushed Aggregate Base course (trailer pads) LF 155

Item 32 B Pipe Bollards EA 10

Division 33 Utilities

Item 33 A

Water service 1-1/2” Water service, Vaults(2), and connections to city water

LF 190

Item 33 B Sanitary Sewerage utilities – 4” pvc connection, vault (2), and connection to city sewer service

LF 145

Item 33 C Grinder Pump and lift station LS 1 xxxx xxxx TOTAL BASE PRICE

Option Item

RV trailer hook ups (2) LS 1 xxxx xxxx TOTAL PRICE

LS = Lump Sum, CY = Cubic Yard, LF = Linear Feet

Vender Name: ____________________________________

Representative: ____________________________________

SAM UEI #: ______________________________________

Phone#: _______________________________________ E-Mail: _________________________________________

File details come from the government source that posted it. Updated .