This file is an ICRA (Infection Control Risk Assessment) Breakdown spreadsheet detailing demolition and new work activities across multiple buildings at the Central Alabama Veterans Health Care System facility in Tuskegee, Alabama for Project No. 619A4-23-103.
The spreadsheet identifies specific building locations, floor assignments, affected rooms, and associated risk classifications for both demolition and new work phases. Demolition activities are mapped across Buildings 2, 3, 3A, 4, 4A, 5, 10, 12, 13, 14, 15, 18, 65, 68, 83, 88, 90, 93, 97, 120, and 129, with affected areas including offices, utility rooms, corridors, and specialized spaces such as optical shops, boiler plants, and chiller plants. New work activities are distributed similarly across the facility's basement, first, second, and attic levels. Risk levels are classified as Low, Medium, or High, with corresponding Class designations (Class II, III, or IV), where Class IV represents the highest risk and applies to spaces such as the MH Group Room, Men's restroom areas, and Security Officer locations. This ICRA breakdown serves as a planning document for the fire alarm system replacement project affecting Buildings 14, 15, 65, 68, 88, 90, and 93, providing contractors with detailed information on infection control considerations and work area classifications necessary for safe project execution within the healthcare facility environment.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Demolition Plan | |||||
| Building | Floor/Room | Affected Locations | Risk Level | Class | Level |
| 2 | 103 | DAV Office | Low | C | II |
| 3A | 101 | Social Work Office | Low | C | II |
| 4A | 110 | MH Group Room | High | C | IV |
| 5B | Basement | Elevator, Stairs, Corridor | Low | C | II |
| 90 | 140, 141 | Optical shop, GECR | Medium | C | III |
| Fire Alarm New Work | ||||||
| Building | Floor | Room | Affected Locations | Risk Level | Class | Level |
| 2 | Basement | 3 | EMS Storage | Low | C | II |
| 2 | 1st | C-1, 106, 105, 104, 103, 102, 102A | Corridor, HAS Offices, Museum, ROI | Low | C | II |
| 3 | 1st | 101, 103, 126, 125A, RCC109R | Men's restroom, Supply room, Kitchen, MOD/WH med room, Corridor | High | C | IV |
| 3A | Basement | 12A, 10, 9, 8B, BC-1, BC-2, 6B, 6C, 17, 5, 4, RCCB04R, 17 | Vacant, Engineering and utility rooms, Veteran clothing storage, corridors | Low | C | II |
| 3A | 1st | 101, C-1, 101 | Social Work office, corridor, Public Restroom | Low | C | II |
| 4 | 1st | RCC119R, 120, 103 | Police dispatch, Vending, corridor | Low | C | II |
| 4A | Basement | 2, 3, 7, 8A, RCCB03R | OIT, VSO, Vacant | Low | C | II |
| 4A | 1st | 110, RCC106R, 109, 108, RCC113R | MH Group Room, Corridor, Security Officer, MH office | High | C | IV |
| 5 | Basement | RCCB05R, 22, 25, 32 | Corridor/elevator lobby, Engineering | Low | C | II |
| 10 | 1st | Vacant | Low | C | II | |
| 12 | Basement | Boiler Plant | Low | C | II | |
| 12 | 1st | Boiler Plant | Low | C | II | |
| 13 | 1st | Engineering | Low | C | II | |
| 14 | 1st | Engineering | Low | C | II | |
| 15 | 1st | Engineering, Fire Department | Low | C | II | |
| 18 | 1st | Vacant | Low | C | II | |
| 65 | 1st | Vacant | Low | C | II | |
| 68 | Basement | Engineering, Safety, CDCE, Supply chain | Medium | C | III | |
| 68 | 1st | HR, EMS, PIV | Low | C | II | |
| 68 | 2nd | Education, FMS, Supply Chain | Low | C | II | |
| 68 | Attic | Attic | Low | C | II | |
| 83 | Basement | C11, B4 | Corridor, Engineering | Low | C | II |
| 83 | 1st | RCC112R | Corridor | Low | C | II |
| 88 | 1st | Warehouse | Low | C | II | |
| 90 | 1st | 140, 141, 102, 103, RCC136R, 127, RCC117R | GECR Storage, Conference Room, Reception, Optic Shop, Male Restroom, Billiards | Medium | C | III |
| 93 | 1st | Chapel | Low | C | II | |
| 97 | Basement | Chiller Plant | Low | C | II | |
| 97 | 1st | Chiller Plant | Low | C | II | |
| 120 | Basement | EC05, RG03, G11, G10, G09, 006D | Corridor, Engineering, EMS Storage | Low | C | II |
| 5, 120, 129 | Basement | Tunnel | Corridor | Low | C | II |
| 129 | Basement | CG-6, RCCG01R, CG-7 | Corridors, GECR Storage | Low | C | II |
| 129 | 1st | C1-4 | Main entrance corridor | Low | C | II |