Attachment 4 - Itemized Cost Breakdown.xlsx

XLSX spreadsheet 20 KB Posted

Attached to
Replace Fire Alarm System for Buildings 15, 65, 68, 88, 90, & 93
Solicitation number
36C24726R0028
Issued by

About this file

This file is an Itemized Cost Breakdown Worksheet template for Solicitation No. 36C24726R0028, a fire alarm system replacement project at the Central Alabama Veterans Health Care System. The template is structured according to the MasterFormat classification system and provides line items organized by 16 construction divisions, including General Requirements, Existing Conditions, Concrete, Metals, Wood and Plastic, Thermal and Moisture Protection, Openings, Finishes, Specialties, Equipment, Furnishings, Special Construction, Fire Suppression, Plumbing, HVAC, Electrical, Communications, and an Other category. Each division contains rows for itemizing costs across four cost categories: Material, Labor, Equipment, and Other, with automatic totals calculated for each division.

The worksheet includes subtotal rows for all divisions combined, followed by separate line items for Overhead, Profit, Bonds and Insurance, and a final Total Proposal amount. All cells are currently blank with zero dollar values displayed, indicating this is a blank template for offerors to complete. This cost breakdown format is typical for construction and renovation projects and allows vendors to present detailed pricing information aligned with standard industry cost categories and work divisions. The template is designed to be submitted as part of the proposal response for the fire alarm system replacement at the six Veterans Affairs buildings in Tuskegee, Alabama.

View the file

Other files

Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Solicitation No. 36C24726R0028 Attachment 4 – Cost/Price Breakdown Worksheet
DESCRIPTIONMATERIALLABOREQUIPMENTOTHERTOTAL
Division 01 - General Requirements
$$$$ - 0
$$$$ - 0
$$$$ - 0
$$$$ - 0
$$$$ - 0
$$$$ - 0
$$$$ - 0
$$$$ - 0
$$$$ - 0
$$$$ - 0
Division Total$ - 0$ - 0$ - 0$ - 0$ - 0
Division 02 – Existing ConditionsMATERIALLABOREQUIPMENTOTHERTOTAL
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
Division Total$ - 0$ - 0$ - 0$ - 0$ - 0
Division 03 – ConcreteMATERIALLABOREQUIPMENTOTHERTOTAL
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
Division Total$ - 0$ - 0$ - 0$ - 0$ - 0
Division 05 - MetalsMATERIALLABOREQUIPMENTOTHERTOTAL
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
Division Total$ - 0$ - 0$ - 0$ - 0$ - 0
Division 06- Wood and PlasticMATERIALLABOREQUIPMENTOTHERTOTAL
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
Division Total$ - 0$ - 0$ - 0$ - 0$ - 0
Division 07- Thermal and Moisture ProtectionMATERIALLABOREQUIPMENTOTHERTOTAL
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
Division Total$ - 0$ - 0$ - 0$ - 0$ - 0
Division 08- Openings (Doors and Windows)MATERIALLABOREQUIPMENTOTHERTOTAL
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
Division Total$ - 0$ - 0$ - 0$ - 0$ - 0
Division 09- FinishesMATERIALLABOREQUIPMENTOTHERTOTAL
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
Division Total$ - 0$ - 0$ - 0$ - 0$ - 0
Division 10- SpecialtiesMATERIALLABOREQUIPMENTOTHERTOTAL
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
Division Total$ - 0$ - 0$ - 0$ - 0$ - 0
Division 11- EquipmentMATERIALLABOREQUIPMENTOTHERTOTAL
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
Division Total$ - 0$ - 0$ - 0$ - 0$ - 0
Division 12- FurnishingsMATERIALLABOREQUIPMENTOTHERTOTAL
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
Division Total$ - 0$ - 0$ - 0$ - 0$ - 0
Division 13- Special ConstructionMATERIALLABOREQUIPMENTOTHERTOTAL
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
Division Total$ - 0$ - 0$ - 0$ - 0$ - 0
Division 21- Fire SuppressionMATERIALLABOREQUIPMENTOTHERTOTAL
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
Division Total$ - 0$ - 0$ - 0$ - 0$ - 0
Division 22- PlumbingMATERIALLABOREQUIPMENTOTHERTOTAL
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
Division Total$ - 0$ - 0$ - 0$ - 0$ - 0
Division 23- Heating, Ventilating, and Air conditioning (HVAC)MATERIALLABOREQUIPMENTOTHERTOTAL
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$ - 0
Division Total$ - 0$ - 0$ - 0$ - 0$ - 0
Division 26 ElectricalMATERIALLABOREQUIPMENTOTHERTOTAL
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
Division Total$ - 0$ - 0$ - 0$ - 0$ - 0
Division 27- CommunicationsMATERIALLABOREQUIPMENTOTHERTOTAL
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
Division Total$ - 0$ - 0$ - 0$ - 0$ - 0
Other (If applicable)MATERIALLABOREQUIPMENTOTHERTOTAL
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
Other Total$ - 0$ - 0$ - 0$ - 0$ - 0
MATERIALLABOREQUIPMENTOTHERTOTAL
SUB TOTAL$ - 0$ - 0$ - 0$ - 0$ - 0
Overhead$$$$$
Profit$$$$$
Bonds and Insurance$$$$$
Total Proposal$ - 0$ - 0$ - 0$ - 0$ - 0

File details come from the government source that posted it. Updated .