This is a Project Manual Volume 1 containing 100% construction documents and technical specifications for the USFS Fort Missoula Building 105 Bakery Renovation project (Design Contract #12034319D0001, Order #1240LU23F0047).
The specifications encompass comprehensive requirements for converting the approximately 2,700 square-foot historic bakery building into a wood shop for the USFS Historic Preservation Team. Key work includes selective demolition, cast-in-place concrete, structural steel framing (for optional covered storage), rough and finish carpentry, thermal and moisture protection, metal roof panels, fiberglass reinforced paneling, gypsum board assemblies, linoleum flooring, interior and exterior painting, door hardware, plumbing, and HVAC systems. Eight option items are specified: covered storage structure with concrete slab, water main and hydrant extension, compressed air system, equipment relocation, gravel parking area, ABA parking spot, concrete sidewalks, and electrical upgrades to an adjacent brick building. The project requires extensive coordination with utility companies, testing and inspection agencies, and adherence to Montana Public Works Standards, ACI standards, ASTM specifications, and applicable building codes. Administrative requirements include detailed submittal procedures using web-based project management software (Procore or equivalent), bi-monthly progress meetings, RFI processing with 7-calendar-day response times, and comprehensive closeout documentation including record drawings, operations and maintenance manuals, and warranties. Project design team includes Mosaic Architecture as architect and Morrison-Maierle providing structural, mechanical, plumbing, and electrical engineering. The contractor must establish temporary utilities, maintain erosion and sediment control per Missoula MS4 permit requirements, and provide mock-ups for evaluation before proceeding with full installation of specified materials and systems.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT MANUAL VOLUME 1:
USFS
FORT MISSOULA -
BUILDING 105
BAKERY RENOVATION
Design Contract # 12034319D0001
Order #1240LU23F0047 Option Item 01
Date: March 31, 2025
100% CONSTRUCTION DOCUMENTS
Technical Specifications
PROJECT MANAGER-CONTACT
James Blimmel, PE, Contracting Officer’s Representative Missoula, MT 59804
James.blimmel@usda.gov
ARCHITECT
MOSAIC ARCHITECTURE, P.C.
317 North Cruse Ave, Suite 201
Helena, Montana 59601 www.mosaicarch.com
Project Information Page 1 of 2 USFS Building 105 Bakery Reno
PROJECT INFORMATION SHEET
FORT MISSOULA
BUILDING 105 – BAKERY RENOVATION
PROJECT LOCATION
Fort Missoula
Missoula, Montana 59808
PROJECT MANAGER; Contracting Officer’s Representative (C.O.R.) for USFS primary project contact for DESIGN PHASE only. See solicitation materials for bidding and construction contact information:
James Blimmel, PE, Contracting
Officer’s Representative
Missoula, MT 59804
James.blimmel@usda.gov
PROJECT DESIGN TEAM
Do not contact the design team directly. All contracts to be through the USFS project contract.
Design Contract # 12034319D0001
Design Order #1240LU23F0047 Option Item 01
ARCHITECT:
Mosaic Architecture, P.C.
317 N Cruse, Suite 201 Helena, Montana 59601 ph: 406-449-2013 Matt Aune, AIA Matta@mosaicarch.com
STRUCTURAL ENGINEER:
Morrison-Maierle 1055 Mount Avenue Missoula, MT 59801 ph: 406-495-3439
MECHANICAL/PLUMBING ENGINEER:
Morrison-Maierle 1055 Mount Avenue Missoula, MT 59801 ph: 406-542-8880 Jason Beaudette, PE jbeaudette@m-m.net
Project Information Page 2 of 2 USFS Building 105 Bakery Reno
ELECTRICAL ENGINEER:
Morrison-Maierle 1055 Mount Avenue Missoula, MT 59801 ph: 406-542-8880 Trevor Larson, PE tlarson@m-m.net
PROJECT INFORMATION SHEET
FORT MISSOULA
BUILDING 105 – BAKERY RENOVATION
SPECIFICATIONS SECTIONS 01 – 33 ARE INCLUDED HEREIN. ALL CIVIL SITEWORK
TO BE COMPLETED IN COMPLIANCE WITH THESE SECTIONS AND THE MONTANA
PUBLIC WORKS STANDARDS LATEST ADDITION. THOSE STANDARDS ARE
INCORPORATED INTO THIS DOCUMENT BY REFERENCE.
Building 105 - Bakery
Renovation TABLE OF CONTENTS 100% CD Set
TABLE OF CONTENTS
SPECIFICATIONS SECTIONS 01 – 33 ARE INCLUDED HEREIN. ALL CIVIL SITEWORK TO BE
COMPLETED IN COMPLIANCE WITH THESE SPECIFICATIONS AND THE LATEST ADDITION
OF THE MONTANA PUBLIC WORKS STANDARDS LATEST ADDITION. THOSE STANDARDS
ARE INCORPORATED INTO THIS DOCUMENT BY REFERENCE.
DIVISION 01 - GENERAL REQUIREMENTS
01 1000 SUMMARY
01 2300 OPTION ITEMS
01 3000 ADMINISTRATIVE REQUIREMENTS
01 3200 CONSTRUCTION PROGRESS DOCUMENTATION
01 3233 PHOTOGRAPHIC DOCUMENTATION
01 4000 QUALITY REQUIREMENTS
01 4130 CONTRACTOR QUALITY CONTROL
01 5000 TEMPORARY FACILITIES AND CONTROLS
01 5713 TEMPORARY EROSION AND SEDIMENT CONTROL
01 6000 PRODUCT REQUIREMENTS
01 6116 VOLATILE ORGANIC COMPOUND (VOC) CONTENT
RESTRICTIONS
01 7329 CUTTING AND PATCHING
01 7700 CLOSEOUT PROCEDURES
01 7823 OPERATION AND MAINTENANCE DATA
01 7839 PROJECT RECORD DOCUMENTS
01 7900 DEMONSTRATION AND TRAINING
DIVISION 02 - EXISTING CONDITIONS
02 4100
02 4113
DEMOLITION
SELECTIVE SITE DEMOLITION
DIVISION 03 – CAST IN PLACE CONCRETE
03 3000 CAST IN PLACE CONCRETE (SITE)
03 3000 CAST IN PLACE CONCRETE
03 5400 CAST UNDERLAYMENT
DIVISION 05 - METALS
05 1200 STRUCTURAL STEEL FRAMING
05 5000 METAL FABRICATIONS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
Renovation TABLE OF CONTENTS 100% CD Set
06 1000 ROUGH CARPENTRY
06 2000 FINISH CARPENTRY
06 8316 FIBERGLASS REINFORCED PANELING
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 2100 THERMAL INSULATION
07 4113 METAL ROOF PANELS
07 7123 MANUFACTURED GUTTERS AND DOWNSPOUTS
07 8400 FIRESTOPPING
DIVISION 08 - OPENINGS
08 1433 STILE AND RAIL WOOD DOORS
08 7100 DOOR HARDWARE
DIVISION 09 - FINISHES
09 2116 GYPSUM BOARD ASSEMBLIES
09 6543 LINOLEUM FLOORING
09 9113 EXTERIOR PAINTING
09 9123 INTERIOR PAINTING
DIVISION 10 - SPECIALTIES
10 1400 SIGNAGE
10 2800 TOILET, BATH, AND LAUNDRY ACCESSORIES
10 4400 FIRE PROTECTION SPECIALTIES
DIVISION 11 - EQUIPMENT
11 3300 ATTIC LADDER
DIVISION 22 - PLUMBING
220000 GENERAL REQUIREMENTS OF PLUMBING AND HVAC
220500 GENERAL PROVISION OF PLUMBING AND HVAC
220519 METERS AND GAGES FOR PLUMBING AND HVAC PIPING
220523 GENERAL DUTY VALVES FOR PLUMBING AND HVAC
220529 HANGERS AND SUPPORTS FOR PLUMBING AND HVAC PIPING AND EQUIPMENT
220548 VIBRATION AND SEISMIC CONTROLS FOR PLUMBING AND HVAC PIPING AND EQUIPMENT
220553 IDENTIFICATION FOR PLUMBING AND HVAC PIPING AND EQUIPMENT
220716 PLUMBING AND HVAC EQUIPMENT AND PIPING INSULATION
Renovation TABLE OF CONTENTS 100% CD Set
221116 DOMESTIC WATER PIPING
221119 DOMESTIC WATER PIPING SPECIALTIES
221123 INLINE, DOMESTIC-WATER PUMPS
221316 SANITARY WASTE AND VENT PIPING
221319 SANITARY WASTE PIPING SPECIALTIES
221513 GENERAL-SERVICE COMPRESSED-AIR PIPING
223300 ELECTRIC, DOMESTIC-WATER HEATERS
224100 PLUMBING FIXTURES
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
230593 TESTING, ADJUSTING, AND BALANCING FOR HVAC
230713 DUCT INSULATION
232300 REFRIGERANT PIPING
233113 METAL DUCTS
233115 DUST COLLECTION DUCTWORK
233300 AIR DUCT ACCESSORIES
233330 LOUVERS
233346 FLEXIBLE DUCTS
233423 HVAC POWER VENTILATORS
233713 GRILLES, REGISTERS, AND DIFFUSERS
238125 SPLIT SYSTEM HEAT PUMPS
238230 PROPELLER UNIT HEATERS
238231 HEATERS
238500 WOOD DUST COLLECTORS
DIVISION 26 - ELECTRICAL
260010 GENERAL ELECTRICAL REQUIRMENTS ON SPECS
260505 SELECTIVE DEMOLITION OF ELECTRICAL SYSTEMS
260519 LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES
260526 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS
260529 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS
260533 RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS
260544 SLEEVES AND SLEEVE SEALS FOR ELECTRICAL RACEWAYS AND CABLING
260548.16 SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS
260553 IDENTIFICATION FOR ELECTRICAL SYSTEMS
260923 LIGHTING CONTROL DEVICES
Renovation TABLE OF CONTENTS 100% CD Set
DIVISION 31 – EARTHWORK
31 2000 EARTH MOVING
31 2333 TRENCHING AND BACKFILLING
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 1100
32 1213
32 1216
32 1313
32 9200
CRUSHED BASE COURSE
ASPHALT TACK COAT
ASPHALT PAVING
CONCRETE SIDEWALK AND MISC. NEW CONCRET
TURF AND GRASSES
33 3000 SANITARY SEWERAGE UTILITIES
262416 PANELBOARDS
262713 ELECTRICITY METERING
262726 WIRING DEVICES
262813 FUSES
262816 ENCLOSED SWITCHES AND CIRCUIT BREAKERS
262913.03 MANUAL AND MAGNETIC MOTOR CONTROLLERS
264313 SURGE PROTECTION FOR LOW-VOLTAGE ELECTRICAL POWER CIRCUITS
265119 LED INTERIOR LIGHTING
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
283111 DIGITAL, ADDRESSABLE FIRE-ALARM SYSTEM
DIVISION 33 - UTILITIES
33 1000 WATER UTILITIES
Building 105 - Bakery Renovation 01 1000 - 1 Summary
SECTION 01 1000
SUMMARY
PART 1 GENERAL
1.01 PROJECT
A. Project Name: Building 105 - Bakery Renovation B. Owner's Name: United States Forest Service.
C. Owner's Representative: Contracting Officer.
D. The Project consists of the alteration of the historic Bakery building on the Fort Missoula campus. The building is approximately 2,700 square feet and is to be converted to a wood shop for the USFS Historic Preservation Team.
1.02 DESCRIPTION OF ALTERATIONS WORK
A. Scope of alterations work is indicated on drawings.
1.03 WORK BY OWNER
A. Equipment Relocation: If the Option Item for equipment relocation is not accepted, the USFS will contract separately or self-perform relocation of shop equipment, tables, tools, benches, and storage racks. USFS staff will oversee the final placement of all shop equipment. Shop equipment will be located prior to installation of final dust collection ductwork to assure duct placement in the proper location.
1.04 OWNER OCCUPANCY
A. Contracting Officer intends to occupy the Project upon Substantial Completion. During construction, the building will NOT be occupied.
B. Cooperate with Contracting Officer to minimize conflict and to facilitate Contracting Officer's operations.
C. Schedule the Work to accommodate Contracting Officer occupancy.
1.05 CONTRACTOR USE OF SITE AND PREMISES
A. Construction Operations: Limited to areas noted on Drawings.
B. Arrange use of site and premises to allow:
1. Contracting Officer occupancy.
2. Work by Others.
3. Work by Contracting Officer.
C. Provide access to and from site as required by law and by Contracting Officer:
1. Provide temporary site access from the north off Post Siding Road. Existing fencing to be used as security fence. Existing gate to be used as secure access.
2. Do not obstruct roadways, sidewalks, or other public ways without permit.
END OF SECTION
This page intentionally left blank
Building 105 - Bakery Renovation 01 2300 - 1 Option Items
SECTION 01 2300
OPTION ITEMS
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Description of Option Items.
1.02 ACCEPTANCE OF OPTION ITEMS
A. Option Items quoted on Bid Forms will be reviewed and accepted or rejected at Contracting Officer's option. Accepted Option Items will be identified in the Owner-Contractor Agreement.
B. Coordinate related work and modify surrounding work to integrate the Work of each Option Items.
1.03 SCHEDULE OF OPTION ITEMS 1 - 7
A. Option Item 1 - Covered Storage
1. Base Bid: do not provide concrete slab and wood storage cover structure as shown on plans. See A101 for limits of base bid concrete work.
2. Option Item 1: provide concrete slab and steel-framed wood storage cover structure as shown on plans sheet a104.
B. Option Item 2 - Water Main and Hydrant:
1. Base Bid: do NOT provide water main extension as shown on plans. Do not provide new hydrant as shown on plans.
a. No new water main work in Base Bid.
b. 1 inch polyethylene water service line to building IS included in Base Bid. Water service line to run as shown on C003. If Option Item 2 is NOT constructed, water service line to be extended south to connect to existing 4-inch water main (at point of connection of water main in Option Item 2).
2. Option Item 2: Provide water main extension as shown on C002, C003.
a. Water main begins at connection to existing 12" water main in Post Siding Road and extends south to existing 4" water main to the Southwest of the Bakery building.
b. Option item includes 6" lateral and fire hydrant.
c. Option Items includes all connections and valving associated with water main.
d. Option Item includes caping existing 4" main as shown south of Post Siding Road and as shown Southwest of the Bakery building.
C. Option Item 3 - Compressed Air System:
1. Base Bid: do not provide a compressed air system as shown on P201.
a. Do not provide compressed air piping.
b. Do not provide hose reels
c. Do not provide power to compressor (provide space in electrical panel, but no breaker or conduit to compressor).
2. Option Item 3: provide complete and functional compressed air system.
a. Provide compressed air piping as shown on P201.
b. Provide hose reels as shown on sheet P201.
c. Provide electrical breaker, conduit, disconnect, and hook-up of owner-provided air compressor.
D. Option Item 4 - Equipment Relocation:
1. Base Bid: Owner to relocate and set wood working equipment. General Contractor to hook-up dust collection system.
2. Option Item 4: Relocate wood working equipment, set equipment at the direction of the Owner and install dust collection system. Equipment to be relocated is shown on Sheet A103. Owner to relocate work tables, clamps, bench-top tools, and hand-tools.
a. Equipment to be moved from the existing shop at 1600 Catlin Street. The site is accessed at the intersection of Catlin and S14th St W. The route is approximately
Building 105 - Bakery Renovation 01 2300 - 2 Option Items
2.6 miles from existing shop to the Bakery building.
b. Equipment to be relocated as part of Bid Option includes
1) Belt sander
2) 2 band saws
3) Miter Saw (owner to relocate mounting table and run-out tables)
4) Drill press.
5) Downdraft table
6) Drum Sander
7) Joiner
8) Lathe
9) LOBO multi-function tenoner/shaper
10) 2 mortise machines
11) planer
12) panel saw
13) router
14) 4 shapers
15) scroll saw
16) tenoner
17) 2 table saws. Owner to disassemble and re-install custom wood run-out tables.
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION - NOT USED
END OF SECTION
Option Item 5 - Gravel Parking Area
1. Base Bid: do not provide gravel surfaced parking area or dry well as shown on plans.
2. Option Item 5: provide gravel surfaced parking area and dry well as shown on plan sheets
C002 and C003.
Option Item 6 - ABA Parking Spot
1. Base Bid: do not provide the ABA parking spot or related items as shown on plans.
2. Option Item 6: provide ABA parking spot including the asphalt surfacing, reinforced concrete, parking block, ABA parking sign, and striping as shown on plan sheet C004.
Option Item 7 - Concrete Sidewalk
1. Base Bid: provide gravel surfaced walkways where all concrete sidewalks are shown on the plans (east and west side of the building). Gravel walkway shall extend to the existing parking lot on the west side, as ABA parking spot will not be installed with gravel walkway. 6" reinforced concrete pad for dust collector is part of base bid.
2. Option Item 7: provide concrete sidewalks as shown on plans. Include a note with additional price if extended to existing parking lot (in the scenario with a concrete sidewalk but no ABA parking spot).
1. Base Bid: do not provide electrical upgrades for the Brick building.
2. Option Item 7: provide electrical upgrades for the Brick building (just west of the Bakery) per the engineering narrative from Morrison-Maierle. Include an electrical drawing to be reviewed prior to proceeding. Coordinate receptacle or hardwire locations for the listed equipment with the COR.
Option Item 8 - Electrical Upgrades
Building 105 - Bakery Renovation 01 3000 - 1 Administrative Requirements
SECTION 01 3000
ADMINISTRATIVE REQUIREMENTS
PART 1 GENERAL
1.01 SECTION INCLUDES
A. General administrative requirements.
B. Electronic document submittals.
C. Contractor's review.
D. Submittal procedures.
E. Preconstruction meeting.
F. Progress meetings.
G. Construction progress schedule.
H. Request for Intepretation (RFI) procedures.
I. Submittals for review, information, and project closeout.
J. Owner submittal review.
1.02 RELATED REQUIREMENTS
A. Section 01 16000 - Product Requirements: General product requirements.
1.03 GENERAL ADMINISTRATIVE REQUIREMENTS
A. Comply with requirements of Section 01 7000 - Execution and Closeout Requirements for coordination of execution of administrative tasks with timing of construction activities.
B. Make the following types of submittals to Contracting Officer:
1. Requests for Interpretation (RFI).
2. Shop drawings, product data, and samples.
3. Test and inspection reports.
4. Design data.
5. Manufacturer's instructions and field reports.
6. Applications for payment and change order requests.
7. Progress schedules.
8. Coordination drawings.
9. Correction Punch List and Final Correction Punch List for Substantial Completion.
10. Closeout submittals.
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION
3.01 ELECTRONIC DOCUMENT SUBMITTAL
A. Project Management Software: the Contractor shall implement, manage, own or subscribe to service of web-based construction management software, Procore or equal, to manage, host, and track the following items
1. Project Management Software shall be used the following project management tasks at a minimum. The Contractor shall provide access/use of the software to the Owner's staff, Architect-Engineers staff, sub-contractors, and consultants staff.
a. Submittals
b. RFIs
c. Posted Drawings
d. Posted Specifications
e. Project Schedule
f. Daily Reports
g. Inspection and progress photos
Building 105 - Bakery Renovation 01 3000 - 2 Administrative Requirements
h. Testing results
i. Punch lists
2. Contractor and Sub-contractors are required to use this service.
3. It is Contractor's responsibility to submit documents in allowable format.
4. Subcontractors, suppliers, Contracting Officer and Contracting Officer's consultants will be permitted to use the service at no extra charge.
5. Users of the service need an email address, internet access, and PDF review software that includes ability to mark up and apply electronic stamps (such as Adobe Acrobat, www.adobe.com, or Bluebeam PDF Revu, www.bluebeam.com), unless such software capability is provided by the service provider.
6. Paper document transmittals will not be reviewed; emailed electronic documents will not be reviewed.
7. All other specified submittal and document transmission procedures apply, except that electronic document requirements do not apply to samples or color selection charts.
3.02 CONTRACTOR'S REVIEW
A. Contractor's review
1. Action and Informational Submittals: the General Contractor and applicable Sub- Contractor shall review each submittal and check with coordination with other work of the contract and for compliance with the Contract Documents. Note corrections and field dimensions. Mark with approval stamp before submitting to Contracting Officer.
2. Project Closeout and Maintenace/Material Submittals: Refer to requirements in Division 01 Section "Closeout Procedures".
3. Approval Stamp: The General Contractor and applicable Sub-Contractor shall stamp each submittal with a uniform, approval stamp. Include project name and location, submittal number, Specification Section title and number, name of reviewer , date of Contractor's approval, and statement certifying that submittal has been reviewed, checked, and approved for compliance with the Contract Documents.
3.03 SUBMITTAL PROCEDURES
A. Coordination: Coordinate preparation and processing of submittals with performance of construction activities.
1. Coordinate each submittal with fabrication, purchasing, testing, delivery, other submittals, and related activities that require sequential activity.
2. Coordinate transmittal of different types of submittals for related parts of the work so processing will not be delayed because of need to review submittals concurrently for coordination.
a. Contracting Officer reserves right to withhold action on a submittal requiring coordination with other submittals until related submittals are received.
B. Processing Time: Allow time for submittal review, including time for resubmittals, as follows:
Time for review shall commence on Contracting Officer's receipt of submittal. No extension of the Contract Time will be authorized because of failure to transmit submittals enough in advance of the work to permit processing, including resubmittals.
1. Initial Review: Allow 15 days for initial review of each submittal. Allow additional time if coordination with subsequent submittals is required. Contracting Officer will advise Contractor when a submittal being processed must be delayed for coordination.
2. Intermediate Review: If intermediate submittal is necessary, process it in same manner as initial submittal.
3. Re-submittal Review: Allow 15 days for review of each resubmittal.
C. Identification and Information: Place a permanent label or title block on submittal item for identification.
1. Indicate name or firm or entity that prepared each submittal on label or title block.
2. Provide a space approximately 6 by 8 inches on label or beside title block to record
Contractor's review and approval markings and action taken by Contracting Officer.
Building 105 - Bakery Renovation 01 3000 - 3 Administrative Requirements
3. Include the following information for processing and recording action taken:
a. Project name.
b. Date.
c. Name of Contracting Officer.
d. Name of Contractor.
e. Name of subcontractor.
f. Name of supplier.
g. Name of manufacturer.
h. Submittal number or other unique identifier, including revision identifier.
i. Number and title of appropriate Specification Section.
j. Drawing number and detail references, as appropriate.
k. Locations(s) where product is to be installed, as appropriate.
l. Other necessary identification.
D. Identification and Information: Identify and incorporate information in each electronic submittal file as follows:
1. Assembly complete submittal package into a single indexed file with links enabling navigation of each item.
2. Name file with submittal number or other unique identifier, including revision identifier.
a. File name shall use project identifier and Specification Section number followed by a decimal point and then a sequential number (e.g. LNHS-061000.01). Resubmittals shall include an alphabetic suffix after another decimal point (e.g. LNHS- 061000.01.A).
3. Provide means of insertion to permanently record Contractor's review and approval markings and action taken by Contracting Officer.
4. Include the following information on a inserted cover sheet:
a. Project name.
b. Date.
c. Name and address of Contracting Officer.
d. Name of Contractor.
e. Name of firm or entity that prepared submittal.
f. Name of subcontractor.
g. Name of supplier.
h. Name of manufacturer.
i. Number and title of appropriate Specification Section.
j. Drawing number and detail references, as appropriate.
k. Related physical samples submitted directly.
l. Other necessary identification.
E. Options: Identify options requiring selection by the Contracting Officer.
F. Deviations: Identify deviations from the Contract Documents on submittals.
G. Resubmittal: Make resubmittals in same form and number of copies as initial submittal.
1. Note date and content of previous submittal.
2. Note date and content of revision in label or title block and clearly indicate extent of revision.
3. Resubmit submittals until they are marked with approval notation from Contracting
Officer's action stamp.
3.04 PRECONSTRUCTION MEETING
A. Attendance Required:
1. Contracting Officer representative.
2. Contractor.
3. All major sub-contractors.
B. Agenda:
Building 105 - Bakery Renovation 01 3000 - 4 Administrative Requirements
1. Execution of Contracting Officer-Contractor Agreement.
2. Submission of executed bonds and insurance certificates.
3. Distribution of Contract Documents.
4. Submission of list of subcontractors, list of products, schedule of values, and progress schedule.
5. Designation of personnel representing the parties to Contract.
6. Procedures and processing of field decisions, submittals, applications for payments, proposal request, Change Orders, and Contract closeout procedures.
7. Scheduling.
C. Contractor will record minutes and distribute copies within seven days after meeting to participates, with one copy to Contracting Officer, participants, and those affected by decisions made.
3.05 PROGRESS MEETINGS
A. Schedule and administer meetings throughout progress of the work at maximum bi-monthly intervals.
B. Attendance Required:
1. Contractor.
2. Contracting Officer representative.
3. Contractor's superintendent.
C. Agenda:
1. Review minutes of previous meetings.
2. Review of work progress.
3. Field observations, problems, and decisions.
4. Identification of problems that impede, or will impede, planned progress.
5. Review of submittals schedule and status of submittals.
6. Maintenance of progress schedule.
7. Corrective measures to regain projected schedules.
8. Planned progress during succeeding work period.
9. Maintenance of quality and work standards.
10. Effect of proposed changes on progress schedule and coordination.
11. Other business relating to work.
D. Record minutes and distribute copies within two days after meeting to participants, with two copies to Contracting Officer, Contracting Officer, participants, and those affected by decisions made.
3.06 CONSTRUCTION PROGRESS SCHEDULE
A. Within 10 days after date of the Agreement, submit preliminary schedule for review.
B. Within 20 days after review of preliminary schedule, submit final complete schedule.
C. See Section 01 3200 Construction Progress Documentation for complete project schedule requirements.
3.07 REQUESTS FOR INTERPRETATION (RFI)
A. Definition: A request seeking one of the following:
1. An interpretation, amplification, or clarification of some requirement of Contract
Documents arising from inability to determine from them the exact material, process, or system to be installed; or when the elements of construction are required to occupy the same space (interference); or when an item of work is described differently at more than one place in Contract Documents.
2. A resolution to an issue which has arisen due to field conditions and affects design intent.
B. All RFIs to be submitted through Contractor's project management software. RFIs not submitted through the software will not be recognized.
Building 105 - Bakery Renovation 01 3000 - 5 Administrative Requirements
C. Whenever possible, request clarifications at the next appropriate project progress meeting, with response entered into meeting minutes, rendering unnecessary the issuance of a formal RFI.
D. Preparation: Prepare an RFI immediately upon discovery of a need for interpretation of Contract Documents. Failure to submit a RFI in a timely manner is not a legitimate cause for claiming additional costs or delays in execution of the work.
1. Prepare a separate RFI for each specific item.
a. Review, coordinate, and comment on requests originating with subcontractors and/or materials suppliers.
b. Do not forward requests which solely require internal coordination between subcontractors.
2. Prepare in a format and with content acceptable to Contracting Officer.
E. Reason for the RFI: Prior to initiation of an RFI, carefully study all Contract Documents to confirm that information sufficient for their interpretation is definitely not included.
1. Include in each request Contractor's signature attesting to good faith effort to determine from Contract Documents information requiring interpretation.
2. Unacceptable Uses for RFIs: Do not use RFIs to request the following::
a. Approval of submittals (use procedures specified elsewhere in this section).
b. Changes that entail change in Contract Time and Contract Sum (comply with provisions of the Conditions of the Contract).
F. Content: Include identifiers necessary for tracking the status of each RFI, and information necessary to provide an actionable response.
1. Official Project name and number, and any additional required identifiers established in
Contract Documents.
2. Contracting Officer's, Contracting Officer's, and Contractor's names.
3. Discrete and consecutive RFI number, and descriptive subject/title.
4. Issue date, and requested reply date.
5. Reference to particular Contract Document(s) requiring additional information/interpretation. Identify pertinent drawing and detail number and/or specification section number, title, and paragraph(s).
6. Annotations: Field dimensions and/or description of conditions which have engendered the request.
7. Contractor's suggested resolution: A written and/or a graphic solution, to scale, is required in cases where clarification of coordination issues is involved, for example;
routing, clearances, and/or specific locations of work shown diagrammatically in Contract Documents. If applicable, state the likely impact of the suggested resolution on Contract Time or the Contract Sum.
G. Attachments: Include sketches, coordination drawings, descriptions, photos, submittals, and other information necessary to substantiate the reason for the request.
H. RFI Log: Prepare and maintain a tabular log of RFIs for the duration of the project.
1. Indicate current status of every RFI. Update log promptly and on a regular basis.
2. Note dates of when each request is made, and when a response is received.
3. Highlight items requiring priority or expedited response.
4. Highlight items for which a timely response has not been received to date.
I. Review Time: Contracting Officer will respond and return RFIs to Contractor within seven calendar days of receipt. For the purpose of establishing the start of the mandated response period, RFIs received after 12:00 noon will be considered as having been received on the following regular working day.
1. Response period may be shortened or lengthened for specific items, subject to mutual agreement, and recorded in a timely manner in progress meeting minutes.
J. Responses: Content of answered RFIs will not constitute in any manner a directive or authorization to perform extra work or delay the project. If in Contractor's belief it is likely to lead to a change to Contract Sum or Contract Time, promptly issue a notice to this effect, and
Building 105 - Bakery Renovation 01 3000 - 6 Administrative Requirements follow up with an appropriate Change Order request to Contracting Officer.
1. Response may include a request for additional information, in which case the original RFI will be deemed as having been answered, and an amended one is to be issued forthwith.
Identify the amended RFI with an R suffix to the original number.
2. Do not extend applicability of a response to specific item to encompass other similar conditions, unless specifically so noted in the response.
3. Upon receipt of a response, promptly review and distribute it to all affected parties, and update the RFI Log.
4. Notify Contracting Officer within seven calendar days if an additional or corrected response is required by submitting an amended version of the original RFI, identified as specified above.
3.08 SUBMITTALS FOR REVIEW
A. When the following are specified in individual sections, submit them for review:
1. Product data.
2. Shop drawings.
3. Samples for selection.
4. Samples for verification.
B. Electronic submittals are required through Contractor's project management software.
C. Submit to Contracting Officer for review for the limited purpose of checking for compliance with information given and the design concept expressed in Contract Documents.
D. Samples will be reviewed for aesthetic, color, or finish selection.
E. After review, provide copies and distribute in accordance with SUBMITTAL PROCEDURES article below and for record documents purposes described in Section 01 7800 - Closeout Submittals.
3.09 SUBMITTALS FOR INFORMATION
A. When the following are specified in individual sections, submit them for information:
1. Design data.
2. Certificates.
3. Test reports.
4. Inspection reports.
5. Manufacturer's field reports.
6. Other types indicated.
B. Submit for Contracting Officer's knowledge as contract administrator or for Contracting Officer.
3.10 SUBMITTALS FOR PROJECT CLOSEOUT
A. Submit Correction Punch List for Substantial Completion.
B. Submit Final Correction Punch List for Substantial Completion.
C. When the following are specified in individual sections, submit them at project closeout in compliance with requirements of Section 01 7800 - Closeout Submittals:
1. Project record documents.
2. Operation and maintenance data.
3. Warranties.
4. Bonds.
5. Additional stock materials as indicate.
D. Submit for Contracting Officer's benefit during and after project completion.
3.11 OWNER SUBMITTAL REVIEW
A. Submittals for Review: Contracting Officer will review each submittal, and approve, or take other appropriate action.
Building 105 - Bakery Renovation 01 3000 - 7 Administrative Requirements
B. Submittals for Information: Contracting Officer will acknowledge receipt and review. See below for actions to be taken.
C. Contracting Officer's actions will be reflected by marking each returned submittal using virtual stamp on electronic submittals.
D. Contracting Officer's and consultants' actions on items submitted for review:
1. Authorizing purchasing, fabrication, delivery, and installation:
a. "No Exceptions Taken", or language with same legal meaning.
b. "Revised as noted/no re-submittal required", or language with same legal meaning.
1) At Contractor's option, submit corrected item, with review notations acknowledged and incorporated.
2. Not Authorizing fabrication, delivery, and installation:
a. "Revise and Resubmit".
1) Resubmit revised item, with review notations acknowledged and incorporated.
2) Non-responsive resubmittals may be rejected.
b. "Rejected".
1) Submit item complying with requirements of Contract Documents.
E. Contracting Officer's and consultants' actions on items submitted for information:
1. Items for which no action was taken:
a. "Received" - to notify the Contractor that the submittal has been received for record only.
2. Items for which action was taken:
a. "Reviewed" - no further action is required from Contractor.
Building 105 - Bakery Renovation 01 3200 - 1 Construction Progress Documentation
SECTION 01 3200
CONSTRUCTION PROGRESS DOCUMENTATION
PART 1 GENERAL
1.01 SUMMARY
A. Section includes administrative and procedural requirements for documenting the progress of construction during performance of the Work, including the following:
1. Contractor's construction schedule including cost-loading.
2. Construction schedule updating reports.
3. Daily construction reports.
4. Site condition reports.
1.02 DEFINITIONS
A. Activity: A discrete part of a project that can be identified for planning, scheduling, monitoring, and controlling construction project. Activities included in a construction schedule consume time and resources.
1. Critical Activity: An activity on the critical path that must start and finish on the planned early start and finish time.
2. Predecessor Activity: An activity that precedes another activity in the network.
3. Successor Activity: An activity that follows another activity in the network.
B. CPM: Critical path method, which is a method of planning and scheduling a construction project where activities are arranged based on activity relationships. Network calculations determine when activities can be performed and the critical path of Project.
C. Critical Path: The longest connected chain of independent activities through the network schedule that establishes the minimum overall Project duration and contains no float.
1.03 INFORMATIONAL SUBMITTALS
A. Format for Submittals: Submit required submittals in the following format:
1. Working electronic copy of schedule file, where indicated.
2. PDF electronic file.
B. Startup Network Diagram: Of size required to display entire network for entire construction period. Show logic ties and activities.
C. Contractor's Construction Schedule: Initial schedule, of size required to display entire schedule for entire construction perio
1. Submit a working electronic copy of schedule, using software indicated, and labeled to comply with requirements for submittals. Include type of schedule (initial or updated) and date of label.
D. Cost-loading of schedule: Contractor's Construction Schedule to include contract cost-loading per pay period. Cost loading to be broken down by:
1. CSI division for all work.
2. Mobilization and start-up to be included as a seperate cost line item.
3. General conditions to be distributed throughout schedule as costs are incurred.
E. CPM Reports: Concurrent with CPM schedule, submit each of the following reports. Format for each activity in reports shall contain activity number, activity description, original duration, remaining duration, early start date, early finish date, late start date, late finish date, and total float in calender days.
1. Activity Report: List of all activities sorted by activity number and then early start date, or actual start date if known.
2. Logic Report: List of preceding and succeeding activities for all activities, sorted in ascending order by activity number and then early start date, or actual start date if known.
F. Construction Schedule Updating Reports: Submit with Applications for Payment.
G. Daily Construction Reports: Submit at a weekly intervals.
Building 105 - Bakery Renovation 01 3200 - 2 Construction Progress
H. Site Condition Reports: Submit at time of discovery of differing conditions.
I. Site Condition Reports: Submit at time of discovery of differing conditions.
1. Work Stages: Indicate important stages of construction for each major portion of the work.
J. Milestones: Include milestones indicated in the Contract Documents in schedule, including, but not limited to, theNotice to Proceed, Substantial Completion, and final completion.
1.04 COORDINATION
A. Coordinate Contractor's construction schedule with the schedule of values, list of subcontracts, submittal schedule, progress reports, payment requests, and other required schedules and reports.
1. Secure time commitments for performing critical elements of the work from entities involved.
2. Coordinate each construction activity in the network with other activities and schedule them in proper sequence.
PART 2 PRODUCTS
2.01 CONTRACTOR'S CONSTRUCTION SCHEDULE, GENERAL
A. Time Frame: Extend schedule from date established for commencement of the work to date of final completion.
1. Contract completion date shall not be changed by submission of a schedule that shows an early completion date, unless specifically authorized by Change Order.
B. Cost-loading of schedule: Contractor's Construction Schedule to include contract cost-loading per pay period. Cost loading to be broken down by:
1. CSI division for all work.
2. Mobilization and start-up to be included as a seperate cost line item.
3. General conditions to be distributed throughout schedule as costs are incurred.
C. Activities: Treat each story or separate area as a separate numbered activity for each main element of the work. Comply with the following:
1. Activity Duration: Define activities so no activity is longer than 20 days, unless specifically allowed by the Contracting Officer.
2. Procurement Activities: Include procurement process activities for the following long lead items and major items, requiring a cycle of more than 60 days, as separate activities in schedule. Procurement cycle activities include, but are not limited to, submittals, approvals, purchasing, fabrication, and delivery.
3. Submittal Review Time: Include review and resubmittals times as indicated in Section 01 3300 "Submittal Procedures" in schedule. Coordinate submittal review times in Contractor's construction schedule and submittal schedule.
4. Startup and Testing Time: Include no fewer than 15 days for startup and testing.
5. Substantial Completion: indicate completion in advance of date established for Substantial
Completion, and allow time for Contracting Officer's administrative procedures necessary for certification of Substantial Completion.
6. Punch List and Final Completion: Include not more than 30 days for completion of punch list items and final completion.
D. Constraints: Include constraints and work restrictions indicated in the Contract Documents and as follows in schedule, and show how the sequence of the work is affected.
1. Phasing: Arrange list of activities on schedule by phase.
2. Work Under More Than One Contract: Include a separate activity for each contract.
3. Work Restrictions: Show the effect of the following items on teh schedule:
a. Coordination with existing constructions.
b. Limitations of continued occupancies.
c. Uninterruptible services.
d. Use of premises restrictions.
Building 105 - Bakery Renovation 01 3200 - 3 Construction Progress
e. Provisions for future construction.
f. Seasonal variations.
E. Milestones: Include milestones indicated in the Contract Documents in schedule, including, but not limited to, the Notice to Proceed, Substantial Completion, and Final Completion.
F. Upcoming Work Summary: Prepare summary report indicating activities scheduled to occur or commence prior to submittal of next schedule update. Summarize the following issues:
1. Unresolved issues.
2. Unanswered issues.
3. Rejected or un returned submittals.
4. Notations on returned submittals.
5. Pending modifications affecting the Work and Contract Time.
G. Recovery Schedule: When periodic update indicates the Work is 14 or more calender days behind the current approved schedule, submit a separate recovery schedule indicating means by which Contractor intends to regain compliance with the schedule.
H. Computer Scheduling Software: Prepare schedules using current version of the program that has been developed specifically to manage construction schedules.
1. Use Microsoft Project, for latest Windows operating system.
2.02 CONTRACTOR'S CONSTRUCTION SCHEDULE (GANTT CHART)
A. Gantt-Chart Schedule: Submit a comprehensive, fully developed, horizontal, Gantt chart type, Contractor's construction schedule within 30 days of date established for commencement of work.
B. Preparation: Indicate each significant construction activity separately. Identify first workday of each week with a continuous vertical line.
1. For construction activities that require three months or longer to complete, indicate an estimated completion percentage in 10 percent increments within time bar.
2.03 REPORTS
A. Daily Construction Reports: Prepare a daily construction report recording the following information concerning events at Project site:
1. List of subcontractors at Project site.
2. List of separate contractors at Project site.
3. Approximate count of personnel at Project site.
4. Equipment at Project site.
5. Material deliveries.
6. High and low temperatures and general weather conditions, including presence of rain and snow.
7. Accidents.
8. Meetings and significant decisions.
9. Unusual events.
10. Stoppages, delays, shortages, and losses.
11. Meter readings and similar recordings.
12. Emergency procedures.
13. Change Orders received and implemented.
14. Services connected and disconnected.
15. Equipment or system test and startups.
16. Partial completions and occupancies.
17. Substantial Completions authorized.
B. Site Conditions Reports: Immediately on discovery of a difference between site conditions and the Contract Documents, prepare and submit a detailed report. Submit with a Request for Information. Include a detailed description of the differing conditions, together with recommendations for changing the Contract Documents.
Building 105 - Bakery Renovation 01 3200 - 4 Construction Progress
PART 3 EXECUTION
3.01 CONTRACTOR'S CONSTRUCTION SCHEDULE
A. Contractor's Construction Schedule Updating: At bi-weekly intervals, update schedule to reflect actual construction progress and activities. Issue schedule 4 work days before each regularly scheduled progress meeting.
1. Revise schedule immediately after each meeting or other activity where revisions have been recognized or made. Issue updated schedule concurrently with the report of each such meeting.
2. Include a report with updated schedule that indicates every change, including, but not limited to, changes in logic, durations, actual starts and finishes, and activity durations.
3. As the work progresses, indicate final completion percentage for each activity.
B. Distribution: Distribute copies of approved schedule to Contracting Officer, separate contractors, testing and inspecting agencies, and other parties identified by Contractor with need-to-know schedule responsibility.
1. Post copies in Project meeting rooms and temporary field offices.
2. When revisions are made, distribute updated schedules to the same parties and post in the same locations. Delete parties from distribution when they have completed their assigned portion of the work and are no longer involved in performance of construction activities.
Building 105 - Bakery Renovation 01 3233 - 1 Photographic Documentation
SECTION 01 3233
PHOTOGRAPHIC DOCUMENTATION
PART 1 GENERAL
1.01 SUMMARY
A. Section includes administrative and procedural requirements for the following:
1. Preconstruction meeting.
2. Periodic construction photographs.
B. Related Requirements:
1. Section 01 7700 "Closeout Procedures" for submitting photographic documentation as
Project Record Documents at Project Closeout.
1.02 INFORMATIONAL SUBMITTALS
A. Construction Photographs: Submit digital photographs to Contracting Officer.
1. Identification: With each digital file submittal include electronic file information stating the following information:
a. Date photograph was taken as date stamped on camera.
PART 2 PRODUCTS
2.01 PHOTOGRAPHIC MEDIA
A. Digital Images: Provide image in JPEG format, with minimum size of 8 megapixels, and date stamped by camera.
PART 3 EXECUTION
3.01 CONSTRUCTION PHOTOGRAPHS
A. General: take photographs using the maximum range of depth of field, and that are in focus, to clearly show the work. Photographs with blurry or out-of-focus areas will not be accepted.
1. Maintain key plan with each set of construction photographs that identifies each photographic location.
B. Digital Images: Submit digital images exactly as originally recorded in the digital camera, without alteration, manipulation, editing, or modifications using image-editing software.
1. Date and Time: Include date and time in file name for each image.
2. Field Office Images: Maintain one set of images accessible in the field office at Project site, available at all times for reference.
C. Preconstruction Photographs: Before commencement of work, take photographs of Project site and surrounding properties, including existing items to remain during construction, from different vantage points, as directed by Contracting Officer.
1. Flag construction limits before taking construction photographs.
2. Take photographs to show existing conditions adjacent to property before starting the work.
3. Take photographs of existing buildings either on or adjoining property to accurately record physical conditions at start of construction.
4. Take photographs of all the existing building exterior elevations to accurately record the physical condition of the building exterior prior to the tart of construction.
5. Take photographs of all the existing building interior spaces to accurately record the physical conditions of each room within the building prior to the start of construction.
D. Periodic Construction Photographs: Take photographs weekly, with timing each month adjusted to coincide with the cutoff date associated with each Application for Payment. Select vantage points to show status of construction and progress since last photographs were taken.
E. Final Completion Construction Photographs: Take color photographs after date of Substantial Completion for submission a Project Record Documents.
Building 105 - Bakery Renovation 01 4000 - 1 Quality Requirements
SECTION 01 4000
QUALITY REQUIREMENTS
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Submittals.
B. Quality assurance.
C. Testing and inspection agencies and services.
D. Control of installation.
E. Mock-ups.
F. Tolerances.
1.02 RELATED REQUIREMENTS
A. Section 01 3000 - Administrative Requirements:
B. Section 01 6000 - Product Requirements: Requirements for material and product quality.
1.03 QUALITY ASSURANCE
A. Testing Agency Qualifications:
1. Prior to start of work, submit agency name, address, and telephone number, and names of registered Engineer or responsible party.
1.04 TESTING AND INSPECTION AGENCIES AND SERVICES
A. Contractor will employ and pay for services of an independent testing agency to perform required testing.
1. Provide all structural code required testing.
2. Perform all required ductwork seal testing.
3. All required hydrostatic testing fo water main. All required bacteriological testing of water mains.
4. All required testing of fire hydrants.
5. All required special inspections.
B. Employment of agency in no way relieves Contractor of obligation to perform Work in accordance with requirements of Contract Documents.
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION
3.01 CONTROL OF INSTALLATION
A. Monitor quality control over suppliers, manufacturers, products, services, site conditions, and workmanship, to produce work of specified quality.
B. Comply with manufacturers' instructions, including each step in sequence.
C. Should manufacturers' instructions conflict with Contract Documents, request clarification from
Contracting Officer before proceeding.
D. Comply with specified standards as minimum quality for the work except where more stringent tolerances, codes, or specified requirements indicate higher standards or more precise workmanship.
E. Have work performed by persons qualified to produce required and specified quality.
F. Verify that field measurements are as indicated on shop drawings or as instructed by the manufacturer.
G. Secure products in place with positive anchorage devices designed and sized to withstand stresses, vibration, physical distortion, and disfigurement.
Building 105 - Bakery Renovation 01 4000 - 2 Quality Requirements
3.02 MOCK-UPS
A. Before installing portions of the Work where mock-ups are required, construct mock-ups in location and size indicated for each form of construction and finish required to comply with the following requirements, using materials indicated for the completed Work. The purpose of mock-up is to demonstrate the proposed range of aesthetic effects and workmanship.
B. Accepted mock-ups establish the standard of quality the Contracting Officer will use to judge the Work.
C. Provide supervisory personnel who will oversee mock-up construction. Provide workers that will be employed during the construction at Project.
D. Tests shall be performed under provisions identified in this section and identified in the respective product specification sections.
E. Assemble and erect specified items with specified attachment and anchorage devices, flashings, seals, and finishes.
F. Obtain Contracting Officer's approval of mock-ups before starting work, fabrication, or construction.
G. Accepted mock-ups shall be a comparison standard for the remaining Work.
H. Where mock-up has been accepted by Contracting Officer and is specified in product specification sections to be removed, protect mock-up throughout construction, remove mock-up and clear area when directed to do so by Contracting Officer.
3.03 TOLERANCES
A. Monitor fabrication and installation tolerance control of products to produce acceptable Work.
Do not permit tolerances to accumulate.
B. Comply with manufacturers' tolerances. Should manufacturers' tolerances conflict with
Contract Documents, request clarification from Contracting Officer before proceeding.
C. Adjust products to appropriate dimensions; position before securing products in place.
3.04 TESTING AND INSPECTION
A. Testing Agency Duties:
1. Provide qualified personnel at site. Cooperate with Contracting Officer and Contractor in performance of services.
2. Perform specified sampling and testing of products in accordance with specified standards.
3. Ascertain compliance of materials and mixes with requirements of Contract Documents.
4. Promptly notify Contracting Officer and Contractor of observed irregularities or non-compliance of Work or products.
5. Perform additional tests and inspections required by Contracting Officer.
6. Submit reports of all tests/inspections specified.
B. Limits on Testing/Inspection Agency Authority:
1. Agency may not release, revoke, alter, or…