Attachment 4 - Drawings.pdf
PDF 10 MB Posted
- Attached to
- Z2DA--Replace Dual Duct Boxes on Second Floor - 539-21-201 Federal contract opportunity
- Solicitation number
- 36C25026B0042
About this file
This document is a set of construction drawings for a federal construction project at the Cincinnati V.A. Medical Center in Cincinnati, Ohio. The project scope involves replacing dual duct boxes on the 2nd floor of the facility, as indicated in the title "REPLACE DUAL DUCT BOXES ON 2ND FLOOR."
The construction documents include comprehensive mechanical, electrical, and architectural plans with detailed specifications for HVAC systems, ductwork, piping, controls, and automation. Key mechanical components include the installation of new fan coil units (FCU-A240 through FCU-A265), new supply and return ductwork with specified sizes ranging from 6 inches to 48 inches, and a new chilled water booster pump (1-P2-2) with associated piping connections. The drawings specify duct pressure classes, leakage tables, and air distribution devices including square plaque diffusers and eggcrate ceiling registers. Electrical work involves disconnecting the existing chilled water booster pump from motor control center MCC-2, installing a new 30-ampere fused disconnect switch, extending circuits to new equipment with specified wire gauges and conduit sizes, and reconnecting loads to existing branch panels 2A2 and 2D2. Controls and automation include 2-pipe fan coil unit sequences of operation with temperature sensors, supply air temperature monitoring, drain pan overflow switches, and integration with the Building Automation System (BAS) using Tridium controls. The construction documents are dated October 10, 2025, prepared by STAN Engineers and Levin Porter Associates for the U.S. Department of Veterans Affairs, with the project managed by Zach Schmidt. All work is fully sprinklered and must comply with phasing requirements to maintain facility operations during construction, with coordination required for weekend or night work to minimize downtime to occupied areas.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Atch RFI 6 life safety plan.pdf | ||
| Atch RFI 7 ACM SURVEY REPORT.pdf | ||
| Atch RFI 4 Lead Paint Report.pdf | ||
| 36C25026B0042 0002.docx | DOCX document | |
| 36C25026B0042_1.pdf | ||
| 36C25026B0042 0001.docx | DOCX document | |
| Attachment 3 - Specs.pdf | ||
| Attachment 2 - VHA Directive 1192.01.pdf | ||
| Attachment 11 -Honeywell Siemens JCI Redacted.pdf | ||
| Attachment 10 - FX Controls Redacted.pdf | ||
| Attachment 9 - PCRA.pdf | ||
| Attachment 6 - EMR Form.docx | DOCX document | |
| Attachment 5 - VAAR 852.219-75.docx | DOCX document | |
| Attachment 12 - Tridium Niagara Redacted.pdf | ||
| Attachment 8 - ICRA.pdf | ||
| Attachment 1 - OH20260082 01022026.pdf | ||
| Attachment 7 - Request for Information.docx | DOCX document | |
| 36C25026B0042_1.docx | DOCX document |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
M001
INDEX, LEGEND, AND GENERAL
NOTES -
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
REPLACE DUAL DUCT BOXES ON
2ND FLOOR
CINCINNATI, OH
539-21-201
Project Manager
10/10/2025Revisions: Date:
Cincinnati V.A.
Medical Center
35% SCHEMATIC DESIGN 03/23/2020
65% DESIGN DEVELOPMENT (DD1) SUBMITTAL 08/10/2020
95% DESIGN DEVELOPMENT (DD2) SUBMITTAL 10/16/2020
100% CD SUBMITTAL 11/28/2020
ZACH SCHMIDT
BID DOCUMENTS 08/19/2021
CD UPDATE SUBMITTAL 10/10/2025
INDEX OF DRAWINGS
SHEET DESCRIPTION
SECOND FLOOR PLAN - REMOVALS1-MD102
1-MH102
SECOND FLOOR DUCT PLAN - NEW WORK
JAC GEH
DUCT THERMOSTAT WITH AVERAGING ELEMENT
DUCT STATIC PRESSURE SENSOR
DUCT HUMIDITY SENSOR
ROOM SENSOR: TEMPERATURE, HUMIDITY
LENGTH IN DUCT WHEN SPACE PERMITS)
REMOTE BULB THERMOSTAT
ROOM CONTROL: THERMOSTAT, HUMIDISTAT
DIFFERENTIAL PRESSURE SWITCH
DUCT TEMPERATURE SENSOR WITH AVERAGING ELEMENT
SMOKE DETECTOR (SEE ELECTRICAL SPECIFICATIONS)
DUCT OR PIPE TEMP. SENSOR
DUCT OR PIPE THERMOSTAT (NOTE 1: PROVIDE 12" MIN.
AFTER FILTER
CURRENT SENSING RELAY
AIR FOIL WHEEL (FAN)
AIR HANDLING UNIT
ANALOG INPUT
AIR PRESSURE DROP
ANALOG OUTPUT
AUTOMATIC TEMPERATURE CONTROLS
BACKWARD INCLINED WHEEL (FAN)
AIR FLOW MEASURING DEVICE
ABOVE FINISHED FLOOR
DIFFERENTIAL OR STATIC PRESSURE TRANSMITTER
CLEAN OUT
CEILING GRILLE
CEILING DIFFUSER
CEILING REGISTER
COLD WATER (POTABLE)
DIGITAL OUTPUT
DIGITAL INPUT
DIRECT DIGITAL CONTROLS
DRY BULB TEMPERATURE, DEG. F
AUTOMATIC CONTROL DAMPER
EXHAUST FAN
ENGINEERING CONTROL CENTER
DOUBLE WIDTH DOUBLE INLET (FAN)
DOOR UNDERCUT BY GENERAL CONTRACTOR
ITEM. (TO BE USED AS AN AID IN COORDINATING THE
LISTED SIZE OF DUCT, PIPE, DEVICE OR EQUIPMENT
APPROXIMATE ELEVATION FROM FLOOR TO CENTER OF
MANUAL VOLUME DAMPER
U/C
VARIOUS TRADES.)
FIRE DAMPER
BUTTERFLY VALVE
CIRCUIT SETTER
BALL VALVE
COMBINATION BALANCING/SHUT-OFF VALVE
MANUAL AIR VENT
AUTOMATIC FLOW CONTROL VALVE
TEST PLUG (PRESSURE/TEMPERATURE)
SAFETY VALVE OR PRESSURE RELIEF
PRESSURE REDUCING VALVE
STRAIGHT-THRU TWO-POSITION CONTROL VALVE
THREE-WAY MODULATING CONTROL VALVE
STRAIGHT-THRU MODULATING CONTROL VALVE
EX.
EF
EXISTING
DWDI
ECC
DI
DO
DB
DDC
D
Db
DECIBELS
BUILDING NO. WHERE EQUIPMENT IS LOCATED.
EQUIPMENT ABBREVIATION (SUPPLY FAN)
SUPPLY FAN NO.3 IN BUILDING NO.1
SHEET NUMBER WHERE DRAWN
DRAWING NUMBER WHERE DRAWN
SUPPLY TOP REGISTER OR GRILLE (WALL TYPE)
RETURN DUCT (UP & DOWN)
VANED ELBOW & AIR SPLIT TYPE DUCT TAKE-OFF
EXHAUST OR RETURN TOP REGISTER OR GRILLE,
EXHAUST OR RETURN BOTTOM REGISTER OR GRILLE,
EXHAUST OR RETURN CEILING REGISTER OR GRILLE
SUPPLY DUCT (UP & DOWN)
INCLINED RISE, IN DIRECTION OF AIR FLOW
NEW DUCT - WIDTH X DEPTH
RECTANGULAR ELBOWS WITH VANES EVEN IF
VANED ELBOW (PROVIDE ALL SQUARE OR
INCLINED DROP, IN DIRECTION OF AIR FLOW
ACOUSTICAL DUCT LINING
STANDARD RADIUS ELBOW
R
10/8
FC
D
SYMBOL IS MISSING)
FLEXIBLE CONNECTION
UP
(WALL TYPE)
(WALL TYPE)
DN
UP
1-01
1-SF3
AIR HANDLING UNIT NUMBER
TERMINAL UNIT DESIGNATION
TYPICAL UNIT NO.
DN
SECTION LETTER
ECCENTRIC REDUCER
DIRECTION OF FLOW
CAPPED OUTLET
SIDE CONNECTION
EXISTING WORK.
ACCESSORIES
INVERTED BUCKET TRAP SET INCLUDING PIPING
POINT OF CONNECTION BETWEEN NEW AND
RISE OR DROP IN PIPE
BOTTOM CONNECTION, 45 DEG. OR 90 DEG.
TOP CONNECTION, 45 DEG. OR 90 DEG.
REDUCER OR INCREASER
DIRECTION OF PIPE PITCH (DOWN)
THERMOMETER
UNIVERSAL (2-BOLT) INVERTED BUCKET TRAP STATION
STRAINER
GATE VALVE
PRESSURE GAGE
CHECK VALVE
GLOBE VALVE
PIPING ACCESSORIES
FLOAT AND THERMOSTATIC TRAP SET INCLUDING
GATE VALVE WITH 3/4" HOSE END ADAPTER
EXISTING PIPE TO BE REMOVED
DRAIN LINE
UNION
D
CW
CR
CO
CG
CD
BIW
ATC
AFW
AI
APD
AO
AHU
AFM
AFF
AF
VENT LINE
HEATING HOT WATER RETURN
HEATING HOT WATER SUPPLY
LOW PRESSURE STEAM CONDENSATE RETURN
LOW PRESSURE STEAM (15 PSIG & BELOW)
MEDIUM PRESSURE STEAM CONDENSATE RETURN
MEDIUM PRESSURE STEAM (16 PSIG THRU 59 PSIG)
NUMBER INDICATES STEAM PRESSURE
NUMBER INDICATES STEAM PRESSURE
LPR
V
HWS
HWR
LPS (5)
MPS (30)
MPR
HEATING
SP
S
F
T
H
T
T H
WET BULB TEMPERATURE, DEG. FWb
MAXIMUM
OUTSIDE AIR
PRE-FILTER
PUMPED CONDENSATE
PREHEAT COIL
RELATIVE HUMIDITY
SUPPLY FAN
STEAM HUMIDIFIER
TRANSFER GRILLE
UNIT HEATER
STATIC PRESSURE (INCHES OF WATER)
PRESSURE REDUCING VALVE
PRESSURE DROP (FEET OF WATER)
TOP REGISTER (WALL TYPE)
VARIABLE FREQUENCY DRIVE
STATIC PRESSURE SENSOR
DOOR UNDERCUT BY GENERAL CONTRACTOR
SPS
TR
U/C
VFD
UH
V
TG
VALVE
S.P.
SH
SF
Rh
PD
PF
PH
PRV
MAX
O.A.
NOM
MIN
PC
NOMINAL
MINIMUM
HEATING COIL
HORSEPOWER
FLR.
HC
HP
FLOOR
BLOW UNLESS OTHERWISE NOTED)
CEILING DIFFUSERS (FOUR WAY
CHILLED WATER RETURN
CHILLED WATER SUPPLY
CHS
CHR
AIR CONDITIONING
CONTROL CIRCUIT CONN.
H1 N
ETCHED CLEAR LACQUER
E.C.L.
WHITE BAKED ENAMELW.B.E.
BRAKE HORSEPOWER
BHP
BRITISH THERMAL UNIT
BTU
BRITISH THERMAL UNIT PER HOUR
BTUH
CUBIC FEET PER MINUTE
CFM
DEGREE
DEG
DIAMETER
DIA
DIFFERENTIAL PRESSURE SENSOR
DPS
ENTERING
ENT
F
FAHRENHEIT
FPM
FEET PER MINUTE
FT
FEET
GALLONS PER MINUTE
GPM
HEAD
HD
CHILLED WATER RETURN
CHR
CHILLED WATER SUPPLY
CHS
INCHES
IN
INCHES WATER COLUMN
IN WC
INCHES WATER GAUGE
IN WG
LEAVING AIR TEMPERATURE
LAT
LEAVING
LVG
MBH
1000 BTUH
MERV
MINIMUM EFFICIENCY REPORTING VALUE
NC
NOISE CRITERIA
REVOLUTIONS PER MINUTE
RPM
SMOKE DAMPER (SUPPLY)
SDS
SMOKE DAMPER (RETURN)
SDR
STEAM PRESSURE REDUCING VALVE
SPRV
VOLUME DAMPERVD
HIGH PRESSURE STEAM CONDENSATE RETURN
HIGH PRESSURE STEAM (60 PSIG AND ABOVE)
NUMBER INDICATES STEAM PRESSURE
HPS (125)
HPR
PIPE UP
PIPE DOWN
IN-LINE CENTRIFUGAL FAN
ICF
T
T
T
T
H dP
CS
DP SP
1-MS4
A
H7
9'-6"
MV
MANUAL AIR VENT
ABBREVIATIONS
CONTROLSPIPING SYMBOLS
DRAWING SYMBOLS
DUCTWORK SYMBOLS
GENERAL NOTES
GENERAL
VALVES
ABBREVIATIONS
EXHAUST DUCT (UP & DOWN)
UP DN
PUMPED CONDENSATE RETURNPC
EXPANSION TANK PIPE
ET
FCU
FAN COIL UNIT
PUMP
P
PROPELLER UNIT HEATER
PUH
RETURN FAN
RF
WATER FILTERWF
POWER TYPE ROOF VENTILATOR
RV
POWER TYPE WALL VENTILATORWV
COR
PROPELLER TYPE EXHAUST FAN
PEF
RETURN AIR
R.A.
SUPPLY AIR
S.A.
SINGLE WIDTH SINGLE INLET (FAN)
SWSI
SPECIFIC GRAVITY
SP. GR.
ACCESS DOOR
AD
FCW
FOWARD CURVED WHEEL (FAN)
FC
FLEXIBLE CONNECTION
ENERGY EFFICIENCY RATIO
EER
EXHAUST AIR
E.A.
CONTRACTING OFFICER'S REPRESENTATIVE
AIR SEPARATOR
AS
ANGLE GLOBE VALVE
PIPE GUIDE
PIPE ANCHOR
ORIFICE UNION
STAINLESS STEEL DUCT
DOMESTIC HOT WATER SUPPLYDHW
DOMESTIC HOT WATER RECIRCULATIONDHWR
COMBINATION AXIAL/BACKWARD CURVED WHEEL
A/BCW
UTILITY SET FANUSF
T
GENERAL
DOMESTIC COLD WATER
W
FLOW METER
PIPE MOUNTED DDC TEMPERATURE SENSOR
TOP GRILLE (WALL TYPE)TG
WATER GAUGEWG
WATTSW
VARIABLE AIR VOLUMEVAV
THERMOSTATTSTAT
TOTAL STATIC PRESSURETSP
SMOKE DETECTOR
SD
SUPPLY AIR TEMPERATURE
SAT
OUTSIDE DIAMETER
OD
N.C.
NORMALLY CLOSED
N.O.
NORMALLY OPEN
MCA
MINIMUM BRANCH CIRCUIT AMPACITY
LEAVING WATER TEMPERATURE
LWT
ENTERING WATER TEMPERATURE
EWT
EXTERNAL STATIC PRESSURE
ESP
DIRECT EXPANSION
DX
ENTERING AIR TEMPERATURE
EAT
1 ALL PIPING IN FINISHED ROOMS OR SPACES SHALL BE CONCEALED IN A FURRED CHASE OR ABOVE THE SUSPENDED CEILING.
2 ACCESS PANELS IN NON ACCESSIBLE SUSPENDED CEILINGS ARE REQUIRED FOR ALL VALVES, TRAPS, DAMPERS, CLEANOUTS, CONTROLS, ETC.
3 FOR TYPICAL STEAM, WATER AND REFRIGERANT PIPING CONNECTIONS TO EQUIPMENT, SEE STANDARD DETAILS AND PIPING
SCHEMATICS.
4 PIPE CONNECTIONS TO AIR HEATING AND COOLING COILS SHALL BE MADE TO PROVIDE COUNTER FLOW BETWEEN HEATING
MEDIUM AND AIR.
5 WHERE DUCTS OR PIPES ARE REMOVED THRU BUILDING ELEMENT THAT IS TO REMAIN, PATCH BUILDING OPENING TO MATCH
EXISTING WHERE OPENING IS NOT RE-USED.
6 ALL PRESSURES LISTED ARE GAGE PRESSURE UNLESS OTHERWISE NOTED.
7 ALL CUTTING AND PATCHING REQUIRED FOR THE PROJECT WORK SHALL BE INCLUDED IN THE CONTRACT. REFINISH ANY SURFACE
DISTURBED UNDER THIS WORK TO MATCH EXISTING.
8 WHERE WORK IS REQUIRED ABOVE EXISTING SUSPENDED CEILINGS, CONTRACTOR SHALL CAREFULLY REMOVE SUSPENDED
CEILING COMPONENTS AS REQUIRED TO PERFORM THE SPECIFIED WORK. UPON COMPLETION, REINSTALL CEILING AND
COMPONENTS. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE TO CEILING COMPONENTS.
9 ALL WALL & FLOOR PENETRATIONS SHALL BE FIRESTOPPED TO RETARD PASSAGE OF FIRE & SMOKE.
10 WHERE EXISTING LAY-IN DEVICE IN SUSPENDED CEILING IS REMOVED AS PART OF THIS PROJECT, PROVIDE NEW ACOUSTIC
CEILING TILE TO FILL EMPTY GRID SPACE. CEILING TILE PATTERN, STYLE, COLOR, ETC. SHALL MATCH ADJACENT TILES.
11 ANY REMOVED EQUIPMENT SHALL BE TURNED OVER TO THE VA. ITEMS NOT DESIRED BY THE VA SHALL BE REMOVED FROM THE
PREMISES AND DISPOSED OF PROPERLY BY THE CONTRACTOR.
12 REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION.
13 THE CONTRACT DRAWINGS ARE NOT INTENDED TO SHOW EVERY VERTICAL OR HORIZONTAL OFFSET WHICH MAY BE NECESSARY
TO INSTALL THE SYSTEMS. COORDINATE WORK IN ADVANCE WITH ALL OTHER TRADES AND REPORT IMMEDIATELY ANY
ANTICIPATED INSTALLATION ISSUES.
14 FIELD VERIFY EXISTING CONDITIONS, INCLUDING DUCT, PIPE AND EQUIPMENT SIZES, SERVICES AND LOCATIONS PRIOR TO
PERFORMING WORK.
15 HEPA FILTERED EXHAUST IS REQUIRED TO MAINTAIN A MINIMUM OF 0.01" W.G. NEGATIVE PRESSURE IN CONSTRUCTION AREAS.
COORDINATE WITH COR.
16 WHERE CONTROL DEVICES ARE REMOVED, PNEUMATIC LINES SHALL BE REMOVED BACK TO ACTIVE MAIN AND CAPPED, AND
CONTROL WIRING AND CONDUIT SHALL BE REMOVED BACK TO SOURCE.
17 ALL ITEMS THAT REQUIRE ACCESS, SUCH AS FOR OPERATING, CLEANING, SERVICING, MAINTENANCE, AND CALIBRATION, SHALL BE
EASILY AND SAFELY ACCESSIBLE BY PERSONS STANDING AT FLOOR LEVEL, OR STANDING ON PERMANENT PLATFORMS, WITHOUT
THE USE OF PORTABLE LADDERS. EXAMPLES OF THESE ITEMS INCLUDE, BUT ARE NOT LIMITED TO: ALL TYPES OF VALVES, FILTERS
AND STRAINERS, TRANSMITTERS, CONTROL DEVICES.
18 CONTRACTOR IS RESPONSIBLE TO VISIT THE SITE, EXAMINE AND ACCEPT EXISTING CONDITIONS PRIOR TO BIDDING. SITE VISITS
SHALL BE COORDINATED WITH THE COR.
19 ALL EXISTING DUCTWORK, PIPING, EQUIPMENT, CONTROLS, ETC. SHOWN DASHED SHALL BE REMOVED. THE MAJORITY OF WORK
TO BE REMOVED IS SHOWN. REMOVE ALL INCIDENTAL ABANDONED UTILITY ITEMS THAT MAY NOT BE SHOWN BUT ARE
ASSOCIATED WITH THE REMOVAL WORK.
20 INCLUDE ALL WORK NECESSARY TO ACCOMMODATE PHASING. REFER TO GENERAL REQUIREMENTS SECTION 01 00 00 AND SHEET
1-A001.
21 WHERE EXISTING HVAC UTILITIES IN SERVICE WILL BE DISRUPTED DURING THE CONSTRUCTION OF THIS PROJECT, THIS WORK
SHALL BE PERFORMED ON WEEKENDS OR WEEK NIGHTS, IF REQUIRED BY THE COR. DOWNTIME SHALL BE KEPT TO A MINIMUM, AND SHALL BE COORDINATED AND SCHEDULED WELL IN ADVANCE WITH THE COR.
22 RE-INSULATE DUCTWORK AND PIPING WHERE EXISTING INSULATION HAS BEEN DAMAGED OR REMOVED IN THE PERFORMANCE OF
WORK IN THIS PROJECT, INCLUDING INSULATION REMOVAL FOR ASBESTOS ABATEMENT.
23 ALL WORK MUST BE COORDINATED WITH THE CONTRACTING OFFICER AND COR TO MAINTAIN OPERATION OF THE EXISTING
FACILITY.
24 EXISTING CONDITIONS SHOWN ARE BASED UPON AVAILABLE EXISTING DRAWINGS, AND MAY DIFFER FROM ACTUAL WORK IN PLACE.
THE CONTRACTOR SHALL TAKE ALL NECESSARY FIELD MEASUREMENTS AND FIELD VERIFY ALL CONDITIONS AFFECTING THE
EXECUTION OF THE WORK. ANY VARIATION BETWEEN EXISTING CONDITIONS AND THE WORK SHOWN ON THE CONTRACT
DOCUMENTS WHICH MAY IMPACT THE PROGRESS OF THE WORK SHALL BE BROUGHT TO THE ATTENTION OF THE CONTRACTING
OFFICER IN WRITING FOR RESOLUTION BEFORE PROCEEDING WITH THE WORK.
25 ABATEMENT, REMOVAL OR ENCAPSULATION OF EXISTING HAZARDOUS MATERIALS (ASBESTOS, LEAD, ETC.) IS INCLUDED IN THIS
CONSTRUCTION CONTRACT. REFER TO DRAWINGS AND/OR SPECIFICATIONS FOR LOCATION AND QUANTITIES OF ASBESTOS. ANY
ABATEMENT WORK PERFORMED AS PART OF THIS PROJECT SHALL BE COMPLETED PRIOR TO STARTING ANY OTHER PROJECT
WORK.
26 DURING THE PERFORMANCE OF THIS WORK, COOLING SHALL NOT BE DISRUPTED TO ANY AREA OUTSIDE THE CURRENT AREA OF
WORK, DURING NORMAL WORKING HOURS.
DOMESTIC HOT WATER SUPPLY
DHW
DOMESTIC HOT WATER RECIRCULATION
DHWR
FREE STEAM (LOW PRESSURE STEAM)
FS(5)
M
VALVE ON RISE/DROP (LOCATED IN VERTICAL PIPE)
(REFER TO DETAIL FOR ADDITIONAL SPECIALTIES)
SST
CS
PT
SP
AFMS
AIRFLOW MEASURING STATION
CURRENT SWITCH (FAN STATUS INDICATION)
START-STOP RELAY FOR FAN
FAN SPEED CONTROL SIGNAL
PRESSURE TRANSMITTER
TT TEMPERATURE TRANSMITTER
OS ROOM OCCUPANCY SENSOR(S)
DPT DIFFERENTIAL PRESSURE TRANSMITTER
PS PRESSURE SWITCH
DUPLEX PLUME EXHAUST FAN PACKAGE
DPF
CONSTANT VOLUME REHEAT TERMINAL UNIT
CVR
VARIABLE VOLUME REHEAT TERMINAL UNITVVR
SIMPLEX PLUME EXHAUST FANSPF
M601
DETAILS, SCHEDULES, CONTROLS AND AUTOMATION
M501
DETAILS
1-MP102
SECOND FLOOR PIPING PLAN - NEW WORK
INDEX, LEGEND, AND GENERAL NOTESM100
PARTIAL FLOOR PLANS - FIRST FLOOR AND EV32-C124 AIR BALANCE1-M101
AutoCAD SHX Text R
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text F
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text E-76259
AutoCAD SHX Text I
AutoCAD SHX Text A
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text E
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text G
AutoCAD SHX Text N
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text H
AutoCAD SHX Text O
AutoCAD SHX Text
DREW
AutoCAD SHX Text
KOENIG
AutoCAD SHX Text A.
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text I
AutoCAD SHX Text
EXPIRES: 12/31/2025
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i t h
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
REPLACE DUAL DUCT BOXES ON
2ND FLOOR
CINCINNATI, OH
539-21-201
Project Manager
10/10/2025Revisions: Date:
Cincinnati V.A.
Medical Center
35% SCHEMATIC DESIGN 03/23/2020
65% DESIGN DEVELOPMENT (DD1) SUBMITTAL 08/10/2020
95% DESIGN DEVELOPMENT (DD2) SUBMITTAL 10/16/2020
100% CD SUBMITTAL 11/28/2020
ZACH SCHMIDT
BID DOCUMENTS 08/19/2021
CD UPDATE SUBMITTAL 10/10/2025
1-M101
PARTIAL FLOOR PLANS - FIRST
FLOOR AND EV32-C124 AIR BALANCE 01
SCALE: 1/8" = 1'-0"
PARTIAL FIRST FLOOR PLAN
JAC GEH
SCALE: 1/8" = 1'-0"
PARTIAL BASEMENT FLOOR PLAN
SCALE: 1/8" = 1'-0"
PARTIAL SECOND FLOOR PLAN
BASEMENT KEY PLAN
NO SCALE
UP
UP
DN
UP
UP
UP
UP
UP
UP
DN
UP
UP
DN
UP
UP
UP
DN
UP
UP
UP
DN
UP
DN
UPDN
UP
DN
UP
UP
UP
UP
UP
UP
UP
DN
DN
DN
DN
UP
UP
UP
UP
DN
UP
UP
DN
DN
DN
DN
DN
UP
DN
UP
DN
DN
UP
DN
UP
DN
DN
FIRST FLOOR KEY PLAN
NO SCALE
UP
DN
DN
DN
DN
UP
DN
UP
UP
DN UP
DN
DN UP
UP
DN
UP
UP
A/C Shaft
A/C Shaft
A/C Shaft
SECOND FLOOR KEY PLAN
NO SCALE
SCALE: 1/8" = 1'-0"
PARTIAL FIRST FLOOR PLAN
UP
UP
DN
DN
DN
DN
UP
UP
UP
UP
DN
UP
UP
DN
DN
DN
DN
DN
UP
DN
UP
DN
DN
UP
DN
UP
DN
DN
FIRST FLOOR KEY PLAN
NO SCALE
SCALE: 1/8" = 1'-0"
PARTIAL FIRST FLOOR PLAN
1. EXISTING AIR DEVICE TO REMAIN - BALANCE TO CFM INDICATED.
2. TURN COOLING COIL CONDENSATE DRAIN PIPE DOWN IN THIS
LOCATION AND TERMINATE A MINIMUM OF 1" BELOW RIM OF
EXISTING JANITOR SINK.
PLAN NOTES
A. COORDINATE AND SCHEDULE (MINIMUM 3 WEEKS NOTICE) IN
ADVANCE WITH COR, DOWNTIME OF ALL UTILITIES REQUIRED FOR
PERFORMANCE OF THIS WORK.
B. REFER TO SHEET M001 FOR LEGEND, ABBREVIATIONS, AND
ADDITIONAL GENERAL NOTES.
GENERAL NOTES
Signal
C128
Tele.
C127
PCMM
Coordinator
A146A
Quality
Manager
A146B
Squad Stor.
A146
Heart Exam
A148
Heart Exam
A149
Restroom
A149A
Heart Exam
A150
M. Tlt.
C124
F. Tlt.
C123
Employee
Health
C122A
Conference
Room
C122
Office
C121
Exam
C122D
Exam
C122C
PEC
Corridor
C*1*11
Waiting
Room
C103
Exam
Room
C104
HAC
C105
PEA
C106
Exam
C107
Tlt
C104A
Stor
C104B
Office
C122B
Corridor
C*1*13
Corridor
C101
Up to
EV32-C124
Dn. to
Bsmt.
8"x6"
6"Ø
8"x6"
8"x6" x
UP UP
C002A
Elec. Rm.
C008
EMS SuperChief EMS
EMS Off.
Canteen
Stor.
F. Tlt.
A026B
M. Tlt.
C006
F. Tlt.
C007
Up to
EV32-C124
8"x8"8"x8"
8"x6"
X-Ray
Room
A246
Control
A246A
Elec.
A246B
Student Off.
A251
Patient
Toilet
A249C
Control
A249B
BE
Fluororoom
A249
Storage
A249A
G.P.
Radiography
A248
Tlt.
A248A
Trans.
A248B
Prep Rm.
C214
Control
C215
Tlt.
C214A
CT Scanner
C214B
6"x6"
6"x6"
CR1
CR1
Down to 1st
EV32-C124
UP
DN
Corridor
C*1*5
Conf. Room
A144A
Nurse
Pract.
A144B
Nurse
Pract.
A144C
Stair 5
S*1*5
M. Tlt.
A174 Nursing
Lounge
A158
Elec.
A161A
F. Tlt.
Stor.
A173
C*1*9
HAC
A160
D
FCU-A242 (ON
FLOOR ABOVE)
0.75"
AutoCAD SHX Text R
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text F
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text E-76259
AutoCAD SHX Text I
AutoCAD SHX Text A
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text E
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text G
AutoCAD SHX Text N
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text H
AutoCAD SHX Text O
AutoCAD SHX Text
DREW
AutoCAD SHX Text
KOENIG
AutoCAD SHX Text A.
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text I
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i t h
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
REPLACE DUAL DUCT BOXES ON
2ND FLOOR
CINCINNATI, OH
539-21-201
Project Manager
10/10/2025Revisions: Date:
Cincinnati V.A.
Medical Center
35% SCHEMATIC DESIGN 03/23/2020
65% DESIGN DEVELOPMENT (DD1) SUBMITTAL 08/10/2020
95% DESIGN DEVELOPMENT (DD2) SUBMITTAL 10/16/2020
100% CD SUBMITTAL 11/28/2020
ZACH SCHMIDT
BID DOCUMENTS 08/19/2021
CD UPDATE SUBMITTAL 10/10/2025
1-MD102
SECOND FLOOR PLAN - REMOVALS
SCALE: 1/8" = 1'-0"
PARTIAL SECOND FLOOR PLAN - REMOVALS
JAC GEH
SECOND FLOOR KEY PLAN
NO SCALE
1. REMOVE EXISTING DUAL DUCT AIR TERMINAL UNIT AND
ASSOCIATED DUCTWORK, SUPPORTS, CONTROLS, ACCESSORIES,
ETC. ASBESTOS-CONTAINING TAN MASTIC SHALL BE REMOVED BY
A STATE-LICENSED ASBESTOS ABATEMENT CONTRACTOR. REFER
TO SPECIFICATION SECTION 02 82 11.
2. REMOVE EXISTING AIR DEVICE AND ASSOCIATED DUCTWORK,
ACCESSORIES, ETC. ASBESTOS-CONTAINING TAN MASTIC SHALL BE
REMOVED BY A STATE-LICENSED ASBESTOS ABATEMENT
CONTRACTOR. REFER TO SPECIFICATION SECTION 02 82 11.
3. REMOVE EXISTING DUCTWORK TO THIS POINT, CAP AND SEAL
AIRTIGHT. ASBESTOS-CONTAINING TAN MASTIC SHALL BE
REMOVED BY A STATE-LICENSED ASBESTOS ABATEMENT
CONTRACTOR. REFER TO SPECIFICATION SECTION 02 82 11.
4. REMOVE EXISTING DUCTWORK TO THIS POINT FOR RECONNECTION
IN NEW WORK. ASBESTOS-CONTAINING TAN MASTIC SHALL BE
REMOVED BY A STATE-LICENSED ASBESTOS ABATEMENT
CONTRACTOR. REFER TO SPECIFICATION SECTION 02 82 11.
5. REMOVE EXISTING BOOSTER PUMP IN EXISTING CHILLED WATER
BRANCH PIPING SERVING THIS FLOOR OF THE BUILDING.
6. REMOVE EXISTING PIPING TO THIS POINT FOR RECONNECTION IN
NEW WORK. ASBESTOS-CONTAINING FITTING INSULATION SHALL BE
REMOVED BY A STATE-LICENSED ASBESTOS ABATEMENT
CONTRACTOR. REFER TO SPECIFICATION SECTION 02 82 11.
7. REMOVE EXISTING FAN COIL UNIT AND ASSOCIATED CONTROLS,
DUCTWORK, PIPING, ETC.
8. REMOVE EXISTING PROPELLER FAN MOUNTED INSIDE DUCT, AND
ASSOCIATED WIRING, CONTROLS, ACCESSORIES, ETC.
9. REMOVE EXISTING AIR VALVES AND TURN OVER TO COR. REMOVE
ASSOCIATED INLET AND OUTLET DUCT TRANSITIONS TO PREPARE
DUCT FOR CONNECTION TO NEW.
10. REMOVE EXISTING ABANDONED STEAM COIL AND ASSOCIATED
DUCTWORK, PIPING, SUPPORTS, ETC.
11. REMOVE EXISTING PIPING BACK TO ACTIVE MAIN AND CAP.
12. EXISTING EXHAUST FAN AND ASSOCIATED DUCTWORK TO REMAIN.
13. ACTUAL LOCATION/ROUTING OF ALL EXISTING HOT & COLD SUPPLY
DUCT BRANCHES IS BELIEVED TO BE AS SHOWN ON THIS DRAWING.
OF THE TWO BRANCH DUCTS REFERENCED WITH THIS NOTE, THE
BRANCH BEING CAPPED SHALL BE THE ONE THAT IS CONNECTED
TO THE HOT SUPPLY DUCT MAIN IN THE CORRIDOR THAT IS BEING
ABANDONED IN PLACE WITH NO AIRFLOW. THE BRANCH THAT IS
RECONNECTED AND RE-USED IN NEW WORK SHALL BE THE
BRANCH CONNECTED TO THE COLD SUPPLY DUCT MAIN.
CONTRACTOR TO FIELD VERIFY PRIOR TO CUTTING/CAPPING
DUCTS.
14. PROVIDE SHEETMETAL BLANK-OFF ON BACK OF SIDEWALL GRILLE.
PLAN NOTES
A. COORDINATE AND SCHEDULE (MINIMUM 3 WEEKS NOTICE) IN
ADVANCE WITH COR, DOWNTIME OF ALL UTILITIES REQUIRED FOR
PERFORMANCE OF THIS WORK.
B. REFER TO SHEET M001 FOR LEGEND, ABBREVIATIONS, AND
ADDITIONAL GENERAL NOTES.
GENERAL NOTES
DN
UP
DN UP DN
DN UP
UP
1 1
Recep.
A202
Imaging
Recep.
A201
Stor.
A202A
Digital
Chest Rm.
A203
Dressing
Rm.
A203A
Speech
Pathlgy.
A204
Rehab Care
Line
A205
Man Rehab
Care Line
A206
Staff
A207
Occupational
Therapy
A208
EMG Lab
A209
Rehab
Exam
A210
Rehab
Exam
A211
Elec.
A212
HAC
A213
Staff Tlt.
A214
PT Storage
A215
Hydrotheraphy
A216
Physical
Ther.
Supervisor
A218
Adl. Clinic
A208A
EMG Lab
A209A
Elec.
A217A
Corridor
C*2*2
Light Box
Room
A215B
SCI Exam
A215A
Stor.
A218A
Stair 2
S*2*2
Oxygen
Storage
A221
Therapy
Supervisor
A222
Ante Room
A223
Stor.
A210A
Dirty Room
A222A
Equip Wash
A222B
Mechanical
Room
A222C
Compressor
Room
A222D
Soiled
Receiving &
Decontamination
A222E
Equipment
Storage and Testing
A228A
Office
A230
Dressing
Rm.
A227B
Office
A231
LKRS.
A227A
Shower
A227
Elec.A225B
Service
Lobby
A225
Trash
Chute
A225A
Lounge A226
Training
Room
A224
HAC
A225C
Office
A232
Nuclear Med. Sec.
C200
Waiting
C201
C202
Work Rm.
C203
CAT Scan
Room
C204
Gamma
Camera
C205
Prep Bay
C204A
C207
Elec.
C209
Tlt.
C204F
Tele.
C208
Break
Room
A240
Stair 1
S*2*1
Signal
Closet
A239
Tlt.
A236
Tlt.
A235
G.P.
Radiography
A242
Control
A243
Storage
A243A
Stair 5
S*2*5
Reading
Room
A245
Gamma
Camera
C210
Hot Lab
C212
Stor.
C213
X-Ray
Room
A246
Control
A246A
Clos
A243B
Clos
A243C
Ultrasound
A266
Corridor
C*2*1
Elec.
A246B
Corridor
C*2*3
Viewing
A256
Reading
Room
A257
Reading
Room
A258
Adm.
A259
Chief
Radiology
A260
Adm. Asst.
A261
Off.
A262
Resident
Reading
Room
A263
Room
A264
Reading
Room
A262A
Tlt.
A260A
Pat. Tlt.
A266B
Ultrasound
A265
Stor
A255
Tlt.
A253B
Break Rm.
A253
Elec.
A253A
HAC
A254
Digital
Radiography
A252
Control
A252A
Student Off.
A251
Office
A251B
Patient
Toilet
A249C
Control
A249B
BE
Fluororoom
A249
Storage
A249A
Work Rm.
A250A
Cl. Supp.
A296
Sig. Clos.
A250
Clean
Supply
Room
A251A M. Lkrs.
A270
Tlt.
A270A
Staff
Lounge
A269
F. Lkrs.
A271
Tlt.
A271A
Conf.
A272
RN
Manager
A273
Elec.
A275
HAC
A274
On Call
A276
Tlt.
A276A
Stair 9
S*2*9
Off.
A268
Off.
A267
Pat. Room
A280
Pat. Room
A281
G.P.
Radiography
A248
Tlt.
A248A
Trans.
A248B
Soil.
A278
A235A
Corridor
C*2*4
Prep Rm.
C214
Control
C215
Scope
Wash
C216A
Bone
Density Lab
C211
Tlt.
C216Q
Tlt.
C214A
CT Scanner
C214B
Elec.
A239A
Corridor
C*2*25
CT Room
#2
A2013
Stair 11
S*2*11
Clean
Supply
A2011
Storage
A2010
PACS Read
A2008
S.P. Control
A2009
Special
Procedures
A2015
MRI
Component
A2007
MRI Room
A2001A
MRI
A2001
Equipment
Storage
A2023
MRI
Equipment
A2001B
Storage
A2025
Corridor
C*2*15
Waiting
A2000
Dressing
Room
A2002
Chage Area
A2002A
Toilet
A2002B
Elec.
A2006
Signal
A2005
Men Staff
A2004
Women
Staff
A2003
CT Control
A2014
Adm.
Equip.
A2016A
CT Room
#1
A2016
S.P.
Equipment
A2021
CT Prep
A2017
Toilet
A2018
Storage
A2020
Office
A2022
IR Reading
A2024
Office
A208A
CT Office
A2019
Toilet
A2024A
HAC
A2026
A/C Shaft
A/C Shaft
Reading
T
T
T
T
T
T
T
T
T
T T T T
T
T
T
T
T
T
T
T
TT
32x24"
45x24"
20x16"
16x12"
30x10"
8"Ø
26x14"
26x12"
48x24"
2 2
AutoCAD SHX Text R
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text F
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text E-76259
AutoCAD SHX Text I
AutoCAD SHX Text A
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text E
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text G
AutoCAD SHX Text N
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text H
AutoCAD SHX Text O
AutoCAD SHX Text
DREW
AutoCAD SHX Text
KOENIG
AutoCAD SHX Text A.
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text I
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i t h
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
REPLACE DUAL DUCT BOXES ON
2ND FLOOR
CINCINNATI, OH
539-21-201
Project Manager
10/10/2025Revisions: Date:
Cincinnati V.A.
Medical Center
35% SCHEMATIC DESIGN 03/23/2020
65% DESIGN DEVELOPMENT (DD1) SUBMITTAL 08/10/2020
95% DESIGN DEVELOPMENT (DD2) SUBMITTAL 10/16/2020
100% CD SUBMITTAL 11/28/2020
ZACH SCHMIDT
BID DOCUMENTS 08/19/2021
CD UPDATE SUBMITTAL 10/10/2025
1-MH102
SECOND FLOOR DUCT PLAN - NEW
WORK 01
SCALE: 1/8" = 1'-0"
PARTIAL SECOND FLOOR DUCT PLAN - NEW WORK
JAC GEH
SECOND FLOOR KEY PLAN
NO SCALE
1. EXISTING RECEPTACLE TO REMAIN.
2. REFER TO SHEET 1-M101 FOR EXHAUST FAN 1-EF23 AIR BALANCE.
3. PROVIDE LENGTH OF STRAIGHT SHEET METAL DUCTWORK AT
TERMINAL UNIT INLET AS REQUIRED BY UNIT MANUFACTURER.
TRANSITION TO CONNECT UNIT INLET AND OUTLET TO EXISTING
DUCTS.
4. PROVIDE NEW DUCTWORK IN PLACE OF AIR VALVES. MATCH
EXISTING SIZE.
5. ACTUAL LOCATION/ROUTING OF ALL EXISTING HOT & COLD SUPPLY
DUCT BRANCHES IS BELIEVED TO BE AS SHOWN ON THIS DRAWING.
NEW OUTSIDE AIR SUPPLY DUCT BRANCHES/DIFFUSERS SHALL
CONNECT TO THE COLD SUPPLY DUCT TO REMAIN, NOT THE HOT
SUPPLY DUCT THAT IS BEING ABANDONED IN PLACE WITH NO
AIRFLOW. CONTRACTOR TO FIELD VERIFY PRIOR TO CONNECTING
NEW OUTSIDE AIR DUCT BRANCHES TO EXISTING DUCTS.
PLAN NOTES
A. COORDINATE AND SCHEDULE (MINIMUM 3 WEEKS NOTICE) IN
ADVANCE WITH COR, DOWNTIME OF ALL UTILITIES REQUIRED FOR
PERFORMANCE OF THIS WORK.
B. REFER TO SHEET M001 FOR LEGEND, ABBREVIATIONS, AND
ADDITIONAL GENERAL NOTES.
C. DUCT RUNOUT TO DIFFUSER SHALL BE THE SAME SIZE AS THE
DIFFUSER NECK SIZE UNLESS OTHERWISE NOTED.
GENERAL NOTES
DN
UP
DN UP DN
DN UP
UP
(TB)E (TB)E
(AHU)E
(FC)E
9"Ø
11"Ø
12"X13"
13"Ø 12"Ø
23"x10" 23"x10"
8"X6"
19"X 8" 18"X 5"
19"X 8"
18"X 5"
19"X 8" 18"X 5"
19"X 8" 18"X 5"
"X
19"X 8"
18"X 5"
6"Ø
19"X 8"
18"X 5"
19"X 8" 18"X 5"
19"X 8" 18"X 5"
4"Ø
4"Ø
4"Ø
4"Ø
CD1-8"Ø
CD1-10"Ø
CD1-10"Ø
CD1-10"Ø
CD1-10"Ø
CD1-10"Ø
CD1-8"Ø
CD1-8"Ø
CD1-8"Ø
CD1-8"Ø
CD1-6"Ø
CD1-6"Ø
CD1-8"Ø
CD1-10"Ø
CD1-10"Ø
CD2-6"Ø
CD1-10"Ø
CD1-6"Ø
CD2-8"Ø
CD1-8"Ø
CG1
CG1
CG1
CG1
CG1
CG1
CG1
CG1
CG1
CG1
CG1
CG1
CG1
Recep.
A202
Imaging
Recep.
A201
Stor.
A202A
Digital
Chest Rm.
A203
Dressing
Rm.
A203A
Speech
Pathlgy.
A204
Rehab Care
Line
A205
Man Rehab
Care Line
A206
Staff
A207
Occupational
Therapy
A208
EMG Lab
A209
Rehab
Exam
A210
Rehab
Exam
A211
Elec.
A212
HAC
A213
Staff Tlt.
A214
PT Storage
A215
Hydrotheraphy
A216
Physical
Ther.
Supervisor
A218
Adl. Clinic
A208A
EMG Lab
A209A
Elec.
A217A
Corridor
C*2*2
Light Box
Room
A215B
SCI Exam
A215A
Stor.
A218A
Stair 2
S*2*2
Oxygen
Storage
A221
Therapy
Supervisor
A222
Ante Room
A223
Stor.
A210A
Dirty Room
A222A
Equip Wash
A222B
Mechanical
Room
A222C
Compressor
Room
A222D
Soiled
Receiving &
Decontamination
A222E
Equipment
Storage and Testing
A228A
Storage
A228B
Office
A230
Dressing
Rm.
A227B
Office
A231
LKRS.
A227A
Shower
A227
Elec.A225B
Service
Lobby
A225
Trash
Chute
A225A
Lounge
A226 Training
Room
A224
HAC
A225C
Office
A232
Nuclear Med. Sec.
C200
Waiting
C201
Reading
C202
Work Rm.
C203
CAT Scan
Room
C204
Gamma
Camera
C205
Uptake
Prep Bay
C204A
I.V. Prep
Rm.
C207
Elec.
C209
Room
C204E
Tlt.
C204F
Tele.
C208
Break
Room
A240
Stair 1
S*2*1
Signal
Closet
A239
Tlt.
A236
Tlt.
A235
G.P.
Radiography
A242
Control
A243
Storage
A243A
Stair 5
S*2*5
Reading
Room
A245
Gamma
Camera
C210
Hot Lab
C212
Stor.
C213
X-Ray
Room
A246
Control
A246A
Clos
A243B
Clos
A243C
Ultrasound
A266
Corridor
C*2*1
Elec.
A246B
Corridor
C*2*3
Viewing
A256
Reading
Room
A257
Reading
Room
A258
Adm.
A259
Chief
Radiology
A260
Adm. Asst.
A261
Off.
A262
Resident
Reading
Room
A263
Room
A264
Reading
Room
A262A
Tlt.
A260A
Pat. Tlt.
A266B
Ultrasound
A265
Stor
A255
Tlt.
A253B
Break Rm.
A253
Elec.
A253A
HAC
A254
Digital
Radiography
A252
Control
A252A
Student Off.
A251
Office
A251B
Patient
Toilet
A249C
Control
A249B
BE
Fluororoom
A249
Storage
A249A
Work Rm.
A250A
Cl. Supp.
A296
Clean
Equipment
Sig. Clos.
A250
Clean
Supply
Room
A251A M. Lkrs.
A270
Tlt.
A270A
Staff
Lounge
A269
F. Lkrs.
A271
Tlt.
A271A
Conf.
A272
RN
Manager
A273
Elec.
A275
HAC
A274
On Call
A276
Tlt.
A276A
Stair 9
S*2*9
Off.
A268
Off.
A267
Pat. Room
A280
Pat. Room
A281
Pat. Room
Lin.
A294
G.P.
Radiography
A248
Tlt.
A248A
Trans.
A248B
Soil.
A278
Ante
A235A
Dispatch
Area
A236A
Corridor
C*2*4
Prep Rm.
C214
Control
C215
Scope
Wash
C216A
Stor.
C216B
Bone
Density Lab
C211
Tlt.
C216Q
Tlt.
C214A
CT Scanner
C214B
Elec.
A239A
Corridor
C*2*25
CT Room
#2
A2013
Stair 11
S*2*11
Clean
Supply
A2011
Storage
A2010
PACS Read
A2008
S.P. Control
A2009
Special
Procedures
A2015
MRI
Component
A2007
MRI Room
A2001A
MRI
A2001
Equipment
Storage
A2023
MRI
Equipment
A2001B
Storage
A2025
Corridor
C*2*15
Waiting
A2000
Dressing
Room
A2002
Chage Area
A2002A
Toilet
A2002B
Elec.
A2006
Signal
A2005
Men Staff
A2004
Women
Staff
A2003
CT Control
A2014
Adm.
Equip.
A2016A
CT Room
#1
A2016
S.P.
Equipment
A2021
CT Prep
A2017
Toilet
A2018
Storage
A2020
Office
A2022
IR Reading
A2024
Office
A208A
CT Office
A2019
Toilet
A2024A
HAC
A2026
A/C Shaft
A/C Shaft
Reading
FCU-A243
FCU-A246
FCU-A248
FCU-A251B
FCU-A224
FCU-A265
13"Ø
CD1-10"Ø
FCU-A264
FCU-A257
FCU-A262A
FCU-A261
FCU-A259
FCU-A260
8"Ø x
10"x10"
10"x12"
12"x12"
8"x8"
14"x10"
10"x10"
10"x8"
12"x12"
8"x10" x x x
C H
S
C H
R
C H
R
C H
S
CD1-8"Ø
CD1-8"Ø
CD1-8"Ø
CD1-6"Ø
CD1-8"Ø
48"X 8"
48"X 8" 25"x 5"
19"x 8"
Down to 1st
FCU-A222
CG1
CD1-12"Ø
CD1-10"Ø
(TB)E
(TB)E
(TB)E
CG1
CG1
CD1-10"Ø
FCU-A249
CD1-10"Ø
CD1-8"Ø
CG1
FCU-A252
CD1-10"Ø
CD1-10"Ø
CG1
12"x12"
CD1-10"Ø
CD2-6"Ø
CD2-6"Ø
CD2-8"Ø
CD2-6"Ø
CD2-6"Ø
12"x12"
CD1-10"Ø
CD2-6"Ø
CD2-6"Ø
CD2-6"Ø
CD2-6"Ø
CD2-6"Ø
CD2-6"Ø
CD2-6"Ø
CD2-6"Ø
CD2-6"Ø
CD2-6"Ø
CD2-6"Ø
CD2-6"Ø
CD2-6"Ø
CG1
CD2-6"Ø
CD2-6"Ø
6"Ø
CD2-6"Ø
CD2-6"Ø
CD2-6"Ø
FCU-A240
CD1-10"Ø
CD1-10"Ø
FCU-A242
CD2-6"Ø
CD2-6"Ø
CD2-6"Ø
(TB)E
CG1
16"x8"
CD2-6"Ø
14"x10"
6"x6"
6"x6"
CR1
CR1
14"x10"
14"x12"
12"x12"
12"x12"
12"x12"
1-VAV2-3
1-VAV2-2
14"x10"
18"x8"
16"x10"
16"x8"
16"x8"
16"x8"
32"x12"
14"x10"
14"x10"
10"x10"
FCU-A230
CG1
10"x10" x
12"x14"
14"X14"
CD2-8"Ø
CD2-8"Ø
CD2-6"Ø
CG1
CG1
14"x8"
CG1
CG1
30"x12"
30"x12"
CG1
EV32-C124
AutoCAD SHX Text R
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text F
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text E-76259
AutoCAD SHX Text I
AutoCAD SHX Text A
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text E
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text G
AutoCAD SHX Text N
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text H
AutoCAD SHX Text O
AutoCAD SHX Text
DREW
AutoCAD SHX Text
KOENIG
AutoCAD SHX Text A.
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text I
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i t h
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
REPLACE DUAL DUCT BOXES ON
2ND FLOOR
CINCINNATI, OH
539-21-201
Project Manager
10/10/2025Revisions: Date:
Cincinnati V.A.
Medical Center
35% SCHEMATIC DESIGN 03/23/2020
65% DESIGN DEVELOPMENT (DD1) SUBMITTAL 08/10/2020
95% DESIGN DEVELOPMENT (DD2) SUBMITTAL 10/16/2020
100% CD SUBMITTAL 11/28/2020
ZACH SCHMIDT
BID DOCUMENTS 08/19/2021
CD UPDATE SUBMITTAL 10/10/2025
1-MP102
SECOND FLOOR PIPING PLAN -
NEW WORK 01
SCALE: 1/8" = 1'-0"
PARTIAL SECOND FLOOR PIPING PLAN - NEW WORK
JAC GEH
SECOND FLOOR KEY PLAN
NO SCALE
1. REPLACE EXISTING BOOSTER PUMP IN EXISTING CHILLED WATER
BRANCH PIPING SERVING THIS FLOOR OF THE BUILDING.
2. TURN COOLING COIL CONDENSATE DRAIN PIPE DOWN IN THIS
LOCATION AND TERMINATE A MINIMUM OF 1" BELOW RIM OF
EXISTING JANITOR SINK.
3. ROUTE CHILLED WATER SUPPLY AND RETURN PIPING DOWN NEW
WALL CHASE TO CONNECT TO FAN COIL UNIT. REFER TO
ARCHITECTURAL DRAWINGS.
4. ROUTE CONDENSATE DRAIN PIPE THROUGH FLOOR. REFER TO
SHEET 1-M101 FOR CONTINUATION. DRILLING OF EXISTING FLOOR
SLAB FOR NEW PIPE PENETRATION SHALL OCCUR AT NIGHT (I.E.
AFTER 6PM BUT PRIOR TO 6AM.
5. EXISTING CONDENSATE DRAIN PIPING TO REMAIN.
6. THIS WALL THERMOSTAT SHALL INCLUDE AN INTEGRAL HUMIDITY
SENSOR.
PLAN NOTES
A. COORDINATE AND SCHEDULE (MINIMUM 3 WEEKS NOTICE) IN
ADVANCE WITH COR, DOWNTIME OF ALL UTILITIES REQUIRED FOR
PERFORMANCE OF THIS WORK.
B. REFER TO SHEET M001 FOR LEGEND, ABBREVIATIONS, AND
ADDITIONAL GENERAL NOTES.
C. ALL NEW CONDENSATE DRAIN PIPING SHALL BE 0.75" UNLESS
NOTED OTHERWISE.
GENERAL NOTES
DN
UP
DN UP DN
DN UP
UP
C H
S
C H
R
CHS
CHR
2.5"
CHS
CHR
CHS
CHR
CHS
CHR
CHR
CHS
C H
S
C H
R
C H
S
C H
R
2"
1"
1"
0.75"
0.75"
1"
1.25"
1.5"
1.5"
1.25"
1.25"
1"
0.75"
2"
1" 0.75"
D
D
D
D
1.25"
D
D
D
Recep.
A202
Imaging
Recep.
A201
Stor.
A202A
Digital
Chest Rm.
A203
Dressing
Rm.
A203A
Speech
Pathlgy.
A204
Rehab Care
Line
A205
Man Rehab
Care Line
A206
Staff
A207
Occupational
Therapy
A208
EMG Lab
A209
Rehab
Exam
A210
Rehab
Exam
A211
Elec.
A212
HAC
A213
Staff Tlt.
A214
PT Storage
A215
Hydrotheraphy
A216
Physical
Ther.
Supervisor
A218
Adl. Clinic
A208A
EMG Lab
A209A
Elec.
A217A
Corridor
C*2*2
Light Box
Room
A215B
A215A
Stor.
A218A
Stair 2
S*2*2
Oxygen
Storage
A221
Therapy
Supervisor
A222
Stor.
A210A
Dirty Room
A222A
Equip Wash
A222B
Mechanical
Room
A222C
Compressor
Room
A222D
Soiled
Receiving &
Decontamination
A222E and Testing
A228A
Office
A230
Dressing
Rm.
A227B
Office
A231
LKRS.
A227A
Shower
A227
Elec.A225B
Service
Lobby
A225
Trash
Chute
A225A
Lounge
A226
Training
Room
A224
HAC
A225C
Office
A232
Nuclear Med. Sec.
C200
Waiting
C201
Work Rm.
C203
C204
Gamma
Camera
C205
C204F
Tele.
C208
Break
Room
A240
Stair 1
S*2*1
Signal
Closet
A239
Tlt.
A236
Tlt.
A235
G.P.
Radiography
A242
Control
A243
Storage
A243A
Stair 5
S*2*5
Reading
Room
A245
Gamma
Camera
C210
Hot Lab
C212
Stor.
C213
X-Ray
Room
A246
Control
A246A
Clos
A243B
Clos
A243C
Ultrasound
A266
Corridor
C*2*1
Elec.
A246B
Corridor
C*2*3
Viewing
A256
Reading
Room
A257
Reading
Room
A258
Adm.
A259
Chief
Radiology
A260
Adm. Asst.
A261
Off.
A262
Resident
Reading
Room
A263
Room
A264
Reading
Room
A262A
Tlt.
A260A
Pat. Tlt.
A266B
Ultrasound
A265
Stor
A255
Tlt.
A253B
Break Rm.
A253
Elec.
A253A
HAC
A254
Digital
Radiography
A252
Control
A252A
Student Off.
A251
Office
A251B
Patient
Toilet
A249C
Control
A249B
BE
Fluororoom
A249
Storage
A249A
Work Rm.
A250A
Cl. Supp.
A296
Sig. Clos.
A250
Clean
Supply
Room
A251A M. Lkrs.
A270
Tlt.
A270A
Staff
Lounge
A269
F. Lkrs.
A271
Tlt.
A271A
Conf.
A272
RN
Manager
A273
Elec.
A275
HAC
A274
On Call
A276
Tlt.
A276A
Stair 9
S*2*9
Off.
A268
Off.
A267
Pat. Room
A280
Pat. Room
A281
G.P.
Radiography
A248
Tlt.
A248A
Trans.
A248B
Soil.
A278
Corridor
C*2*4
Prep Rm.
C214
Control
C215
Scope
Wash
C216A
C211
Tlt.
C214A
CT Scanner
C214B
Elec.
A239A
CT Room
#2
A2013
Stair 11
S*2*11
Clean
Supply
A2011
Storage
A2010
PACS Read
A2008
S.P. Control
A2009
Special
Procedures
A2015
MRI
Component
A2007
MRI Room
A2001A
MRI
A2001
Equipment
Storage
A2023
MRI
Equipment
A2001B
Storage
A2025
Corridor
C*2*15
Waiting
A2000
Dressing
Room
A2002
Chage Area
A2002A
Toilet
A2002B
Elec.
A2006
Signal
A2005
Men Staff
A2004
Women
Staff
A2003
CT Control
A2014
Adm.
Equip.
A2016A
CT Room
#1
A2016
S.P.
Equipment
A2021
CT Prep
A2017
Toilet
A2018
Storage
A2020
Office
A2022
IR Reading
A2024
Office
A208A
CT Office
A2019
Toilet
A2024A
HAC
A2026
A/C Shaft
A/C Shaft
Reading
(TB)E (TB)E
(AHU)E
(FC)E
9"Ø
11"Ø
12"X13"
13"Ø 12"Ø
23"x10" 23"x10"
8"X6"
19"X 8" 18"X 5"
19"X 8"
18"X 5"
19"X 8" 18"X 5"
19"X 8" 18"X 5"
"X
19"X 8"
18"X 5"
6"Ø
19"X 8"
18"X 5"
19"X 8" 18"X 5"
19"X 8" 18"X 5"
4"Ø
4"Ø
4"Ø
4"Ø
13"Ø
48"X 8"
48"X 8" 25"x 5"
19"x 8"
(TB)E
(TB)E
(TB)E
(TB)E
FCU-A243
FCU-A246
FCU-A248
FCU-A249
FCU-A251B
FCU-A252
FCU-A224
FCU-A265
FCU-A264
FCU-A257
FCU-A262A
FCU-A261
FCU-A259
FCU-A260
0.75"
D
CHS
CHR
C H
R
C H
S
FCU-A222
1.25"
D
1.5"
1-P2-2
FCU-A240
FCU-A242
FCU-A230
D
D
D
D
D
D
D
D
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
AutoCAD SHX Text R
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text F
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text E-76259
AutoCAD SHX Text I
AutoCAD SHX Text A
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text E
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text G
AutoCAD SHX Text N
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text H
AutoCAD SHX Text O
AutoCAD SHX Text
DREW
AutoCAD SHX Text
KOENIG
AutoCAD SHX Text A.
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text I
M501
DETAILS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i t h
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
REPLACE DUAL DUCT BOXES ON
2ND FLOOR
CINCINNATI, OH
539-21-201
Project Manager
10/10/2025Revisions: Date:
Cincinnati V.A.
Medical Center
35% SCHEMATIC DESIGN 03/23/2020
65% DESIGN DEVELOPMENT (DD1) SUBMITTAL 08/10/2020
95% DESIGN DEVELOPMENT (DD2) SUBMITTAL 10/16/2020
100% CD SUBMITTAL 11/28/2020
ZACH SCHMIDT
BID DOCUMENTS 08/19/2021
CD UPDATE SUBMITTAL 10/10/2025
JAC GEH
CONICAL OUTLET
BRANCH DUCT
THERMAL INSULATION
SEE SPECIFICATIONS
THERMAL INSULATION
SEE SPECIFICATIONS
BRANCH DUCT
AIR SPLIT DUCT TAKE-OFF
PLAN VIEW
BRANCH DUCT TAKE-OFF PLAN VIEW
AIR
FLOW
AIR
FLOW
A I R
F L O
W
SUPPLY REGISTER
OR BRANCH DUCT
TURNING VANES
MAIN
SUPPLY
DUCT
SEE FLOOR PLAN FOR
SPLIT DIMENSION
DAMPER
MANUAL VOLUME
DAMPER
1/4 W OR
4" MIN.
AIR
FLOW
MAIN SUPPLY
DUCT
W
A I R
F L O
W
SQUARE ELBOW SHOWN.
PROVIDE ROUND ELBOW
WHEN SHOWN ON PLANS
NOTES:
1.
2.
3.
4.
ALL VANE ELBOWS SHALL BE CONSTRUCTED AND INSTALLED AS DETAILED BY
SMACNA.
WHEN W1 DOES NOT EQUAL W2, VANE SHALL BE SINGLE THICKNESS VANE TYPE
REGARDLESS OF W DIMENSION.
ALL SINGLE THICKNESS VANES SHALL HAVE A 2" RADIUS, 1 1/2" MAXIMUM
SPACE BETWEEN VANES AND A 3/4" TRAILING EDGE.
WHEN W EQUALS W2 AND W1 IS GREATER THAN 20", VANES SHALL BE DOUBLE
VANE TYPE.
W
W1
VANE
VANE
NOTES:
1.
2.
THE INTERIOR SURFACE OF ALL RADIUS ELBOWS SHALL BE MADE ROUND.
ALL STANDARD RADIUS ELBOWS CAN BE SUBSTITUTED WITH SHORT RADIUS
ELBOWS. ALL SHORT RADIUS ELBOWS SHALL HAVE VANES. VANES SHALL BE
CONSTRUCTED, SUPPORTED AND FASTENED AS RECOMMENDED BY SMACNA.
R SHALL
EQUAL
OR BE
GREATER
THAN W.
R SHALL
EQUAL
OR BE
GREATER
THAN
1/3W.
W
R
R
W
W
R SHALL
EQUAL
OR BE
GREATER
THAN
1/6W.
STANDARD RADIUS OR
LONG RADIUS ELBOW
SHORT RADIUS ELBOW
WITH ONE VANE
SHORT RADIUS ELBOW
WITH TWO VANES
W W
W
W
1/6W
R
NOTE:
UNLESS OTHERWISE INDICATED ON PLANS, MAXIMUM ANGLES SHOWN SHALL APPLY.
M
A
X
M
A
X
E Q
U I P
M E
N T
AIR
FLOW
AIR
FLOW
TYPICAL DUCTWORK TRANSITION
PLAN OR SIDE VIEW
TYPICAL DUCTWORK TRANSITION WITH
EQUIPMENT MOUNTED IN DUCT
PLAN OR SIDE VIEW
M
A
X
M
A
X
M A
X
M
A
X
FROM STRUCTURE
SAME AS DIFFUSER
INLET: 5'-0" MAX
FLEXIBLE DUCT SIZE
LENGTH.
12"
CEILING
SUPPORT SADDLE
VOLUME DAMPER W/
LOCKING QUAD
SADDLE
SHEET METAL
FOR CHANGE OF
DIRECTION GREATER
USE RIGID ELBOWS
THAN 45°
SEE SPECIFICATIONS FOR CLAMPS
AND SEALANT (TYP.)
TYPICAL DIFFUSER
IN EXISTING PLASTER
OR LAY-IN CEILING
THE BRANCH DUCT TAKE-OFF MAY BE USED FOR UP TO 15% OF THE MAIN DUCT CFM ANYTIME,
AND UP TO 40% WHEN THE MAIN DUCT VELOCITY IS 1000 FPM OR LESS. THE AIR SPLIT DUCT
TAKE-OFF SHALL BE USED IN ALL OTHER CASES
MANUAL VOLUME
1/8" CLEARANCE
ALL AROUND
SECTIONSIDE ELEVATION
STIFFEN BLADE
AS REQUIRED
DUCT
1/2" ROUND ROD PIN
INSULATION
STAND-OFF
HANDLE WITH
LOCKING
QUADRANT
INSIDE END BEARING
OUTSIDE END BEARING
DAMPER BLADE
INSULATION SEE
SPECIFICATION
DELETE INSULATION STAND-OFF ON DUCTWORK WITHOUT EXTERIOR INSULATION.
DETAIL SHOWS SINGLE BLADE DAMPER. DAMPER INSTALLATION SHALL BE SIMILAR
FOR MULTI-BLADE DAMPERS & ROUND DAMPERS.
NOTES:
1.
2.
420ONE 1 x 18 GA. STRAP36
TWO 1/2 DIA. RODS
TWO 3/8 DIA. RODS
ONE 1 x 16 GA. STRAP
50 700
ONE 1 x 22 GA. STRAP
QUANTITY/SIZE
MAX. DUCT
HANGER STRAPS OR RODS
MAX. LOAD
LBS.
MAX.
IN.
SPACING
DIA. - IN.
IN.
50" DIA. &
UNDER
LOAD RATED
FASTENERS
BAND OF SAME
SIZE AS HANGER
STRAP
HANGER RODS
OVER 50" DIA.
BAND
NOTE:
TABULATED DATA FROM SMACNA
ALLOWS FOR DUCT REINFORCING AND
INSULATION, BUT NO EXTERNAL LOAD.
DUCTWORK TRANSITIONS
SUPPLY DUCTWORK TAKE-OFFS
DUCTWORK SQUARE VANE ELBOWS
FLEXIBLE AIR DUCT CONNECTOR
DUCTWORK RADIUS ELBOWS
VOLUME DAMPER DETAIL
ROUND DUCT HANGERS
DAMPER WHERE
TURNING VANES
STRAP HANGER
251 CFM TO 400 CFM - 10" DIA.
401 CFM TO 700 CFM - 12" DIA.
101 CFM TO 250 CFM - 8" DIA.
100 CFM AND LESS - 6" DIA.
ARE TO BE SIZED AS FOLLOWS:
BRANCH DUCT SIZES, UNLESS NOTED ON PLANS
BRANCH DUCT TAKE-OFF WITH MANUAL DAMPER.1
STRAP HANGER
SPIN-IN TAP
FITTING
6" MIN
RETURN/
EXHAUST DUCT
CEILING
CEILING DEVICE
RECTANGULAR
DUCT, NOTE 1
MANUAL
DAMPER
STRAP HANGER
SCHEDULED
SPIN-IN BRANCH TAP FITTING
WITH MANUAL DAMPER
SHEETMETAL PLENUM
SAME SIZE AS AIR DEVICE
NOTES:
RETURN OR EXHAUST GRILLE/REGISTER CONNECTION
FLEXIBLE AIR DUCT
CONNECTOR. SEE DETAIL
ON THIS SHEET
ROUND DUCT - NOTE 2
MAIN EXHAUST OR RETURN
PLAN VIEW
AIR
FLOW AIR FLOW
W
PROVIDE VOLUME DAMPER
AT EACH BRANCH DUCT
1/4W OR 4" MIN.
BRANCH DUCT
45 DEG.
EXHAUST OR RETURN
BRANCH DUCTWORK
NOTES:
1. LATCHES SHALL BE OF THE WEDGE TYPE TO CLOSE DOORS TIGHTLY.
2. HINGES ON THE ACCESS DOORS SHALL HAVE NON-CORROSIVE PINS.
3. SEE SMACNA 2005, FIGURE 9-15
ACCESS DOOR
CASING
GASKET
HANDLE INSIDE
FLEXIBLE
WASHER
FACTORY
FABRICATED
LATCH
SECTION "B-B"
INSULATION
DUCT
GASKET
INSULATION
INSULATION
"A"
"A"
ACCESS PANEL AND DOOR DETAIL
ACCESS PANEL
PIPE HANGERS
5 FT
6 8 10
9 1110 12
1312 14
1614 17 2219 23
2725 28 3230
20 2418 14 16128
1064 532 2 1/2 1 1/2
1 1 1/4
THRU 3/4
7 7
SIDE VIEW TRAPEZE HANGER FOR UP TO 1000
LB. UNIFORM LOAD
ADJUSTABLE CLEVIS HANGER
TYPE 1 - SEE SPECIFICATIONS
ADJUSTABLE CLEVIS HANGER TYPE
43 - SEE SPECIFICATIONS
PROVIDE INSULATION SHIELD
& INSERT FOR ALL PIPING
(8" MIN.)
BAND
1-5/8" 12 GAUGE CHANNEL
OR 2"x2"x1/4" ANGLE
1/2" DIA. HANGER
RODS WITH 36" MAX.
SPACING ON EACH
CHANNEL
WELD
SADDLE
INSULATION SHIELD
AT HANGER
PROVIDE HIGH COMPRESSIVE
STRENGTH INSULATION (9 PSF
MIN. DENSITY) UNDER
INSULATION SHIELD
INSULATION (VAPOR
BARRIER TYPE IS
REQUIRED FOR LOW
TEMPERATURE PIPE)
HANGER ROD
MAXIMUM PIPE/TUBING SUPPORT SPACING
NOTE: FOR TRAPEZE HANGER TAKE SPACING OF SMALLEST SIZE ON TRAPEZE.
NOM. SIZE
PIPE
TUBING
IN.
FT.
FT.
M
A X
NOTE: SEE SPECIFICATIONS FOR
DETAILED HANGER REQUIREMENTS
FLANGED CONNECTION
ON FAN SIDE
WASHER
1-1/2" MIN. TO 3" MAX. INSTALLED. 6"
NOMINAL WITH MATERIAL TAUT
FLEXIBLE
MATERIAL AS
SPECIFIED
1"x1/8" DRAW BAND
1"x1/8" BAND IRON
BOLT ON 4" CENTERS
5/16" FLANGE
DUCT
SHEET METAL SCREWS ON
12" CENTERS
RIVET ON 4"
CENTERS
SHEET METAL AS
SPECIFIED FOR
DUCTWORK.
1"x1/8" BAND IRON
BOLT ON 4" CENTERS
1" FLANGE & HEMALTERNATE
POSITION
OF BOLT
1 1/2" POCKET SLIP
DUCT
SHEET METAL AS
SPECIFIED FOR
DUCTWORK.
1 1/2" MIN. TO 3" MAX. INSTALLED. 6"
NOMINAL WITH MATERIAL TAUT
FLANGED
CONNECTION ON
FAN SIDE
WASHER
FLEXIBLE MATERIAL
AS SPECIFIED
FLEXIBLE DUCT CONNECTIONS
AutoCAD SHX Text R
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text F
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text E-76259
AutoCAD SHX Text I
AutoCAD SHX Text A
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text E
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text G
AutoCAD SHX Text N
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text H
AutoCAD SHX Text O
AutoCAD SHX Text
DREW
AutoCAD SHX Text
KOENIG
AutoCAD SHX Text A.
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text I
AutoCAD SHX Text
EXPIRES: 12/31/2025
AutoCAD SHX Text
%%USECTION "A-A"
AutoCAD SHX Text "B"
AutoCAD SHX Text "B"
AutoCAD SHX Text
%%UROUND FLEXIBLE CONNECTION
%%URECTANGULAR FLEXIBLE CONNECTION
M601
DETAILS, SCHEDULES, CONTROLS
AND AUTOMATION -
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i t h
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
REPLACE DUAL DUCT BOXES ON
2ND FLOOR
CINCINNATI, OH
539-21-201
Project Manager
10/10/2025Revisions: Date:
Cincinnati V.A.
Medical Center
35% SCHEMATIC DESIGN 03/23/2020
65% DESIGN DEVELOPMENT (DD1) SUBMITTAL 08/10/2020
95% DESIGN DEVELOPMENT (DD2) SUBMITTAL 10/16/2020
100% CD SUBMITTAL 11/28/2020
ZACH SCHMIDT
BID DOCUMENTS 08/19/2021
CD UPDATE SUBMITTAL 10/10/2025
AIR DISTRIBUTION DEVICES
SURFACE
TYPE MOUNTING
DESCRIPTION
EGGCRATE FILTER GRILLE
SYMBOL
CG1
LAY-IN
FINISH
E.C.L.
STEEL
ALUM.
MATERIAL
W.B.E.
ACCESSORIES
JAC GEH
P/N
POSITIVE (P)
PRESSURE
NEGATIVE (N)
DUCT PRESSURE CLASS & LEAKAGE TABLE
SYSTEM
SYSTEMS
ALL
DUCT INVOLVED
SUPPLY AIR DUCTS FROM OUTLET OF AH-UNIT
FAN COIL UNITS TO SUPPLY AIR DEVICES
SUPPLY AIR DUCTS FROM OUTLET OF
ALL OTHER EXHAUST AIR DUCTS
ALL DUCTWORK EXCEPT AS LISTED BELOW.
TO CEILING DIFFUSERS.
P
N
OR
P
RECTANGULAR
DUCT
SMACNA LEAKAGE CLASS
-3"
+1" A
A
CONST.
SMACNA
W.G.
+6"
2"
CLASS
SEAL
SMACNA
A
CLASS
A
ROUND
DUCT
TWO PIPE FAN COIL UNIT SCHEDULE
VERTICAL
SLOPE TOP
TYPE
1 FURNISH WITH CONDENSATE OVERFLOW DETECTION DEVICE. FLOAT SWITCH IN THE AUXILIARY DRAIN PAN SHALL STOP THE FAN WHEN WATER LEVEL IN THE PAN RISES TO A NEAR
OVERFLOW LEVEL.
VERIFY/COORDINATE CABINET DIMENSIONS, COIL PIPING HAND, MOUNTING & RECESS REQUIREMENTS PRIOR TO ORDERING.
UNITS SHALL BE PROVIDED WITHOUT CONTROLS BY MANUFACTURER. DDC CONTROLS SHALL BE PROVIDED IN FIELD. REFER TO CONTROL DIAGRAM AND SEQUENCE ON THIS SHEET
AND 23 09 23.
UNITS SHALL BE PROVIDED WITHOUT PIPING PACKAGE. REFER TO PIPING DETAILS ON THIS SHEET FOR FIELD PROVIDED PIPING COMPONENTS.
UNITS SHALL BE PROVIDED WITHOUT FILTER (REFER TO FLOOR PLANS AND AIR DISTRIBUTION DEVICE SCHEDULE ON THIS SHEET FOR FILTER GRILLES).
PROVIDE EC FAN MOTOR.
PROVIDE UNIT WITH FACTORY INSTALLED DISCONNECT SWITCH BY UNIT MANUFACTURER.
REFER TO DRAWINGS FOR QUANTITY AND LOCATIONS OF FAN COIL UNITS.
FCU-A242
NO.
UNIT
COOLING REQUIREMENTS WITH
45°F ENT. WATER TEMP.
MIN.
8.07
MBH
TOTAL
MIN.
8.07
MBH
SENS.
ENT. AIR F
Wb
Db
MAX. LOSS
FT. WATER
THRU COIL
1.35 5
GPM
2-WAY
AUTO
VALVE
TYPE
RUN-
SIZE
OUT
.75"
FAN MOTOR
HP(W)
NOM.
APPROXIMATE SIZE
W
115-1
PHASE
VOLT.-
H
L
NOTES:
AUTO
VALVE
CV
0.91465 (40)
FCU-A243 2.80 2.80 0.5 115-1 33 260.33165 (42)
FCU-A246 11.00 11.00 1.94 115-1
1.31625
2-WAY
2-WAY
.75"
.75"
EXT.
S.P.
MAX
CFM
0.3"
0.3"
HVAC DESIGN DATA
DESIGN ALTITUDE: 482 FT.
Db ( °F)
OUTDOOR DESIGN TEMPERATURES
EXAM ROOMS
INDOOR AREA DESIGN CONDITIONS
OFFICES
92.8
74.5
8.1
SUMMER
% HUMIDITY
DEG. F Db WINTER
DEG. F Wb SUMMER
DEG. F Db SUMMER
Db ( °F)
72 50
% HUMIDITY
WINTER
7272 50ALL OTHER AREAS
NOTES:
1 REFER TO 2-PIPE FAN COIL UNIT CONTROLS ON THIS SHEET FOR UNOCCUPIED CONTROL.
6777 -UNOCCUPIED MODE (NOTE 1) -
HORIZONTAL
CONCEALED DUCTED
HORIZONTAL
CONCEALED DUCTED
HORIZONTAL
CONCEALED DUCTED
FCU-A248
12.30 12.13 2.50
2-WAY
.75" 115-1
1.7625
FCU-A249 11.70 11.70 2.21 115-11.5625
FCU-A251B 2.80 2.80 0.5 115-10.33165 (42)
2-WAY
2-WAY
.75"
.75"
0.3"
0.3"
0.3"
HORIZONTAL
CONCEALED DUCTED
HORIZONTAL
CONCEALED DUCTED
FCU-A252 10.80 10.80 1.87 115-1
1.27625
(100)
FCU-A257
5.96 5.96 0.81 115-1
0.55355 (72)
2-WAY
2-WAY
.75"
.75"
0.3"
0.3"
HORIZONTAL
CONCEALED DUCTED
HORIZONTAL
CONCEALED DUCTED
FCU-A259 5.42 5.33 0.69 115-10.46355 2-WAY .75"0.3"
HORIZONTAL
CONCEALED DUCTED
FCU-A260 8.61 8.46 1.21 115-10.82680 2-WAY .75"0.3"
HORIZONTAL
CONCEALED DUCTED
LOCATION
ROOM A240
ROOM A222
ROOM A242
ROOM A248
ROOM A249
ROOM A251B
FCU-A261 8.80 8.64 1.27 115-1
0.86680 2-WAY
.75" 0.3"
HORIZONTAL
CONCEALED DUCTED
ROOM A246
ROOM A224
ROOM A243
SQUARE PLAQUE DIFFUSERCD1
EGGCRATE CEILING REGISTERCR1
48 26
48 26
48 26
33 26
48 26
38 26
38 26
56 26
56 26
STEEL EXPANSION SHIELD FOR EXISTING CONSTRUCTION AND
INSERTS FOR NEW CONSTRICTION. THIS TYPE SHALL BE USED
ONLY IN SLABS OR BEAMS OF 4" MIN DEPTH
3/8" MIN DIA EXPANSION BOLTS FOR
EXISTING CONSTRUCTION AND INSERTS
FOR NEW CONSTRUCTION
CONCRETE
FLOOR SLAB
CLIP
ANGLE
NUTS & WASHERS
3/8" MIN DIA
HANGER RODS
FOR PIPES UNDER 2" IN SIZE USE 1-1/2"x1-1/2"x1/4"
ANGLE. ALL PIPES 2" & LARGER USE 3"x3"x1/4"
ANGLE
TURNBUCKLE
3/8" MIN DIA HANGER
RODS
3/8" MIN DIA INSERTS
NEW CONSTRUCTION
ONLY.
SECURING HANGER RODS IN CONCRETE
TYPICAL MANUAL AIR VENT
AIR VENT
1/2" BALL VALVE
1/4" COPPER TUBING
1/2" x 4" NIPPLE
CIRCULATING WATER PIPING
ELEVATION
NOTES:
1. VENT ALL HIGH POINTS AS INDICATED ABOVE.
2. IF AUTOMATIC AIR VENTS ARE USED, PIPE DISCHARGE TO NEAREST DRAIN.
MV
OR
AV
DRAIN VALVE AND AIR VENT
CONNECTIONS (HYDRONIC SYSTEMS)
TYPICAL CHILLED AND HOT WATER PIPING DRAIN VALVE CONNECTIONS
ELEVATION
THREADED PIPING
ELEVATION
WELDED PIPING
TYPICAL WATER PIPING
REDUCER, IF REQUIRED
3/4" BALL VALVE
ADAPTER TO 3/4" HOSE
THREAD-PROVIDE HOSE CAP NUT
NOTES:
1. DRAIN ALL LOW POINTS AS INDICATED ABOVE.
P/T PORT (TYP)
CHR
UNION
SHUT-OFF VALVE (TYP)
STRAINER
CHS
COOLING COIL
AIR VENT
NOTE: UNLESS OTHERWISE NOTED, ALL PIPING COMPONENTS SHOWN SHALL BE PART OF PIPING
PIPING PACKAGE FURNISHED AND INSTALLED BY HVAC CONTRACTOR IN FIELD.
FAN COIL UNIT PIPING DIAGRAM - COOLING COIL
MODULATING PRESSURE INDEPENDENT CONTROL VALVE
BY TEMPERATURE CONTROLS SUBCONTRACTOR
GENERAL CONTROLS NOTES
1 A COMPLETE SYSTEM OF AUTOMATIC TEMPERATURE CONTROLS SHALL BE
INSTALLED UNDER THIS PROJECT AS REQUIRED TO ACCOMPLISH THE SPECIFIED
SEQUENCES OF OPERATION.
2 DIVISION 26 SCOPE OF WORK INCLUDES A POWER SOURCE TO THE MOTOR
STARTERS. ALL HVAC POWER SOURCES REQUIRED BEYOND THESE STARTERS OR
BEYOND SOURCES EXPLICITLY SHOWN ON THE DIVISION 26 DRAWINGS, SHALL BE
PROVIDED UNDER THE TEMPERATURE CONTROLS WORK. THIS SHALL INCLUDE BUT
NOT BE LIMITED TO WIRING, CONDUIT, TRANSFORMERS, RELAYS, FUSES, ETC.
3 THERMOWELLS FOR INSTALLATION OF TEMPERATURE SENSORS SHALL BE
FURNISHED UNDER THE TEMPERATURE CONTROLS WORK AND SHALL BE INSTALLED
AS PART OF THE HVAC PIPING WORK. PIPING WORK SHALL INCLUDE PROPERLY
SIZED WELDOLET OR THREADOLET FITTINGS PLACED WHERE DIRECTED BY THE
CONTROL SYSTEM SUPPLIER.
4 POINTS SHOWN ARE INTENDED AS AN AID TO THE CONTRACTOR INDICATING THE
MINUMUM POINTS REQUIRED FOR CONTROL AND MONITORING. ALL INPUT AND
OUTPUT POINTS, AND THEIR REQUIRED INTERFACE AND ACCESSORY HARDWARE,
SHALL BE PROVIDED FOR A COMPLETE AND FUNCTIONAL CONTROL SYSTEM. IF
ADDITIONAL POINTS ARE REQUIRED TO ACCOMPLISH THE SEQUENCES OF CONTROL
SPECIFIED, THESE POINTS, ALONG WITH ADDITIONAL DIRECT DIGITAL CONTROL
PANEL(S) (IF REQUIRED), SHALL ALSO BE PROVIDED.
5 ALL FANS WITH SPEED CONTROL CAPABILITY (VFD, E.C. MOTOR, ETC.) SHALL HAVE
SPEED ADJUSTABLE VIA THE FAN GRAPHIC AT THE ECC.
6 KW USAGE OF ALL VFDs PROVIDED UNDER THIS PROJECT SHALL BE REPORTED TO
EXISTING "EDART" SOFTWARE. COORDINATE WITH VA COR.
7 CONTROLS SUBCONTRACTOR SHALL PROVIDE TRAINING TO BUILDING
OCCUPANTS FOR OVERRIDE OF UNOCCUPIED MODE (WALL STAT OVERRIDE PUSH
BUTTON).
8 POWER SOURCE FOR ALL "BUILDING CONTROLLERS", "PROGRAMMABLE EQUIPMENT
CONTROLLERS", AND FOR ALL CONTROLS SERVING EQUIPMENT THAT IS
CONNECTED TO EMERGENCY POWER, SHALL BE THE "CRITICAL" BRANCH OF THE
EMERGENCY POWER SYSTEM.
9 NEW CONTROLS SHALL BE TRIDIUM, IN ACCORDANCE WITH SPECIFICATION SECTION
23 09 23. MODIFICATIONS TO THE EXISTING JOHNSON CONTROLS AND AUTOMATED
LOGIC SYSTEMS WILL ALSO BE REQUIRED FOR ANY SCOPE MODIFYING OR
REMOVING EXISTING EQUIPMENT, AND SHALL BE INCLUDED AS PART OF THIS
CONTRACT - ALL POINTS, PROGRAMMING, TRENDS, ALARMS, GRAPHICS, ETC. SHALL
BE REMOVED FROM THESE EXISTING CONTROL SYSTEMS FOR ALL EQUIPMENT THAT
IS REMOVED UNDER THIS PROJECT.
HORIZONTAL
CONCEALED DUCTED
FCU-A262A
8.10 7.96 1.05
2-WAY
.75" 115-1
0.71680
FCU-A264 2.70 2.70 0.5 115-10.33165 (42)
FCU-A265 6.26 6.15 0.68 115-10.46625
2-WAY
2-WAY
.75"
.75"
0.3"
0.3"
0.3"
HORIZONTAL
CONCEALED DUCTED
HORIZONTAL
CONCEALED DUCTED
FCU-A230 (10) 4.40 4.32 0.5 115-1
0.33355
FCU-A224 (10) 3.40 3.40 0.5 115-10.33215 (57)
2-WAY
2-WAY
.75"
.75"
0.3"
0.3"
HORIZONTAL
CONCEALED DUCTED
HORIZONTAL
CONCEALED DUCTED
FCU-A222 (9) 12.30 12.30 2.15 115-11.46680 2-WAY .75"0.3"
HORIZONTAL
CONCEALED DUCTED
ROOM A257
ROOM A259
ROOM A262A
ROOM A264
ROOM A265
FCU-A240
8.00 7.86 1.14 115-1
0.77625 2-WAY
.75"
0.3"
HORIZONTAL
CONCEALED DUCTED
ROOM A261
ROOM A252
ROOM A260
56 26
33 26
48 26
38 26
33 26
56 26
48 26
(187)5
ROOM A230
SQUARE…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .